    LogicalFramework

    Analysis/Approach(LFA)

  • 7/29/2019 6810509 Log Frame Analysis

    2/61

    OBJECTIVES

    1. Introduce Logical Framework

    Analysis/Approach (LFA) and its uses.

    2. Familiarize with the main steps involved in

    conducting an LFA.

    3. Give a concrete example.

    4. Exercise on the Project Planning Matrix (?).

  • 7/29/2019 6810509 Log Frame Analysis

    3/61

    INTRODUCTION

    LFA was first developed by Practical Concepts

    Inc. in 1969 for the U.S. Agency for

    International Development (USAID). It has

    since been widely adoptedand adaptedby

    the international donor community and is

    used forparticipatory project planning, as an

    analytic tool for project approval, or as amonitoring and evaluation framework.

  • 7/29/2019 6810509 Log Frame Analysis

    4/61

    What is LFA?

    A designing approach that can be used for

    planning, implementing and evaluating

    projects or programmes.

  • 7/29/2019 6810509 Log Frame Analysis

    5/61

    Purpose of LFA

    The purpose of LFA is to undertakeparticipatory, objectives-oriented planningthat spans the life of project or policy work tobuild stakeholder team commitment andcapacitywith a series of workshops.

    The technique requires stakeholders to come

    together in a series of workshops to setpriorities and plan for implementation andmonitoring.

  • 7/29/2019 6810509 Log Frame Analysis

    6/61

    The two terms Logical Framework (LF or Logframe) and

    the Logical Framework Approach (LFA) are sometimes

    confused. The LogFrame is a document, the Logical

    Framework Approach is a project design methodology.

    For most purposes the three terms; Logical Framework

    Approach, ZOPP and OOPP are terms for the sameproject design methodology or process. The terms

    OOPP and ZOPP mean respectively; Objectives

    Oriented Project Planning and in German Ziel

    Orientierte Projek Planung. All three terms refer to a

    structured meeting process which we will refer to as

    LFA.

  • 7/29/2019 6810509 Log Frame Analysis

    7/61

    Steps LFA1. Situation Analysis

    Stakeholder Analysis

    Problem Analysis

    Objective Analysis

    2. Strategy Analysis

    3. Project Planning Matrix Matrix

    Assumptions

    ObjectiveIndicators

    Verification

    4. Implementation

    5. Monitoring

    6. Evaluation

  • 7/29/2019 6810509 Log Frame Analysis

    8/61

  • 7/29/2019 6810509 Log Frame Analysis

    9/61

    The LFA approach begins by analyzing the existing situation and

    developing objectives for addressing real needs.

    A situation analysis has as its core task to find out the actual state ofaffairs with respect to an issue to be analyzed; it is focused by

    problems and an attempt to understand the system which

    determines the existence of the problems.

    The analysis phase is the most critical, yet most difficult, phase of

    the logframe approach. The analysis phase consists of three stages:

    1. Analysis of stakeholders

    2. Analysis of problems

    3. Analysis of objectives.

  • 7/29/2019 6810509 Log Frame Analysis

    10/61

    Stakeholders AnalysisIn using the LFA approach, the stakeholder analysis is an analysis of the

    problems, fears, interests, expectations, restrictions and potentials of

    all:

    important groups

    organisations and institutions

    implementing agencies

    other projects and

    individuals

    who may have an influence on a situation/(intended) project or are

    themselves affected by it. Those analyzed in detail should be limited to

    those who are perceived to: be able to contribute to questions to be answered .

    be important with regard to decisions to be taken.

    They should constantly be referred to in developing the LFA.

  • 7/29/2019 6810509 Log Frame Analysis

    11/61

    Who are the stakeholders involved in the

    project and how are they affected?

