EDUCATION AND TRAINING Jul ‘03 Electronic Engineering degree
Institute Polytechnic University of Bari Degree thesis “Control system through finger-print matching”
Aim Fingerprint device interfacing by C language statements and LabView control system development.
CERTIFICATIONS June ‘20 BUREAU VERITAS Hazardous area assessment
- NFPA 70 - Electrical Equipment Hazardous Area
April ‘19 COMPEX 01-04 Certificate No. 081647GV - Ex01: Preparation & Installation of Ex 'd', 'n', 'e' and 'p' electrical equipment - Ex02: Maintenance & Inspection of Ex 'd', 'n', 'e' and' p' electrical equipment - Ex03: Preparation & Installation of Ex 'i' equipment and systems - Ex04: Maintenance & Inspection of Ex 'i' equipment and systems
Sep ‘14 BHGE OIL&GAS QUALIFIED INSPECTOR Intertek on Behalf of BHGE OIL&GAS Qualified Electrical Inspector for the following electrical commodities: - UCS - Panel based on MKVI-e/S and PLC - Control Cabin for OIL&GAS application
June ‘14 ARAMCO QUALIFIED INSPECTOR Intertek on Behalf of ARAMCO Authorized Inspector (SAP No. 70018161) - QM-01, Electrical – General - QM-19, Motor Control Center - MCC - QM-20, Switchgear
May ‘07 - Now Member of “Ordine degli Ingegneri di Bari ” n. B-10235.
Feb ‘03 LabView Training Base Certificate Level 1 and 2 about LabView, DSC e Real Time by National Instrument .
WORKSHOP & FORUM - Virtual Instruments by National Instruments - Fanuc Field development by GE-Fanuc. - Renewable Energy by UNAE Puglia - “ATEX 94/9/CE e 99/92/CE guidelines , Electrical check DPR 462/2001” by
CSAD & Politecnico di Bari - “UNI CEI EN 16001:2009 standard” by CSAD & Politecnico di Bari
SUMMARY WORK EXPERIENCE Jan ‘05 - Now
Fifteen (15) years of experience as an Engineer Technical Specialist / QA-QC Senior Inspector. Specialized in Oil & Gas and Automation system: electric, electronic and instrumentation commodities. Main roles covered: management of various projects starting from Kick Off Meeting to items delivery.
Occupation or position held Freelance Main activities and
responsibilities - Inspections and tests on:
o DCS (Distributed Control System);
Page 2/15 - Curriculum vitae of MOCCIA Marco Francesco
o SCADA (Supervisory Control And Data Acquisition); o ICSS (Integrated Control and Safety Systems); o Control cabinet:
Unit Control Panel for Gas and Steam turbine; Uninterruptible Power Supplies; Motor Control Center; MV Switchgear; CCC - Anti-Surge system; GE / Bently Nevada 3500 - Vibration Monitor; Fire & Gas System; Emergency Shut Down System; Generator Control and Protection Panel.
o Electrical: MV electrical motor; MV electrical generator; MV Filter; MV transformer.
o Local Equipment room: Local Control Cabin; E-house; Battery Room.
o Cables: MV; LV; earth cable; Serial.
o HW/SW check on Oil&Gas applications: SUVIMAC II+(SIEMENS – Moore); MKVIeS (GE O&G – Nuovo Pignone); Experion PKS (Honeywell); Triconex (Schneider Electrics);
o Communication protocol: Modbus; Profibus; Profinet; ControlNet; OPC.
o Skid: Axial and Centrifugal Pumps; Hydraulic Starting system; Fuel
Gas Scrubber; Metering system; Lube Oil Console. o Standards:
ATEX/IECEx; SIL; AS-3000; NORSOK; UL; CCC; GOST; ARAMCO.
o PMI inspections and tests on metal assembling or centrifugal impeller;
o Visual inspections on welding; - Issuing of daily inspection reports and specific QC reports; - Issuing and reviewing of quality procedures and Factory Acceptance Test
procedure; - Witnessing and Reviewing for Inspection Test Plan, Quality Control Plan; - Check of compliance to applicable codes & specifications; - Document controller: documentation check provided by suppliers, partners
and/or sub-contractors; - Attend or conduction PIM and KOM; - Expediting on materials for projects supplies; - Internal Audits and inspection for supplier quality standards, procedure, HSE
and OSHA.
MAIN PROJECTS ACTIVITY
Aug ‘20 – Now Resident inspector on behalf of Baker and Hughes’s supplier on dedicate project. The role included a daily and Expediting reports issued to the client added to GANTT scheduling review for production activities and inspections coordination.
Project CANADA LNG Prj – KITIMAT, British Columbia, Canada.
