6 ReportingTemplate ForLUCC May2014

Embed Size (px)

Citation preview

  • 8/10/2019 6 ReportingTemplate ForLUCC May2014

    1/1

    Re ortin Tem late for RSPO Historical Land Use Cover Chan e Anal sis and Com ensation Liabilit

    Date of submission DD MM YYYY

    Re ortin Guidance 1. COMPANY INFORMATION

    Box 1.1 - Name of RPSO member

    Box 1.2 - RSPO membershi number

    Box 1.3 - Date of oinin RSPO DD MM YYYY

    Box 1.4- Date of first RSPO certification

    Box 1.5 - Total number of certified management

    units

    Separate reports should be filed for each

    management unitBox 1.6- Name of subsidiary/management unit

    Box 1.7 - Countr of subsidiar mana ement unit

    Additional location details to be supplied in

    supporting documents

    Box 1.8 - Province and district of

    subsidiar mana ement unit

    2. COMPENSATION CASE

    Is the compensation process for this

    subsidiary/management unit self-initiated or a

    product of a report or complaint?

    Box 2.1 -Was this case initatied voluntarily or was it

    reported/referred?

    The means by which the entity was reported or

    referred (if relevant) to the CTF (e.g. complaints

    panel, certification body report, etc)

    Box 2.2 - If case was reported/referred, through

    which channel did this occur?

    3. SUMMARY OF RAW LIABILITY

    What was the nature of the liability? (E.g. land

    clearing without prior HCV assessment)Box 3.1 - Description of liability

    Period of liability begins at the November 2005

    cutoff date through the date at which liability was

    resolved. In most cases, the end of the liability

    period would be the date of completion of the HCV

    assessment.

    Box 3.2 - Period of liability 11/2005-DD/MM/YYYY

    Description of how the liability was resolved (e.g.

    HCV assessment completed).Box 3.3 - Briefly explain resolution of liability

    For the full period of liability, was the managementunit under control of a non-RSPO member, an RSPO

    member with no certified management units, or an

    RSPO member with certified management unit(s) at

    the time of liability. Please explain any changes in

    control that occured during the time period of

    liability.

    Box 3.4 - Controlling party of management unit

    during time period of liability

    Box 3.5 -Starting date of management control of unit

    b re ortin com an

    Box 3.6 - Total area of management unit (hectares)

    Total area cleared during period of liability. In most

    cases, this is the total area cleared without prior

    HCV assessment.

    Box 3.7- Total area of raw liability (hectares)

    Box 3.8 - Sub-totals of raw liability, by timeframe (in

    hectares

    November 2005 to November 30, 2007December 1, 2007-December

    31, 2009

    January 1, 2010 - May 9, 2014 (date of introduction of

    compensation mechanism)

    Land clearing after May 9, 2014 (date of

    introduction of compensation mechanism)

    Box 3.9 - Any potential Social Impacts related to

    losses of HCVs 4,5,or 6?

    Y/N

    Box 3.10 - Briefly explain specific

    circumstances?+B51

    4. HISTORICAL LAND USE/COVER CHANGE (LUC)

    ANALYSIS

    Answer yes if the company opts for compensation of

    the total area of liability using the coefficient 1.0 , in

    lieu of conducting a full land use change analysis.

    Box 4.1 Use coefficient 1.0 for total area? Y/N

    Box 4.2- LUC Analysis results (in hectares) before

    multification coefficient

    Vegetation CoefficientNovember 2005 to November

    30, 20071 Dec.2007 to 31 December 2009

    January 1, 2010 to May 9, 2014 (date of

    introduction of the compensation

    mechanism

    Land clearing after May 9, 2014 (date of

    introduction of compensation mechanism)

    Coefficient 1.0

    Coefficient 0.7

    Coefficient 0.4

    Coefficient 0

    Sub-total (sum of rows)

    Box 4.3- Was any of the land clearance non-

    commercial?

    Y/N

    Explain any specific circumstances surrounding any

    of the clearing listed in 04.2, such as instances of

    non-commercial clearing, reference to additional

    supporting documents that may help justify the

    categorization of vegetation types used, etc.

    Box 4.4 - Explanation of specific circumstances

    Has any of the clearance without prior HCV

    assessment occurred on areas specifically prohibited

    by the P&Cs? Such areas must be identified and,

    where appropriate, remediated.

    Box 4.5 - Any clearance of areas where planting is

    prohibited by P&Cs (e.g. riparian zones, steep slopes,

    deep peat, areas prohibited by country-specific

    legislation)?

    Y/N

    (Example: 5 0 hectares of riparian areas were cleared

    in 2007 without prior HCV assessment. This area is

    currently planted with palms and is under active

    management)

    Box 4.6 - Briefly describe any areas identified in Box

    4.5, including hectare estimates and current

    circumstances of such areas.

