Queensland Hunter Gas Pipeline Submissions report 6–1 6 Revised statement of commitments 6.1 Introduction This chapter contains the revised Statement of Commitments (SoCs). Following the exhibition of the EA between 19 September and 20 October 2008, 60 submissions from stakeholders were received and analysed. These submissions and ongoing fieldwork have formed the basis for the revised SoCs. 6.2 Statement of commitments The revised SoCs in the following table include: An objective. Details of the high level, principle based commitment. The timing of when the commitment applies. Reference to any of the key sections of the EA, documents of guiding principles that influence the objective and implementation of the commitment.

6 Revised statement of commitments

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 6 Revised statement of commitments

Queensland Hunter Gas Pipeline

Submissions report 6–1

6 Revised statement of commitments

6.1 Introduction

This chapter contains the revised Statement of Commitments (SoCs).

Following the exhibition of the EA between 19 September and 20 October 2008, 60 submissions from

stakeholders were received and analysed.

These submissions and ongoing fieldwork have formed the basis for the revised SoCs.

6.2 Statement of commitments

The revised SoCs in the following table include:

• An objective.

• Details of the high level, principle based commitment.

• The timing of when the commitment applies.

Reference to any of the key sections of the EA, documents of guiding principles that influence the objective and

implementation of the commitment.

Page 2: 6 Revised statement of commitments

6–2 Queensland Hunter Gas Pipeline

Submissions report

Tab

le 6

.1

Re

vise

d S

tate

men

t o

f C

om

mit

men

ts

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

Pro

po

sal

ove

rall

En

sure

so

un

d

en

viro

nm

ent

al

man

ag

em

ent

of

the

prop

osal

.

P1

Pip

elin

e co

nstr

uctio

n an

d m

ana

gem

ent o

f en

viro

nmen

tal a

spec

ts o

f th

e pi

pelin

e co

nstr

uctio

n an

d op

erat

ion

will

be

guid

ed b

y th

e A

PIA

Cod

e.

Pri

or

to

cons

truc

tion

, co

nstr

uctio

n,

and

op

erat

ion

AP

IA C

ode

2005

(or

la

test

edi

tion)

.

En

sure

ob

ject

ives

of

ad

ap

tive

man

ag

em

ent

ar

e m

et.

P2

Eac

h co

nstr

uctio

n sp

read

will

hav

e a

qual

ified

man

ager

des

igna

ted

with

re

spon

sibi

lity

for

ensu

ring

that

the

obj

ectiv

es o

f ada

ptiv

e m

anag

emen

t and

the

SoC

s ar

e m

et.

Pri

or

to a

nd

duri

ng

cons

truc

tion

Cha

pter

18

of th

e E

A

Pip

elin

e ro

ute

fin

ali

sa

tio

n

Ens

ure

final

rou

te

min

imis

es im

pact

s o

n

natu

ral a

nd b

uilt

en

viro

nm

ent

.

RI

Fin

al r

oute

alig

nmen

t w

ill b

e c

aref

ully

sel

ecte

d b

y ap

plyi

ng th

e ro

ute

sele

ctio

n pr

oces

s, o

bjec

tives

and

crit

eria

de

scri

bed

in C

hapt

er 3

of t

he E

A.

Pri

or

to

cons

truc

tion

C

hapt

er 3

of t

he E

A

R

2 A

ny

alig

nmen

t ch

ange

s ou

tsid

e of

the

Stu

dy

Are

a w

ill b

e su

bjec

t to

a co

nsis

tenc

y as

sess

men

t, in

form

ed t

hrou

gh a

des

ktop

ass

essm

ent o

f eac

h of

the

en

viro

nmen

tal i

ssue

s id

entif

ied

by

app

lyin

g th

e sa

me

met

hodo

log

y us

ed in

this

E

A.

An

y po

ten

tially

sig

nific

ant i

mpa

cts

iden

tifie

d w

ill b

e in

vest

igat

ed a

nd

man

aged

.

Pri

or

to

cons

truc

tion

C

hapt

er 7

of t

he E

A

R

3 W

he

re a

ny

fina

l alig

nmen

t ch

an

ges

out

side

of

the

Stu

dy

Are

a ar

e si

gnifi

cant

ly

inco

nsis

tent

with

the

Par

t 3A

app

rova

l of

the

prop

osal

, the

pro

pone

nt w

ill a

pply

for

m

odifi

catio

n un

der

sect

ion

75W

of t

he E

P&

A A

ct.

Pri

or

to

cons

truc

tion

E

P&

A A

ct

Cha

pter

7 o

f the

EA

Con

tinu

e to

info

rm

stak

eh

old

ers

of

the

p

rog

ress

of

rout

e

refin

emen

t an

d fin

alis

atio

n

R4

A c

op

y of

the

fin

alis

ed p

ipe

line

rou

te (

sca

le o

f 1

:14

0,00

0 A

4)

will

be

ma

de

avai

labl

e to

DoP

, DW

E, D

EC

C, D

PI,

DoL

and

rel

evan

t st

akeh

olde

rs.

Pri

or

to

cons

truc

tion

C

hapt

er 3

of t

he E

A

Page 3: 6 Revised statement of commitments

Queensland Hunter Gas Pipeline

Submissions report 6–3

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

R

5 L

and

ho

lde

rs d

irect

ly a

ffe

cte

d a

t an

y fu

ture

sta

ge o

f th

e ro

ute

refin

emen

t w

ill b

e fo

rmal

ly n

otif

ied

by

lett

er o

f the

fin

alis

ed p

ipel

ine

rout

e.

Pri

or

to

cons

truc

tion

C

hapt

er 3

of t

he E

A

Co

nst

ruct

ion

ma

nag

emen

t

Man

ag

em

ent

sys

tem

s in

pla

ce fo

r p

rote

ctio

n

of e

nvi

ron

me

nt.

CM

1 A

CE

MP

will

be

deve

lope

d in

con

sulta

tion

with

DE

CC

, DP

I, D

WE

, DoL

and

re

leva

nt C

MA

s to

man

age

envi

ronm

enta

l iss

ues

asse

ssed

and

impl

em

ent

iden

tifie

d m

itig

atio

n an

d m

anag

emen

t m

easu

res

whe

re r

equi

red.

Pri

or

to

cons

truc

tion

P

art B

of

the

EA

Cha

pter

5 o

f the

EA

.

AP

IA C

ode.

C

M1A

T

he p

ropo

nent

will

dire

ct it

s co

ntra

ctor

s to

car

ry o

ut

the

pro

ject

in a

ccor

danc

e w

ith

the

cond

ition

s of

app

rova

l, th

e re

vise

d st

atem

ent

of c

omm

itmen

ts a

nd th

e C

EM

P.

Du

ring

co

nstr

uctio

n

Min

imis

e im

pact

s as

soci

ated

with

the

lo

catio

n a

nd o

pera

tion

of te

mpo

rary

co

nstr

uctio

n c

amps

, st

ora

ge a

nd

de

po

ts.

CM

2 C

on

stru

ctio

n c

am

ps,

pip

elin

e s

tora

ge

are

as a

nd

veh

icle

de

pots

will

be

loca

ted

in

acco

rdan

ce w

ith t

he c

rite

ria

set o

ut i

n C

hap

ter

5.

Pri

or

to

cons

truc

tion

an

d

duri

ng

cons

truc

tion

Cha

pter

5 o

f the

EA

Page 4: 6 Revised statement of commitments

6–4 Queensland Hunter Gas Pipeline

Submissions report

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

Min

imis

e im

pact

s on

hu

man

am

enity

as

a re

sult

of c

ons

truc

tion

ho

urs

.

CM

3 C

on

stru

ctio

n w

ork

s w

oul

d b

e u

nd

ert

ake

n b

etw

ee

n 7

am

an

d 6

pm

, se

ven

da

ys a

w

ee

k fo

r 2

8 d

ays

an

d th

en

nin

e d

ays

off

, e

xce

pt

in th

e fo

llow

ing

inst

an

ces

wh

ere

e

xte

nd

ed

con

stru

ctio

n h

ou

rs m

ay

occ

ur w

he

n:

• H

DD

dril

l rig

is in

ope

ratio

n un

til c

ompl

etio

n of

the

HD

D b

ore

(co

ntin

uity

of

pro

cess

re

qu

ired

).

• B

orin

g is

in o

pera

tion

until

com

plet

ion

of t

he

borin

g.

• W

ater

filli

ng a

nd h

ydro

-tes

ting

of th

e pi

pelin

e is

und

erw

ay (

cont

inui

ty o

f pr

oces

s is

re

quir

ed).

• E

xten

ua

ting

cir

cum

sta

nces

ou

t of

the

con

trol

of

the

proj

ect (

such

as

wea

the

r,

indu

stri

al r

ela

tion

s) r

esul

t in

de

lays

to

the

pip

elin

e p

rog

ram

, no

tice

wo

uld

be

giv

en

to th

e D

oP D

irect

or-G

ener

al w

ith a

n ou

tline

of

prop

osed

wo

rk h

ours

and

sch

edul

e.

• W

ork

s d

o n

ot p

ose

an

au

dib

le d

istu

rba

nce

to a

ny

resi

de

nce

s.

• T

ran

spo

rt o

f pla

nt,

eq

uip

me

nt a

nd

pip

e b

y o

vers

ize

d tr

ucks

out

sid

e o

f ho

urs

a

s re

qu

ired

by

aut

hor

ities

for

safe

ty r

eas

ons

.

• It

is r

equ

ire

d in

an

em

erg

en

cy to

avo

id in

jury

or

loss

of l

ife, p

rope

rty

and/

or t

o p

reve

nt e

nvir

onm

en

tal h

arm

.

• A

gree

men

t is

rea

ched

with

loca

l res

iden

ts in

ord

er t

o re

duce

the

dura

tion

of

cons

truc

tion

activ

ities

and

/or

man

age

othe

r tr

affic

, am

enity

or

dist

urba

nce

issu

es.

Co

nstr

uct

ion

C

ha

pte

rs 5

and

11

of

the

EA

C

M4

Wh

ere

co

nst

ruct

ion

no

ise

is a

ud

ible

at

the

maj

or le

vel a

t sen

sitiv

e re

ceiv

ers,

co

nsul

tatio

n w

ith im

pact

ed r

esi

dent

s w

ill b

e u

nder

take

n 4

8 h

ours

in a

dvan

ce o

f w

ork

and

dur

ing

the

loca

l con

stru

ctio

n pe

riod

as n

eces

sary

. T

he le

vel o

f m

ajor

au

dibi

lity

at s

ensi

tive

rece

iver

s is

50d

BA

at

isol

ated

res

iden

ces

and

55dB

A a

t to

wn

ship

res

iden

ces.

