Introduction
PartI.Pre-Construction-StartingYourProject
1.SevenStepstoConstructionStartup
2.ManagingConstructionSubmittals
PartII.ProcessesandProcedures(Everyone'sFavourite)
3.FundamentalsOfConstructionScheduling
4.ConstructionProjectCloseout-Everyone’sFavouritePartOfTheProject
PartIII.OnTheJobsite
5.HowToPlanYourNextConstructionCraneLift
PartIV.YourConstructionCareerandBusiness
6.StartingYourCareerInConstruction
7.GrowingYourConstructionBusiness
Conclusion
Introduction
OverthelastyearortwoI’vebeenworkingonthewebsitehttps://www.cnstrctr.com,duringmytimewritingforthiswebsiteI’vecometorealizethatconstructionisanindustrythatdoesn’tshareknowledgeoftenenough.Weallworkinourconfined“company”silosandrarelyisthere
collaborationbetweenprojectteamsandcompanies.Whatthismeansisthattheindustryasawholesuffersandgenerallyfallsfurtherbehindinallsortsofwayscomparedtootherindustries.I’vespokewithalotofpeopleinmycareerandoneofthebiggest
thingsthatI’velearnedisthatmostofusareinthisbecauseweenjoycreating.Weenjoybuildingsomethingtangible.Myself–themostrewardingpartofourindustryisseeingsomethingcometolifeandwatchpeopleusingabuildingthatyou’vehadahandin.Thisbookisintendedtoassistyouindevelopingyourskillsasa
projectmanager,superintendent,engineerorarchitect.Itwillhelpyoutounderstandprojectprocesses,onsiteactivitiesandhelpyoutobuildyournextconstructionempire.ThankyoufordownloadingthisbookandIreallyhopeyouenjoy!–cnstrctr
Startingaconstructionprojectcanbeadauntingordeal.There’salottoconsiderandsometimesverylittletimetodoit.Thekeythingtorememberwhenspendingstartingupyourprojectistoprioritizebasedonimportance.Todaywe’llbewalkingthroughsomeofthekeythingstoconsiderwhenstartingupyourconstructionproject.
STEPONE–UNDERSTANDYOURPROJECTANDGETYOUR
CONTRACTINLINE
Beforestartinganyprojectyoushouldunderstandwhatyouarebuilding.Spendtimewiththedrawings(evenitifmeansafewextrahoursafter5pm)andreadthespecificationthroughandthrough.Highlightingdrawingssometimeshelpstodefinescope(moreonthatlater).Onceyouhaveafirmhandleonthescope,makesureyouhave
yourcontractexecutionunderwaywithyourownerorpartner.Unlessyouaretheowner,undernocircumstanceshouldyoustartaprojectwithoutsomeformofagreementorcontractinplace.
STEPTWO–VERIFYYOURCONTRACTAMOUNTANDBUDGETAND
TRADESCOPES
Understandingtheprojectbudgetisequallyasimportantasthescope.Ifyoualreadyhavethebudgetset(byyourestimatingdepartment)you’llneedtoplaysomecatchup,otherwiseyoumayneedtotenderoutthevariousscopesofworktodifferenttrades.Finalizingthetradescopesofworkandcontractswillinvolve
finalizingpricing(throughquotationsorformalsubtradetendering).Verifyingwhatisineachscopeofworkandmakingallowancestocoveroffanyrisksorscopegapsisimportant.Trynottorushthisstageasaproperprojectbuyincansaveyoualotoftimeandmoneyinthelongrun.
STEPTHREE–SAFETY
Gettingyoursafetyplaninlineearlywillhelpyoutostarttheprojectoffright.TheprojectsafetyplanshouldcoverallofthedifferentlegalandregionalHSErequirementsthatwillbeoutlinedbydifferentsafetyassociations.Youcannormallyfindthisononeoftheirwebsites.
OSHAIHSA
Makesureyoutakeoutyournoticeofproject(orwhatevertheequivelantisinyourarea),completeyoursafetyplan,assessandmeasurethesafetyrisksandimplementappropriatesafetyplans,takeoutinsuranceandanyothercertificationsyouneed,understandyouremergencyresponseplan,andputallworkersthroughpropersafetytraining.
STEPFOUR–PROJECTEXECUTIONANDPROJECTCONSTRUCTION
PLANS
Theprojectexecutionandconstructionplansarereallyjustdocumentswhichoutlinethedifferentprocessesyou’llbefollowingontheproject.Belowisalistofsubjectsthatshouldbeincludedwithinthetwodocuments
TeamSummaryandOrganizationalChartSubmittalandRFImanagementandproceduresChangemanagementandproceduresSchedulemanagementandproceduresforupdatingandnotificationrequirementsBillingmanagementandproceduresMaterialshandlingplan(howwillmajorandminordeliveriesbehandledandwhatarethedetailsbehindeach)Verticalaccessplan(howismaterialgettingtoandfromthevariouselevations)Majorworkplans(iecraneliftsandhighriskactivities)QualityControlPlanRiskmanagementplanHumanResourcesandTrainingRequirements
Theprojectexecutionandconstructionplansarereallyjustdocumentswhichoutlinethedifferentprocessesyou’llbefollowingontheproject.
STEPFIVE–VERIFYYOURSCHEDULE
Bythistimeyou’vealreadyputtogetheryourscheduleandunderstandtheworkbreakdownstructure.Nowyouneedtoverifyitwithyourawardedtrades.Considerimplementingpullplanningorregularschedulingexerciseswithyourforemen.Haveregularmeetingstocheckstatusandverifythatthedurationsyouhaveinyourschedulearecorrect.
STEPSIX–GETCOPIESOFYOURCONSTRUCTIONPERMIT
Unlessyouwanttoendupinasituationwhereyourconstructionprojectcomestoahaltwhenthebuildinginspectorshowsupmakesureyouhavetakenoutalloftheappropriatepermits.Foryourbuildingpermit,makesureyou’reawarewhoisresponsibleforit,onsomeprojectsthearchitectis,onsometheowner,andonsomeprojectsthegeneralcontractorisresponsible.Nomatterwhoisultimatelyresponsiblenoworkshouldstartuntiltheappropriatepermitisinhand.Inadditiontothemainpermittherearemanyothersmallpermits
thatyoumayneedtoget,permitssuchasanHVACpermit,ElectricalPermit,LaneClosures,ElevatorPermit,andthelistgoesonandon.Beforestartingactivitiesresearchittounderstandwhatpermitsapplytoyourwork.