Supplier Primiceri SPA – Modugno (ITA)
Item inspected - N. 4 Local Control Cabin (FAR cabin) - N. 4 Battery Room (BR cabin)
Page 3/15 - Curriculum vitae of MOCCIA Marco Francesco
Jun ‘20 – Now Resident inspector on behalf of Baker and Hughes’s supplier on dedicate project. Entailed management of inspections, witness of Pre-FAT and FAT, collection of data for punch lists preparation and issuance. The role included a daily and weekly reports issued to the client added to GANTT scheduling review for production activities and inspections coordination.
Project Golden Pass LNG Terminals, LLC - Sabine Pass, Texas, US
Supplier Primiceri SPA – Modugno (ITA)
Item inspected - N. 6 Control Cabin (CER) - N. 3 VARIABLE SPEED DRIVE LER LOCAL CABIN (VFD-LER)
Feb ‘20 – Jan ‘20 CompEx inspector on behalf Rosetti Marino SPA, compliance checking of ATEX equipment installed as per IEC 60079-17:2013.
Project TYRA TEH living quarter TOTAL E&P DANMARK A/S Supplier FRAMO cargo pumping systems
Item inspected - N. 2 Emergency Generator Cabins - N. 3 Fire Water Pump Cabins - N. 5 Water Mist Cabinets
Oct ‘18 – Dec ‘18 Lead Auditor on behalf Technip FMC - NOVATEK new Russian’s suppliers qualification process:
Checking requirements as per ISO 9001:2015 HSSE requirements Manufacturer´s capabilities (Engineering, Production, Core Unit
Assembly/Packaging, Testing) Fulfilment of specific standards according to IEC 61508 / IEC 61511 and
IEC 60079 Project Lead Auditor ARTIC LNG2
Vendors visited - Machine Monitoring System – Dynamica NPC – Omsk (RUS) - Main Security Systems – ITG (Intexgaz) – Saint Petersburg (RUS) - Analyzer online and houses – NPP RPE GKS, LLC – Kazan (RUS) - Custody Metering system – NPP RPE GKS, LLC – Bugulma (RUS) - Analyzer online and houses – Ekohimpribor NPO, LLC – Dubna (RUS)
Mar ‘18 – Aug ‘18 TPI inspection coordinator on behalf of SAIPEM S.P.A. for ICSS (Experion PKS Honeywell system)
Lead Project inspector scheduling; Team Leader and inspectors coordination; Review production activities; FAT procedure and doc review; Punch List and Non Conformity management.
Project Inspector Coordinator KIPIC Al-Zour Refinery Project Suppliers visited - DCS – ICSS Local Control Cabin
o Honeywell International Inc. - Houston (USA) – (DCS system) o Panelmatic Inc. - Youngstown (USA) – (Matrix panels) o KROHNE group - Houston (USA) – (Leak Detection system)
Nov ‘17 – Jan ‘18 Main inspector on behalf of BHGE’s new China supplier, project inspector with daily and weekly reports issued to the client added to GANTT scheduling review for production activities and inspection coordination.
Project Inspector ARAMCO – Master Gas Project II Suppliers visited - Local Control Cabin
o INABENSA Electrical Co Ltd - Tianjin (CHN) - (Electrical assembling) o HUAXI Container Eng. Co Ltd - Tianjin (CHN) - (Mechanical Construction)
Aug ‘13 – Nov ‘17 Main resident inspector on behalf of BHGE’s supplier: Team Leader for overlapping projects, parallel tests on various items on the same purchase order and/or on the same project. The role of team leader entailed management of inspectors, witness of Pre-FAT and FAT, collection of data for punch lists preparation and issuance. The role included a daily and weekly reports issued to
Page 4/15 - Curriculum vitae of MOCCIA Marco Francesco
the client added to GANTT scheduling review for production activities and inspections coordination.
Supplier visited - Primiceri S.p.A., Modugno (ITA); UCS control panel; UPS Control Cabin; Generator control and protection panel; DCS Systems; ESD Systems; F&G Systems; Vibration and temperature monitoring system; Control Cabin.
Resident Inspector (projects followed)
- LV SWITCHGEAR PANEL o OPC - Al-Sheiba; o MoE - IRAQ
- GCPP o EGINA; o Grossenkneten; o Basrah; o ZADCO;
- MKVI UCS PANEL o PIGAP I o West Qurna I; o West Qurna II o APLNG II; o ICHTHYS; o Martinica plant (Revamping);
- CONTROL CABIN o WAFA; o MESSINA; o SHELL BRUNEI; o KIRIKKALE; o DOMINION; o ZADCO; o CAMERON; o RUMAILA; o SVERDRUP; o CAMERON Project;
E-House; Residue; RIE;
o KHURAIS + AIN DAR; o Dominion; o MoE; o Dangote refinery; o Lemonagrass.
