14
7 Prioritized Project List

7 Prioritized Project List - North Delta

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 7 Prioritized Project List - North Delta

7 Prioritized Project List

Page 2: 7 Prioritized Project List - North Delta

Monroe Urbanized Area 2040 Metropolitan Transportation Plan Adopted November 23, 2015

Alliance Transportation Group, Inc. 7-1

7 Fiscally Constrained Project List This chapter provides tables and maps that describe and illustrate the package of projects included in this MTP. The fiscally constrained projects have been grouped by time period – Stage I (2016-2020), Stage II (2021-2030), and Stage III (2031-2040). For roadway projects, the tables include a column called “Prioritization Ranking” that lists the ranking of the project that resulted from the project prioritization

process discussed in Chapter 4. Projects included in Stage I from the TIP were not ranked during the prioritization process. These projects are denoted with a “T” in the ID field (e.g. T14). Additionally, a list of vision projects has been included; these projects are important to the region, but are currently unfunded within the 2040 planning horizon.

Source: Kurt Bauschardt (via Flickr)

Page 3: 7 Prioritized Project List - North Delta

Monroe Urbanized Area 2040 Metropolitan Transportation Plan Adopted November 23, 2015

Alliance Transportation Group, Inc. 7-2

Pri

orit

izat

ion

Ran

kin

g

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

6 4 19

43

37

29

45

Tota

l Yea

r of

Ex

pend

itur

e C

ost

$292

,500

$141

,700

$327

,120

$365

,860

$230

,840

$219

,420

$1,1

43,8

61

$5,4

55,0

00

$483

,900

$188

,100

$1,6

77,3

24

$1,0

69,5

20

$533

,600

$2,1

19,3

20

$366

,800

$433

,500

$5,0

95,7

96

$30,

447,

382

$5,5

36,3

70

$6,0

95,0

00

$3,1

76,9

10

$7,5

24,2

61

$11,

147,

054

Leng

th

(mi)