STEPSEVEN–STARTTHEWORK
Thefearofstartingornotknowingsometimescausespeopletohesitateinpullingthetriggeronaproject.Nothingcandelayaprojectmorethanaslowstartsomakesureyoushowurgencyandpushthescheduleandprojectfromthebeginning.Nomatterhowwellyouplanaproject,problemswillarise.Bystartingaprojectyou’reforcingthoseproblemstocomeoutsoonerratherthanlater.
Nothingcandelayaprojectmorethanaslowstartsomakesureyoushowurgencyandpushthescheduleandprojectfromthebeginning.
Startingaprojectcanbeadauntingtaskbutbyfollowingourstepsaboveyoushouldbepreparedandworkingonyourprojectinnotime.Haveyoustartedupaprojectrecently?Whatweresomeofthelessonslearnedthatyouhad?
ManagingConstructionSubmittals
Submittalsarelikethestartingblocksonaconstructionproject.Ifyouhaveasolidstarttherestoftheprojectwillbeeasiertowin.Ifyouhaveaslowstartorstumbleonthesubmittalsthanyou’llspendtherestoftheprojectcatchingup.Managingthesubmittalprocessisfairlystraightforwardbuttodo
soyouneedanunderstandingofsomebasicconcepts,workflowsandtohelpyoualongtheway,technology.
CONSTRUCTIONSUBMITTALCONCEPTS
CutSheet–Asetofdataorinformationonaproductormaterialthatispre-manufactured.Forexampleyougetcutsheetsofwashroomaccessories,lightfixtures,caulkinganddrywallcomponents.ShopDrawing–somethingthatiscustombuiltoralteredtosuit
siteconditions.Shopdrawingswillincludeplans,elevations,sectionsetcofeachcomponenttobeinstalled.Shopdrawingsaretypicallyprovidedforstructuralsteel,rebar,miscmetals,tilelayoutsetc.Theintentionofshopdrawingsistoprovidesitespecificinstallationinstructions.Samples–samplesarebasicallywhattheysaytheyare.Samples
aresmallpiecesorfullsizepiecesofproductswhichrepresentthefinalproducttobeinstalled.Someproductssuchastilemayrequirethatarangeofsamplesbesubmitted.Thiswayyouthearchitectwillgetabetterunderstandingoftherangeofacceptableinflectioninaproduct.Mockups–wheremultiplematerialscometogethertheconsultant
orownermayrequestamockup.Mockupsaregreatwaytocontrolqualityasalotoftheinterfacescanbefiguredoutinadvance.Basicallyamockupisalargesectionofaspecificmaterialorsetofconstrucitonmaterialsinstalledtolooklikethefinalproduct.
CONSTRUCTIONSUBMITALWORKFLOW
Yourcontracttypewillchangewhatyoursubmittalworkflowwilllooklike,however,ingeneraltheywillalwayslookthesame.Step1–SubcontractorReceivesSubmittalfromSupplieror
EngineersSubmittalsThemselves.Step2–SubcontractorSubmitsSubmittaltoGeneralContractor.Step3–GeneralContractorReviewsSubmittal–ifitconformsto
thespecificationcontinueontostep4–ifnotthegeneralcontractormarksupthesubmittalwithcommentsandsendsitbacktothesubcontractorasreviseandresubmit.Step4–GeneralContractorsendsSubmittaltotheConsultants
(PrimeConsultantifunderatypicalcontracttype).Step5–Eachoftheapplicableconsultantsreviewsthesubmittals
andmarksitwithoneofthefollowingstatus:
Reviewed–nocommentsReviewedasNoted–minorcommentsnotrequiringaresubmissionReviseandResubmit–majorcommentsorrevisions,resubmissionisrequired
Step6–Consultantsreturnsubmittalonceit’sallbeenreviewedtothegeneralcontractor.Step7–Generalcontractorsendsbacktothesubcontractor.Step8–ifthesubmittalrequiresresubmissionthesubcontractor
revisesandresubmitsbacktothegeneralcontractor(startagainatstep3)ifnotthesubcontractorfilesandordersmaterialsbasedonthesubmittal.Aswementionedatthestartofthissectiontheworkflowfor
constructionsubmittalswillchangebasedonyourcontracttype.Asarecommendationmeetwithyourconsultantsatthestartoftheprojectandestablishtheroutingforeachsubmittalsoeveryoneisonthesamepage.Wewon’tgointogreatdetailoverwhattolookforinyoursubmittal
reviewsbutthereisalotofgreatinformationoveratthisarticleonwhatconsultantsshouldlookforinconstructionsubmittalreviews.
STREAMLININGTHECONSTRUCTIONSUBMITTALPROCESSWITH
TECHNOLOGY
Thereareplentyofdifferentonlinesolutionstohelpyouimprove
theconstructionsubmittalprocess.Ratherthanwriteouttheprosandconsofeach(checkoutourtechnologyinconstructionarticleformoreinformation)we’regoingtofocusonwaysthiscanhelp.DigitalDistribution–ratherthanemailingsubmittalsbackand
forthtooneanotherandrevisionspotentiallygettinglostacentraldepositorycanhelptokeeptrackofallthefiles.Somesoftwareplatformswillevenemailoutnotificationsandallowyoutoassignsubmittalstoindividualssotheyknowwhentheyneedtoreviewadocument.Tracking–asmentionedabove–submittalscangetlost.Easily.
Usingtechnologyhelpstoavoidthatandputownershiponindividuals.Onlineordigitalplatformscanletyouprintreportswhichindicatewhichareoutstandingandatdifferentreviewstages.Collaboration–oneoftheslowestprocessesforreviewing
submittalsisthefactthatonlyonepartycanreviewatatime.Bythetimeasubmittalhasmadeitthroughallofthevariouspartiesitcouldbeonetotwoweekslater.Someplatformsalloweachpartytoreviewandmarkupthedocumentsonline.Gettingtheconstructionsubmittalprocessrightonaprojectcan
meanthesuccessorfailureofaproject.Hopefullywithsomeoftheabovetipsandadviceyoucangetitrightonyournextproject.