Co

nstr

uct

ion

C

ha

pte

rs 5

and

11

of

the

EA

The

co

nstr

uctio

n no

ise

crite

ria w

ithin

T

ab

le 1

1.2

has

be

en

se

t to

co

rres

pon

d to

D

EC

Cs

Env

ironm

enta

l Noi

se

Con

trol M

anua

l.

C

M5

Bla

stin

g w

ill b

e s

ched

uled

to 9

am t

o 5p

m M

onda

y to

Sat

urda

y. N

o bl

astin

g w

ill b

e sc

hedu

led

for

Sun

da

ys o

r pu

blic

hol

ida

ys.

Co

nstr

uct

ion

C

ha

pte

rs 5

and

11

of

the

EA

Page 5: 6 Revised statement of commitments

Queensland Hunter Gas Pipeline Submissions report 6–5

Obj

ectiv

e R

ef #

H

igh

leve

l prin

cipl

ed c

omm

itmen

t Ti

min

g R

efer

ence

Min

imis

e im

pact

of

trenc

hing

ope

ratio

ns.

CM

6 C

onst

ruct

ion

spre

ads

will

end

eavo

ur to

min

imis

e th

e le

ngth

of o

pen

trenc

h by

us

ing

stag

ed c

onst

ruct

ion

met

hods

and

forw

ard

plan

ning

. D

urin

g co

nstru

ctio

n S

ectio

n 5.

3 of

the

EA

Man

agem

ent s

yste

ms

in p

lace

for p

rote

ctio

n of

wor

kers

and

the

publ

ic.

CM

7 A

Saf

ety

Man

agem

ent P

lan

will

be

prep

ared

con

sist

ent w

ith th

e re

quire

men

ts o

f A

S 2

885.

P

rior t

o co

nstru

ctio

n A

S28

85

HIP

AP

No.

4 (D

oP,

1992

). C

hapt

er 1

4 of

the

EA

Com

mun

ity a

nd s

take

hold

er c

onsu

ltatio

n

Ens

ure

effe

ctiv

e an

d re

cept

ive

cons

ulta

tion

with

com

mun

ity a

nd

othe

r sta

keho

lder

s is

co

ntin

ued.

C1

An

inte

grat

ed s

take

hold

er c

onsu

ltatio

n pr

oces

s w

ill c

ontin

ue to

be

impl

emen

ted

thro

ugho

ut th

e pr

ojec

t. Th

e ou

tcom

es o

f ong

oing

con

sulta

tion

will

con

tinue

to

influ

ence

the

proj

ect.

Prio

r to

cons

truct

ion,

co

nstru

ctio

n, a

nd

oper

atio

n

Cha

pter

6 o

f the

EA

Ens

ure

resp

onsi

vene

ss to

is

sues

and

con

cern

s ra

ised

by

the

com

mun

ity.

C2

A 2

4-ho

ur to

ll fre

e co

ntac

t tel

epho

ne n

umbe

r will

be

esta

blis

hed.

A s

yste

m to

re

ceiv

e, re

cord

, tra

ck a

nd re

spon

d to

issu

es a

nd c

once

rns

will

be

impl

emen

ted.

P

rior t

o co

nstru

ctio

n an

d du

ring

cons

truct

ion

AS

4269

Com

plai

nts

Han

dlin

g C

hapt

er 1

1 of

the

EA

Ens

ure

liais

on w

ith

key

gove

rnm

ent

stak

ehol

ders

.

C3

The

prop

onen

t will

est

ablis

h a

fram

ewor

k fo

r a g

over

nmen

t lia

ison

gro

up (G

LG) t

o lia

ise

with

DE

CC

, DP

I, D

WE

and

DoP

, DoL

and

rele

vant

CM

As.

P

rior t

o co

nstru

ctio

n an

d du

ring

cons

truct

ion

Cha

pter

6 o

f the

EA

Bio

dive

rsity

Min

imis

e im

pact

s to

rip

aria

n ve

geta

tion.

B

1 M

easu

res

will

be

impl

emen

ted

to p

reve

nt a

nd/o

r min

imis

e ha

rm to

ripa

rian

vege

tatio

n th

at m

ay re

sult

from

con

stru

ctio

n an

d/or

ope

ratio

n of

the

pipe

line.

C

ross

ing

poin

ts w

ill b

e se

lect

ed to

min

imis

e th

e ex

tent

of r

ipar

ian

vege

tatio

n cl

earin

g an

d lim

ited

to th

e na

rrow

est a

rea

prac

ticab

le.

Dur

ing

cons

truct

ion

Cha

pter

9 o

f the

EA

C

omm

itmen

t re

fere

nce

W1,

C3

Min

imis

e na

tive

vege

tatio

n di

stur

banc

e.

B2

Equ

ipm

ent s

tora

ge a

reas

and

sto

ckpi

le a

reas

will

be

loca

ted

away

from

ripa

rian

zone

s w

ithin

exi

stin

g cl

eare

d or

deg

rade

d la

nds.

D

urin

g co

nstru

ctio

n C

hapt

er 9

of t

he E

A

Page 6: 6 Revised statement of commitments

6–6 Queensland Hunter Gas Pipeline

Submissions report

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

B

2A

Whe

re f

easi

ble,

the

RO

W w

ill b

e al

igne

d ad

jace

nt t

o co

mpl

emen

tary

infr

astr

uctu

re

to e

nsur

e m

inim

al im

pact

s on

nat

ive

vege

tatio

n a

nd

hab

itat r

ela

tive

to a

ppro

ved

pr

ojec

ts a

t tha

t lo

catio

n.

Pri

or

to

cons

truc

tion

C

hapt

er 4

of t

he

Sub

mis

sion

s R

epor

t

B

2B

In s

peci

fied

area

s, c

onst

ruct

ion

activ

ities

wou

ld o

pera

te in

a r

educ

ed R

OW

of n

ot

mor

e th

an 2

0m.

Du

ring

co

nstr

uctio

n

Cha

pter

4 o

f the

S

ubm

issi

ons

Rep

ort

B

2C

In s

peci

fied

area

s, a

nd in

con

sulta

tion

with

an

ecol

ogis

t, c

onst

ruct

ion

activ

ities

w

ou

ld e

nsur

e m

atu

re n

ativ

e tr

ee

s ar

e a

void

ed

.

Du

ring

co

nstr

uctio

n

Cha

pter

4 o

f the

S

ubm

issi

ons

Rep

ort

B

2D

In s

peci

fied

area

s, a

nd w

here

con

sist

ent w

ith D

EC

C g

uid

elin

es, s

trat

egie

s w

ill b

e d

evel

op

ed

for

re-u

sin

g v

eg

eta

tion

tha

t ha

s b

ee

n re

mo

ved

fro

m th

e R

OW

in

reha

bilit

atio

n w

ork

s.

Du

ring

co

nstr

uctio

n

Cha

pter

4 o

f the

S

ubm

issi

ons

Rep

ort

B

2E

In

spe

cifie

d a

rea

s, s

tand

s o

f th

rea

ten

ed

flo

ra w

ill b

e co

rdo

ne

d o

ff a

nd

avo

ide

d

duri

ng c

onst

ruct

ion.

D

urin

g

cons

truc

tion

C

hapt

er 4

of t

he

Sub

mis

sion

s R

epor

t

Min

imis

e im

pact

s to

th

reat

ened

rep

tiles

. B

3 C

onst

ruct

ion

timin

g w

ill b

e d

eve

lope

d in

con

side

ratio

n of

avo

idin

g re

leva

nt

sens

itivi

ties

in th

e lif

ecyc

le o

f the

se s

peci

es, i

nclu

ding

bre

edin

g tim

es,

follo

win

g o

utco

mes

of

ide

ntifi

ed

fie

ldw

ork

.

Pri

or

to

cons

truc

tion

C

hapt

er 9

of t

he E

A

B

4 W

here

iden

tifie

d po

tent

ial h

abita

t ex

ists

in th

e fin

al R

OW

, a

herp

etol

ogis

t w

ill

insp

ect t

he p

oten

tial h

abita

t pr

ior

to c

onst

ruct

ion.

Ind

ivid

uals

, if f

ound

in th

e R

OW

, w

ill b

e re

loca

ted

to a

dja

cent

sui

tab

le h

abita

t ou

tsid

e o

f th

e R

OW

.

Du

ring

co

nstr

uctio

n

Cha

pter

9 o

f the

EA

,

Min

imis

e th

e s

pre

ad

an

d/or

est

ablis

hmen

t o

f w

ee

ds.

B5

Wee

d m

anag

emen

t mea

sure

s w

ill b

e de

velo

ped

for

inco

rpor

atio

n in

to th

e C

EM

P,

taki

ng in

to c

onsi

dera

tion:

• A

rev

iew

of

rele

vant

des

ktop

info

rmat

ion

rela

ting

to

rele

vant

nox

ious

and

en

viro

nmen

tal w

eed

list

ings

.

• R

esu

lts o

f b

iod

ive

rsity

fie

ldw

ork.

• Li

aiso

n w

ith la

ndo

wne

rs r

egar

ding

an

y lo

cally

occ

urrin

g w

eed

man

age

men

t is

sues

or

exis

ting

man

ag

em

ent

arr

ang

em

en

ts.

Pri

or

to

cons

truc

tion

C

hapt

er 9

of t

he E

A

Com

mitm

ent

refe

ren

ce L

3

B

6 A

ny

exca

vate

d m

ater

ial c

onta

inin

g w

eed

s w

ill n

ot b

e st

ored

nea

r w

ate

rwa

ys o

r e

xist

ing

sta

nds

of

nat

ive

veg

eta

tion

.

Du

ring

co

nstr

uctio

n

Cha

pter

9 o

f the

EA

B

7 N

oxi

ous

we

eds

in a

reas

dis

turb

ed b

y co

nstr

uctio

n ac

tiviti

es w

ill b

e m

anag

ed fo

r a

min

imum

of

two

year

s po

st c

ompl

etio

n.