Jan ‘13 – Jun ‘13 Inspection supporting on behalf of GE O&G on FQP (First Piece Qualification) Jointly with GE O&G representative (SQE) in order to test hardware assembling and software developing under GE O&G standards.
Dedicate Inspector FQP – first piece qualification
Suppliers visited - REP Holding – Saint Petersburg (RUS); UCS control panel (SW developing)
- ELECTROPULT – Saint Petersburg (RUS); UCS control panel (HW assembling)
Sep ‘12 – Dec ‘12 Main inspector on behalf of GE Oil&Gas: witness of Pre-FAT and FAT, collection of data for punch lists preparation and issuance in order to share and discuss with final customer. GANTT scheduling review for production activities and inspections coordination. The role included a daily and weekly reports issued directly to the Project Director and Project Quality Manager.
Project Dedicate Inspector APLNG - Conoco Philips - under AS Standards Suppliers visited - EMERSON Process Man. – Seregno (ITA);
Gas Chromatography cabinet. - BoschRexroth – Cernusco sul Naviglio (ITA);
Hydraulic Starting skid. - Marioff – HI FOG – Pero (ITA);
Water mist fire protection skid. - Tecnova HT – Pregnana M.se (ITA);
Wobbe Meter skid. - Filters – Scalenghe (ITA);
Oil Mist eliminator skid. - CEG S.p.A., Bibbiena (ITA);
DC Panel;
Page 5/15 - Curriculum vitae of MOCCIA Marco Francesco
Inverter Panel – C.C.R./BLOWER
Jan ‘12 – Jun‘12 Main inspector on behalf of GE Oil&Gas: Check and review of documentation issued by supplier, witness of Pre-FAT and FAT, collection of data for punch lists. GANTT scheduling review for production activities and inspections. The role included a daily and weekly reports issuing.
Project Dedicate Inspector GOLIAT Project under NORSOK Standards Suppliers visited - Bartech Technor – Stavanger (NOR);
ATEX RIO cabinet. - ABB-AS. – Oslo (NOR);
Antisurge system cabinets.
ON-CALL INSPECTOR ACTIVITY
Jul ‘20-Sept ‘20 Inspection on behalf of Baker and Hughes: witness of tests and report issuing. Project LUBE OIL CONSOLE PACKAGING - MIDOR REFINERY - Alexandria, Egypt
Supplier visited - Primiceri S.p.A., Modugno (ITA); Hydraulic Piping Test Lube Oil Console Packaging – FAT
Aug ‘20 Inspection on behalf of Sonatrach: witness of tests and report issuing. Project MV - MOTOR Booster pump – EL MERK PROJECT - ALGERIA
Supplier visited - ABB, Helsinki (FIN); MV - Squirrel cage motor 2080 kW – FAT MV - Squirrel cage motor 165 kW – FAT
Jun ‘20 Inspection on behalf of Baker and Hughes: witness of tests and report issuing. Project PIPING - PUMPING SKID - INDIAN OIL CORPORATION LIMITED - NIGERIA
Supplier visited - Primiceri S.p.A., Modugno (ITA); Hydraulic Piping Test Hardness Test on Welds Dye Penetrant Test on welds Butt Weld R.X. Test
Jun ‘20 Inspection on behalf of Baker and Hughes: witness of tests and report issuing. Project ANOH GAS PLANT PROJECT - NIGERIA
Supplier visited - Primiceri S.p.A., Modugno (ITA); GCPP – FAT
Jun ‘20 Inspection on behalf of Baker and Hughes: witness of tests and report issuing. Project LG - YEOSU KOREA
Supplier visited - Primiceri S.p.A., Modugno (ITA); MV SWITCHGEAR PANEL LCC – FAT
Jun ‘20 Inspection on behalf of ARSEN & TOUBRO: witness of tests and report issuing. Project AIN T’SILA FIELD – ISARENE JV – GT POWER
Supplier visited - Primiceri S.p.A., Modugno (ITA); GCPP SCADA integration test – I-FAT
Jun ‘20 Inspection on behalf of Baker and Hughes: witness of tests and report issuing. Project AIN T’SILA FIELD – ISARENE JV – GT POWER
Supplier visited - Primiceri S.p.A., Modugno (ITA); Bus-Tie Synchronization Panel – FAT
Page 6/15 - Curriculum vitae of MOCCIA Marco Francesco
May ‘20 Expediting Project on behalf of Baker and Hughes: Supplier project documentation issuing check.