0.40

--

0.75

0.85

0.50

0.50

1.50

0.80

0.70

0.25

2.25

2.65

1.20

5.40

0.75

0.50

6.00

2.70

0.70

0.80

0.95

2.25

--

Impr

ovem

ent

Ove

rlay

Traf

fic S

igna

l

Ove

rlay

Ove

rlay

Ove

rlay

Ove

rlay

Ove

rlay

2 La

ne R

econ

stru

ctio

n

Ove

rlay

Ove

rlay

2 La

ne R

econ

stru

ctio

n

Ove

rlay

Ove

rlay

Ove

rlay

Ligh

ting

Ove

rlay

ITS

Impr

ovem

ents

New

4 L

ane

and

brid

ge

Wid

en t

o 4

Lane

s, r

ealig

n

Reco

nstr

uctio

n, N

ew 2

Lan

e

Cent

er T

urn

Lane

Cent

er T

urn

Lane

Und

erpa

ss

Lim

its

Mon

tgom

ery

St t

o S

4th

St

Man

e St

LA 3

033

to P

ine

Ridg

e Rd

Arka

nsas

Rd

to C

aldw

ell R

d

Cald

wel

l Rd

to S

tand

ard

Reed

Rd

Mos

s Pa

rk D

r to

Bla

ck B

ayou

Hip

poly

te A

ve t

o Ve

rnon

St

Cole

man

Ave

to

LA 3

4

LA 3

4 to

I-2

0

Cole

man

Ave

to

Nat

chito

ches

St

US

80 t

o LA

616

Moo

re R

d to

Gar

rett

Rd

LA 3

033

to L

A 34

US

80 t

o LA

139

Cent

ury

Blvd

to

LA 1

5

Hud

son

Ln t

o W

ashi

ngto

n St

LA 1

5 to

Fin

ks H

idea

way

Rd

US

80 t

o U

S 16

5

I-20

to

Kans

as L

n

LA P

urch

ase

Gar

dens

to

US

165-

B

165-

B to

I-2

0

US

165

to F

inks

Hid

eaw

ay R

d

RR

Rou

te

Cole

man

Ave

Dow

ning

Pin

es R

d

Edw

ards

Rd

Fort

y O

aks

Farm

Rd

Fort

y O

aks

Farm

Rd

Gle

nwoo

d D

r

Jack

son

St

Mon

tgom

ery

St

Nat

chito

ches

St

Nor

th 4

th S

t

Ole

Hw

y 15

Park

er R

d

Sand

el S

t

Stub

bs V

inso

n Rd

US

165

Wal

nut

St

US

165

Kans

as L

ane

Conn

ecto

r

Gar

rett

Rd

US

165-

B Co

nnec

tor

LA 5

94 (

Texa

s Av

e)

Old

Ste

rling

ton

Rd

N 4

th S

t

Pro

ject

ID

T1

T2

T3

T4

T5

T6

T7

T8

T9

T10

T11

T12

T13

T14

T15

T16

202

203

205

212

308

401

402

Ro

adw

ay P

roje

cts

Sta

ge I

(20

16-2

020)

Page 4: 7 Prioritized Project List - North Delta

Monroe Urbanized Area 2040 Metropolitan Transportation Plan Adopted November 23, 2015

Alliance Transportation Group, Inc. 7-3

Pri

orit

izat

ion

Ran

kin

g

18

18

18

N/A

N/A

N/A

N/A

N/A

N/A

Tota

l Yea

r of

Ex

pend

itur

e C

ost

$9,2

89,2

12

$3,6

78,5

28

$5,3

50,5

86

$435

,000

$1,0

84,9

66

$1,4

64,9

70

$32,

771,

353

$16,

301,

373

$6,1

60,0

36

Leng

th

(mi)

2.50

1.10

1.60

--

--

--

--

--

--

Impr

ovem

ent

Wid

en t

o 4

Lane

s; N

ew 4

Lan

e

Cent

er T

urn

Lane

Wid

en f

rom

2 t

o 3

lane

s

Roun

dabo

ut

Enha

ncem

ent

Safe

ty

Brid

ge

Ove

rlay

Mai

nten

ance

Lim

its

I-20

to

LA 1

5

LA 8

40 (

Fors

ythe

Ave

) to

US

165

US

165

to K

ansa

s Ln

Texa

s Av

e

Vario

us

Vario

us

Vario

us

Vario

us

Vario

us

Rou

te

Gar

rett

Rd

Loop

Rd

Loub

erta

/Elm

/Cen

tral

Ave

Sout

h 8t

h St

Vario

us

Vario

us

Vario

us

Vario

us

Vario

us

Pro

ject

ID

411

416

417

501

Line

It

em

Line

It

em

Line

It

em

Line

It

em

Line

It

em

Page 5: 7 Prioritized Project List - North Delta

Monroe Urbanized Area 2040 Metropolitan Transportation Plan

Adopted November 23, 2015

Alliance Transportation Group, Inc. 7-4

Figure 7-1: Stage I Roadway Projects

Page 6: 7 Prioritized Project List - North Delta

Monroe Urbanized Area 2040 Metropolitan Transportation Plan Adopted November 23, 2015

Alliance Transportation Group, Inc. 7-5

[This page intentionally left blank]

Page 7: 7 Prioritized Project List - North Delta

Monroe Urbanized Area 2040 Metropolitan Transportation Plan Adopted November 23, 2015

Alliance Transportation Group, Inc. 7-6

Pri

orit

izat

ion

Ran

kin

g

53

44

11

11

27

40

49

38

41

43

43

43

54

54

51

50

32

1 17

18

18

18

18

Tota

l Yea

r of

Ex

pend

itur

e C

ost

$5,1

79,0

89

$6,4

12,2

05

$5,6

72,3

36

$2,1

70,2

85

$4,7

47,4

98

$12,

084,

541

$12,

731,

927

$4,1

00,1

12

$9,4

94,9

97

$9,9

05,0

08

$2,1

57,9

54

$4,6

61,1

80

$21,

363,

742

$7,3

37,0

43

$12,

300,

336

$4,6

22,3

37

$2,5

89,5

45

$26,

974,

422

$11,

652,

950

$6,0

42,2

71

$19,

137,

967

$4,1

00,1

12

$4,2

72,7

48

Leng

th

(mi)