OnlineConstructionSubmittalPlatforms
ProcorePlangridAutodeskBIM360eSub
FundamentalsOfConstructionScheduling
Scheduling,oneofthecornerstonesofasuccessfulprojectandonethatalotofpeopleshyawayfrom.We’veallbeenbeenonthatprojectwherethescheduleisbehind,theschedulewhenpresentedisconfusingornon-existentandit’syourjobtomakethemostsenseofit.Whenyougoogletheterm“schedule”awiderangeofsubjects
comesup,fromadetailedtheorybehinddevelopingtheproperbreakdownstructuretodifferentconceptsonleanplanningandprinciples.Todaywearegoingtoexplaintoyousomeofthefundamentalsofconstructionscheduling.Asasidenote–thisarticledoesexpectthatyouknowhowtooperatetheschedulingsoftware,fortutorialsonschedulingsoftware,unfortunatelyyou’llneedtogoogleit.Tostartlet’sexplainsomeofthebasicterminology:
BASICSCHEDULINGCONCEPTSYOUNEEDTOKNOW
GanttChart–youknowthoseweirdbarchartsyoualwaysseesomeonebringoutinameeting?Aganttchartisjustafancynameforit.UltimatelyaganttchartisthedefaultdisplayformostschedulesandschedulingsoftwaresuchasMicrosoftProjectorPrimavera.Afewbasicnotes:theganttchartliststheprojectactivitiesalongtheY-Axis.AlongtheX-Axisistheprojecttimeline(byday,month,quarter,yearetc).Thebarsthataredisplayedrepresentthedurationofagivenactivity.WorkBreakDownStructure(WBS)–thinkoftheworkbreakdown
structureasyourcategorieswithinyourschedule.Theyarebucketswhereyoucanentercategoriesandallowyoutodisplayyourinformationinamoreorganizedfashion.Agoodexampleofaworkbreakdownstructurecategorymightbe“Substructure”or“Superstructure”Activities–Activitiesarethebreadandbutterofyourschedule,
eachactivityislistedalongtheYAxisofthescheduleandrepresentsanitemofworkonyourproject.Activitieshavedurations(whichwewillgetinto)andfitwithinacategoryorworkbreakdown.Agoodexampleofacategorymightbe“PlaceConcrete–Level03”.Durations–durationsarethelengthoftimethataparticular
activitywilltakeandthusthelengthofthebarinthegiantchart.Activitiesaretypicallysetuptobe“days”indurationbutmorecomplexschedulingsoftwarescangetdownintothehoursandminutes.Relationships–relationshipsarereallyoneofthemostimportant
partofaschedule.Activitiesandworkbreakdownstructurewithoutrelationshipsarereallyjustanorganizedlist.Relationshipsdefinewhatactivitiesarebeforeandafteranactivityandaretypicallyrepresentedonaschedulewithblackarrows.Therearedifferenttypesofactivitiesbutthemostcommonandwidelyusedisfinishtostart.Agoodexampleofhowanactivityshouldaffectyourschedule,afinishtostartactivitywouldbeappliedtothedrywallasitrelatesto
thepaintingactivity,meaningthepaintingworkwouldonlystartafterthedrywallworkwasdone.Thereareplentyofotherthingstoknowbutunderstandingthe
abovetermsandwhattheylooklikeonaschedulewillgiveyougoodfootingforthenextstepsthatwe’llexplain.
BASICSTEPSTOPROPERLYSETTINGUPYOURSCHEDULE
Inthissectionwe’llwalkyouthroughtherightwaytosetupyourfirstschedule.WhenpeoplestartschedulingIseealotofpeoplegetovereagerandstartlistingactivitiesrightaway.Beforeyoudothat,stopandreadthebelow:Step1–ThinkitThroughAswementionedabove–alotofpeoplejumpintothingsquickly
andstartlistingyouractivitieswithoutreallyplanningtheproject.Beforeyoustartspendtimewithyourdrawings,spendtimewiththespecificationandyourclienttounderstandtheirneeds.Somequestionsyoushouldbeaskingyourselfare:
Doesmyprojectneedtobecompletedinphases(iedoesitstartallatonceorcanIonlydopartoftheproject)Whataremysiterestrictions?Dothingsneedtoremainuntilotheractivitiesarecompleted?Arethereanycriticalmilestonesorturnoversthatneedtobemet?Arethereanyrestrictionspreventingyoufromstarting(ieisthereatenantinthebuildingnow?)Whatarethemajorscopesofwork?
Step2–SetUpYourWorkBreakDownStructureEarlierinthearticleweexplainedwhataworkbreakdown
structureisbutdidn’tgointomuchdetail.WementionedyoushouldthinkofyourWBSasthecategoriesorbucketsactivitieswillfallinto.Essentiallytheyarethemajorscopesofworkyouractivitieswillfallinto.Theseshouldbesetupatthestartoftheprojectandplannedoutinadvance.Workbreakdownshouldbesetupsoit’sbrokenupintomajorgroupsfollowedbyamorerefinedbreakdown.Agoodexampleofthisisasfollows:
Milestones
Preconstruction
DesignPermitsProcurement
TenderingContractsSubmittals
Construction
DemolitionSubstructureSuperstructureBuildingEnvelopeFinishesMechanicalElectrical
DeficienciesandCloseout
Theaboveisabasicworkbreakdownstructurebutshouldhelpyoutounderstandtheconceptbehindit.Therearelotsofdifferentwaystobreakdownaprojectbutultimatelyitwillbetailoredtoyourproject.Remember,startbigandworkdowntosmall.Activitiesshouldbeutilizedfortheactualworkitself.Step3–ListYourActivitiesAnotherhugemistakeIseealotofnewpeoplemakeistolist
activitiesout,buildrelationshipsandsetdurationsrightaway.Tosimplifyyourlifebeginbylistingoutallofyouractivitieswithineachworkbreakdowndivisionfortheentireproject.DONOTsetthedurationsortherelationshipsyet.Oncecompletesleeponit,andre-review.Makesureeverythinghasbeenlisted,thereasonfortakingthisapproachisthatonceyoustartaddingrelationshipsadding
activitiesinbetweenbecomesmuchmoredifficultandtakesmuchlonger.Whennamingyouractivitiesmakesuretokeepthenaming
conventionconsistent,forexample,don’taddthelevelattheendandatthestart,keepformattingandwordingthesame.Anothergoodsuggestionifyourbuildinghasmultipleareasistolisttheareaorphasewithinthenameitself.Thiswayifyouhavetwodrywallitemsyoucandistinguishbetweenthem.Agoodexampleofsomeactivitynamesincludes:
PHSA_LVL01_ConcretePHSB_LVL03_ConcreteArea2_UL_DrywallCeilingsArea2_LL_DrywallCeilings
Asyoucanseethelabellingisconsistentthroughout.Thishelpsinreadingtheshedulelateronandmakesitlookmoreprofessional.Step4–BuildYourRelationships
Okaythemomentyou’vebeenwaitingfor,whereyourscheduleactuallystartstospitoutrealinformation.Buildingtherelationshipsrequiresabasiclevelofconstructionknowledge,understandingwhatreliesonwhichactivitiestocomplete.Thisisaskillthatisdevelopedoveryearsandeachpersonmayhavedifferentideas.Tobuildyourrelationshipsbetweenactivitiesconsiderbringinginotherstoasssistyouindevelopingthelogic.Tobuildarelationshiptheactualmethodvariesfromsoftwarefrom
softwarebutinessenceyouneedtodeterminewhatgoesfirstandlinkthetwoactivities.Therearemanydifferentrelationshiptypes,belowisasummaryforyou:
FinishtoStart[FS]–themostcommontypeofrelationshipmeansthatoneactivitymustfinishbeforethenextisstartedFinishtoFinish[FF]–meansthatthefinishofoneactivitymustoccuratthesametimeasanotheractivity.