Project Golden Pass LNG Export Project
Supplier visited - Primiceri S.p.A., Modugno (ITA); Local Control Cabin – FAT
May ‘20 Inspection on behalf of Baker and Hughes: witness of tests and report issuing. Project LG Chem Yeosu site (South Korea)
Supplier visited - Primiceri S.p.A., Modugno (ITA); Local Control Cabin – FAT Battery room – FAT MCC – FAT
Mar ’20 -Apr ‘20 Inspection on behalf of Baker and Hughes: witness of tests and report issuing. Project DUQM REFINERY
Supplier visited - Primiceri S.p.A., Modugno (ITA); Lube Oil Console Packaging – FAT
Mar ‘20 Inspection on behalf of Baker and Hughes: witness of tests and report issuing. Project SINOCHEM QUANZHOU PETROCHEMICAL
Supplier visited - Primiceri S.p.A., Modugno (ITA); Hydraulic Piping Test Lube Oil Console Packaging – FAT
Dec ‘19 Inspection on behalf of SAIPEM: witness of tests and report issuing. Project ISTRANA, ITA.
Supplier visited - Technomec - Taranto (ITA); Control Cabins painting check – FAT
Dec ‘19 Inspection on behalf of ADNOC Refining: witness of test and report issuing. Project TAKREER, Abu Dhabi-UAE.
Supplier visited - STATRON AG - Zurich (CHE); DC UPS Panel – FAT
Nov ‘19 Inspection on behalf of Venture Global: witness of tests and reports issuing. Project Block Calcasieu Pass, USA.
Supplier visited - Baker Huges - Hungary - Fòt (HUN); Distributed Control System – FAT
Oct ‘19 Inspection on behalf of BHGE: witness of tests and reports issuing. Project BAPCO Modernization Program, Bahrain.
Supplier visited - Primiceri S.p.A., Modugno (ITA); Hydraulic Piping Test
Sep - Oct ‘19 Inspection on behalf of SAIPEM: witness of tests and reports issuing. Project KOC feed pipelines for new refinery project, KUWAIT.
Supplier visited - TechnipFMC Technologies Measurement Solutions, ERIE (USA); Sentry Turbine Meter – FAT Rotary Vane PD Meters – FAT Ultrasonic Flowmeter – FAT
Sep ‘19 Inspection on behalf of QATAR GAS: witness of tests and reports issuing. Project Barzan Pipeline Project, QATAR
Supplier visited - SIEMENS-ELETTROMECCANICA CIAURRI S.r.l., Sava (ITA);
Page 7/15 - Curriculum vitae of MOCCIA Marco Francesco
SCHELTER MV-SWITCHGEAR – FAT
Aug ‘19 Inspection on behalf of ENI SPA: witness of tests and reports issuing. Project EOC Production, Restoration Project, NIGERIA
Supplier visited - Schneider Electric, Mumbay (IND); DCS, ESD System – FAT
July ‘19 Inspection on behalf of BHGE: witness of tests and reports issuing. Project Johan Castberg FPSO GTGs Project
Supplier visited - Primiceri S.p.A., Modugno (ITA); Control Cabin – Internal test + FAT Cyber Security – FAT
June ‘19 Inspection on behalf of BHGE: witness of tests and reports issuing. Project MELAKA REFINERY DIESEL EURO 5 PROJECT – HYUNDAI Project
Supplier visited - Primiceri S.p.A., Modugno (ITA); 11 KV MV Switchgear - Internal test + FAT Local Cabin - Internal test + FAT
June ‘19 Inspection on behalf of BHGE: witness of tests and reports issuing. Project Liza 2 FPSO - GTGs Project
Supplier visited - Primiceri S.p.A., Modugno (ITA); GCPP Panels – Internal test + FAT
May ‘19 Inspection on behalf of BHGE: witness of tests and reports issuing. Project RAAJASTHAN – INDIA Project
Supplier visited - Primiceri S.p.A., Modugno (ITA); GCPP Panels – Internal test + FAT SCAP Panel – Internal test + FAT
Mar ‘19 Inspection on behalf of BHGE: witness of tests and reports issuing. Project SAUDI ARABIA MODON – SAUDI Project
Supplier visited - Primiceri S.p.A., Modugno (ITA); UPS SWITCHBOARD + SOFSTART – FAT 3PH+N SWITCHBOARD – FAT
Mar ‘19 Inspection on behalf of BHGE: witness of tests and reports issuing. Project MELAKA REFINERY DIESEL EURO 5 PROJECT – HYUNDAI Project
Supplier visited - Primiceri S.p.A., Modugno (ITA); Local Control Cabin – Painting check Generator Control protection panel – FAT
Mar ‘19 Inspection on behalf of BHGE: witness of tests and reports issuing. Project LG CHEM - KOREA - Project
Supplier visited - Primiceri S.p.A., Modugno (ITA); Local Control Cabin – Final and shipment check Generator Control protection panel – FAT
Feb ‘19 Inspection on behalf of BHGE: witness of intermediate tests and reports issuing. Project JOHAN CASTBERG STATOIL - Project
Supplier visited - SRB S.p.A. - Primiceri S.p.A., Monopoli (ITA); Control Cabin
o Visual Examination of Welds (VT) o Water Tightness Test on External Welds (WT)
Page 8/15 - Curriculum vitae of MOCCIA Marco Francesco
Jan ‘19 Inspection on behalf of BHGE: witness of FAT and reports issuing. Project Diecimo and Porcari LUCART - Project
Supplier visited - Primiceri S.p.A., Modugno (ITA); Generator Control protection panel
Oct ‘18 Inspection on behalf of SAIPEM: witness of FAT and reports issuing. Project IPP OKPAI PHASE II - Project
Supplier visited - Tozzi Electrical Equipment S.p.A. Foggia (ITA); MV Switchgear, Modularized Electrical Container (MEC-1)
Sep ‘18
Inspection on behalf of GE O&G: witness of FAT and reports issuing. Project HANWHA POWER SYSTEMS
Supplier visited - PREI S.r.l. Alzate B.za (ITA); UCS Cabinet.