1.20

1.00

5.75

2.20

1.10

2.80

2.95

0.95

2.20

2.55

0.50

1.20

4.95

1.70

2.85

1.20

0.60

6.25

2.70

1.40

2.35

0.95

1.10

Impr

ovem

ent

Wid

en t

o 5

Lane

s

New

2 L

ane

ITS

Impr

ovem

ents

ITS

Impr

ovem

ents

Wid

en t

o 5

Lane

s

Wid

en t

o 4

Lane

s

Wid

en t

o 6

Lane

s

Wid

en t

o 5

Lane

s

Wid

en t

o 5

Lane

s

Cent

er T

urn

Lane

Wid

en t

o 4

Lane

s

Cent

er T

urn

Lane

Wid

en t

o 4

Lane

s

Wid

en t

o 4

Lane

s

Wid

en t

o 4

Lane

s

Add

Cent

er T

urn

Lane

Wid

en t

o 3

Lane

s ea

ch

Wid

en t

o 4

lane

s

Wid

en t

o 4

Lane

s

Wid

en t

o 4

Lane

s

New

2 L

ane

and

Brid

ge

Wid

en t

o 4

Lane

s,

real

ignm

ent

Cent

er T

urn

Lane

Lim

its

Hol

land

Dr

to R

aym

ond

Dr

New

Nat

chito

ches

Rd

to

I-20

to

Kans

as L

n

Fors

ythe

Ave

to

Texa

s Av

e

Kans

as L

ane

to L

A 13

9

Sand

al S

t to

Oua

chita

Loo

p

Rive

rsid

e D

r to

US

165

Gilb

ert

St t

o Ka

nsas

Lan

e

Ole

Hig

hway

15

to W

ell R

d

Chen

iere

Dam

to

LA 8

38

US

80 t

o M

ane

St

Man

e St

to

Thom

as R

d

Wes

t St

udy

Area

Bou

ndar

y to

Nut

land

Rd

to P

rairi

e Rd

La 1

5 to

Cal

dwel

l Rd

Stan

dife

r St

to

Lee

St

I-20

to

N 7

th S

t

I-20

to

LA 1

39

I-20

to

LA 6

16

US

80 t

o LA

838

Raym

ond

Rd t

o LA

139

US

165

to G

arre

tt R

d

Win

nsbo

ro R

d to

Ora

nge

St

Rou

te

Fink

s H

idea

way

Rd

(Ph2

)

Was

hing

ton

St E

xt

LA 3

4/U

S 80

N &

S 1

8th

St

US

80

LA 3

4

US

80 (

Loui

svill

e Av

e)

US

80

US

80

LA 3

033

Dow

ning

Pin

es R

d

Dow

ning

Pin

es R

d

LA 1

5

LA 1

5 (W

insb

oro

Rd)

LA 6

16 (

Arka

nsas

Rd)

US

165-

B (J

acks

on S

t)

Mill

St/

Stel

la S

t Co

uple

t

Oua

chita

Loo

p Ea

st

Oua

chita

Loo

p W

est

Wel

l Rd

Fink

s H

idea

way

Rd

(Ph3

)

Tich

elli

Rd

Park

view

Dr/

S 12

th S

t

Pro

ject

ID

101

103

104

201

204

206

207

208

209

211

214

215

301

302

303

306

307

405

406

412

414

415

418

Sta

ge I

I (2

021-

2030

)

Page 8: 7 Prioritized Project List - North Delta

Monroe Urbanized Area 2040 Metropolitan Transportation Plan Adopted November 23, 2015