    Key questions to ask in preparation for developing the

    logframe are:

    1. Who will be involved in the logframe development?

    2. Where will the development be conducted?

    3. Who will facilitate the development of the logframe ?

    4. What background materials, papers and expertisemay be needed?

    5. What materials and logistics are required?

  • 7/29/2019 6810509 Log Frame Analysis

    12/61

    The Stakeholders

    Stakeholders include those who directly benefit from or have

    a legitimate interest in the company's activities and all thosewho have an impact and/or are affected by the impact, due

    to the company's performance and actions. The corporate

    communityand the wider communityare all stakeholders.

    Corporate community includes the management, employees,shareholders, joint ventures/partnerships/subsidiaries,

    suppliers and contractors, customers and consumers. Wider

    community includes the ecosystem, the local government,

    the host communities and the indigenous communities.Foremost, the generations to come are indispensable

    stakeholders and must be taken into account in all corporate

    affairs. What we do or not do today will certainly impinge on

    the future generations.

  • 7/29/2019 6810509 Log Frame Analysis

    13/61

    Problem Analysis

    The analysis phase usually begins with an analysis of

    problems. The problem analysis is undertaken by

    identifying the main problems and developing a

    'problem tree' through an analysis of cause and effects.

    Key questions.1. Which are the problems the project is addressing?

    2. What are the root causes of those problems?

    3. What is the larger picture in which those problems

    and their root causes exist?

    4. What are the links between the problems?

  • 7/29/2019 6810509 Log Frame Analysis

    14/61

    Problem Tree

    A main output of the problem analysisis the problem tree. The first

    procedure in problem analysis is

    brainstorming. Before thebrainstorming exercise commences it

    is important that the facilitator explain

    the process and the group agrees on

    some rules for brainstorming.

  • 7/29/2019 6810509 Log Frame Analysis

    15/61

    If there is no agreement betweenparticipants on the statement of

    the problem, it is unlikely there willbe agreement on the

    solution. This stage therefore

    seeks to get consensus on the

    detailed aspects of the problem.

    Agreement and Consensus

  • 7/29/2019 6810509 Log Frame Analysis

    16/61

    Brainstorming techniques can be used toidentify the main problems. All participants

    are invited to write their problem ideas on

    small cards. (approximately 8 in by 4 in.) Theparticipants may write as many cards as they

    wish. The participants then group the cards

    or look for cause-effect relationship betweenthe themes on the cards by arranging the

    cards to form a problem tree.

    Brainstorming

  • 7/29/2019 6810509 Log Frame Analysis

    17/61

    After all of the problems are displayed theyshould then be clustered into groups of similar

    issues

    The problem tree is developed by:

    1. moving problems from the clusters of

    problems2. adding new problems that emerge

    3. problems can be moved up or down the tree

    as required

    Clustering

  • 7/29/2019 6810509 Log Frame Analysis

    18/61

  • 7/29/2019 6810509 Log Frame Analysis

    19/61

    Objective Analysis

    A procedure for systematically1. identifying

    2. categorizing3. specifying

    4. balancing out

    objectives of all parties involved in a

    specific situation

  • 7/29/2019 6810509 Log Frame Analysis

    20/61

    Objective TreeIn this step the problem statements are converted into

    objective statements and if possible into an objective tree.

    1. Problems are restated as objectives

    The problem tree is transformed into an objectives treeby restating the problems as objectives.

    2. Positive mirror image of the problem tree

    The objectives tree can be viewed as the positive

    mirror image of the problem tree. It is usually

    necessary to reorder the position of objectives as you

    develop the tree.

  • 7/29/2019 6810509 Log Frame Analysis

    21/61

    Means and Ends

    The objectives tree can be considered as an 'ends-

    means' diagram. The top of the tree is the end that is

    desired and the lower levels are the means to achieving

    the end. Based on this objectives tree, certain means

    are feasible and some are perhaps outside the scope ofthe problem.

    Nonetheless, these means provide the foundation for

    developing programmes, projects or strategies to

    address the problems discussed earlier.