Ope

ratio

n C

hapt

er 9

of t

he E

A

Page 7: 6 Revised statement of commitments

Queensland Hunter Gas Pipeline

Submissions report 6–7

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

Min

imis

e im

pact

s to

ho

llow

dep

end

ent a

nd

oth

er

faun

a in

w

oodl

and

are

as.

B8

In

thos

e a

reas

iden

tifie

d b

y su

rve

y a

s se

nsiti

ve w

ood

lan

d a

rea

s fo

r n

estin

g f

aun

a

spec

ies,

an

ecol

ogis

t w

ill c

heck

ho

llow

bea

ring

tre

es p

rior

to c

lea

ring

in th

e R

OW

. F

auna

fou

nd n

estin

g w

ill b

e re

loca

ted

to s

uita

ble

adja

cent

hab

itat.

Du

ring

co

nstr

uctio

n

Cha

pter

9 o

f the

EA

B

9 S

tand

s of

veg

etat

ion

in th

e R

OW

con

tain

ing

hollo

w b

earin

g tr

ees

will

be

clea

red

usi

ng a

two

stag

e cl

eari

ng p

roce

ss w

ith a

dja

cent

non

-hol

low

bea

ring

tre

es to

be

cl

eare

d fir

st.

Du

ring

co

nstr

uctio

n

Cha

pter

9 o

f the

EA

B

10

L

ogs,

de

ad

tree

s, a

nd o

ther

ha

bita

t fea

ture

s w

ill b

e re

loca

ted

from

the

area

of

clea

ring

to p

rovi

de h

abita

t in

adja

cen

t are

as w

here

feas

ible

and

pra

ctic

al d

urin

g co

nstr

uctio

n. H

abita

t fe

atur

es w

ill b

e re

inst

ated

with

in t

he

RO

W,

follo

win

g co

nstr

uctio

n.

Du

ring

co

nstr

uctio

n a

nd

op

erat

ion

Cha

pter

9 o

f the

EA

B

11

In th

ose

area

s w

here

hol

low

bea

ring

tre

es h

ave

been

rem

oved

, and

in

cons

ulta

tion

with

an

ecol

ogis

t, ne

st b

oxes

(as

nec

essa

ry)

will

be

fixed

to s

uita

ble

reta

ined

veg

etat

ion,

in a

wa

y th

at d

oes

not d

amag

e th

e tr

ee.

Du

ring

co

nstr

uctio

n a

nd

op

erat

ion

Cha

pter

9 o

f the

EA

B9

Min

imis

e im

pact

s to

na

tive

faun

a sp

ecie

s.

B12

D

esig

nate

d pe

rson

nel w

ill s

urve

y th

e op

en c

onst

ruct

ion

tren

ch a

head

of

cons

truc

tion

wo

rks

daily

. A

ny

trap

ped

faun

a sp

ecie

s w

ill b

e re

loca

ted.

Add

ition

al

mea

sure

s to

pro

tect

faun

a du

ring

con

stru

ctio

n, in

clud

ing

the

pro

visi

on o

f fau

na

refu

ges

will

be

furt

her

expl

ored

.

Du

ring

co

nstr

uctio

n

Sec

tion

5.3,

Fig

ure

5.2

of th

e E

A

Cha

pter

9 o

f the

EA

Com

mitm

ent

refe

renc

e P

2

B18

Min

imis

e im

pact

s to

aq

uatic

hab

itat

and

fish

sp

ecie

s du

rin

g

cros

sing

of i

dent

ified

se

nsiti

ve w

ate

rwa

ys.

B13

W

ater

cour

se c

ross

ings

for

all

sens

itive

wat

erw

ays

will

be

des

igne

d so

as

not

to

pre

clu

de

fish

pa

ssa

ge

, w

he

re n

ece

ssar

y in

co

nsu

ltatio

n w

ith th

e D

PI.

Pri

or

to

cons

truc

tion

Fi

shno

te: P

olic

y an

d G

uide

lines

for F

ish

Frie

ndly

Wat

erw

ay

Cro

ssin

gs (

NS

W

Fis

heri

es)

Cha

pter

9 a

nd

Cha

pter

15

of th

e E

A

Com

mitm

ent

refe

ren

ce: W

1, W

5,

W6

, W7

.

Page 8: 6 Revised statement of commitments

6–8 Queensland Hunter Gas Pipeline

Submissions report

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

B

13A

C

oars

e w

ood

y de

bris

and

oth

er in

str

eam

hab

itat

feat

ures

will

be

relo

cate

d fr

om

the

area

of c

onst

ruct

ion,

and

rei

nsta

ted

in s

trea

m, f

ollo

win

g co

nstr

uctio

n.

Du

ring

co

nstr

uctio

n

Cha

pter

4 o

f the

S

ubm

issi

ons

Rep

ort

Min

imis

e b

iod

ive

rsity

im

pact

s fr

om

op

erat

ion

of th

e p

rop

osa

l.

B14

O

pera

tions

and

mai

nten

ance

sta

ff w

ill b

e in

form

ed o

f th

e im

port

ance

of a

ny

rein

sta

ted

ha

bita

t to

en

sure

tha

t it

is n

ot r

emov

ed a

s pa

rt o

f op

erat

iona

l act

iviti

es.

Ope

ratio

n C

hapt

er 9

of t

he E

A

Min

imis

e im

pac

ts t

o

woo

dlan

d bi

rd

spec

ies.

B15

In

are

as id

entif

ied

as p

oten

tial m

ove

me

nt c

orri

do

rs fo

r av

ifau

na,

an

d in

co

nsul

tatio

n w

ith a

n ec

olog

ist,

the

follo

win

g m

itiga

tion

mea

sure

s w

ill b

e im

ple

men

ted

:

• R

educ

tion

in th

e w

idth

of t

he

RO

W a

s ne

cess

ary.

• S

ite-s

peci

fic r

eve

geta

tion

and

man

agem

ent p

lans

to e

nsu

re t

hat t

he r

oute

is

rest

ored

as

far

as p

ract

icab

le to

its

orig

inal

sta

te.

Con

stru

ctio

n t

imin

g th

at is

sym

path

etic

to

the

lifec

ycle

sen

sitiv

ities

of t

he r

elev

ant

spec

ies

ide

ntif

ied

thro

ug

h fie

ldw

ork

sur

veys

.

Du

ring

co

nstr

uctio

n

Cha

pter

9 o

f the

EA

Min

imis

e im

pact

s to

G

ree

n a

nd G

old

en

Bel

l Fro

g, w

etla

nd b

ird

spec

ies.

B16

S

peci

fic m

easu

res

will

be

deve

lope

d to

min

imis

e po

tent

ial i

mpa

cts

to G

reen

and

G

olde

n B

ell F

rogs

and

we

tland

bir

d sp

ecie

s, w

hic

h w

ill in

clud

e:

• S

peci

alis

t adv

ice

from

a h

erp

etol

ogis

t and

we

tland

eco

logi

st o

n c

onst

ruct

ion

met

hodo

log

y, a

nd t

he im

ple

men

tatio

n of

re

leva

nt C

hyt

rid

Fun

gus

cont

rols

.

• A

dvic

e g

aine

d fr

om li

aiso

n w

ith t

he lo

cal C

MA

, and

loca

l rep

rese

nta

tives

of

DE

CC

’s P

arks

and

Wild

life

Gro

up.

• M

aint

enan

ce o

f exi

stin

g w

ate

r qu

ality

.

• C

onst

ruct

ion

duri

ng w

inte

r m

onth

s, a

nd s

peci

fical

ly o

uts

ide

of th

e G

reen

and

G

old

en

Be

ll F

rog

bre

ed

ing

se

aso

n o

f S

ep

tem

be

r to

Fe

bru

ary

.

Pri

or

to

cons

truc

tion

C

hapt

er 9

of t

he E

A

W6

, W7

Min

imis

e im

pact

s re

late

d to

th

e s

pre

ad

of C

inn

amon

Fu

ngu

s a

nd

Ch

ytri

d F

un

gus

.

B17

In

vest

igat

e m

anag

emen

t m

easu

res

to m

inim

ise

the

spre

ad o

f C

inna

mon

Fun

gus

and

Ch

ytri

d F

ungu

s, t

akin

g in

to c

onsi

dera

tion:

• T

he

ou

tcom

es o

f a

ris

k as

sess

me

nt c

on

du

cte

d to

det

erm

ine

are

as

of th

e

RO

W w

here

ris

k of

the

dis

ease

ma

y be

hig

h.

• A

dvic

e g

aine

d fr

om li

aiso

n w

ith D

EC

C a

nd o

the

r re

leva

nt g

ove

rnm

ent

age

nci

es.

• C

urre

nt a

vaila

ble

initi

ativ

es r

ela

ting

to h

ygie

ne,

and

chem

ical

or

othe

r co

ntro

l m

ech

ani

sms.

Pri

or

to

cons

truc

tion

C

hapt

er 9

of t

he E

A

Com

mitm

ent

refe

ren

ce C

3

Hyg

iene

pro

toco

l for

th

e co

ntro

l of d

isea

se

in fr

ogs,

DE

CC

20

01.

Page 9: 6 Revised statement of commitments

Queensland Hunter Gas Pipeline

Submissions report 6–9

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

Ada

ptiv

ely

ma

nage

re

sidu

al b

iod

iver

sity

co

nstr

ain

ts in

a

cco

rda

nce

with

pr

ecau

tiona

ry

prin

cipl

es.

B18

In

con

stra

int

area

s w

here

spr

ing

field

wor

k w

as p

recl

uded

from

lack

of a

cces

s pe

rmis

sion

, fie

ldw

ork

will

be

ca

rrie

d o

ut t

o de

term

ine

appl

icab

le m

anag

emen

t m

easu

res

that

ma

y be

req

uire

d. T

hes

e m

easu

res

wo

uld

be d

eve

lope

d us

ing

the

exis

ting

fram

ewor

k in

Cha

pter

4.

Pri

or

to

cons

truc

tion

C

hapt

er 4

of t

he

Sub

mis

sion

s R

epor

t

AM

1

Pre

ven

t th

e sp

read

of

Can

e T

oads

(Bu

fo

mar

inus

) fr

om k

no

wn

ar

eas

of in

fest

atio

n.

