  7-Year Statement (2014-2020) Page 49 coming years as a result of the Government’s development plans. In order to minimize dependence on groundwater supplies, the following measures for additional desalination capacity are planned by PAEW in order to meet the demand for potable water as indicated in the forecast:  a capacity expansion at the RAECO Desalination Plant by 6,000 m 3 /d (1.3 MIGD) in 2014; and  addition of temporary plant with capacity 10,000 m 3 /d (2 MIGD) in 2017 (to be relocated from the Ghubrah site). PAEW has also requested OPWP to initiate procurement for a new IWP of capacity 30,000 m 3 /d (7 MIGD), to be completed in the fourth quarter of 2017. This request was made in anticipation of a requirement to meet the industrial water requirements of Ad Duqm as well as non-industrial requirements, prior to Royal Decree79/2013. It is expected to be clarified in 2014 whether PAEW will be responsible for the industrial water demands, whether OPWP will proceed with the IWP procurement, and if so, the capacity requirement for the plant. Figure 18 Desalinated Water Supply / Demand Balance  “Ad Duqm Zone” 2014 2015 2016 2017 2018 2019 2020 “Ad Duqm Zone”  Thousand m 3  /d Peak Water Demand 4 6 12 17 23 28 31 Non-Industrial Demand 3 5 7 9 12 14 16 Fisheries and Industrial Demand 1 1 5 8 11 14 15 Contracted Desalination Capacity  Ad Duqm Desalination Plant 6 6 6 6 6 6 6 Prospective Contracted Capacity Expansion of Ad Duqm Desalination Plant 6 6 6 6 6 6 6 Temporary Plant - - - 10 10 10 10 New IWP - - - - 30 30 30 Total  Contracted + Prospective 12 12 12 22 52 52 52 Reserve Over non-Industrial Demand, excluding new IWP 9 7 5 13 10 8 6 Over Total Demand, including new IWP 8 6 0 -4 29 24 19 0 5 10 15 20 25 30 35 40 45 2014 2015 2016 2017 2018 2019 2020 Thousand m 3 /d Ad Duqm Desalination Plant Expansion of Ad Duqm Plant Temporary Plant New IWP Peak Demand: Total Peak demand: Non-Industrial

7 Years Statement 2014-2020 53

Embed Size (px)

DESCRIPTION

OPWP 2020 Page 53

Citation preview

  • 7-Year Statement (2014-2020) Page 49

    coming years as a result of the Governments development plans. In order to minimize dependence on

    groundwater supplies, the following measures for additional desalination capacity are planned by PAEW in

    order to meet the demand for potable water as indicated in the forecast:

    a capacity expansion at the RAECO Desalination Plant by 6,000 m3/d (1.3 MIGD) in 2014; and

    addition of temporary plant with capacity 10,000 m3/d (2 MIGD) in 2017 (to be relocated from the

    Ghubrah site).

    PAEW has also requested OPWP to initiate procurement for a new IWP of capacity 30,000 m3/d (7 MIGD), to

    be completed in the fourth quarter of 2017. This request was made in anticipation of a requirement to meet

    the industrial water requirements of Ad Duqm as well as non-industrial requirements, prior to Royal

    Decree79/2013. It is expected to be clarified in 2014 whether PAEW will be responsible for the industrial water

    demands, whether OPWP will proceed with the IWP procurement, and if so, the capacity requirement for the

    plant.

    Figure 18 Desalinated Water Supply / Demand Balance Ad Duqm Zone

    2014 2015 2016 2017 2018 2019 2020

    Ad Duqm Zone Thousand m3/d

    Peak Water Demand 4 6 12 17 23 28 31

    Non-Industrial Demand 3 5 7 9 12 14 16

    Fisheries and Industrial Demand 1 1 5 8 11 14 15

    Contracted Desalination Capacity

    Ad Duqm Desalination Plant 6 6 6 6 6 6 6

    Prospective Contracted Capacity

    Expansion of Ad Duqm Desalination Plant 6 6 6 6 6 6 6

    Temporary Plant - - - 10 10 10 10

    New IWP - - - - 30 30 30

    Total Contracted + Prospective 12 12 12 22 52 52 52

    Reserve

    Over non-Industrial Demand, excluding new IWP 9 7 5 13 10 8 6

    Over Total Demand, including new IWP 8 6 0 -4 29 24 19

    0

    5

    10

    15

    20

    25

    30

    35

    40

    45

    2014 2015 2016 2017 2018 2019 2020

    Thousandm3/d

    Ad Duqm Desalination Plant

    Expansion of Ad Duqm Plant

    Temporary Plant

    New IWP

    Peak Demand: Total

    Peak demand: Non-Industrial