Aug ‘18 Inspection on behalf of GE O&G: witness of FAT and reports issuing. Project HELANG FPSO – MALAYSIA
Supplier visited - Primiceri S.p.A., Modugno (ITA); Control Cabin.
Jan ‘18 – Mar ‘18 Inspection on behalf of GE Oil&Gas: factory acceptance tests, regarding installed items MV motor frequency converter and MV Switchgear. Collection of data for punch lists preparation and issuance in order to share and discuss with final customer. The role included a daily reports issuing. Supporting for Punch List closure
Project FREEPORT
Supplier visited - H2 Energy-FPT – Fècamp (FRA). E-House
Sep ‘16 Expediting and Inspection on behalf of DUSLO-Techip: check of GANTT scheduling for production activities and reports issuing.
Project DUSLO CPAVOK 4 Suppliers visited - TOZZI GREEN S.p.A. – Foggia (ITA).
LV Switchgears LV BUS DUCT
May ‘16 Expediting on behalf of ENEL Green Power: check of GANTT scheduling for production activities and reports issuing.
Project CERRO PABELLON
Suppliers visited - TOZZI GREEN S.p.A. – Foggia (ITA). Control cabins with MV/LV transformer sections
Dec ‘15 Inspection on behalf of KARACHAGANAK: witness of FAT and reports issuing. Project KARACHAGANAK PETROLEUM OPER. B.V
Suppliers visited - Nuovo Pignone – Bari (ITA). Industrial PC for SUVIMAC sys
Nov ‘15 Inspection on behalf of Lloyd’s Register Energy : witness of FAT and reports issuing.
Project SOC BASRA IRAQ
Suppliers visited - ACS group Srl – Taranto (ITA). LV Switchboard – MCC Panel
Nov ‘15 Inspection on behalf of ENI IRAQ BV: factory acceptance tests, the role included
Page 9/15 - Curriculum vitae of MOCCIA Marco Francesco
a daily and weekly reports issuing. Project ZUBAIR
Suppliers visited - Lucy Switchgear – Dubai (UAE). 11KV Switchgears SF6
Sep ‘15 Inspection on behalf of ENEL Green Power: witness of FAT and reports issuing. Project CARRERA PINTO – Pexico SA
Suppliers visited - Prysmian Group – Giovinazzo (ITA). MV Cables; LV Multi-pole cable.
Sep ‘14 Inspection on behalf of GE O&G: witness of FAT and reports issuing. Project HIGHVIEW; TIANJIN; RELIANCE
Suppliers visited - GE Power Conversion – Rugby (GBR). MV Generator Generator Excitation Panel
Sep ‘13 Inspection on behalf of GE O&G: witness of FAT and reports issuing. Project BRUNEI LNG - SENDIRIAN BERHAD
Suppliers visited - Brush HMA – Ridderkerk (NLD). MV Generator Generator Excitation Panel
Aug ‘13 Inspection on behalf of GE O&G: witness of FAT and reports issuing. Project ENI - VERSALIS SPA – STEAM TURBINE SAC1-8
Suppliers visited - TECNOMEC S.r.l. Bari (ITA); Lube Oil Console Piping.
Jul ‘13 Inspection on behalf of GE O&G: witness of Pre-FAT and FAT, collection of data for punch lists preparation and issuance in order to share and discuss with final customer. The role included a daily reports issuing.