B1

9

Spe

cific

mea

sure

s w

ill b

e d

eve

lop

ed

to e

nsur

e th

at C

ane

To

ads

(B

ufo

mar

inus

) a

re n

ot t

ran

spo

rte

d a

wa

y fr

om

kno

wn

infe

sta

tion

are

as

by c

on

stru

ctio

n p

lan

t o

r e

quip

me

nt.

Du

ring

co

nstr

uctio

n

Sto

p th

e to

ad, c

heck

yo

ur lo

ad, D

EC

C

20

07.

Ab

ori

gin

al h

eri

tag

e

Min

imis

e im

pact

s to

kn

ow

n si

tes

of h

igh

sign

ifica

nce

(cat

ego

rise

d a

s h

igh

im

pact

site

s).

AH

1 T

he R

OW

has

bee

n al

igne

d to

avo

id th

e fo

llow

ing

fou

r si

tes

base

d on

the

o

utco

mes

of

an a

rch

ae

olo

gic

al s

urve

y w

ith e

lde

rs:

• E

urab

a M

issi

on A

bori

gina

l Cer

emon

y an

d D

ream

ing.

• E

urab

a M

issi

on B

uria

l.

• E

ura

ba

Wh

ala

n C

reek

Mo

difi

ed

(C

arv

ed

or

Sca

rre

d)

Tre

e

• W

alla

long

Bru

sh C

onfli

ct s

ite.

Pri

or

to

cons

truc

tion

S

ectio

n 10

.1.5

of t

he

EA

Tab

les

10.4

and

10.

5 of

the

EA

App

endi

x E

A

H1

A

Th

e R

OW

will

be

alig

ne

d to

avo

id t

he

Gil

Gil

Cre

ek

sca

rred

tre

e o

nce

the

ou

tcom

es o

f an

arc

haeo

logi

cal s

urve

y w

ith A

bori

gina

l kno

wle

dge

hold

ers

is

kno

wn

.

Pri

or

to a

nd

duri

ng

cons

truc

tion

Sec

tion

10.1

.5 o

f the

E

A

Tab

les

10.4

and

10.

5 of

the

EA

App

endi

x E

Min

imis

e p

ote

ntia

l fo

r ac

cide

ntal

impa

ct o

n si

tes

of lo

w t

o m

oder

ate

sign

ifica

nce

(c

ate

goris

ed

as

low

to

mod

era

te im

pa

ct

site

s)

AH

2 S

ite t

ypes

and

site

s ca

tego

rised

as

low

to

mod

erat

e im

pact

, w

her

e id

en

tifie

d d

urin

g p

re c

ons

truc

tion

sur

veys

co

nd

uct

ed

by

a q

ua

lifie

d a

rch

ae

olo

gis

t with

as

sist

ance

from

rep

rese

ntat

ives

of

rele

vant

reg

iste

red

Abo

rigin

al s

take

hold

ers,

will

be

man

aged

in a

ccor

danc

e w

ith th

e m

easu

res

indi

cate

d in

Ta

bles

10.

4 an

d T

able

10

.5.

Pri

or

to a

nd

duri

ng

cons

truc

tion

Sec

tion

10.1

.5 o

f the

E

A

Tab

les

10.4

and

10.

5 of

the

EA

App

endi

x E

Page 10: 6 Revised statement of commitments

6–10 Queensland Hunter Gas Pipeline

Submissions report

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

A

H3

A

ll p

erso

nn

el a

nd

con

trac

tors

wo

rkin

g o

n s

ite w

ill r

ece

ive

tra

inin

g in

the

ir re

spon

sibi

litie

s un

der

the

Nat

iona

l Par

ks a

nd W

ildlif

e A

ct 1

974

as p

art o

f an

A

borig

inal

he

rita

ge in

duct

ion

prog

ram

. Add

ition

al s

ite s

peci

fic tr

aini

ng w

ill b

e gi

ven

to w

ork

ers

wh

en

wo

rkin

g w

ithin

ide

ntif

ied

se

nsiti

ve z

one

s, a

s p

er t

he

pre

dic

tive

m

od

el.

Con

stru

ctio

n S

ectio

n 10

.1.5

of t

he

EA

Tab

le 1

0.4

of th

e E

A

App

endi

x E

A

H4

A m

echa

nism

will

be

deve

lope

d to

pro

vide

for

the

man

agem

ent

of im

pact

s to

ar

tefa

ct s

catt

ers

abov

e a

give

n de

nsity

. T

his

mec

han

ism

will

:

• S

tate

thr

esho

lds

whe

n w

ork

s in

the

imm

edia

te v

icin

ity w

ill s

top.

• Id

entif

y re

leva

nt p

roje

ct p

ers

onne

l with

au

thor

ity to

sto

p w

orks

in th

e im

med

iate

vic

inity

whe

n th

e pr

escr

ibed

thre

shol

d is

rea

ched

.

• In

clud

e pr

ovis

ion

for

veri

ficat

ion

of s

igni

fican

ce o

f the

find

by

the

proj

ect

arch

aeol

ogis

t or

sim

ilar.

• P

rovi

de a

fram

ew

ork

for

the

reso

lutio

n an

d m

anag

emen

t of

the

find,

see

king

in

put f

rom

re

leva

nt A

bori

gina

l gro

ups,

and

the

DE

CC

.

Pri

or

to

cons

truc

tion

S

ectio

n 10

.1.5

of t

he

EA

Tab

le 1

0.4

Min

imis

e im

pact

to

oth

er

item

s o

f hig

h si

gnifi

canc

e.

AH

5 S

houl

d an

y ite

ms

or s

ites

of h

igh

sign

ifica

nce,

incl

udin

g A

borig

inal

hu

man

re

mai

ns,

no

t pr

evi

ous

ly id

entif

ied

be

unc

ove

red

du

rin

g co

nst

ruct

ion

, all

wo

rks

in

the

imm

edia

te v

icin

ity o

f the

fin

d w

ill c

ease

. A m

echa

nism

will

be

deve

lope

d to

m

anag

e th

is c

ontin

genc

y. W

orks

will

not

rec

omm

ence

in th

e ar

eas

until

ap

prop

riate

cle

aran

ce is

giv

en;

spec

ialis

t ad

vice

will

be

soug

ht a

s ne

cess

ary.

Con

stru

ctio

n S

ectio

n 10

.1.5

of t

he

EA

Tab

le 1

0.4

of th

e E

A

App

endi

x E

Con

serv

ing

hig

h

sign

ifica

nce

site

s.

AH

6 T

he s

trat

egic

app

roac

h de

scrib

ed in

Cha

pter

10

of th

e E

A fo

r id

entif

icat

ion

of

pote

ntia

l hig

h s

ign

ifica

nce

site

s th

roug

h or

al r

esea

rch

with

trad

ition

al k

now

ledg

e h

old

ers

will

be

co

mp

lete

d a

nd

iden

tifie

d co

nst

rain

ts m

app

ed

on

alig

nm

ent

sh

ee

ts

in o

rde

r th

at id

entif

ied

high

sig

nific

an

ce s

ites

can

be

avo

ide

d in

the

RO

W

alig

nmen

t. T

he p

ropo

nent

will

pro

vide

a c

opy

of th

e re

sear

ch o

n a

conf

iden

tial

bas

is to

DE

CC

and

Do

P a

nd d

esc

ribe

ho

w t

he

pro

posa

l ha

s re

spon

de

d to

thes

e

findi

ngs

with

in th

e ex

istin

g fr

amew

ork

pres

ente

d in

Cha

pter

10.

Pri

or

to

cons

truc

tion

S

ectio

n 10

.1.5

of t

he

EA

App

endi

x E

Page 11: 6 Revised statement of commitments

Queensland Hunter Gas Pipeline

Submissions report 6–11

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

Con

trib

utin

g to

u

nd

ers

tan

din

g o

f in

dige

nous

cu

ltura

l he

ritag

e va

lues

.

AH

7 In

rel

atio

n to

impa

cts

on a

rtef

act s

catt

ers

belo

w th

e th

resh

old

iden

tifie

d in

AH

5,

the

prop

onen

t, in

con

sulta

tion

with

re

leva

nt r

egis

tere

d lo

cal A

bori

gina

l st

akeh

olde

rs, w

ill d

evel

op a

pro

gram

to u

nder

take

with

in t

he 3

0m R

OW

in e

ach

of

the

five

bio

reg

ions

on

e s

trat

egic

res

ear

ch p

roje

ct to

det

erm

ine

cu

ltura

l her

itag

e

sign

ifica

nce

and

prov

ide

the

outc

omes

of t

he r

esea

rch

to th

e lo

cal A

bori

gina

l st

akeh

olde

rs c

onsu

lted

in a

for

m to

be

agre

ed.

Pri

or

to

cons

truc

tion

S

ectio

n 10

.1.5

of t

he

EA

Tab

les

10.4

and

10.

5

App

endi

x E

His

tori

cal h

eri

tag

e

Min

imis

e im

pact

s on

kn

ow

n ha

rd a

nd

mod

erat

e hi

stor

ical

he

ritag

e co

nstr

aint

s.

HH

1

Use

the

her

itage

ass

ess

me

nt t

o in

form

th

e fi

nal a

lign

me

nt o

f th

e R

OW

. P

rio

r to

co

nstr

uctio

n

Sec

tion

10.2

of

the

EA

.

App

endi

x F

Cha

pter

5 a

nd

App

endi

x E

of t

he

Sub

mis

sion

s R

epor

t

H

H2

Mai

ntai

n co

nsul

tatio

n w

ith th

e H

erita

ge B

ranc

h of

DoP

, lo

cal c

ounc

ils a

nd

othe

r re

leva

nt

age

ncie

s a

nd s

take

ho

lder

s.

Pri

or

to a

nd

duri

ng

cons

truc

tion

Sec

tion

10.2

of

the

EA

.

App

endi

x F

Cha

pter

5 a

nd

App

endi

x E

of t

he

Sub

mis

sion

s R

epor

t

H

H3

In

clu

de

re

leva

nt k

no

wn

he

rita

ge

co

nst

rain

ts in

the

CE

MP

. P

rio

r to

and

du

rin

g

cons

truc

tion

Sec

tion

10.2

of

the

EA

.

App

endi

x F

Cha

pter

5 a

nd

App

endi

x E

of t

he

Sub

mis

sion

s R

epor

t

Min

imis

e im

pac

ts o

n po

tent

ial h

ard

and

mod

erat

e hi

stor

ical

he

ritag

e co

nstr

aint

s.