  • 7/29/2019 6810509 Log Frame Analysis

    22/61

    Just as the problem tree shows cause-effect

    relationships, the objective tree shows means-

    end relationships. The means-end relationshipsshow the means by which the project can

    achieve the desired ends or future desirable

    conditions.

    Frequently there are many possible areas that

    could be the focus of an "intervention" ordevelopment project. The next step addresses

    those choices.

  • 7/29/2019 6810509 Log Frame Analysis

    23/61

    Strategy Analysis

    searching for and deciding on solutions

    follows the problems and objectives analysis

    prerequisite to designing action strategies

    Points to consider

    overall concepts, strategic plans, objectives

    people, target groups, organizations, agencies

    methods, procedures, processes

    technologies, services, products, outputs

    measures, actions, materials, inputs

  • 7/29/2019 6810509 Log Frame Analysis

    24/61

    Conducting a Strategy Analysis

    1. ordering sequence of the problem

    and objective trees

    2. clustering objectives

    3. feasibility of different interventions

    4. continuous task in projectmanagement

  • 7/29/2019 6810509 Log Frame Analysis

    25/61

    The objective tree usually shows the large number of

    possible strategies or means-end links that couldcontribute to a solution to the problem.

    Since there will be a limit to the resources that can be

    applied to the project, it is necessary forthe participants to examine these alternatives and

    select the most promising strategy.

    After selection of the decision criteria, these are

    applied in order to select one or more means-endchains to become the set of objectives that will form

    the project strategy.

    Alternatives Analysis

  • 7/29/2019 6810509 Log Frame Analysis

    26/61

    Project Planning Matrix

    (1) Matrix

    (2) Assumptions

    (3) Objective Indicators(4) Verification

  • 7/29/2019 6810509 Log Frame Analysis

    27/61

    Narrative SummaryObjectively Verifiable

    Indicators - OVIs

    Means of Verification

    -MOVs

    External Factors

    (Assumptions)

    Development

    Objective

    Immediate Objective

    Outputs (Results)

    1.

    2.

    3.

    Activities

    1.

    2.

    3.

    4.

    Inputs

    1.1

    1.2

    1.3

    1.4

    http://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htmhttp://d/Folder%20Lock/Locker/My%20Documents/Consulting/LFA/logframdoc.htm
  • 7/29/2019 6810509 Log Frame Analysis

    28/61

    Column headings - definition of terms

    Narrative Summary: This term used to

    describe the text that "narrates" the

    objectives. It could have been giventhe title "Hierarchy of Objectives", but

    this might be misleading because the

    bottom cell in the column is asummary of the activities.

  • 7/29/2019 6810509 Log Frame Analysis

    29/61

    Column headings - definition of terms

    Objectively Verifiable Indicators (OVIs):

    These are the measures, direct or indirect

    that will verify to what extent the

    objectives have been fulfilled. The term

    "objectively" implies that if these should

    be specified in a way that is independentof possible bias of the observer.

  • 7/29/2019 6810509 Log Frame Analysis

    30/61

    Column headings - definition of terms

    Means of Verification (MOVs): These

    statements specify source of the

    information for the measurements or

    verification specified in the indicators

    column. For example, will statistics from an

    external source be used for the verificationor will project resources be used to gather

    the statistics.

  • 7/29/2019 6810509 Log Frame Analysis

    31/61

    Column headings - definition of terms

    External Factors (Assumptions): These are

    important events, conditions, or decisions which

    are necessarily outside the control of the

    project, but which must remain favorable for theproject objective to be attained. The implication

    here is the design team have an obligation to

    consider what might derail their efforts and toplan responsibly to reduce that risk of

    "derailment".

  • 7/29/2019 6810509 Log Frame Analysis

    32/61

    Row headings - definition of terms

    Development Objective: The higher level

    objective that the project is expected to

    contribute to. The addition of the word

    "contribute' implies that this project alone

    is not expected to achieve the

    development objective. Other project'simmediate objectives are expected to also

    contribute.

