1
1) Cut 8 - 2×4s and 2 - 2×6s @ 72'' in preparation for building the frames. 2) Build the two frames as pictured to the right. Be sure to extend the boards 1½'' past the 12' frame uprights. 3) Cut 8 - 2×4s and 2 - 2×6s @ 69''. 4) Stand upright frames and attach the frames with the 69'' boards by lining up the boards with the end 1½'' overhangs. 5) Once the structure is standing, frame the floor as shown with 2×6s. 6) To frame the roof, cut the top of the rafter to a 4/12 pitch and cut the bottom to match the laterals. Connect the rafters with a 2×4 on each side flush with the peak of the rafters to make the ridge. NOTE: Exceeding the 70'' rise will require longer material for the uprights. Diagonal bracing may be added depending on height. 6x6 ELEVATED BLIND INSTRUCTIONS VERTICAL FRAME ×2 FLOOR FRAMING STEEL & TRIM 2×4 Flat Purlin 2×4 Rafter 2×4 - 72" Lateral 2×4 - 72" Lateral 2×4 - 72" Lateral 2×6 - 72" Lateral 2×4 - 72" Lateral 2×4×12 Uprights Double 2×4×12 Uprights All Floor Framing 2×6 Top of Floor 75½" Frame Side Frame Side Frame Section Frame Section Opening may vary to fit personal preferences Corner and Gable Trim Universal Ridgecap Corner and Gable Trim Corner and Gable Trim J-Trim J-Trim Bottom Trim Bottom Trim 2×4 - 69" 2×4 - 69" 2×6 Floor Framing 12' 70" 10" 22" 40" 6' 4 12 72" 24" 21" 16" typ 72"

6X6 hunting blind - hw.menardc.com · 6x6 ELEVATED BLIND INSTRUCTIONS VERTICAL FRAME ×2 FLOOR FRAMING STEEL & TRIM 2×4 Rafter 2×4 Flat Purlin 2×4 - 72" Lateral 2×4 - 72" Lateral

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 6X6 hunting blind - hw.menardc.com · 6x6 ELEVATED BLIND INSTRUCTIONS VERTICAL FRAME ×2 FLOOR FRAMING STEEL & TRIM 2×4 Rafter 2×4 Flat Purlin 2×4 - 72" Lateral 2×4 - 72" Lateral

1) Cut 8 - 2×4s and 2 - 2×6s @ 72'' in preparation for building the frames.2) Build the two frames as pictured to the right. Be sure to extend the boards1½'' past the 12' frame uprights.3) Cut 8 - 2×4s and 2 - 2×6s @ 69''.4) Stand upright frames and attach theframes with the 69'' boards by lining up the boards with the end 1½'' overhangs.5) Once the structure is standing, framethe floor as shown with 2×6s.6) To frame the roof, cut the top of the rafter to a 4/12 pitch and cut the bottom to match the laterals. Connect the rafters with a 2×4 on each side flush with the peak of the rafters to make the ridge.NOTE: Exceeding the 70'' rise will require longer material for the uprights. Diagonal bracing may be added depending on height.

6x6 ELEVATED BLIND

INSTRUCTIONS

VERTICAL FRAME ×2

FLOOR FRAMING STEEL & TRIM

2×4 Flat Purlin2×4 Rafter

2×4 - 72" Lateral

2×4 - 72" Lateral

2×4 - 72" Lateral

2×6 - 72" Lateral

2×4 - 72" Lateral

2×4×12 Uprights

Double2×4×12Uprights

All FloorFraming2×6

Top of Floor 75½"

Frame Side

Frame Side

Frame Section

Frame Section

Opening may vary to fit personal preferences

Corner andGable Trim

Universal Ridgecap

Corner andGable Trim

Corner andGable Trim

J-Trim

J-Trim

Bottom Trim

Bottom Trim

2×4 - 69"

2×4 - 69"

2×6 Floor Framing

12'

70"

10"

22"

40"

6'

412

72"

24"

21"

16"typ

72"