HH

4 Id

entif

y an

d a

void

with

in th

e R

OW

pot

entia

l har

d an

d m

ode

rate

her

itage

co

nstr

aint

s.

Pri

or

to a

nd

duri

ng

cons

truc

tion

Sec

tion

10.2

of

the

EA

.

App

endi

x F

Cha

pter

5 a

nd

App

endi

x E

of t

he

Sub

mis

sion

s R

epor

t

Page 12: 6 Revised statement of commitments

6–12 Queensland Hunter Gas Pipeline

Submissions report

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

H

H5

Mai

ntai

n co

nsul

tatio

n w

ith th

e H

erita

ge B

ranc

h of

DoP

, lo

cal c

ounc

ils a

nd

othe

r re

leva

nt

age

ncie

s a

nd s

take

ho

lder

s.

Pri

or

to a

nd

duri

ng

cons

truc

tion

Sec

tion

10.2

of

the

EA

.

App

endi

x F

Cha

pter

5 a

nd

App

endi

x E

of t

he

Sub

mis

sion

s R

epor

t

H

H6

Incl

ude

rele

vant

pot

entia

l he

ritag

e c

ons

tra

ints

in t

he

CE

MP

. P

rio

r to

and

du

ring

co

nstr

uctio

n

Sec

tion

10.2

of

the

EA

.

App

endi

x F

Cha

pter

5 a

nd

App

endi

x E

of t

he

Sub

mis

sion

s R

epor

t

No

ise

and

vib

rati

on

Min

imis

e th

e im

pact

of

cons

truc

tion

and

oper

atio

n no

ise

and

vibr

atio

n on

su

rro

un

din

g r

esid

en

ts

and

prop

erty

.

N1

Con

stru

ctio

n n

ois

e an

d vi

brat

ion

man

agem

ent s

trat

egie

s w

ill b

e ou

tlin

ed

in th

e C

EM

P.

Con

stru

ctio

n an

d op

erat

ion

mea

sure

s w

ill in

clud

e:

• Li

aisi

ng w

ith c

om

mun

ity t

o a

dvi

se o

n lik

ely

timin

g an

d du

ratio

n of

noi

sy

activ

ities

.

• R

esol

ving

com

plai

nts

rece

ived

from

res

iden

ts a

nd la

ndo

wn

ers.

• U

sin

g n

ois

e a

ba

tem

en

t m

eas

ure

s w

he

re r

eas

ona

ble

and

fe

asi

ble

.

Co

nstr

uct

ion

an

d

oper

atio

n E

nviro

nmen

tal N

oise

C

ontro

l Man

ual,

EP

A,

19

94

NS

W In

dust

rial N

oise

P

olic

y, E

PA

200

0

Cha

pter

11

of th

e E

A

Min

imis

e im

pact

s of

bl

astin

g.

N2

Bla

stin

g w

ill b

e c

arrie

d ou

t in

acc

orda

nce

with

Aus

tral

ian

Sta

ndar

d A

S 2

187.

C

onst

ruct

ion

AS

2187

Cha

pter

11

of th

e E

A

Min

imis

e th

e im

pact

of

cons

truc

tion

and

oper

atio

n no

ise

and

vibr

atio

n on

su

rro

un

din

g r

esid

en

ts.

N3

Fol

low

ing

rout

e fin

alis

atio

n, a

ny

pote

ntia

l maj

or n

oise

impa

cts

will

be

iden

tifie

d an

d if

requ

ired

spec

ific

loca

lised

miti

gatio

n m

easu

res

will

be

deve

lope

d in

co

nsu

ltatio

n w

ith lo

cal r

esi

den

ts a

nd

sta

keh

old

ers

.

Pri

or

to a

nd

duri

ng

cons

truc

tion

Env

ironm

enta

l Noi

se

Con

trol M

anua

l, E

PA

, 1

99

4

Cha

pter

11

of th

e E

A

Cha

pter

18

of th

e E

A

Page 13: 6 Revised statement of commitments

Queensland Hunter Gas Pipeline

Submissions report 6–13

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

Min

imis

e th

e im

pact

of

blas

ting

. N

4 B

last

ing

area

s w

ill b

e id

entif

ied

and

man

agem

ent

proc

edur

es d

efin

ed in

the

CE

MP

in a

ccor

danc

e w

ith A

S 2

187.

P

rio

r to

and

du

ring

co

nstr

uctio

n

AS

218

7

Cha

pter

11

of th

e E

A

Cha

pter

18

of th

e E

A

Tra

ffic

an

d t

ran

sp

ort

Min

imis

e im

pa

ct o

n

roa

d n

etw

ork

s.

T1

Pre

para

tion

of c

ross

ing

plan

s in

con

sulta

tion

with

the

appr

opri

ate

road

aut

hori

ty.

C

onst

ruct

ion

AS

174

2.3

RT

A T

D 2

006-

05

Cha

pter

11

of th

e E

A

T

2 A

ny

over

size

d or

ove

r w

eig

ht

load

s w

ill b

e tr

ansp

orte

d in

acc

orda

nce

with

RT

A

requ

irem

ents

. C

onst

ruct

ion

Roa

d Tr

ansp

ort

(Mas

s, L

oadi

ng a

nd

Acc

ess)

Reg

ulat

ions

20

05

Cha

pter

11

of th

e E

A

Min

imis

e im

pact

s on

h

um

an

re

cep

tors

an

d

loca

l tra

ffic

netw

ork

s.

T3

Spe

cific

loca

lised

traf

fic im

pact

s w

ill b

e as

sess

ed fo

llow

ing

the

dete

rmin

atio

n of

th

e lo

catio

n of

con

stru

ctio

n ca

mps

, pip

elin

e st

orag

e ar

eas,

veh

icle

dep

ots

and

RO

W a

cce

ss p

oint

s.

If th

ere

are

sign

ifica

nt im

pact

s id

entif

ied

the

n sp

ecifi

c tr

ansp

ort a

rran

gem

ents

ass

ocia

ted

with

pip

e tr

ansp

ort a

nd s

tora

ge a

nd

cons

truc

tion

vehi

cle

mov

emen

ts w

ill b

e de

velo

ped

to m

inim

ise

loca

lised

impa

cts

on

oth

er

road

use

rs.

Pri

or

to a

nd

duri

ng

cons

truc

tion

Cha

pter

11

of th

e E

A

Cha

pter

18

of th

e E

A

Air

qu

alit

y

Min

imis

e re

duc

tion

in

air

qual

ity f

rom

dus

t an

d pa

rtic

ulat

e m

atte

r.

A1

Wor

king

pra

ctic

es w

ill b

e m

ana

ged

to m

inim

ise

nuis

ance

dus

t.

Con

stru

ctio

n C

hapt

er 1

1 of

the

EA

A

2 B

last

ing

will

be

con

duct

ed a

t ap

prop

riate

tim

es, w

ith c

onsi

dera

tion

of s

ite

cond

ition

s an

d se

nsiti

ve r

ecei

vers

.

Con

stru

ctio

n A

S21

87

Cha

pter

11

of th

e E

A

A

3 T

he b

urni

ng o

f mat

eria

l on

site

will

be

proh

ibite

d, e

xcep

t und

er th

e in

stru

ctio

n of

fir

e s

erv

ices

. C

onst

ruct

ion

Cha

pter

11

of th

e E

A

A

4 V

ehic

les

will

be

mai

ntai

ned

to e

nsur

e em

issi

ons

are

kept

to th

e m

inim

um

prac

ticab

le.

Con

stru

ctio

n A

ustr

alia

n D

esig

n R

ules

and

rel

evan

t m

an

ufa

ctur

er

spec

ifica

tions

Cha

pter

11

of th

e E

A

Page 14: 6 Revised statement of commitments

6–14 Queensland Hunter Gas Pipeline

Submissions report

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

Con

tain

men

t of

gas

w

ithin

the

pipe

line.

A

5 R

egul

ar m

aint

enan

ce c

heck

s w

ill b

e un

dert

aken

and

a le

ak d

etec

tion

syst

em w

ill

be in

stal

led.

O

pera

tion

AS

2885

.3

Cha

pter

11

of th

e E

A

So

cio

-eco

no

mic

Min

imis

e a

dver

se

soci

al a

nd e

cono

mic

im

pact

s o

f acc

ess

to

priv

ate

prop

erty

.

SE

1 F

inal

rou

te s

ele

ctio

n ac

ross

pri

vate

pro

pert

ies

will

be

con

duct

ed in

con

sulta

tion

with

land

ow

ners

to m

inim

ise

impa

cts

duri

ng c

onst

ruct

ion

and

oper

atio

n of

the

pipe

line.

Pri

or

to

cons

truc

tion

C

hapt

er 1

2 of

the

EA

Min

imis

e im

pa

ct o

f pi

pelin

e ea

sem

ent

on

lan

do

wn

ers.

SE

2 T

he p

ropo

nent

will

con

tinue

neg

otia

tions

with

land

owne

rs r

egar

ding

loca

tion

of

ease

men

t, a

bove

grou

nd in

fras

truc

ture

and

com

pens

atio

n an

d te

rms

and

cond

ition

s of

con

sent

.

Pri

or

to

cons

truc

tion

C

hapt

er 1

2 of

the

EA

Cre

ate

em

ploy

me

nt

oppo

rtun

ities

. S

E3

Str

ateg

ies

will

be

put

in p

lace

to

max

imis

e em

plo

ymen

t op

port

uniti

es fo

r lo

cal a

nd

indi

geno

us w

ork

ers

(eg

wor

king

with

loca

l em

plo

ymen

t a

nd t

rain

ing

agen

cies

).

Pri

or

to

cons

truc

tion

C

hapt

er 1

2 of

the

EA

Lan

d u

se p

lan

nin

g

Min

imis

e la

nd u

se

conf

licts

. L1

T

he d

etai

led

pipe

line

alig

nmen

t w

ill c

ontin

ue to

be

ref

ined

to a

void

land

use

co

nflic

ts,

part

icul

arly

in r

elat

ion

to

exi

stin

g an

d pr

opos

ed u

rban

se

ttle

men

ts,

extr

activ

e in

dust

ries

, en

viro

nmen

tally

sen

sitiv

e la

nd u

ses.