  • 7/29/2019 6810509 Log Frame Analysis

    33/61

    Row headings - definition of terms

    Immediate Objective: The effect which is

    expected to be achieved as the result of

    the project delivering the planned outputs.

    There is a tendency for this to be expressed

    in terms of the "change in behavior" of a

    group, or institution and the projectoutputs are expected to facilitate this

    change.

  • 7/29/2019 6810509 Log Frame Analysis

    34/61

    Row headings - definition of terms

    Outputs: These are the "deliverables"

    the tangible results that the project

    management team should be able toguarantee delivering. The objective

    statements should specify the group or

    organization that will benefit. Outputsare delivered, usually on a certain date

    or dates.

  • 7/29/2019 6810509 Log Frame Analysis

    35/61

    Row headings - definition of terms

    Activities: These are the activities

    that have to be undertaken by the

    project to produce the outputs.The activities take time to perform.

  • 7/29/2019 6810509 Log Frame Analysis

    36/61

    Row headings - definition of terms

    Inputs: These are the resources that

    the project "consumes" in the course

    of undertaking the activities. Typicallythey will be human resources, money,

    materials, equipment, and time.

  • 7/29/2019 6810509 Log Frame Analysis

    37/61

    Vertical Logic Vertical Logic: The vertical logic is the reasoning which

    "connects" the three levels of objectives in the matrix;the outputs, the purpose, and the goal. For example

    achievement of all the output level objectives should

    lead to achieving the purpose. Each of these links

    between the objectives is connected by a hypotheses.

    For example at the bottom level - the

    implementation hypotheses the implication is "we

    believe that in the environment ofthis projectthe

    planned outputs willproduce the planned result. At

    this level, the hypotheses are usually supported by

    research or experience. The explanation of the

    hypotheses at the other levels is similar.

  • 7/29/2019 6810509 Log Frame Analysis

    38/61

    Horizontal Logic

    The horizontal logic has similar features to the

    vertical logic. In this case, the links between

    the levels of objectives are the items in

    the External Factors column.

    For example, if the project is successful in

    implementing all of the planned activities, we

    ask ourselves, what circumstances ordecisions (outside the project's control) could

    prevent the delivery of the project outputs.

  • 7/29/2019 6810509 Log Frame Analysis

    39/61

    Implementation

    Operational phase of a project to achieve the

    expected outputs/results

    Plan of Operations

    1. workplans / work schedules

    2. project budget / resources plans

    3. personnel plans

    4. material and equipment plan /procurement plan / staff

    5. training plans

  • 7/29/2019 6810509 Log Frame Analysis

    40/61

    Plan of OperationsImplementation should have a plan of operations i.e. the

    detailed plan for the implementation of project. It isestablished by the project team and will be documented

    as:

    workplans / work schedules

    project budget / resources plans

    personnel plans

    material and equipment plan / procurement plan /

    staff

    training plans.

    The work plan and the project budget constitute the core

    of the Plan of Operations.

  • 7/29/2019 6810509 Log Frame Analysis

    41/61

    Figure 5: Feedback Loops of Miarayon Problems

    LOW

    INCOME

    LOW

    REVENUE

    (LGU)

    BAD

    ROADS

    POOR BASIC

    EDUCATION

    NEGATIVE

    ASPECTS OF

    CULTURE

    REMAINS+

    RESISTANCE TO

    TEACHERS

    COMING FROM

    OUTSIDE OF THE

    TRIBE

    +

    +

    NO QUALIFIED

    IP TEACHER

    ++LIMITED

    ACCESS TO

    MARKET

    SELL TO

    MIDDLEMEN

    +

    +

    CANNOT SEND

    CHILDREN TO

    SCHOOL-

    COMMUNICATIONBARRIER BETWEEN

    TEACHERS &

    STUDENTS

    LOSS OF

    INTEREST

    TO STUDY

    ABSENCES

    +

    ++

    +

    IPs

    POORLY

    EDUCATED

    PEACE &

    ORDER

    PROBLEM

    LOW

    PRODUCTIVITYOF PEOPLE /

    PLACE+

    +

    +

    -

    ++

    +

    +

    LIMITED

    CAPACITY FOR

    INTERVENTION

    +

    -

    LOW OPPORTUNITY

    FOR EMPLOYMENT /

    LIVELIHOOD

    + +

    LACK OF

    PARTICIPATION IN

    THE POLITICAL

    ARENA

    -

    -

  • 7/29/2019 6810509 Log Frame Analysis

    42/61

    Figure 6: Areas of Interventions

    LOWINCOME

    LOW

    REVENUE

    (LGU)