Project GORGON - under AS standards
Suppliers visited - SIEMENS - LECTRUS – Houston (USA). E-House electrical installation
Jul ‘13 Expediting on behalf of TOYO Eng: check of GANTT scheduling for production activities and inspections coordination. Check of production to Nuovo Pignone’s sub-supplier
Project PETRONAS - Plant Rejuvenation and Revamp 4 (PRR4)
Suppliers visited - Nuovo Pignone – Bari (ITA). UCS Panels TMEIC motors DR steam turbines LO Consoles
Mar ‘13 Inspection on behalf of GE O&G: witness of Pre-FAT, FAT and reports issuing. Project SBM – FPSO CIDADE DE ILHABELA
Suppliers visited - Geral Automation – Belley (FRA); UCS panel; DCS Systems; ESD Systems; F&G Systems; Vibration and temperature monitoring system.
Dec ‘12 Inspection on behalf of JGC Co.: witness of FAT and reports issuing.
Page 10/15 - Curriculum vitae of MOCCIA Marco Francesco
Project Bir-Seba Field Development Suppliers visited - Primiceri S.p.A., Modugno (ITA);
UCS control panel; UPS Control Cabin; DCS Systems; ESD Systems; F&G Systems; Vibration and temperature monitoring system;
Dec ‘12 Inspection on behalf of GE O&G: witness of FAT and reports issuing. Project CURTIS ISLAND - BECHTEL INTERNATIONAL
Suppliers visited - EMERSON Process Man. – Seregno (ITA); Gas Chromatography cabinet.
Dec ‘12 Inspection on behalf of SIERRA GORDA: witness of FAT. Project SIERRA GORDA CRUSHER E&I
Suppliers visited - WHITELITE – CARLOW (IRL); E-ROOM; CONTROL ROOM; HYDRAULIC ROOM;
Sep ‘12 Inspection for GE O&G: witness of Pre-FAT, FAT and reports issuing. Project GORGON - CHEVRON AUSTRALIA PTY LTD
Suppliers visited - ITP Benelli spa – Ravenna (ITA); Control Cabin.
Aug ‘12 Inspection on behalf of GE O&G: witness of Pre-FAT, FAT and reports issuing. Project Wheatstone upstream - DRESSER-RAND S.A
Suppliers visited - PREI S.r.l. Alzate B.za (ITA); UCS panel; DCS Systems; ESD Systems; F&G Systems; Vibration and temperature monitoring system.
Jul ‘12 Inspection on behalf of CBI-LUMMUS: witness of FAT and reports issuing. Project Kirish Hydrocracker Complex
Suppliers visited - Honeywell Moscow - Kirish Hydrocracker Complex Project (RUS); DCS (Distributed Control System) on Steam turbine.
Mar ‘12 Inspection on behalf of Petrofac: witness of FAT and reports issuing. Project SHELL - MAJNOON FCP
Suppliers visited - Primiceri S.p.A., Modugno (ITA); 50kVA Containerized AC UPS;
Mar ‘12 Inspection on behalf of GE O&G: witness of Pre-FAT, FAT and reports issuing. Project Yibal - Petroleum Development Oman -
Suppliers visited - PREI S.r.l. (ITA); UCS panel; DCS Systems; ESD Systems; F&G Systems; Vibration and temperature monitoring system.
Dec ‘11 Inspection on behalf of GE O&G: witness of Pre-FAT, FAT and reports issuing.
Page 11/15 - Curriculum vitae of MOCCIA Marco Francesco
Project OMV - BAUMGARTEN & RUDEN GAS COMPRESSOR Suppliers visited - PREI S.r.l. (ITA);
UCS panel; DCS Systems; ESD Systems; F&G Systems; Vibration and temperature monitoring system.
Dec ‘11 Inspection on behalf of GE O&G: witness of Pre-FAT, FAT and reports issuing. Project JACK ST. MALO' - CHEVRON AUSTRALIA PTY LTD
Suppliers visited - PROMEL Srl, Cascine del Riccio (ITA); UCS panel; GCP panel; DCS Systems; ESD Systems; F&G Systems; Vibration and temperature monitoring system.
Nov ‘11 Inspection on behalf of Technip: witness of FAT and reports issuing. Project FUJAIRAH PHASE 2
Suppliers visited - ANSALDO Sistemi Industriali S.P.A., Monfalcone (ITA); Booster Pump Motor 15KVA.
Nov ‘11 Inspection on behalf of ENI-SAIPEM: witness of FAT and reports issuing. Project SHAH PRODUCT PIPELINES – PP05
Suppliers visited - Serck Controls Ltd., Coventry (GBR); SCADA – HONEYWELL.