Pri

or

to

cons

truc

tion

C

hapt

er 3

of t

he E

A

Cha

pter

13

of th

e E

A

L2

C

onst

ruct

ion

sch

edul

ing

will

be

min

dfu

l of

avo

idin

g se

aso

nal

co

nst

rain

ts

asso

ciat

ed w

ith e

xist

ing

land

use

act

iviti

es.

Con

stru

ctio

n C

hapt

er 1

3 of

the

EA

Min

imis

e im

pact

s to

ag

ricul

tura

l act

iviti

es.

L3

The

pro

pone

nt w

ill e

ndea

vour

to

nego

tiate

with

eac

h la

ndo

wne

r te

rms

and

cond

ition

s re

latin

g to

con

stru

ctio

n ac

tiviti

es o

n th

eir

land

, wh

ich

ma

y in

clud

e:

• A

cces

s;

• W

ee

d m

an

age

me

nt;

• C

rop

cont

rol i

n re

latio

n to

gen

etic

ally

mod

ified

org

anis

ms

(GM

O);

and

• L

ive

stoc

k se

curit

y.

Con

stru

ctio

n S

ectio

n 5.

3.13

Sec

tion

6.3.

4

Sec

tion

13.1

.1

Cha

pter

13

of th

e E

A

Nox

ious

Wee

ds A

ct

1993

To

avo

id a

dver

se

impa

cts

on k

now

n ar

eas

of m

ine

subs

ide

nce

and

to

en

sure

tha

t e

ng

inee

rin

g d

esig

n is

co

gnis

ant

of r

ele

vant

L4

Fur

ther

con

sulta

tion

will

be

und

erta

ken

with

the

Min

e S

ubs

iden

ce B

oard

and

the

DP

I M

iner

als

in o

rder

to c

ontin

ue to

rev

iew

pro

pose

d m

ine

exp

ansi

ons

that

ma

y im

pact

the

pip

elin

e.

Pri

or

to

cons

truc

tion

C

hapt

er 1

3 of

the

EA

Cha

pter

18

of th

e E

A

Page 15: 6 Revised statement of commitments

Queensland Hunter Gas Pipeline

Submissions report 6–15

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

cons

tra

ints

.

To

reso

lve

pote

ntia

l co

nfli

cts

bet

we

en

po

ssib

le c

oal r

esou

rce

extr

actio

n an

d th

e pi

pelin

e al

ign

men

t.

L4A

F

urth

er c

onsu

ltatio

n w

ill b

e u

nder

take

n w

ith D

PI

Coa

l Adv

ice

in o

rder

to c

ontin

ue

to r

evie

w p

ossi

ble

futu

re d

evel

opm

ents

of

coal

bea

ring

stra

ta (

in p

artic

ular

, in

the

area

so

uthw

est

of

Sco

ne),

that

ma

y im

pact

the

pip

elin

e.

Pri

or

to

cons

truc

tion

S

ubm

issi

ons

Rep

ort

Sec

tion

2.2.

7

To

avo

id la

nd u

se

conf

licts

. L5

F

urth

er r

evie

w a

nd r

oute

ref

inem

ents

to

avo

id p

oten

tial l

and

use

con

flict

s in

re

latio

n to

:

• A

rdgl

en

Qu

arr

y e

xpa

nsi

on.

• M

usw

ellb

rook

’s n

ew

LE

P.

• M

aitla

nd U

rban

Set

tlem

ent.

Pri

or

to

cons

truc

tion

C

hapt

er 1

3 of

the

EA

Cha

pter

18

of th

e E

A

Acc

ess

to C

row

n L

an

ds

L6

Onc

e th

e ro

ute

is f

inal

ised

the

prop

onen

t w

ill c

onsu

lt w

ith D

oL r

egar

ding

Cro

wn

Land

s tr

aver

sed

by

the

pip

elin

e. E

asem

ents

will

be

acqu

ired

purs

uant

to th

e P

ipe

lines

Act

196

7 w

hic

h pr

ovid

es fo

r no

tice

of

the

prop

ose

d ea

sem

ent

to b

e pr

ovid

ed to

DoL

. Fo

r an

y ar

eas

of t

emp

ora

ry o

ccu

pa

tion

of

Cro

wn

La

nd

s ou

tsid

e th

e ea

sem

ent a

lice

nce

will

be

obt

aine

d un

der

the

Cro

wn

Land

s A

ct 1

989.

Pri

or

to

cons

truc

tion

S

ectio

n 7.

2.2

of t

he

EA

Pip

elin

es A

ct 1

967

Cro

wn

Land

s A

ct

1989

Haz

ard

s a

nd

ris

ks

Min

imis

e th

e ris

k of

in

cide

nts

duri

ng

cons

truc

tion

and

oper

atio

n.

H1

The

pip

elin

e w

ill b

e a

ligne

d, d

esig

ned

and

oper

ated

in a

ccor

danc

e w

ith A

S28

85,

DoP

ris

k cr

iteria

, an

d re

quire

d sa

fety

man

agem

ent

syst

em

s.

Pri

or

to, d

uri

ng

cons

truc

tion

an

d

oper

atio

n

AS

2885

.

HIP

AP N

o.4

(DoP

, 19

92).

Cha

pter

14

of th

e E

A

H

2 T

he q

ualit

ativ

e an

d qu

antit

ativ

e ris

k as

sess

men

ts w

ill b

e u

pdat

ed d

urin

g th

e d

esig

n p

ha

se.

Pri

or

to

cons

truc

tion

A

S28

85

HIP

AP N

o.4

(DoP

, 19

92).

Cha

pter

14

of th

e E

A

H

3 T

he

ma

na

gem

en

t m

ea

sure

s d

eve

lop

ed

in th

e S

afe

ty M

an

ag

em

ent

Sys

tem

will

be

com

pa

red

to

the

Pip

elin

e R

ese

arch

Co

unc

il In

tern

atio

na

l pro

toco

ls fo

r as

sess

ing

S

tre

ss C

orr

osio

n C

rack

ing

risk.

Pri

or

to

cons

truc

tion

A

S28

85

HIP

AP N

o.4

(DoP

, 19

92).

App

endi

x J

of t

he E

A

Page 16: 6 Revised statement of commitments

6–16 Queensland Hunter Gas Pipeline

Submissions report

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

H

4 T

he

HA

ZO

P s

tud

y a

nd

re

vise

d s

afe

ty a

na

lysi

s w

ill b

e c

om

ple

ted,

in a

ccor

da

nce

w

ith A

S 2

885.

P

rio

r to

co

nstr

uctio

n

AS

2885

HIP

AP N

o.4

(DoP

, 19

92).

Cha

pter

14

of th

e E

A

Pip

elin

es A

ct 1

967

Su

rfac

e an

d g

rou

nd

wat

er

Ado

pt a

ppro

pria

te

wat

er c

ross

ing

tech

niq

ue

.

W1

The

pro

pone

nt w

ill e

ngag

e w

ith D

EC

C, D

PI

and

DW

E a

nd r

elev

ant

CM

As

with

re

gard

to c

ross

ing

met

hods

and

site

spe

cific

man

agem

ent

mea

sure

s fo

r hi

gh

sens

itivi

ty w

ate

rco

urs

e c

ross

ing

s.

Con

stru

ctio

n

Cha

pter

15

of th

e E

A

Fish

Pas

sage

Req

uire

men

ts fo

r W

ater

way

Cro

ssin

gs,

NS

W F

ishe

ries,

F

airf

ull,

S. a

nd

With

eri

dg

e, G

, 2

003

AP

IA C

ode

W

1A

Site

spe

cific

wa

terc

ours

e cr

ossi

ng m

etho

ds w

ill b

e pr

epar

ed in

acc

orda

nce

with

th

e A

PIA

Cod

e an

d in

con

sulta

tion

with

DW

E p

rior

to c

omm

ence

men

t of

cons

truc

tion

of t

hat

cro

ssin

g.

Pri

or

to

cons

truc

tion

A

PIA

Cod

e

Min

imis

e ch

ang

es

in

wat

erw

ay

cha

nnel

or

bank

form

.

W2

The

pro

pone

nt w

ill im

plem

ent

all p

ract

icab

le m

easu

res

to li

mit

impa

cts

on

wa

terc

ours

es a

nd c

hann

els

duri

ng c

onst

ruct

ion

of th

e pi

pelin

e. M

easu

res

to b

e

imp

lem

ente

d w

ill b

e g

uid

ed

by

ind

ust

ry a

nd

go

vern

men

t gu

ide

line

s a

nd

po

licie

s.

Co

nstr

uct

ion

Fi

sh P

assa

ge –

R

equi

rem

ents

for

Wat

erw

ay C

ross

ings

, N

SW

Fis

herie

s,

Fai

rful

l, S

. and

W

ithe

rid

ge,

G,

200

3

AP

IA C

ode

Cha

pter

15

of th

e E

A

Page 17: 6 Revised statement of commitments

Queensland Hunter Gas Pipeline

Submissions report 6–17

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

Min

imis

e po

llutio

n of

su

rfac

e o

r g

rou

ndw

ate

r.

W3

Soi

l and

wat

er m

anag

emen

t m

easu

res

will

be

impl

emen

ted

durin

g th

e co

nstr

uctio

n ph

ase

thro

ugh

the

CE

MP

. M

anag

emen

t mea

sure

s w

ill b

e p

repa

red

in a

ccor

da

nce

with

Man

agin

g U

rban

Sto

rmw

ater

: Soi

ls a

nd C

onst

ruct

ion

(Lan

dco

m, 2

004

) a

s a

ppro

pria

te to

pip

elin

e c

ons

truc

tion

.

Con

stru

ctio

n M

anag

ing

Urb

an

Sto

rmw

ater

: Soi

ls a

nd

Con

stru

ctio

n (L

andc

om, 2

004)

Soi

l Ero

sion

and

S

edim

ent C

ontro

l E

ngin

eerin

g G

uide

lines

, In

stitu

te o

f E

ngin

eers

Au

stra

lia

(IE

Aus

t, 1

996)

AP

IA C

ode

Cha

pter

15

of th

e E

A

W

3A

A c

ontin

genc

y pl

an w

ill b

e p

repa

red

for

even

ts t

hat h

ave

the

pote

ntia

l to

pol

lute

or

cont

amin

ate

surf

ace

or g

roun

dw

ater

so

urce

s. T

he p

lan

will

incl

ude

thre

shol

d le

vels

, rem

edia

tion

actio

ns

(incl

udin

g m

onito

rin

g) a

nd

com

mu

nic

atio

n st

rate

gie

s.