StarttoStart[SF]–thisrelationshipmeansthatbothactivitiesstartatthesametimeasoneanother.Anexampleofthismightbetwoofthesametypeofactivityindifferentareasorifforexamplemechanicalandelectricalroughincancommenceatthesametime.
Onceyouhaveallofyourrelationshipsinhitscheduleandwatchyourdocumentcometolife!Step5–EnterYourActivityDurationsThenextstepintheprocessistoenteryourdurations,thisis
anothertaskthatyoumaynotbebestsuitedtodoifyou’rejuststartingintheindustry.Oftenittakesmanyyearsofexperiencetounderstandproductivities.ThereareplentyofgreatresourcesforconstructionproductivitiesbutbelowI’veincludedlinkstojustafew:Activitydurationsshouldbebasedinreality.Forexampleifyou
haveadurationthatsaysfivedaysmakesurethereisareasonyouhavefivedaysintheschedule.Ascheduleisonlyasgoodastheinformationthatgoesintoit,sohavinginaccurateinformationfeedingtheschedulecanleadtoaninaccuratescheduleandultimatelyprojectproblems.Step6–PeerReviewThelaststepI’mgoingtomakearecommendationontodayis
doingapeerreviewofyourschedule.Forthemostpartifyou’vefollowedthestepsaboveyou’vecreatedthismostlyinisolation.Thatisn’tgood.Bringinyourpeers,trades,consultantsandeventheownertoreviewyourscheduleandprovidehonestfeedback.Ifsomethingisoutofsequencemakesuretheytellyou,samewithdurations.It’simportanttonotjustgetotherpeople’sopinionsbuttheirknowledgeandtakeonthings.Theymayhaveawaytobuildsomethingfasterbyre-sequencingactivities.
FURTHERREADING
I’veonlytouchedonthebasicsofschedulingintheabovebuttherearelotsofotherimportantthingsyouneedtounderstandbeforeyoucanconsideryourselfanexpert.I’veincludedafewlinksbelowforyourfurtherreading.Specialthankstoallofthepeoplethatprovidedthecontentinthebelowlinks.
WorkBreakDownStructureExplainedinDetailCriticalPathMethodSchedulingTerminologyGlossary–cnstrctrPullPlanningandtheLastPlannerSystem
ConstructionProjectCloseout-Everyone’sFavouritePart
OfTheProject
We’veallbeenthere,stuckonthatjobthateveryonehasleft,constructionprojectcloseoutisnotfun,butit’sanecessaryevilofeveryproject.Dependingonwhattypeofprojectyouareon,projectcloseoutwilllookdifferent,butdependingoverallthereshouldbethreemainareasyouneedtobefocusingon:
TurnoverandPermitCloseoutQualityandIssueCloseoutFinancialCloseoutWarrantyPeriod
Focusingontheseareaswon’tnecessarilyguaranteeasuccessfulcloseoutbutwillputyouontherighttrack.
CONSTRUCTIONTURNOVERANDPERMITCLOSEOUT
ConstructionTurnover,Occupancy,SubstantialPerformance(incaseyou’renotsurewhateachofthesearewe’veaddedthemtotheglossary).Projectturnoverandcanbeaconfusingprocessbutthereareafewmainprocedurestofollow.Projectoccupancymeansthatpeoplecanbeginusingthebuilding.
Inordertogetoccupancyyouneedanumberofdocumentsfromyourconsultantsandvariousagenciesbutultimatelyit’sthebuildinginspectorwhograntsoccupancy.Someofthedocumentstheywillbelookingforinclude:
LettersfromeachoftheconsultantsconfirmingthattheprojectisbuilttodrawingsandspecsLettersfromfirealarmvendorLettersfromElectricalSafetyAssociationinyourareaDocumentationonflamespreadratingandfirestopping/fireproofingmaterialSignofffromthirdpartyinspectorsSignofffromelevatorinspectors
Therearemanydifferentdocumentswhichcanaffectoccupancy–yourbestbetistodiscussthesewithyourbuildinginspectorwellinadvanceofthedateofturnover.
THEDAYOFCONSTRUCTIONTURNOVER
Onthedayofturnover,ensurethatallofyourconsultantwalkthroughshavebeencompleted,thatyourlifesafetysystemsarecommissionedandallofyourfireseperationsarecompleted.Exitsneedtobeinconformancewiththebuildingcode.Constructionturnovershouldneverbeasurprise,regularwalks
withyourbuildinginspectorinadvanceofthedateshouldsettheexpectationinaddvanceforwhatthebuildingwilllooklikecomethebigday.
POSTCONSTRUCTIONOCCUPANCY
Onceyouhaveoccupancy,therewilllikelybealistofitemsthebuildinginspectorwantedcompleteorthatweredeficient.Gettingtheseitemscompletedsothebuildinginspectorcancloseyourpermit.Gettingtheseitemscompletedinatimelymannercanhelptoavoidcomplicationswithoperationofthebuildinginthefuture.Tohelpmanagetheseissuescreateamasterlistofallofyour
deficiencies,highlighttheseasacriticalitemandassignthemtoyourself.