    BAD

    ROADS

    POOR BASIC

    EDUCATION

    NEGATIVE

    ASPECTS OF

    CULTURE

    REMAINS+

    RESISTANCE TO

    TEACHERS

    COMING FROM

    OUTSIDE OF THE

    TRIBE

    +

    +

    NO QUALIFIED

    IP TEACHER

    ++LIMITED

    ACCESS TO

    MARKET

    SELL TO

    MIDDLEMEN

    +

    +

    CANNOT SEND

    CHILDREN TO

    SCHOOL-

    COMMUNICATION

    BARRIER BETWEEN

    TEACHERS &

    STUDENTS

    LOSS OF

    INTEREST

    TO STUDY

    ABSENCES

    +

    ++

    +

    IPs

    POORLY

    EDUCATED

    PEACE &

    ORDER

    PROBLEM

    LOWPRODUCTIVITY

    OF PEOPLE /

    PLACE+

    +

    +

    -

    ++

    +

    +

    LIMITED

    CAPACITY FOR

    INTERVENTION

    +

    -

    LOW OPPORTUNITY

    FOR EMPLOYMENT /

    LIVELIHOOD

    + +

    LACK OF

    PARTICIPATION IN

    THE POLITICAL

    ARENA

    -

    -CARTWHEEL

    GOVTNGOs

    PRIVATE

    CAPABILITYBUILDING/EDUCATION

    ENTERPRISEDEVELOPMENT

    SWOT Analysis

  • 7/29/2019 6810509 Log Frame Analysis

    43/61

    S-WO-T

    Strengths Weaknesses

    Opportunities S-O STRATEGY W-O STRATEGY

    Threats S-T STRATEGY W-T STRATEGY

    SWOT Analysis

    S

  • 7/29/2019 6810509 Log Frame Analysis

    44/61

    Strengths Weaknesses Scholarship program indicates high

    possibility of continuing demand

    High competence in the AdultEducation Program

    Intervention through CADT giving

    sense of security to the IPs

    Innovative approaches to sourcing of

    funds

    Has established credibility among the

    donors; increasing interest of funders in

    Cartwheels programs

    Developed social capital withingovernment agencies, other

    development organizations, and

    business organizations

    Low level of success in the Pre-School

    Program

    Mismatch of the products and services to realclients needs

    Some programs (medical/dental, etc.) not

    within their competence

    Heavily dependent on grants and donations

    Donations showing a downward trend

    Opportunities

  • 7/29/2019 6810509 Log Frame Analysis

    45/61

    Opportunities High demand in secondary, post-secondary education, & adult education

    CADT assures the IPs ownership and management of the lands they are tilling

    Availability of uncultivated land suitable for high yield vegetables & coffee Need for sustainable devt program demanded by ADSDPP as mandated by NCIP

    Available funding for sustainable and capacity-building program for IPs

    is one of the major coffee-producing regions

    have several export markets for coffee like , , , , etc.,

    Threats Issues and needs of the IPs not given significance / priority of the LGU

    Low educational attainment of the IPs

    Lack of access to secondary schools

    IPs lack the capacity to participate in the socio-political affairs of the municipality

    Volatile peace and order situation

    Farming is the primary source of income

    Limited access to market

    Disturbances caused by agitation of land claimants

    S O STRATEGY W O STRATEGY

  • 7/29/2019 6810509 Log Frame Analysis

    46/61

    S-O STRATEGY W-O STRATEGY

    Implementation of ADSDPP (political

    empowerment, peace and order, cultural

    preservation)