Alliance Transportation Group, Inc. 7-7

Pri

orit

izat

ion

Ran

kin

g

28

31

21

21

21

21

33

33

33

33

N/A

N/A

N/A

N/A

N/A

Tota

l Yea

r of

Ex

pend

itur

e C

ost

$1,0

78,9

77

$388

,432

$1,5

53,7

27

$345

,273

$431

,591

$612

,859

$889

,077

$353

,904

$552

,436

$1,2

17,0

86

$3,1

29,4

73

$10,

513,

997

$68,

142,

984

$44,

053,

302

$13,

278,

772

Leng

th

(mi)

1.25

0.45

1.80

0.40

0.50

0.70

1.00

0.40

0.60

1.40

--

--

--

--

--

Impr

ovem

ent

Curv

e co

rrec

tion,

sho

ulde

rs,

pave

men

t re

hab

Shou

lder

s, m

ill, p

atch

, and

pa

vem

ent

reha

b

Join

t re

hab

and

over

lay,

str

ipin

g

Join

t re

hab

and

over

lay,

str

ipin

g

Join

t re

hab

and

over

lay,

str

ipin

g

Reha

b an

d pa

vem

ent

Ove

rlay

and

strip

ing

Ove

rlay

and

strip

ing

Ove

rlay

and

strip

ing

Ove

rlay

and

strip

ing

Enha

ncem

ent

Safe

ty

Brid

ge

Ove

rlay

Mai

nten

ance

Lim

its

US

Hw

y 80

to

Arka

nsas

Rd

Pons

Dr

(City

Lim

its)

to U

S H

wy

165

Milh

aven

Rd

to U

S 80

Kans

as L

n to

MLU

ent

ry

Food

bank

to

Kans

as L

n

I-20

to

DeS

iard

St

Rive

rsid

e D

r to

N 1

8th

S G

rand

St

to N

8th

St

N 8

th S

t to

N 1

8th

St

N 1

8th

St t

o H

wy

165

Vario

us

Vario

us

Vario

us

Vario

us

Vario

us

Rou

te

Wal

lace

Dea

n Rd

(D

istr

ict

A)

Rich

woo

d Rd

No.

2

(Dis

tric

t F)

Kans

as L

n

Cent

ral A

ve

Cent

ral A

ve

N 1

8th

St O

verp

ass

Fors

ythe

Ave

DeS

iard

St

DeS

iard

St

DeS

iard

St

Vario

us

Vario

us

Vario

us

Vario

us

Vario

us

Pro

ject

ID

601

603

701

702

704

705

706

707

708

709

Line

It

em

Line

It

em

Line

It

em

Line

It

em

Line

It

em

Page 9: 7 Prioritized Project List - North Delta

Monroe Urbanized Area 2040 Metropolitan Transportation Plan

Adopted November 23, 2015

Alliance Transportation Group, Inc. 7-8

Figure 7-2: Stage II Roadway Projects

Page 10: 7 Prioritized Project List - North Delta

Monroe Urbanized Area 2040 Metropolitan Transportation Plan Adopted November 23, 2015

Alliance Transportation Group, Inc. 7-9

Pri

orit

izat

ion

Ran

kin

g

9 20

18

N/A

N/A

N/A

N/A

N/A

Tota

l Yea

r of

Ex

pend

itur

e C

ost

$57,

834,

160

$115

,668

,319

$55,

692,

154

$3,2

21,8

17

$11,

935,

057

$71,

727,

504

$52,

615,

775

$13,

670,

599

Leng

th

(mi)

4.05

8.10

3.90

--

--

--

--

--

Impr

ovem

ent

Wid

en t

o 6

Lane

s

Wid

en t

o 6

Lane

s

Wid

en t

o 6

Lane

s

Enha

ncem

ent

Safe

ty

Brid

ge

Ove

rlay

Mai

nten

ance

Lim

its

Oua

chita

Riv

er t

o G

arre

tt R

d

LA 5

46 t

o O

uach

ita R

iver

Gar

rett

Rd

to L

A 59

4

Vario

us

Vario

us

Vario

us

Vario

us

Vario

us

Rou

te

I-20

I-20

I-20

Vario

us

Vario

us

Vario

us

Vario

us

Vario

us

Pro

ject

ID

210

304

413

Line

It

em

Line

It

em

Line

It

em

Line

It

em

Line

It

em

Sta

ge I

II (

2031

-204

0)