Nov ‘11 Inspection on behalf of ENPPI: witness of FAT and reports issuing. Project SETH PLATFORM EGYPT
Suppliers visited - FORES ENGINEERING, Cesena (ITA); LV Switchboard – MCC Panel.
Nov ‘11 Inspection on behalf of GE O&G: witness of FAT and reports issuing. Project JACK ST. MALO' - CHEVRON AUSTRALIA PTY LTD
Suppliers visited - CEG S.p.A., Bibbiena (ITA); UPS Panel;
Oct ‘11 Inspection on behalf of GE O&G: witness of FAT and reports issuing. Project West Qurna NGL - OIL PROJECTS COMPANY (SCOP)
Suppliers visited - PREI S.r.l. (ITA); UCS panel;
Oct ‘11 Inspection on behalf of GE O&G: witness of Pre-FAT, FAT and reports issuing. Project JGC CORP - PNG LNG PR UNIT COMPRESSORS
Suppliers visited - PREI S.r.l. (ITA); UCS panel; DCS Systems; ESD Systems; F&G Systems; Vibration and temperature monitoring system.
Sep ‘11 Inspection on behalf of GE O&G: witness of FAT and reports issuing. Project PTT CHEMICAL PUBLIC COMPANY LIMITED
Page 12/15 - Curriculum vitae of MOCCIA Marco Francesco
Suppliers visited - Primiceri S.p.A., Modugno (ITA); UCS panel;
Sep ‘11 Inspection on behalf of GE O&G: witness of Pre-FAT, FAT and reports issuing. Project FPSO P58&P62 - PETROBRAS
Suppliers visited - PREI S.r.l. (ITA); UCS panel; DCS Systems; ESD Systems; F&G Systems; Vibration and temperature monitoring system.
Sep ‘11 Inspection on behalf of GE O&G: witness of Pre-FAT, FAT and reports issuing. Project GTG Khor Al Zubair - SOUTH GAS COMPANY
Suppliers visited - PREI S.r.l. (ITA); UCS panel; DCS Systems; ESD Systems; F&G Systems; Vibration and temperature monitoring system.
Mar ‘11 – Jun ‘11 Inspection on behalf of CBI CLOUGH JV: witness of FAT and reports issuing. Project Papua New Guinea - Esso Highlands Limited
Suppliers visited - Primiceri S.p.A., Modugno (ITA); UCS panel; DCS Systems; ESD Systems; F&G Systems; Vibration and temperature monitoring system.
Apr ‘11 Inspection on behalf of ENI AGIP KCO: witness of FAT and reports issuing. Project KASHAGAN - ENI AGIP KCO
Suppliers visited - Tozzi Sud S.p.A. Foggia (ITA); 10 KV SWITCHGEARS;
Mar ‘11 Inspection on behalf of Petrofac GS JV: witness of FAT and reports issuing. Project RUWAIS 4th NGL TRAIN
Suppliers visited - TECNOMEC S.r.l. Bari (ITA); Lube Oil Console.
Nov ‘10 Expediting and Inspection on behalf of ENI-SAIPEM: witness of FAT and reports issuing.
Project SAIPEM KZ BRANCH Suppliers visited - Primiceri S.p.A., Modugno (ITA);
Control Cabins.
Jul ‘10 – Sep ‘10 Inspection on behalf of GE O&G: witness of Pre-FAT, FAT and reports issuing. Project PETROFAC EL MERK – INJECTION GAS COMPRESSION
Suppliers visited - PREI S.r.l. (ITA); UCS panel; DCS Systems; ESD Systems; F&G Systems; Vibration and temperature monitoring system.
Page 13/15 - Curriculum vitae of MOCCIA Marco Francesco
May ‘10 Inspection on behalf of GE O&G: witness of Pre-FAT, FAT and reports issuing. Project ARZEW-ALGERIA
Suppliers visited - Primiceri S.p.A., Modugno (ITA); Control Cabin.
Feb ‘10 Inspection on behalf of GE O&G: witness of FAT. Project IRAQ Company For Gas Turbines Ltd Fertilizer
Suppliers visited - Primiceri S.p.A., Modugno (ITA); Control Cabin.
OTHER ACTIVITY Jul ‘08- Now Associate
Name and address of employer
Architecture & Engineer associates “Altereco” Via Noicàttaro, 90 - 70018 Rutigliano (ITA) http://www.altereco.it/Sviluppi.html
Area Sustainable design system, renewable energy. Occupation or position held Associate
Main activities and responsibilities
Project manager – Commissioning engineer – PV design system.