    Capacity-building of IPs; expansion of Adult

    Education (education)

    Bridging market and community (economic

    benefit)

    Shift program to adult / secondary /

    post-secondary education (education)

    development (economic benefits)

    S-T STRATEGY W-T STRATEGY Capacity-building of IPs through education

    (education)

    development (economic benefits)

    Building collaboration with government, NGOs

    and the business sector (political & social

    capital, economic benefit)

    Strengthening and expansion of

    scholarship program (education)

    Support H/S (St. Therese of Miarayon)

    (education)

    development (economic benefits)

    Position on the Influence on

  • 7/29/2019 6810509 Log Frame Analysis

    47/61

    Stakeholder Interest on the ProgramPosition on the

    ProgramImpact of the Program

    Influence on

    the Program

    MILALITTRA /

    Tribal Leaders

    Security of land tenure; productivity Support Capacity-building; political participation;

    livelihood opportunities

    High

    Womens Group Help provide food for the family; additional income;

    education for the children

    Support Additional source of income; capacity-

    building; education of children

    Moderate

    Fr. Kit Bautista -CFI

    Miarayon becoming a pilgrimage site and a bridgebetween the poorest of the poor and richest of the

    rich

    Support Realization of his dream; abridgement ofsocial gaps between rich and poor

    High

    Parish Priest /

    Principal

    Increased enrolment in high school; improved quality

    of education; evangelization and preservation of

    culture

    Support Increased enrolment; expansion of services;

    improvement of educational facility

    High

    Gina Pre-

    School

    Provide equal access to quality education to as many

    children in the country

    Potential

    opposition

    Phasing-out of pre-school High

    CFI Increase literacy rate and improve self-sufficiency of

    IPs

    Support Financial sustainability; focusing of

    programs; matching services to needs of IPs

    High

    Barangay

    Officials

    Peace and order; improvement of income of IPs Support Increased employment for the people;

    improved peace and order condition

    Moderate

    NCIP Promotion and protection of the rights of IPs;

    implementation of IPRA and ADSDPP

    Support Increased performance of advocacy High

    LGU Talakag Promotion of general welfare; local autonomy;

    delivery of basic services; agricultural productivity;

    peace and order

    Support Increased trust for IPs capacity; improved

    peace and order condition; increased

    revenue

    High

    Traders group More profit from trading activities Potential

    opposition

    Decreased income due to rerouting of

    products

    Moderate

    Religious nuns Evangelization; promotion of education Support Increased enrolment; potential increase of

    the faithful

    High

    Land claimants Legitimization of claims on lands allegedly purchasedfrom the IPs

    Oppose Loss of rights to claim and use the land High

    Action Plan coffee project

  • 7/29/2019 6810509 Log Frame Analysis

    48/61

    ActivitiesTarget Output

    Time Frame In-Charge ResourcesQty. Quality

    Planning One (1) year plan drafted Specifications drafted July 2005 CFI Ex. Dir. &

    Consultant, BOD

    Funds, data

    Sourcing of funds 1 Project funded Appropriate and on-

    time

    July December

    2005

    CFI Project Proposal

    Identification of coffee areas

    for rehabilitation

    1,000 hectares identified Suitable for coffee

    plantation

    July December

    2005

    CFI-MILALITTRA Funds, staff

    Lending of Initial capital 1,000 farmers entered into

    MOA through MILALITTRA

    Credible and reliable

    partners

    Jan 2006 onwards CFI Project Funds, staff

    Monitoring 1,000 hectares plantation

    monitored

    Seasonal and regular Planting: May-Dec

    of every year,

    2006-2010

    CFI staff Transpo cost, supplies

    Establishment of trading

    partners

    At least 2 partners identified

    (Figaro, Monks Blend)