Page 11: 7 Prioritized Project List - North Delta

Monroe Urbanized Area 2040 Metropolitan Transportation Plan

Adopted November 23, 2015

Alliance Transportation Group, Inc. 7-10

Figure 7-3: Stage III Roadway Projects

Page 12: 7 Prioritized Project List - North Delta

Monroe Urbanized Area 2040 Metropolitan Transportation Plan Adopted November 23, 2015

Alliance Transportation Group, Inc. 7-11

Pri

orit

izat

ion

Ran

kin

g

8 1 5 18

18

Cos

t (2

015)

$400

,000

,000

$73,

140,

000

$33,

540,

000

$39,

780,

000

$68,

640,

000

Leng

th

(mi)

5.3

4.45

6.45

7.65

13.2

Impr

ovem

ent

New

2 L

ane

and

Brid

ge

New

2 L

ane

and

Brid

ge

New

2 L

ane

New

2 L

ane

New

2 L

ane

and

Wid

en t

o 4

Lane

s

Lim

its

LA 1

43 (

N 7

th S

t) t

o U

S 16

5

LA 3

4 to

US

165

Rich

woo

d Rd

2 t

o Ru

ssel

l Sag

e Rd

LA 6

16 t

o Fi

nks

Hid

eaw

ay R

d Ex

tens

ion

I-20

to

LA 3

4

Rou

te

Fink

s H

idea

way

Rd

Exte

nsio

n

Oua

chita

Loo

p So

uth

Oua

chita

Loo

p So

uthe

ast

Oua

chita

Loo

p N

orth

wes

t

Oua

chita

Loo

p So

uthw

est

Pro

ject

ID

403

404

407

408

409

Vis

ion

Pro

ject

s (U

nfu

nd

ed N

eed

s)

Page 13: 7 Prioritized Project List - North Delta

Monroe Urbanized Area 2040 Metropolitan Transportation Plan

Adopted November 23, 2015

Alliance Transportation Group, Inc. 7-12

Figure 7-4: Vision Roadway Projects

Page 14: 7 Prioritized Project List - North Delta

Monroe Urbanized Area 2040 Metropolitan Transportation Plan Adopted November 23, 2015

Alliance Transportation Group, Inc. 7-13

Transit Projects

Stage I (2016-2020)

Agency Description Funding Source Total Year of Expenditure Cost

Monroe Transit Operating Assistance Section 5307 (Operating) $9,960,562

Monroe Transit Preventive Maintenance Section 5307 (Operating) $2,576,008

Monroe Transit Capital – Rolling Stock/Support Equipment Section 5307 (Capital) $7,318,437

Monroe Transit Paratransit Service Section 5311 $3,228,596

Various Paratransit Service Section 5310 and 5311 $1,032,142

Stage II (2021-2030)

Agency Description Funding Source Total Year of Expenditure Cost

Monroe Transit Operating Assistance Section 5307 (Operating) $21,471,309

Monroe Transit Preventive Maintenance Section 5307 (Operating) $5,552,925

Monroe Transit Capital – Rolling Stock/Support Equipment Section 5307 (Capital) $15,775,859

Monroe Transit Paratransit Service Section 5311 $6,959,666

Various Paratransit Service Section 5310 and 5311 $2,224,918

Stage III (2031-2040)

Agency Description Funding Source Total Year of Expenditure Cost

Monroe Transit Operating Assistance Section 5307 (Operating) $23,717,683

Monroe Transit Preventive Maintenance Section 5307 (Operating) $6,133,884

Monroe Transit Capital – Rolling Stock/Support Equipment Section 5307 (Capital) $17,426,363

Monroe Transit Paratransit Service Section 5311 $7,687,801

Various Paratransit Service Section 5310 and 5311 $2,457,694