May ‘09 - May ‘10 Consulting name and address of
employer Fungo Puglia SCARL
C.da Caggiano, 9 - 70018 Rutigliano (ITA) area Mushroom cultivation
occupation or position held Project Engineer main activities and
responsibilities DCS & Building automation for mushroom cultivation
Feb ‘09 - Jul ‘09 Consulting name and address of
employer MASMEC Srl
Via dei Gigli, 21 - 70026 Modugno (ITA) area System integrator & Functional test
occupation or position held Project Engineer main activities and
responsibilities Software development for inspection of “O-ring Fuel Injector” for FIAT Power
Train - Pratola Serra (AV)
May ‘08 - Feb ‘09 Consulting name and address of
employer ECSA-Automazione Srl
Via Mascagni, 10 - 70123 Bari (ITA) area Process Automation
occupation or position held Project Engineer main activities and
responsibilities Instrument & Automation Engineer, FAT activities for the following companies:
- OM Forklifts S.p.A. Modugno (ITA) Upgrade SW/HW for Forklifts station test
- Bridgestone S.p.A. Modugno (ITA) Revamping “Comerio” line
- Bridgestone S.p.A. Modugno (ITA) Upgrade SW/HW “BatchOff 4” line
- Bridgestone S.p.A. Modugno (ITA) Revamping “Cement House” Building
- Bridgestone S.p.A. Modugno (ITA) Upgrade SW/HW “Squeege” line
Page 14/15 - Curriculum vitae of MOCCIA Marco Francesco
Aug ‘03 – Jul ‘07 Employed name and address of
employer INFOCONSULT srl
S.P. Noicàttaro – Rutigliano Km.1 – 70018 Rutigliano (ITA) area Process Automation / Oil&Gas
position Project Engineer - Employ main activities and
responsibilities - Project Engineer, technical documentation, test
- Commissioning on site - R/D (computer vision) - QC Inspector
Commissioning / Installation on site
- ENEL - Montalto di castro (ITA) UCS Revamping
- NIGC - Shiraz (Iran) SUVIMAC 4 - SW upgrade
- E.ON - Bierwang (GER) SUVIMAC 2 upgrade
- PAPELERA San Sebastian (SPA) UCS - SW upgrade
- Cartiera del Vignaletto – Verona (ITA) UCS - HW/SW upgrade
- SONATRACH - (site di RN-ZN-HRM-OU) (DZA) UCS - DCS SUVIMAC 2 HW/SW upgrade
- SIECO - Milano (Italy) UCS HW - upgrade
- INVENSYS - Milano (Italy) SUVIMAC 2 - DCS Matrikon OPC Configuration
- SONATRACH - Rhourde Nouss (DZA) UCS - DCS SUVIMAC 2 HW/SW upgrade
- SONATRACH - Hassi R’mel (DZA) UCS - DCS SUVIMAC 2 HW/SW upgrade
other projects - Control system revamping for Petrobras P34 (BRA) - Control system upgrade for Kazakhstan plant - Tutor for student on behalf of Polytechnics of Bari
R/D
- Car parking access control with plate recognized & car profile - Control Access System by motion detection - Diagnostic system for auxiliary pump for gas turbine
QC Inspector - S.R.B. Costruzioni srl, Monopoli (ITA) Steel structure construction, Container Control Cabin
- PREI S.r.l. (ITA); UCP Panel MKVI
COMPUTER SKILL O.S. MICROSOFT : DOS, WINDOWS 3.X/95/98/NT/2000/XP/VISTA/7…
LINUX: SUSE, UBUNTU. INTEGRATED DEVELOPMENT
ENVIRONMENT LabView, Imaq Vision Builder, Apacs ProcessSuite, Wanderware Intouch,
MicroAdvantage, Cadence Orcad, MatLab, MPLab, RSLogix 5/500/5000, FactoryTalk View, RSView32, RSNetworx.
LANGUAGE C, FUNCTION BLOCK, LADDER LOGIC, SEQUENTIAL FUNCTION CHART, STRUCTURED TEXT, ASSEMBLER FOR INTEL 8086 E MICROCHIP PIC, DYNAMIC C for RABBIT 3000-4000, ARDUINO – IDE.
NET & PROTOCOLS LAN/TCP-IP, MODBUS, DDE, OPC, DEVICENET, CONTROLNET.
SYSTEM SCADA, DCS SOFTWARE AUTOCAD, SPAC, OFFICE, OPENOFFICE.ORG, CORELDRAW, FLASH, DREAMWEAVER
Page 15/15 - Curriculum vitae of MOCCIA Marco Francesco
LANGUAGES
ENGLISH
COMPREHENSION SPEAKING WRITING
B2 INTERMEDIATE B2 INTERMEDIATE B2 INTERMEDIATE
APPLICABLE FOR E&I - QA/QC Inspector - Control Systems Engineer
HOBBY Skydiving, footing.