Pri

or

to

cons

truc

tion

. P

rote

ctio

n of

the

Env

ironm

ent a

nd

Ope

ratio

ns A

ct 1

997

W

4 T

renc

hes

will

be

com

pact

ed a

nd r

ein

stat

ed in

suc

h a

wa

y as

to c

ompe

nsat

e fo

r se

ttlin

g o

f b

ack

fill.

Wh

ere

cro

wn

s a

re u

sed

, cr

own

bre

aks

will

be

cre

ate

d a

t re

gula

r in

terv

als

and

at d

rain

age

lines

to p

erm

it co

ntin

ued

surf

ace

wa

ter

flow

s an

d pr

even

t sco

urin

g al

ong

the

tren

ch o

r po

ndin

g.

Con

stru

ctio

n A

PIA

Cod

e

Cha

pter

15

of th

e E

A

W

5 A

spi

ll re

spon

se p

roce

dure

, add

ress

ing

fuel

s, lu

bric

ants

and

oth

er c

hem

ical

s w

ill

be o

utlin

ed in

the

CE

MP

. C

onst

ruct

ion

AP

IA C

ode

Cha

pter

15

of th

e E

A

Min

imis

e ch

ang

es

to

exis

ting

surf

ace

and

gro

und

wat

er

reg

ime

s.

W6

The

pro

pone

nt w

ill im

plem

ent

all p

ract

icab

le m

easu

res

to li

mit

pote

ntia

l im

pact

s o

n e

xist

ing

su

rfa

ce a

nd

gro

und

wa

ter

reg

ime

s a

nd

this

will

be

do

cum

en

ted

in th

e

CE

MP

.

Con

stru

ctio

n A

PIA

Cod

e

Cha

pter

15

of th

e E

A

Min

imis

e im

pact

s on

w

ate

r q

ual

ity a

nd

g

eo

mo

rph

olo

gy.

W7

HD

D w

ill b

e u

sed

for

the

cros

sing

of t

he H

unte

r R

iver

in t

he T

om

ago

area

. C

onst

ruct

ion

AP

IA C

ode

Cha

pter

15

of th

e E

A

W

8

Wh

ere

pra

ctic

ab

le w

ate

rco

urs

es w

ill b

e cr

oss

ed

whe

n th

ey

are

dry

. C

ons

tru

ctio

n

AP

IA C

ode

Cha

pter

15

of th

e E

A

Page 18: 6 Revised statement of commitments

6–18 Queensland Hunter Gas Pipeline

Submissions report

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

Min

imis

e th

e ris

k of

po

llutio

n of

sur

face

a

nd

gro

und

wa

ter

an

d

ad

vers

e im

pact

on

su

rfac

e a

nd

grou

ndw

ater

bod

ies.

W9

An

y w

ate

r ex

trac

tion

requ

ired

for

the

prop

osal

, w

ill b

e in

acc

orda

nce

with

the

rele

vant

Wat

er S

harin

g P

lan

and

wa

ter

leg

isla

tion.

C

onst

ruct

ion

Rel

evan

t Wat

er

Sha

ring

Pla

ns u

nder

th

e W

ater

M

anag

emen

t Act

20

00

Cha

pter

15

of th

e E

A

Min

imis

e p

ote

ntia

l im

pact

s o

n s

urfa

ce

and

grou

ndw

ate

r.

W10

F

urth

er a

sses

smen

t will

be

unde

rtak

en o

n w

ater

cour

ses

iden

tifie

d as

bei

ng o

f hi

gh

sens

itivi

ty t

o fin

alis

e cr

ossi

ng lo

catio

ns,

me

thod

s an

d si

te s

peci

fic m

ana

gem

ent

mea

sure

s.

Con

stru

ctio

n Fi

sh P

assa

ge –

R

equi

rem

ents

for

Wat

erw

ay C

ross

ings

, N

SW

Fis

herie

s,

Fai

rful

l, S

. and

W

ithe

rid

ge,

G.

200

3

AP

IA C

ode

Cha

pter

15

of th

e E

A

Cha

pter

18

of th

e E

A

W

11

The

DP

I, D

WE

and

DE

CC

will

be

cons

ulte

d o

n w

ate

rwa

y cr

oss

ing

met

hod

s a

nd

miti

gatio

n m

eas

ures

em

ploy

ed

for

high

sen

sitiv

ity w

ate

rwa

ys.

A p

rofil

e of

the

wa

terw

ay

cros

sing

wou

ld b

e pr

ovid

ed t

o D

PI,

DW

E a

nd D

EC

C.

Con

stru

ctio

n Fi

sh P

assa

ge –

R

equi

rem

ents

for

Wat

erw

ay C

ross

ings

, N

SW

Fis

herie

s,

Fai

rful

l, S

. and

W

ithe

rid

ge,

G,

200

3

AP

IA C

ode

Cha

pter

15

of th

e E

A

Page 19: 6 Revised statement of commitments

Queensland Hunter Gas Pipeline

Submissions report 6–19

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

W

12

If id

entif

ied

by

the

rele

vant

land

hold

er,

the

loca

tion

of u

nreg

iste

red

near

by

grou

ndw

ate

r b

ore

s w

ill b

e m

appe

d an

d th

e p

ipel

ine

rout

e w

ill a

void

the

se b

ores

. P

rio

r to

co

nstr

uctio

n

Cha

pter

15

of th

e E

A

Infr

as

tru

ctu

re

Min

imis

e a

dver

se

impa

cts

on

oth

er

infr

ast

ruct

ure

du

ring

co

nstr

uctio

n an

d op

erat

ion.

I1

Sta

keho

lder

eng

agem

ent

with

infr

astr

uctu

re o

wn

ers

and

man

ager

s w

ill b

e on

goin

g to

ens

ure

thei

r re

quire

men

ts fo

r cr

ossi

ngs

and

wo

rks

in th

e ge

nera

l vic

inity

of

the

ir in

fras

truc

ture

are

impl

emen

ted

duri

ng c

onst

ruct

ion

and

oper

atio

n.

Pri

or

to

cons

truc

tion

C

ode

of P

ract

ice

for

Wor

k N

ear O

verh

ead

Pow

erlin

es,

Wo

rkco

ver,

200

6

Roa

ds A

ct 1

993

Sta

ndar

ds o

f all

rele

vant

util

ities

, in

clud

ing

AR

TC

, C

ount

ry E

nerg

y,

Hun

ter

Wat

er, E

nerg

y A

ust

ralia

, T

rans

grid

, R

TA

and

Te

lstr

a

Cha

pter

16

of th

e E

A

Coo

rdin

ate

mu

ltipl

e in

fra

stru

ctu

re a

nd

se

rvic

e im

pact

s.

I2

A c

olla

bora

tive

man

agem

ent

appr

oach

invo

lvin

g th

e re

leva

nt in

fras

truc

ture

o

wn

ers/

ma

nag

ers

will

be

on

goi

ng

to c

oo

rdin

ate

ma

nag

em

ent

me

asu

res

in a

reas

w

her

e m

ultip

le in

fras

truc

ture

ser

vice

s ar

e af

fect

ed.

Pri

or

to

cons

truc

tion

C

hapt

er 1

6 of

the

EA

Min

imis

e im

pact

s on

th

e pi

pelin

e a

nd

util

itie

s a

nd

in

fra

stru

ctu

re d

uri

ng

mai

nte

na

nce

.

I3

Coo

pera

tive

man

agem

ent a

ppro

ach

will

be

deve

lope

d w

ith u

tility

or

infr

astr

uctu

re

prov

ider

s fo

r m

aint

enan

ce a

nd a

cces

s ar

rang

emen

ts.

O

pera

tion

Cha

pter

16

of th

e E

A

Res

ou

rce

and

was

te m

ana

gem

ent

En

sure

wa

ste

g

en

era

ted

is m

an

ag

ed

appr

opri

atel

y.

RM

1 W

aste

mat

eria

ls w

ill b

e c

lass

ified

and

man

age

d in

acc

orda

nce

with

the

Was

te

Cla

ssifi

catio

n G

uide

lines

(D

EC

C, 2

008)

. C

onst

ruct

ion

Was

te C

lass

ifica

tion

Gui

delin

es,

DE

CC

, 2

00

8

PO

EO

Act

199

7 C

hapt

er 1

7 of

the

EA

Page 20: 6 Revised statement of commitments

6–20 Queensland Hunter Gas Pipeline

Submissions report

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

Min

imis

e im

pact

s on

w

ate

r re

sour

ces,

e

rosi

on

an

d w

ate

r qu

ality

as

a re

sult

of

hyd

rost

atic

test

ing

.

RM

2 A

ppro

pria

te w

ater

sou

rces

for

cons

truc

tion

act

iviti

es in

clud

ing

hyd

ro-t

est

ing

will

be

inve

stig

ated

and

iden

tifie

d. R

elev

ant

irrig

atio

n gr

oups

, w

ater

use

rs/o

wne

rs a

nd

DW

E w

ill b

e co

nsul

ted.

Whe

re li

cens

ing

of s

urfa

ce o

r gr

ound

wat

er e

xtra

ctio

n is

re

quir

ed f

or th

e id

entif

ied

wa

ter

sour

ces,

the

prop

onen

t w

ill o

btai

n th

e re

leva

nt

licen

ce o

r ex

empt

ion

from

DW

E.

Pri

or

to

cons

truc

tion

S

ectio

n 7.

2.4.

of t

he

EA

Cha

pter

15

of th

e E

A

Sec

tion

17.1

and

T

able

17.

3 of

the

EA

Cha

pter

18

of th

e E

A

R

M3

Prio

r to

the

com

men

cem

ent o

f h

ydro

-tes

ting

act

iviti

es,

a h

ydro

sta

tic te

stin

g

prog

ram

/pro

cedu

re w

ill b

e p

repa

red.

Th

is w

ill in

clud

e m

easu

res

to a

ddre

ss:

• C

onfir

min

g qu

antit

y of

wat

er e

xtra

ctio

n.

• P

reve

ntin

g/m

inim

isin

g te

mp

ora

ry d

epl

etio

n o

f w

ate

r re

sou

rces

due

to

wat

er

ext

ract

ion

fo

r h

ydro

sta

tic te

stin

g

• E

rosi

on a

t site

of

hyd

ro-t

est

wa

ter

disc

harg

e.