QUALITYANDISSUEMANAGEMENT(CONSTRUCTIONDEFICIENCIES)
Alotofownershavehighqualityexpectationsandaspartofyourbusinessmodelyouneedtodeliver.Ifthecontractdocumentsandyourbudgetdon’treflectthequalitythatyouthinkyourownerwillbeexpectingyouneedtolevelwiththemupfrontanddiscusswiththemtherequirementstodeliverthatlevelofquality.Asyouneartheendoftheprojectit’stimetostartimplementing
yourdeficiencyprocess.Startthisprocessseveralmonthsinadvanceoftheturnoverdate.We’vealreadywrittenareallygreatarticleonqualityandhowto
managethedeficiencyprocessinconstructionsocheckitouthere.Themostimportantpartaboutissuecloseoutisthatyoudon’tlet
thingslinger.Thelongerissuessitoutstandingthehardertheycanbetoresolve.
FINANCIALCONSTRUCTIONCLOSEOUT
There’sapartineveryprojectmanager’sprojectwheretheystarttogetnervousaboutoverrunningthebudget.Alotoftimesthatnervousnesscomesinthelastfewmonthsoftheprojectwhentheystartreconcilingallofthetradevalues.TypicallyonprojectsIliketostartthisprocessafewmonthsbefore
turnover.Thereareafewgoodpracticestostartwith:
Sendanemailalltradesrequestinganyoutstandingquotationsbyacertaindate.Iftheyfailtosubmitthembythatdateindicatethattheywillnotbeaccepted.Thiswayyouputthetradesonnoticetoensureallquotationsaresubmitted.Requestquotelogsfromeachofthetrades–thiswayyoucanbesurethattheonesyouhavematchtheirlistandtherearenosurprisesdowntheroadonaquoteyoumayhaveoverlookedinyourinbox.Reviewyourchangenoticelogforcompleteness.Ensureallquotationsaresubmittedtotheownerwellinadvanceoftheprojectcompletiondate.
SUBSTANTIALPERFORMANCEONCONSTRUCTIONPROJECTS
There’sarequirementinmostcontracttypestoapplyforsubtantialperformance.Essentiallysubstantialperformanceisamathematicalcalculationthatifgrantedbeginsthe45dayholdbackperiod.Checkwithyourlocalconstructionassociationorarchitecturalassosicationfortheguidelinesinyourarea.
Thesubmissiontypicallyinvolvesidentifyingafewitems:AmountbilledtodateValueofworkoutstandingValueofdeferredwork(workthatwasdelayedbytheownerandagreednottobeincludedintheinitialturnoverdate)Valueofdeficiencies
Assumingtheamountofoutstandinganddeficientworkfallswithinavalueasdictatedbythecalculationyou’llbegrantedsubstantialperformanceonyourconstructionproject.Oncegrantedit’syourresponsibilitytosendittoyourlocalconstructionassociationforpublication.Thiswillnotifysubcontractorsonyourprojectandbegintheleinperiod.Aleincanbeappliedatanypointonyourproject,howeverafter
the45dayholdbackperiodexpirestheprojectcannolongerhaveoneappliedtoitthatwouldotherwiseaffectoccupancyoftheproject.
THECONSTRUCTIONWARRANTYPERIOD
You’veturnedoverthebuildingandachievedsubstantialperformancebutthejobisn’toveryet.Manycontractshaveawarrantyperiod.Oneyearistypicalfortheindustrybutyourcontractmaystipulatelongerperiods.Duringthisperiodyouandyoursubcontractsareresponsibleforfixingdefectsthatariseintheworkmanshipfortheproject.Itshouldbemadecleartoyourownerthatthewarrantiesdon’t
coverdamageorimproperuseofequipement.Inordertoprotectyourselfwerecommendissuingalettertoyourownerandarchitectoutliningtheproceduresforwarrantyclaimsandwhatiscovered.Duringthistimeit’simportanttokeepalogofwarrantyissues.This
wasifthesameissuereoccursyoucanidentifyitmoreeasilyandkeeptrackofproblemtrades.People’stimecanbevaluableandsometimethistaskget’sassigned
topeopleonnewprojects.Ifyouaretheownerofyourbusinessitmaybeworthhiringsomeonededicatedtoresolvingwarrantyissuesonotherprojects.
CONSTRUCTIONCLOSEOUTDONEBETTER
Constructioncloseoutwillbethelastexperienceyourownerhasofyou,anddoingitpoorlycanmeanalossinreturnbusiness.Spendthetimetodoconstructioncloseoutright,bediligentand
followupregularlyonoutstandingitems.Doingthesethingswillhelptoturnoveranddeliverastrongfinishedproduct.
HowToPlanYourNextConstructionCraneLift
Manyconstructionprojectshaveacraneliftonthemandplanningthemcorrectlyisadifficultprocess.Therecanbemanydifferentreasonsforneedingacraneonsite,frommovingabigpieceofequipmentontosite,pouringconcrete,orinstallingwindows,craneshavemanydifferentapplications.Intoday’sarticlewearegoingtowalkthroughsomeofthebasic
requirementsforacraneliftandthingsyoushouldbelookingfor.
WHATYOU’LLNEEDTOSTARTPLANNINGYOURCRANELIFTS
Gettingthebasictoolsandpartiestogethertostartplanningyourfirstliftisimportant.Startingoutorganizedwillhelpyoutobemoreorganizedasthejobget’smorecomplex.
PeopleandCompaniesYou’llNeed
Acranecompany(withanengineer)AsafetydepartmentCitystaff(permitsforroads,sidewalks,airspace,etc)SuperintendentandProjectManagerfortheprojectSubcontractorsandsuppliersTrafficcontrolpersonnel(ifnecessary)
Sometoolsandequipmentyou’llneed
Abinderwithtabstoorganizealloftheinformationyou’llgetAcraneTheequipmentyou’llbeliftingTrafficcontrolequipment(ifnecessary)Thecraneitselfandanyrelatedequipment(jib,extendedboom,hook,counter-weights)
InformationYou’llNeed
Theweightsandsizesofequipmentyou’reliftingAcityservicesplanStructuraldrawingsforthebuildingandsurroundingstructuresGeotechnicalreportWeatherreport(forthedayordaysofthelifts)
DETERMININGYOURREQUIREMENTSFORACONSTRUCTIONCRANE
LIFT(S)
WeightandSizeoftheItems
Oneofthefirstthingsyoushoulddoisestablishwhatthecranewillbefor.Whatistheobjectyouarelifting?Aretheremultiple’softhisobjectandormultipleobjects?Onceyou’vedeterminedwhatyou’llbeliftingpulloutthe
informationontheproducts.Findtheweightanddimensionsoftheobject.Atwotonneitemthatisthesizeofapersonisalotsimplertoliftinsomeinstancesthanatwotonneitemthesizeofaschoolbus.Determingthesizeandweightoftheitemsyou’llbeliftingwillhelp
youtodeterminethecapacityrequirementsofyourcranebutthere’sathirdfactortoconsider.Thelocationoftheliftandfinallocationoftheproductwillalsoimpactthesize.
