7
Designed: Approved: Drawn: Survey Datum: Surveyed: Drawing name: M:\Engineering Services\ARD - CAD - 3D\Traffic Engineering Capital Works 2020-21\Path Designs\CAD\Baden Drive Hopper Crossing\Baden Drive.dwg (22 Mar, 2021) Rev: Drawing No: Sheet No: NA A NA NA NA D.BATTOCCHIO 22_03_2021 D.BATTOCCHIO 22_03_2021 Date: Date: Date: Date: City Transport 45 Princes Highway Werribee VIC 3030 Australia Tel: (03) 9742 0777 Fax: (03) 9741 6237 Amendments Rev By Approved Date A ISSUED FOR ___ ___ _/_/ _ PRIOR TO COMMENCEMENT OF ANY WORKS. WARNING ALL SERVICES SHOWN ON THIS DRAWING ARE APPROXIMATE ONLY AND EXACT LOCATION IS TO BE CONFIRMED ON SITE BY CONTRACTOR Continued on Sheet 2 Notes Prelimanary Design 1 of 7 1. Construct 1.5m footpath as per WCC SD 2-1 2. Provide construction joints, expansion joins and crack control joints as per WCC SD 2-4 3. Incorporate pits as per WCC SD 2-5 4. Construct pram crossings as per WCC SD 3-1 POWELL DRIVE 68 66 46 62 47 48 50 75 77 73 67 69 71 SCALE 1:500 AT A3 SIZE 10 5 0 25m 20 15 64 Obj No: 49 Pedestrian Footpath Baden Drive POWELL DRIVE 49 BADEN DRIVE PROPOSED FOOTPATH LEGEND EXISTING TREE/ VEGETATION EXISTING FOOTPATH Design SEPARATE PROJECT PROPOSED FOOTPATH REMOVE EXISTING FOOTPATH

62 49 BADEN DRIVE POWELL DRIVE - Wyndham City

  • Upload
    others

  • View
    13

  • Download
    0

Embed Size (px)

Citation preview

Designed:

Approved:

Drawn:

Survey Datum:

Surveyed:

Dra

win

g n

am

e: M

:\E

ngine

erin

g S

ervices\A

RD

- C

AD

- 3

D\T

raffic E

ng

ineering C

apital W

orks 2

020-2

1\P

ath D

esigns\C

AD

\B

aden

D

rive H

opper C

rossin

g\B

ad

en

D

rive.dw

g (2

2 M

ar, 2

02

1)

Rev:

Drawing No:

Sheet No:

NAA

NA

NANA

D.BATTOCCHIO22_03_2021

D.BATTOCCHIO22_03_2021

Date:

Date:

Date:

Date:City Transport

45 Princes Highway

Werribee VIC 3030

Australia

Tel: (03) 9742 0777

Fax: (03) 9741 6237

AmendmentsRev By ApprovedDate

A ISSUED FOR ___ ____/_/ _

PRIOR TO COMMENCEMENT OF ANY WORKS.

WARNING

ALL SERVICES SHOWN ON THIS DRAWING ARE

APPROXIMATE ONLY AND EXACT LOCATION IS

TO BE CONFIRMED ON SITE BY CONTRACTOR

Continued on Sheet 2

Notes

Prelimanary Design

1 of 7

1. Construct 1.5m footpath as per WCC SD 2-1

2. Provide construction joints, expansion joins

and crack control joints as per WCC SD 2-4

3. Incorporate pits as per WCC SD 2-5

4. Construct pram crossings as per WCC SD 3-1

P

O

W

E

L

L

D

R

I

V

E

17

17

17

68

66

46

62

47

48

50

75

77

73

67

69

71

SCALE 1:500 AT A3 SIZE

1050 25m2015

64

Obj No:

49

Pedestrian Footpath

Baden Drive

P

O

W

E

L

L

D

R

I

V

E

49

B

A

D

E

N

D

R

IV

E

PROPOSED FOOTPATH

LEGEND

EXISTING TREE/

VEGETATION

EXISTING FOOTPATH

Design

SEPARATE PROJECT

PROPOSED FOOTPATH

REMOVE EXISTING

FOOTPATH

AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
E

Designed:

Approved:

Drawn:

Survey Datum:

Surveyed:

Dra

win

g n

am

e: M

:\E

ngine

erin

g S

ervices\A

RD

- C

AD

- 3

D\T

raffic E

ng

ineering C

apital W

orks 2

020-2

1\P

ath D

esigns\C

AD

\B

aden

D

rive H

opper C

rossin

g\B

ad

en

D

rive.dw

g (2

2 M

ar, 2

02

1)

Rev:

Drawing No:

Sheet No:

NAA

NA

NANA

D.BATTOCCHIO22_03_2021

D.BATTOCCHIO22_03_2021

Date:

Date:

Date:

Date:City Transport

45 Princes Highway

Werribee VIC 3030

Australia

Tel: (03) 9742 0777

Fax: (03) 9741 6237

AmendmentsRev By ApprovedDate

A ISSUED FOR ___ ____/_/ _

PRIOR TO COMMENCEMENT OF ANY WORKS.

WARNING

ALL SERVICES SHOWN ON THIS DRAWING ARE

APPROXIMATE ONLY AND EXACT LOCATION IS

TO BE CONFIRMED ON SITE BY CONTRACTOR

Continued on Sheet 3

Notes

Prelimanary Design

2 of 7

Previous on Sheet 1

1. Construct 1.5m footpath as per WCC SD 2-1

2. Provide construction joints, expansion joins

and crack control joints as per WCC SD 2-4

3. Incorporate pits as per WCC SD 2-5

4. Tree and Vegetation removal will be required,

but avoid where possible

5. Remove existing footpath in front of properties

49 and 51 and replace with 1.5m footpath as

per WCC SD 2-1

56

54

52

50

48

58

60

Obj No:

SCALE 1:500 AT A3 SIZE

1050 25m2015

Pedestrian Footpath

Baden Drive

B

A

D

E

N

D

R

IV

E

43

41

39

37

35

45

47

PROPOSED FOOTPATH

LEGEND

EXISTING TREE/

VEGETATION

EXISTING FOOTPATH

Design

SEPARATE PROJECT

PROPOSED FOOTPATH

REMOVE EXISTING

FOOTPATH

AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
E

Designed:

Approved:

Drawn:

Survey Datum:

Surveyed:

Dra

win

g n

am

e: M

:\E

ngine

erin

g S

ervices\A

RD

- C

AD

- 3

D\T

raffic E

ng

ineering C

apital W

orks 2

020-2

1\P

ath D

esigns\C

AD

\B

aden

D

rive H

opper C

rossin

g\B

ad

en

D

rive.dw

g (2

2 M

ar, 2

02

1)

Rev:

Drawing No:

Sheet No:

NAA

NA

NANA

D.BATTOCCHIO22_03_2021

D.BATTOCCHIO22_03_2021

Date:

Date:

Date:

Date:City Transport

45 Princes Highway

Werribee VIC 3030

Australia

Tel: (03) 9742 0777

Fax: (03) 9741 6237

AmendmentsRev By ApprovedDate

A ISSUED FOR ___ ____/_/ _

PRIOR TO COMMENCEMENT OF ANY WORKS.

WARNING

ALL SERVICES SHOWN ON THIS DRAWING ARE

APPROXIMATE ONLY AND EXACT LOCATION IS

TO BE CONFIRMED ON SITE BY CONTRACTOR

Continued on Sheet 4

Notes

Prelimanary Design

3 of 7

Previous on Sheet 2

1. Construct 1.5m footpath as per WCC SD 2-1

2. Provide construction joints, expansion joins

and crack control joints as per WCC SD 2-4

3. Incorporate pits as per WCC SD 2-5

4. Tree and Vegetation removal will be

required, but avoid where possible

5. Remove existing footpath in front of

properties 35 and 31 and replace with 1.5m

footpath as per WCC SD 2-1

Obj No:

SCALE 1:500 AT A3 SIZE

1050 25m2015

Pedestrian Footpath

Baden Drive

44

42

40

38

36

46

48

31

29

27

25

33

35

B

A

D

E

N

D

R

IV

E

FIR

ST

AV

EN

UE

PROPOSED FOOTPATH

LEGEND

EXISTING TREE/

VEGETATION

EXISTING FOOTPATH

Design

SEPARATE PROJECT

PROPOSED FOOTPATH

REMOVE EXISTING

FOOTPATH

AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
E

Designed:

Approved:

Drawn:

Survey Datum:

Surveyed:

Dra

win

g n

am

e: M

:\E

ngine

erin

g S

ervices\A

RD

- C

AD

- 3

D\T

raffic E

ng

ineering C

apital W

orks 2

020-2

1\P

ath D

esigns\C

AD

\B

aden

D

rive H

opper C

rossin

g\B

ad

en

D

rive.dw

g (2

2 M

ar, 2

02

1)

Rev:

Drawing No:

Sheet No:

NAA

NA

NANA

D.BATTOCCHIO22_03_2021

D.BATTOCCHIO22_03_2021

Date:

Date:

Date:

Date:City Transport

45 Princes Highway

Werribee VIC 3030

Australia

Tel: (03) 9742 0777

Fax: (03) 9741 6237

AmendmentsRev By ApprovedDate

A ISSUED FOR ___ ____/_/ _

PRIOR TO COMMENCEMENT OF ANY WORKS.

WARNING

ALL SERVICES SHOWN ON THIS DRAWING ARE

APPROXIMATE ONLY AND EXACT LOCATION IS

TO BE CONFIRMED ON SITE BY CONTRACTOR

Notes

Prelimanary Design

4 of 7

Previous on Sheet 3

1. Construct 1.5m footpath as per WCC SD

2-1

2. Provide construction joints, expansion joins

and crack control joints as per WCC SD 2-4

3. Incorporate pits as per WCC SD 2-5

4. Construct pram crossings as per WCC SD

3-1

5. Avoid Post Box on north side of Church

Street - Wedge Street South crossing

6. Tree and Vegetation removal will be

required, but avoid where possible

Obj No:

Previous on Sheet 5

SCALE 1:500 AT A3 SIZE

1050 25m2015

Pedestrian Footpath

Baden Drive

32

30

26

24

22

34

36

21

19

17

15

23

25

B

A

D

E

N

D

R

IV

E

SE

CO

ND

AV

EN

UE

PROPOSED FOOTPATH

LEGEND

EXISTING TREE/

VEGETATION

EXISTING FOOTPATH

Design

SEPARATE PROJECT

PROPOSED FOOTPATH

REMOVE EXISTING

FOOTPATH

AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
E

Designed:

Approved:

Drawn:

Survey Datum:

Surveyed:

Dra

win

g n

am

e: M

:\E

ngine

erin

g S

ervices\A

RD

- C

AD

- 3

D\T

raffic E

ng

ineering C

apital W

orks 2

020-2

1\P

ath D

esigns\C

AD

\B

aden

D

rive H

opper C

rossin

g\B

ad

en

D

rive.dw

g (2

2 M

ar, 2

02

1)

Rev:

Drawing No:

Sheet No:

NAA

NA

NANA

D.BATTOCCHIO22_03_2021

D.BATTOCCHIO22_03_2021

Date:

Date:

Date:

Date:City Transport

45 Princes Highway

Werribee VIC 3030

Australia

Tel: (03) 9742 0777

Fax: (03) 9741 6237

AmendmentsRev By ApprovedDate

A ISSUED FOR ___ ____/_/ _

PRIOR TO COMMENCEMENT OF ANY WORKS.

WARNING

ALL SERVICES SHOWN ON THIS DRAWING ARE

APPROXIMATE ONLY AND EXACT LOCATION IS

TO BE CONFIRMED ON SITE BY CONTRACTOR

Notes

Prelimanary Design

5 of 7

Previous on Sheet 4

1. Construct 1.5m footpath as per WCC SD 2-1

2. Provide construction joints, expansion joins

and crack control joints as per WCC SD 2-4

3. Incorporate pits as per WCC SD 2-5

4. Construct pram crossings as per WCC SD

3-1

5. Connect crossings to existing footpath on

Anderson Street

6. Tree and Vegetation removal will be

required, but avoid where possible

Obj No:

SCALE 1:500 AT A3 SIZE

1050 25m2015

Pedestrian Footpath

Baden Drive

18

16

14

12

10

20

11

9

7

5

13

B

A

D

E

N

D

R

IV

E

8

TH

IRD

AV

EN

UE

PROPOSED FOOTPATH

LEGEND

EXISTING TREE/

VEGETATION

EXISTING FOOTPATH

Design

SEPARATE PROJECT

PROPOSED FOOTPATH

REMOVE EXISTING

FOOTPATH

Continued on Sheet 6

AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
E

Designed:

Approved:

Drawn:

Survey Datum:

Surveyed:

Dra

win

g n

am

e: M

:\E

ngine

erin

g S

ervices\A

RD

- C

AD

- 3

D\T

raffic E

ng

ineering C

apital W

orks 2

020-2

1\P

ath D

esigns\C

AD

\B

aden

D

rive H

opper C

rossin

g\B

ad

en

D

rive.dw

g (2

2 M

ar, 2

02

1)

Rev:

Drawing No:

Sheet No:

NAA

NA

NANA

D.BATTOCCHIO22_03_2021

D.BATTOCCHIO22_03_2021

Date:

Date:

Date:

Date:City Transport

45 Princes Highway

Werribee VIC 3030

Australia

Tel: (03) 9742 0777

Fax: (03) 9741 6237

AmendmentsRev By ApprovedDate

A ISSUED FOR ___ ____/_/ _

PRIOR TO COMMENCEMENT OF ANY WORKS.

WARNING

ALL SERVICES SHOWN ON THIS DRAWING ARE

APPROXIMATE ONLY AND EXACT LOCATION IS

TO BE CONFIRMED ON SITE BY CONTRACTOR

Notes

Prelimanary Design

6 of 7

Previous on Sheet 5

1. Construct 1.5m footpath as per WCC SD 2-1

2. Provide construction joints, expansion joins

and crack control joints as per WCC SD 2-4

3. Incorporate pits as per WCC SD 2-5

4. Construct pram crossings as per WCC SD

3-1

5. Connect crossings to existing footpath on

Anderson Street

6. Tree and Vegetation removal will be

required, but avoid where possible

Obj No:

SCALE 1:500 AT A3 SIZE

1050 25m2015

Pedestrian Footpath

Baden Drive

4

2

99

10

6

8

1

97

3

5

B

A

D

E

N

D

R

IV

E

FO

UR

TH

AV

EN

UE

HE

AT

HS

RO

AD

PROPOSED FOOTPATH

LEGEND

EXISTING TREE/

VEGETATION

EXISTING FOOTPATH

Design

SEPARATE PROJECT

PROPOSED FOOTPATH

REMOVE EXISTING

FOOTPATH

AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
E

TYPICAL METHOD FOR PRAM CROSSINGS AND TGSI INSTALLATION

Designed:

Approved:

Drawn:

Survey Datum:

Surveyed:

Dra

win

g n

am

e: M

:\E

ngine

erin

g S

ervices\A

RD

- C

AD

- 3

D\T

raffic E

ng

ineering C

apital W

orks 2

020-2

1\P

ath D

esigns\C

AD

\B

aden

D

rive H

opper C

rossin

g\B

ad

en

D

rive.dw

g (2

2 M

ar, 2

02

1)

Rev:

Drawing No:

Sheet No:

NAA

NA

NANA

D.BATTOCCHIO22_03_2021

D.BATTOCCHIO22_03_2021

Date:

Date:

Date:

Date:City Transport

45 Princes Highway

Werribee VIC 3030

Australia

Tel: (03) 9742 0777

Fax: (03) 9741 6237

AmendmentsRev By ApprovedDate

A ISSUED FOR ___ ____/_/ _

Prelimanary Design

7 of 7 Obj No:

Pedestrian Footpath

Baden Drive

AutoCAD SHX Text
BACK OF KERB
AutoCAD SHX Text
INVERT / FACE OF KERB
AutoCAD SHX Text
PROPERTY BOUNDARY
AutoCAD SHX Text
FOOTPATH
AutoCAD SHX Text
LIP OF KERB
AutoCAD SHX Text
BACK OF KERB
AutoCAD SHX Text
LIP OF KERB
AutoCAD SHX Text
INVERT / FACE OF KERB