• C

hang

es to

wa

ter

qual

ity o

f rec

eivi

ng w

ate

r en

viro

nmen

t.

Pri

or

to

cons

truc

tion

A

naly

sis

of

Hyd

rost

atic

Tes

t W

ater

, CM

IT R

epor

t N

o: C

MIT

-200

5-25

9,

5th

De

cem

ber

200

5

PO

EO

Act

199

7

Ch

ap

ters

15

an

d 1

7 o

f th

e E

A

Co

nta

min

ated

lan

d

No

sign

ifica

nt h

arm

to

hum

an h

eal

th a

nd

en

viro

nm

ent

from

e

xca

vatio

n in

co

nta

min

ate

d s

ites.

CL1

M

anag

emen

t m

easu

res

will

be

prep

ared

as

part

of t

he C

EM

P to

out

line

proc

edur

es to

rev

iew

site

con

ditio

ns in

clud

ing

pote

ntia

l con

tam

inan

ts a

nd w

here

ne

cess

ary,

ou

tline

mea

sure

s to

ens

ure

appr

opri

ate

actio

n w

ill b

e un

dert

aken

du

ring

con

stru

ctio

n to

avo

id a

ny

pote

ntia

l im

pact

s to

the

env

iron

men

t or

hum

an

hea

lth.

Con

stru

ctio

n C

onta

min

ated

Lan

d M

anag

emen

t Act

19

97

Cha

pter

17

of th

e E

A

Con

tam

inat

ion

resu

lting

from

ac

cide

ntal

spi

lls.

CL2

S

ite e

nvir

onm

enta

l man

agem

ent m

easu

res

will

be

deve

lope

d an

d ou

tline

d in

the

C

EM

P w

ith th

e pu

rpos

e of

min

imis

ing

the

pot

entia

l for

spi

lls to

occ

ur a

nd

impl

emen

ting

re

med

ial a

ctio

ns.

Con

stru

ctio

n C

hapt

er 1

7 of

the

EA

So

ils

and

geo

log

y

Man

age

soils

. S

1 S

oil t

ype

s w

ill b

e id

entif

ied

and

de

linea

ted

alon

g th

e al

ignm

ent.

P

rior

to

cons

truc

tion

C

hapt

er 1

7 of

the

EA

S

2 S

oil m

anag

emen

t mea

sure

s w

ill b

e de

velo

ped

acco

rdin

g to

so

il ty

pe a

nd

be

doc

umen

ted

in t

he

CE

MP

. P

rio

r to

and

du

ring

co

nstr

uctio

n

Cha

pter

17

of th

e E

A

Page 21: 6 Revised statement of commitments

Queensland Hunter Gas Pipeline

Submissions report 6–21

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

Exp

ansi

ve s

oils

. S

3 T

he d

epth

of

expa

nsiv

e so

ils w

ill b

e id

entif

ied

and

wh

ere

prac

ticab

le t

he p

ipe

inst

alle

d be

low

the

dep

th o

f ex

pans

ive

soils

. C

onst

ruct

ion

Soi

l Ero

sion

and

S

edim

ent C

ontro

l E

ngin

eerin

g G

uide

lines

, In

stitu

te o

f E

ngin

eers

Au

stra

lia

(IE

Aus

t, 1

996)

Cha

pter

17

of th

e E

A

Min

imis

e lo

ss o

f to

p

soil.

S

4 E

rosi

on a

nd s

edim

ent

man

agem

ent c

ontr

ols

will

be

prep

ared

as

part

of t

he C

EM

P

to m

anag

e an

d m

inim

ise

eros

ion

and

cont

rol s

edim

ent

impa

cts

asso

ciat

ed w

ith

the

cons

truc

tion

of t

he p

ipel

ine.

Con

stru

ctio

n M

anag

ing

Urb

an

Sto

rmw

ater

: Soi

ls a

nd

Con

stru

ctio

n (L

andc

om, 2

004)

Soi

l Ero

sion

and

S

edim

ent C

ontro

l E

ngin

eerin

g G

uide

lines

, In

stitu

te o

f E

ngin

eers

Au

stra

lia

(IE

Aus

t, 1

996)

AP

IA C

ode

Com

mitm

ent

refe

ren

ce W

3

Ch

ap

ters

15

an

d 1

7 o

f th

e E

A

Pre

vent

ris

ing

gro

und

wat

er

and

sa

linity

.

S4

The

pro

pone

nt w

ill im

plem

ent

all p

ract

icab

le m

easu

res

to li

mit

any

imp

act

the

co

nstr

uctio

n an

d op

erat

ion

of th

e pi

pelin

e m

ay

have

on

ris

ing

gro

undw

ater

and

sa

linity

(eg

avo

id b

uild

ing

on t

he s

ide

of h

ills

and

extr

a de

pth

of c

over

whe

re

pos

sib

le).

Con

stru

ctio

n

Cha

pter

17

of th

e E

A

S

5

Opt

ion

s to

ve

geta

te th

e R

OW

with

sa

line

to

lera

nt

veg

etat

ion

wo

uld

be

inve

stig

ate

d

in c

onsu

ltatio

n w

ith D

EC

C a

nd

land

hold

ers

, whe

re a

ppro

pria

te.

Ope

ratio

n C

hapt

er 1

7 of

the

EA

Page 22: 6 Revised statement of commitments

6–22 Queensland Hunter Gas Pipeline

Submissions report

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

Min

imis

ing

impa

cts

of

Aci

d S

ulfa

te S

oil.

S6

Aci

d S

ulfr

ate

Soi

l man

agem

ent

mea

sure

s w

ill b

e pr

epar

ed a

s pa

rt o

f the

CE

MP

in

acco

rdan

ce w

ith r

ele

vant

indu

stry

pra

ctic

e gu

idel

ines

and

pro

cedu

res.

C

onst

ruct

ion

Aci

d S

ulph

ate

Soi

l M

anua

l, A

cid

Sul

phat

e S

oil

Ma

na

gem

ent

Ad

viso

ry C

om

mitt

ee,

1

99

8

Cha

pter

5 o

f the

EA

Cha

pter

17

of th

e E

A

Min

imis

e im

pact

s to

so

il.

S7

A ta

rget

ed g

eot

echn

ical

inve

stig

atio

n w

ill b

e u

nd

ert

ake

n to

ma

p so

il co

nst

rain

ts.

Pri

or

to

cons

truc

tion

C

hapt

er 1

7 of

the

EA

Cha

pter

18

of th

e E

A

Vis

ual

am

en

ity

Mai

ntai

n vi

sual

am

enity

alo

ng th

e R

OW

.

V1

Are

as t

hat

are

visu

ally

sen

sitiv

e w

ill b

e id

en

tifie

d in

the

CE

MP

and

rev

eget

atio

n ca

rrie

d o

ut i

n a

cco

rda

nce

with

th

e A

PIA

Co

de

. O

pera

tion

AP

IA C

ode

Cha

pter

17

of th

e E

A

Mai

ntai

n vi

sual

am

enity

in th

e v

icin

ity

of a

bov

egro

und

an

cilla

ry

infr

ast

ruct

ure

.

V2

Vis

ual a

men

ity w

ill b

e ta

ken

into

con

side

ratio

n in

the

deta

iled

desi

gn a

nd lo

catio

n of

abo

vegr

ound

infr

astr

uctu

re f

acili

ties.

O

pera

tion

Cha

pter

17

of th

e E

A

Gre

enh

ou

se g

as e

mis

sio

ns

Min

imis

e ex

haus

t em

issi

ons

from

tr

ansp

ort

atio

n a

nd

pr

oduc

tion.

GG

1 A

dequ

ate

plan

ning

and

mai

nte

nanc

e to

ens

ure

effic

ien

t use

of v

ehic

les.

C

onst

ruct

ion

Com

mitm

ent

refe

renc

e A

4

Cha

pter

17

of th

e E

A

Min

imis

e ga

s le

aks.

G

G2

Con

tinuo

us m

onito

ring

sys

tem

to d

ete

ct le

aks

an

d a

ma

inte

na

nce

pro

gra

m to

m

inim

ise

fugi

tive

em

issi

ons.

O

pera

tion

Cha

pter

17

of th

e E

A

Cha

pter

5 o

f the

EA

Min

imis

e g

as

rele

ases

. G

G3

Pra

ctic

able

mea

sure

s w

ill b

e im

plem

ente

d to

min

imis

e pl

anne

d re

lea

ses

for

mai

nten

ance

wo

rk.

O

pera

tion

Cha

pter

17

of th

e E

A

Page 23: 6 Revised statement of commitments

Queensland Hunter Gas Pipeline

Submissions report 6–23

Ob

ject

ive

R

ef #

H

igh

le

vel

pri

nc

iple

d c

om

mit

me

nt

Tim

ing

R

efe

ren

ce

G

G4

Pip

elin

e m

aint

enan

ce a

nd s

afet

y m

easu

res

(eg

sign

age)

to m

inim

ise

the

risk

of

acci

dent

al g

as r

elea

ses.

O

pera

tion

AS

2885

Cha

pter

17

of th

e E

A

Ad

apti

ve m

an

agem

ent

of

envi

ron

men

tal

con

stra

ints

Min

imis

e se

riou

s o

r ir

reve

rsib

le

en

viro

nm

ent

al

dam

age.

AM

1 F

urth

er r

efin

emen

t of

the

pipe

line

alig

nmen

t w

ill s

eek

to im

prov

e en

viro

nmen

tal

out

com

es t

hro

ug

h a

void

anc

e o

f re

leva

nt c

on

stra

ints

, an

d a

s n

ece

ssar

y th

e

miti

gatio

n of

an

y ad

ditio

nal a

dve

rse

impa

cts.

Pri

or

to

cons

truc

tion

C

hapt

er 1

8 of

the

EA

En

sure

ad

aptiv

e

man

ag

em

ent

of

en

viro

nm

ent

al

cons

tra

ints

.

AM

2 T

he p

ropo

nent

will

car

ry o

ut t

he fi

eld

wor

k re

ferr

ed to

in T

able

18

.1

Pri

or to

co

nstr

uctio

n a

nd

co

nstr

uctio

n

Cha

pter

18

of th

e E

A

Tab

le 1

8.1

Page 24: 6 Revised statement of commitments