LocationMatters
Pulloutthedrawingsanddeterminethestartandendpointsforyourproduct.Determinewheretheproductwillbedeliveredandwhereitwillneedtoendup,iftherearemultiplelocations,markoutthemalloutonadrawing.Thisneedstobedoneinbothahorizontalandaverticaldirection.
Frequency
Thefrequencyofyourliftwillimpactthetypeofcrane.Needregularlifting(daytoday)butdon’twanttoclosealane,youmayneedtoputinasemi-permanenttowercraneorderrickcrane.Needonelargelift–amobilecranemaybeyourbestbet.Justincasetheabovedoesn’tquitemakesense,we’veincludeda
chartbelowwhichindicateswhateachtypeofcranewillbebestusedfortohelpinyourdecisionmaking.
CraneTypeSpace
RequirementsforSetup
FrequencyofLift(DaysBetweenLifts)
Capacity(Amountitcancarry)
Mobility(SetUpandDuringLift)
BordersonCrane Low Frequent Low High
TowerCrane–Standard Medium Frequent Medium Low
TowerCrane–Luffer Medium Frequent High Low
DerrickCrane Low Frequent Low Medium
MobileCrane High Low High Medium
CrawlerCrane High Low High Medium
Onceyou’vemadeaselectiononthetypeofcraneyouplanongoingwithit’stimetostartfinalizingthelocationofit.There’sanumberofpeopleyou’llneedtostartconsultingatthis
pointbutsomebasicadvicewillbetogetanengineerinvolved.Theywillhelpyoutodeterminethecorrectsizeforthecraneandmakerecommendationsonanyspecialattachmentsthatarerequired(moreonthisalittlelater).Finalizingthelocationofyourcranecomesnext.Somethingsto
askyourselfare:whatarethesiterestrictions?DoIhaveadjacentstructuressurroundingtheliftpointthatcouldlimittheswingradius?IsthereexistingstructurethatIcouldneedtoshore?Aretheresubsurfaceservicesortunnelsthatwouldneedtobeprotectedorreinforcedduringthelift?Ifthelocationhasbeensettled,puttogetherahighleveldrawing
indicatingthecrane,swingradiusandfinallocationsofallofthepickanddropoffpoints.Highlightanysurroundingstructuresandundergroundservicesthattheoperatorandteamneedtobeawareof.Distributethistothegroupincludingyourengineerforreview.Theengineerwillneedtodrawupaformaldocument,stampedwithalloftheloadsandliftingweightsnoted.
Ofspecialnote–asloadsgetfurtherawayfromthecentralhubofthecranethecapacitydecreasesandthereforealargercranemayberequiredforsmallerliftsthathavetotravelalongdistance.
PLANNINGYOURDAY(S)OFLIFTING
Rememberthatbinderwementionedearlier,openitupandbeginpreparingit.Werecommendincludingthefollowingitemswithinthebinder,alotofthesedocumentswillneedtobedevelopedwithyourteamandwillhelptokeepyourinformationorganized:ExecutiveSummary–thisisahighlevelsummaryoftheliftfor
thoseinterestedingettingthecolesnotes.Includethepurposeforthelift,location,timedateandsummaryofthepickpointsandcranetypeandsize.ContactList–thisisimportant,communicationonthedayordays
oftheliftisimportantandit’sgoodtohaveeveryone’scontactinformationinonespot.Thisshouldincludeallpointsofcontactforallcompaniesinvolvedinthelift.EngineeredCraneLayoutandCutsheets–includeallinformation
relatedtothecranelayoutandthecutsheetsonthepieceofequipmentonthecrane.Thisshouldincludethefinalsignedoffdrawingfromtheengineerwementionedearlier.Permits–theresalonglistofpermitsyoumayneed–thiscould
includeapermitforairrights,roadclosepermit,eventhebuildingpermitcouldbegoodtoincludeinthissection.SafetyTab1–ActivitySpecificSafetyPlan–thisisacriticalpiece
ofinformation,andshouldbedevelopedwithallthoseinvolved.Includeadetailjobhazardanalysis.EachtradeshouldhavetheirownJHASafetyTab2–SafetyandEmergencyResponsePlan–Includethe
generalsafetyplanforthecontractorsandanemergencyresponseplanincasesomethingistogoawry.Schedule–developadetailedschedulewithyourteam.This
scheduleneedstoincludethetimeanddurationoftheliftsetup.Whattimeeachofyourloadswillbedeliveredtositeandthetimerequiredforeachofthem.Agoodpracticeforthisistoalsoincludethecontactforeachoftheliftssopeopleknowwhotocontactintheeventsomethingisn’tgoingasplanned.Insurances–there’slikelygoingtobesomeheftyinsurances
providedfromeachofthevendors.Makesureit’sprovidedbyeveryoneandfiledintheeventit’srequired.TrafficControlPlan–unlessyou’rebuildinginanopenfieldthere’s
agoodchanceyourdeliveriesorliftingwillimpacttrafficandorpedestrianflow.Thisshouldbeincludedinthebinderaswellandshouldmarkallcontrolsclearlyaswellasincludeadescriptionforanyflagmenorpolice.OtherInformation–weliketoincludeatabwithother
informationorcorrespondenceattheendofthebinder.Thissectioncanincludethingssuchasdeliveryroutes(ifyouhaveoversizedloadscomingtosite),communicationwithyourowner,andotherpertinentinformationyoufeelyoumightneedonthedayoftheactuallift.