    Medium term Sept- Dec 2005 CFI Communication

    Buying and Trading At 80% target volume

    attained

    Medium term 2007 CFI Project Funds

    Target Output

  • 7/29/2019 6810509 Log Frame Analysis

    49/61

    Activitiesa get Output

    Time Frame In-Charge ResourcesQty. Quality

    Planning 1 Action Plan Attainable August 2005 CFI BOD, TESDA Funds

    Phasing-out of Pre-schools 2 pre-schools Acceptable terms July 2005 May

    2006

    CFI None

    Signing of MOA with St. Therese H/S 1 MOA signed Acceptable terms July 2005 May2006

    CFI & Therese H/S None

    Review / Reformulation of Adult

    Education modules

    1 standard module

    developed

    Appropriate, attuned to

    indigenous culture

    July 2005 May

    2006

    CFI staff, teachers,

    DepEd

    Supplies

    Adult Literacy Program 450 IPs Can read & write,

    learned spiritual,

    cultural, and social

    values

    2006-2010 CFI staff and

    teachers

    Rooms, teachers,

    teaching materials

    TNA At least 3 skills training

    identified; ex. Food

    processing, farming

    tech., etc.

    Understandable &

    measurable

    2006-2010 CFI staff, TESDA &

    other agencies

    Questionnaire

    Drafting of ADSDPP

    IEC on Environmental

    Management

    15-20 IP leaders

    informed

    Appropriate &

    understandable

    July 2005 CFI, NCIP,

    MILALITTRA, &

    DENR

    Funds, resource

    persons

    Tribal Leaders Consultation 15-20 IP leaders

    consulted

    participative Aug 2005 CFI, NCIP, &

    MILALITTRA

    Funds, resource

    persons

    Objectively Verifiable Assumptions &

  • 7/29/2019 6810509 Log Frame Analysis

    50/61

    Narrative SummaryObjectively Verifiable

    Indicators (OVI)Means of Verification

    Assumptions &

    RisksGoal

    Poverty reduction of IPs 60% HH poverty reduction by

    year 2010

    NSO census of 2010; NEDA

    Report

    Objectives:

    Enterprise Development

    Capability-Building

    1,000 HH involved in livelihood

    activities

    MILALITTRA representation in

    the MDC by 2007

    Actual implementation of

    ADSDPP by year 2008

    CFI Annual Report

    LGU Annual Performance Report

    CFI Report / MILALITTRA Report

    to NCIP

    ADSDPP completed and

    implemented

    Funds accessed

    Training conducted

    Output:

    Enterprise Development

    a. reduction of poverty

    incidence

    b. increased productivity

    Capability-Buildinga. conceptualization and

    implementation of ADSDPP

    b. increased literacy rate

    c. improved peace and order

    situation

    d. active participation in

    municipal / provincial affairs

    60% increased family income

    conceptualized by 2005;implemented by 2006

    10% increase in literacy rate

    10% reduction in crime rate

    More visible increase in tribal

    activities in cultural celebrations

    Municipal Treasurers Report

    NCIP reportLGU annual performance report

    LGU annual performance report

    MILALITTRA newsletters;