LET’SDOTHIS–THEBIGDAYOFTHECONSTRUCTIONCRANELIFT
Thebigdayorday’sarehere,andyou’rejustifiablynervous(thoughifyouhavealloftheaboveinformationinhandyou’reaboutaspreparedasyoucanbe).Startthedayearly(wemean4AMearly)andarrivefirsttositetogiveyourselfsometimetomentallypreparefortheday.Startthedayoffbybringingallpartiesintoameetingroomand
doingahuddle,gooverwhoisresponsibleforwhat,whatthescheduleisandappointago/nogopointofcontactforthedayandeachofthedeliveries.Collecteveryone’sinformationincludingthecranedrivers
certificationsandcranecertifications.Makesureeveryonefillsoutthesitespecificjobhazardanalysisandsignsoffonthesafetyplan.oneimportantthingtounderstandisthatthecraneoperator
ultimatelyhasthelastsayonacranelift.Iftheyfeeltheleastbituncomortableaboutasituationtheycancalloffthelift.Respecttheiropinion.Becominganoperatortakeslotsoftrainingandoftentimestheyknowbest.Bemindfulofyourschedulethroughouttheday,ifyourpermits
havetimelimitwatchthemclosely,makesurecommunicationisopen.Considerassigningaradiochannelfortheteamsoeveryoneknow’swhat’sgoingon.
CELEBRATEORRE-GROUP
Thebigdayordayshavecomeandgoneandthingseitherwentwellorhaven’t.Taketimetocelebrateyouraccomplishmentsasateam.It’simportanttorewardpeoplefortheirwork.Ifthing’sdidn’tgoasplanned,startbyunderstandingwhatwentwrongandplanyournextday.Asuccessfulcraneliftcanbealotofworkandyoushouldalways
gointoitprepared.Bekindtopeoplearoundyouandunderstandingoftheirrequirements.Thiswillbesomethingyou’lllikelydoafewtimesinyourcareersotaketimetoreflectonyourlessonslearnedbothgoodandbad.Thinkyouhavewhatittakestoplanacranelift?Letusknowif
you’vedoneoneinthepastandwhatyouthinkaboutourguideinthecomments!
StartingYourCareerInConstruction
IfsomeonewastohaveaskedmefifteenyearsagowhatIwouldbedoingIcouldnothaveguessedacareerinconstruction.Buildingreallycoolstructuresisnotsomethingthateveryoneget’stheopportunitytodointheirlife.WhenIgraduatedhighschoolIdidn’tevenknowthisopportunityexistedforme,sotodayIthoughtI’dwriteanarticleaboutthedifferentopportunitiesforpeopletogetinvolvedinthisindustry.Therearemanyapproachestogettinginvolvedinconstruction
managementorconstructioningeneral.It’soneofthefewindustrieswhereaPhDisnotnecessarilyvaluedheavierthanacollegediplomaandexperience.Becausesomuchofwhatwedoisdependentuponknowledgetypicallythatisvaluedmore.SobelowI’vecompiledsometipsoradviceforsomeonelookingtogetintothisfield!
STARTWITHSOMEWORKEXPERIENCE
SeriouslythisisthebestadviceforanyyoungpersonIseeinterestedintheindustry.Dosomelabourorsurveyingworkpriortogettinginvolved.Helpyourdadputaroofon,frameyourbasement,startingapaintingbusiness.Thereallycoolthingaboutthisisthatitwillteachyouaboutdifferentaspectsabouttheindustrywhileprovidingyouwithdetailedknowledgeaboutatrade.Forme,Iworkedintheasasurveyorforasummerjobandafter
thatIgotajobinamachineshopfabricatingcarparts.AtthetimeIthoughtthejobwasmonotonousinspectingandgrindingdownwelds,butnowsteelandlayoutareoneofmystrongerscopesofworkandIcanfullyunderstandthemwhensomeonesaystheweldispoor.
Thereallycoolthingaboutthisisthatitwillteachyouaboutdifferentaspectsabouttheindustrywhileprovidingyouwithdetailedknowledgeaboutatrade.
TAKESOMESCHOOLING
UltimatelygettingintotheindustryinCanadaortheUnitedStatesmeanstakingsomeschooling.AsImentionedabove,schoolinthisindustryisnotgiventhesameimportanceasitwouldbeasadoctororabusinessconsultant.Manycompaniesvalueexperienceandknowledgeoverschooling.Rightfullyso,youcanlearnmuchmoreinanafternoonwithacarpenterthanyoucaninasemesterofcoursesatUniversity.Thatallbeingsaidschoolisanimportantpartofeveryone’s
educationandlearningthefundamentalsandsomeofthetheoreticalknowledgerelatedtowhywedothingsisimportant.Inadditionschoolingcansometimesprovideyouwiththecontactsyouneedtolandajob,whichbringsustoournextpoint…
COOPORAPPRENTICESHIP
Acoopplacementorapprenticeshipcanbeoneofthemostvaluableexperiencesinapersonslife.Iwasfortunateenoughtogetaplacementatanincrediblecompanywhichthanopenedupintoafull-timeposition.Throughtheco-opIwasabletomeetpeopleindifferentindustries,andbuildrelationshipsearlyoninmycareer.SomeofmybestcontactsarepeopleImetduringthistimeinmylife.Ultimatelyifthefulltimejobhadn’thavebeenofferedtome,Ilikely
couldhavemovedonandbeenofferedajobthroughoneofthepeopleIknewthroughtheplacement.ThisiswhyIvaluethisasthehighestopportunityforpeoplelookingtogetintotheindustry,theexperience,insightandcontactsyoubuildintheindustryduringacooporapprenticeshipareinvaluable.
Ultimatelyifthefulltimejobhadn’thavebeenofferedtome,IlikelycouldhavemovedonandbeenofferedajobthroughoneofthepeopleIknewthroughtheplacement.
INDUSTRYEVENTSANDNETWORKING
YesIknowitsoundslikeI’marecruiterbutthehonesttruthisgettingtoknowpeopleisahugepartofindustry.Ican’tcountthenumberoftimessomeone’shandedmetheircardorI’vegiventhemmineonlytopassalongtheirresumetomyhumanresourcedepartment.Thesetypeseventsarereallyimportanttonotonlysellyourselfbutjusttomeetpeople.Maybeyoucanlearnsomethingaboutroofingatanevent,oranew
leadonaproject,maybeyoucanfindsomeonethatsharesthesamestrugglesasyou.Nomatterwhatcomesoutofthesetypesofsituationsit’srarelybad.
JUSTJUMPIN
Ultimatelynomatterwhatyoudojustgettinginvolvedandshowinginterestisthefirststep.Therearealotofreallygoodpeopleouttherewhoarehappytopassalongtheirknowledgeandstories,sojustfindingthosepeopleandlisteningisagoodfirststep.