    Cartwheel report

    Funds are accessed from

    funding agency

    Training conducted

  • 7/29/2019 6810509 Log Frame Analysis

    51/61

    Narrative SummaryObjectively Verifiable

    Indicators (OVI)Means of Verification

    Assumptions &

    Risks

    Activities

    EMTERPRISE DEVELOPMENT

    Planning One (1) year plan drafted by

    July 2005

    CFI Plan of Action Funds are accessed from

    funding agency

    Sourcing of funds 1 Project funded by January

    2006

    Memomorandum of Agreement

    with funding agency

    Collaboration with concerned

    agencies and business

    sector established

    Identification of coffee areas for

    rehabilitation

    1,000 hectares identified by

    2005

    Report of Project Director

    Lending of Initial capital 1,000 farmers entered into MOA

    through MILALITTRA by 2006

    CFI Annual Report

    Monitoring 1,000 hectares plantationmonitored by 2010

    Report of Project Director

    Establishment of trading partners At least 2 partners identified

    (Figaro, Monks Blend) by 2005

    MOA with Figaro and Monks

    Blend

    Buying and Trading 80% target volume of sales

    attained by 2007

    CFI Sales Report

    Objectively Verifiable Assumptions &

  • 7/29/2019 6810509 Log Frame Analysis

    52/61

    Narrative SummaryObjectively Verifiable

    Indicators (OVI)Means of Verification

    Assumptions &

    RisksActivities

    CAPABILITY BUILDING

    Planning 1 Action Plan drafted by August

    2005

    Action Plan document

    Phasing-out of Pre-schools 2 pre-schools phased-out by

    May 2006

    CFI Annual Report

    Signing of MOA with St. Therese

    H/S

    1 MOA signed by May 2006 MOA with St. Therese

    Review / Reformulation of Adult

    Education modules

    1 standard module developed

    by May 2006

    Written curriculum approved by

    DepEdAdult Literacy Program 450 IPs trained by 2010 CFI Annual Report

    TNA At least 3 skills training

    identified; ex. Food processing,

    farming tech., etc.; by 2010

    CFI Annual Report and DepEd

    Promotion Report

    IEC on Environmental

    Management

    15-20 IP leaders informed by

    July 2005

    Evaluation Report on Seminar

    Workshop

    Tribal Leaders Consultation 15-20 IP leaders consulted by

    August 2005

    ADSDPP Report / NCIP Report

    Precondition

    Cartwheel adopts this

    management plan

    Collaboration established

    with NCIP and othergovernment agencies

  • 7/29/2019 6810509 Log Frame Analysis

    53/61

  • 7/29/2019 6810509 Log Frame Analysis

    54/61

  • 7/29/2019 6810509 Log Frame Analysis

    55/61

  • 7/29/2019 6810509 Log Frame Analysis

    56/61

  • 7/29/2019 6810509 Log Frame Analysis

    57/61

  • 7/29/2019 6810509 Log Frame Analysis

    58/61

  • 7/29/2019 6810509 Log Frame Analysis

    59/61

    C it / M ti ti t

    How stakeholders are affected by the main problem?

  • 7/29/2019 6810509 Log Frame Analysis

    60/61

    Stakeholder How is the stakeholderaffected by the problem?

    Capacity / Motivation to

    participate in addressing the

    problemRelationship with

    other stakeholders1. LGU Potential income is not

    realized Fund sourcing Give directions to otherstakeholder2. BLGU Potential income is not

    realized Provide counterpart Sympathetic with thehouseholds and canbe source of

    information3. RHU Additional workload Right agency to address the

    problem Close coordinationwith the barangay4. DAF Additional workload Responsible agency for farming

    technology Supervise and monitorthe beneficiaries5. Households Directly and most affected Interest and willingness to

    participate in the program Dependent ongovernment agenciesand dependent only on

    available resources6. HKI Willing to address the

    problem Maybe able to provide assistanceto the program Coordinate with theLGU and otherstakeholders

    7. Other

    donors Willing to address the

    problem Maybe able to provide assistance

    to the program Coordinate with the

    LGU and otherstakeholders

    Expected effect of possible project interventions among stakeholders

  • 7/29/2019 6810509 Log Frame Analysis

    61/61

    Stakeholder Stakeholders mainobjective Positiveimpact/benefits Negativeimpact/costs Net Impact

    1. LGU Address the problem

    Reduce the

    incidence of

    malnutrition among

    children ages 5 and

    belowSlow realization of

    result

    Long-term

    weight

    improve,

    decrease

    morbidity

    rate,availability of

    sources of

    nutritious

    food

    2. BLGU Address the problem

    3. RHU Implement what ismandated by law

    4. DAF5.

    HouseholdsImprove health

    condition6. HKI Help and assist

    project

    implementation7. Other