GrowingYourConstructionBusiness
Growingyouconstructionbusinessisoneofthemostimportantpartsofanycompany.Maybeyou’rejuststartingyourownconstructioncompany,ormaybeyou’realreadypartofamediumsizedbusinessbutwanttohelpitgrow.Buildingyourbusinessinconstructiontakeshardworkandregularfinetuning.Manypeoplestartandfail,butfollowingthebelowstepsyou’llfind
successinnotime.
NETWORKLIKEABOSS
OurindustryisbuiltonrelationshipsandsomeofthebestopportunitiesinmycareerhavecomefrompeopleIknowwhoarealreadyintheindustry.Knowingpeoplenotjustinpositionsofinfluencebutalsopeoplewhoareupandcomingintheindustrycanwinyouwork.Justbecausesomeonedoesn’thaveworknowdoesn’tmeantheywon’tinafewyearstime.Fornetworkingfocusonafewareas:Fosterexistingrelationships–fortherelationshipsyou’vealready
builtcontinuetostayintouchwiththosepeople,keepnotesonallofthepeopleyoucomeintouchwithinordertobuildamorepersonalrelationship.BuildNewRelationships–constructionalwayshaspeoplelooking
tomeetothers.Tofindthemconsiderattendingnetworkingeventsforyourlocalconstructionassociations.Joinalocalleadershipclub,ortakepartineventswhichareforindustriesyouareinterestedindoingworkin.Forexample–ifofficefitupsareyourthinglookforbankingnetworkingeventsoraccountingnetworkingevents.Alternativelyeventsforarchitectsandinteriordesignerscanoftengiveyoutheleadorheadsuponupcomingprojects.SocialNetworkIsForConstructionToo–siteslikeLinkedinand
Facebookoffervaluablenetworkingopportunities(checkusoutoninstagram,linkedinandfacebookatthelinksatthebottomofthispage).Theyofferaneasywaytostayintouchwithpeopleandcoldcallnewpeople.Usethesetoolstoexpandyourreachandmakesurepeopleknowyoubeyondyourimmediateumbrella.Thingssuchasbloggingcanmakepeopleseeyouasanexpertinyourfieldandapproachyoufornewwork.Belowareafewresourcesforyourtocheckout:
10TipsforPeopleWhoHateNetworkNetworkTipsforPeopleinConstruction
BIDANDPROJECTREGISTERS
AllpublicworksmustbepubliclytenderedinCanadaandNorth
America,assuchthereareextensivetendercalllistsavailableonlinethroughthegovernment.Inaddition,oftentimesyourlocalconstructionassociationtypicallyhelpstofacilitatetenders.Thesearegreatresourcestohelpyoufindnewconstructionworkavailableintheindustryandsubmitpricingforit.Whiletheselistsaren’talwaysfreetojoin,theyareusefulandcan
putyouintouchwithpeopleyoumaynothavehadthechancetoworkwithinthepast.Asalways,whenpricingthistypeofwork,therewillbeawiderangeofclientssoriskwillbehire.Makesureyoudoyourresearchbeforetakinganyproject.Belowareafewlinkstoexamplesofbidregistries:
OntarioWorksRegistryMerx
FOLLOWUPWITHPASTCLIENT
Repeatworkisalwaysthebestandjustbecausesomeonedidn’thireyoubackrightawaydoesn’tmeantheywouldn’tbeinterestedinworkingwithyouagain.AgreatstoryofmineisaclientwhoIthoughtdidn’tenjoyworking
withme.Aftertheprojectwascompletedtheclientthanwentandworkedwithseveralothercontractors.Throughoutthoseexperiencestheclientwouldconstantlycallmeandaskmeforadviceormyopinion.Aftertheprojectswerecompletedwethanbecamesomeonehetrustedandinturnwereawardmuchmorework.Repeatclientscangiveyousomeofthemostreliableandlowest
riskwork.Stayintouchwithpeople,meetupforcoffee,lunchetc.Ifnotforabusinessopportunitythanjusttoseehowsomeoneisdoing.
DOWHATYOUSAYANDSAYWHATYOU’LLDO
Thisgoesforanybusinessbutisespeciallytrueintheconstructionworld.Ourindustry(likeitornot)hasareputationfortakingadvantageofpeople.Partofthereasonforthisisbecausenoteveryoneunderstandsourindustry.Bydoingexactlywhatyousayyou’regoingtodoandbreaking
downthestepstoyourclientsineasilyunderstandablechunksyoucansetyourselfapart.Noonelikesacontractororsubcontractorthatgoesoverbudgetor
get’sbehindschedule,butthingschangeandthesesortsofthingshappen.Behonestwithindividualswhenthesechellengescreepupandyou’llfindrepeatclients.Ultimatelydoingwellintheconstructionbusinesscomesdownto
deliveringprojects,buildingtrustwithindividualsaroundyou,workinghardandnotbeingafraidtobesocial.Doyouhaveanyotherrecommendationsforbuildingyour
business?Sharethemwithusbelowinthecomments!
Conclusion
Bynowyou’veallhadthechancetolearnaboutallofthedifferentaspectsofaconstructionproject.WhenIopenedthisbookInotedthatourindustrywasnotoriouslyclosedoffandisolatedfromoneanother.Becauseourworkisprimarilyjudgedbyhowmanypercentagepointswemakeonaprojectwetendtokeepourknowledgeinternalizedandnotshareitwithothersinfearoflosingourcompetitiveedge.Ichallengeyoutotakewhatyou’velearnedinthisbookandshareit
withothers.Eithersharethebook,grabdrinkswithacompetitor,anowner,asubcontractorandsharewhatyou’velearned.Sharingknowledgewillmakeusallstrongerindividualsandhelptopropelourindustryforward.Togetherifweallcareaboutourindustrywecanmakeitbetter.Ithankyouforreadingthisbook–forongoingblogarticlesand
advicemakesuretocheckouthttps://www.cnstrctr.comandifyou’reinterestedheadonovertohttp://www.52constructiontips.comtojoinourfreemailinglistwherewesendoutweeklyadvice.Lastly–ifyouhaveanyfeedbackfeelfreetoreachouttothe
[email protected]–wewillbemorethanhappytoreturnanyquestionsorcommentsweget!HappyBuilding!