    If the LUC analysis was conducted by an external

    organization, please provide the name of this

    organization. If the analysis was conducted

    internally, "internal" is a sufficient response. Please

    note that the CTF may request additional data

    and/or information on methodology from whoever

    conducted the LUC analysis.

    Box 4.5 - Name of organization who conducted LUC

    analysis

    5. CALCULATION OF FINAL LIABILITY

    Land controlled by a non-member at time of

    clearance

    Land controlled by an RSPO

    member with no certified units at

    time of clearance (Including land

    aquired from RSPO members with

    no certified management unit(s) at

    the time of clearance)

    RSPO member with at least one

    certified unit(Inluding land aquired

    from other RSPO members with

    certified management unit(s))at

    time of clearance.

    Guidance

    Remediation and/or compensation required only for

    Social HCVs if there is insufficient proof (e.g. SEIA) of

    appropriate negotiation process and/or outcomes

    (Based on LUC above, final liability will always be zero

    hectares, social liability is addressed separately)

    Remediation and/or compensation is

    required only for Social HCVs if there is

    insufficient proof (e.g. SEIA) of appropriate

    negotiation process and/or outcomes (

    Based on LUC above, final liability will

    always be zero hectares , social liability is

    addressed separately)

    N.A. (no certified areas in existence yet)

    Final Liability (Ha) 0 0 N.A.

    Guidance

    Remediation and/or compensation required only for

    Social HCVs if there is insufficient proof (e.g. SEIA) of

    appropriate negotiation process and/or outcomes (

    Based on LUC above, final liability will always be zero

    hectares, social liability is addressed separately)

    Sum of: all areas cleared commercially

    without prior HCV assessment X

    vegetation coefficients in Nov 2005. Final

    liability

    =(Hectares)X(1.0)+(Hectares)X(0.7)+(Hecta

    res)X(0.4)+(Hectares)X(0) for

    commercially cleared areas.

    Sum of: all areas cleared without prior HCV

    assessment X vegetation coefficients in Nov

    2005. Final liability

    =(Hectares)X(1.0)+(Hectares)X(0.7)+(Hectares)X(0.4)+(Hectares)X(0) for all areas

    cleared.

    Final Liability (Ha) 0 (hectares) (hectares)

    Guidance

    Sum of: all areas cleared commercially without prior

    HCV assessment X vegetation coefficients in Nov 2005.

    Final liability

    =(Hectares)X(1.0)+(Hectares)X(0.7)+(Hectares)X(0.4)+(He

    ctares)X(0) for commercially cleared areas.

    Sum of: all areas clearedwithout prior HCV

    assessment X vegetation coefficients in

    Nov 2005. Final liability

    =(Hectares)X(1.0)+(Hectares)X(0.7)+(Hecta

    res)X(0.4)+(Hectares)X(0) for all areas

    cleared.

    Twice the sum of: all areas clearedwithout

    prior HCV assessment X vegetation

    coefficients in Nov 2005. Final liability

    =(2)X((Hectares)X(1.0)+(Hectares)X(0.7)+(He

    ctares)X(0.4)+(Hectares)X(0)) for all areas

    cleared.

    Final Liability (Ha) (hectares) (hectares) (hectares)

    Guidance

    1. Sum of all areas cleared without prior HCV

    assessment X their Nov 2005 vegetation coefficient(s).

    2. All cleared land owned by members shall be

    managed in full accordance with the RSPO standard and

    certified as soon as possible.

    3. When land cleared is certified, palm products from

    areas with a vegetation coefficient < 0.4 in Nov 20 05

    may be sold as certified.

    4. Palm products from land cleared with vegetation

    coefficients > 0.4 in Nov 2005 may not be claimed as

    RSPO-certified even though the management unit is

    certified (must be either part of mass balance or kept

    out by physical segregation).

    5. RSPO members acquiring new areas of land after [date of introduction of the Remediation and

    Compensation Procedures ] shall commit in writing not

    to instigate, encourage or support, directly or indirectly,

    any land clearing without prior HCV assessment.

    6. Expulsion* of member or application of membership

    rejected if all requirements above are not m et.

    Expel from RSPO* Expel from RSPO*

    Final Liability (Ha) (hectares)N.A. (Any clearance needs to be explained

    separately)

    N.A. ( Any clearance needs to be explained

    separately)

    Total sum of the final liability calculations from Box

    5.1 in hectares. Compensation/remediation for

    social HCVs calculated separately.

    Box 5.2 Final conservation liability (hectares)

    *The RSPO BHCV-CP may review exceptional cases of accidental and limited land clearing without prior HCV assessment

    Control of LandFinal liability will be calculated in hectares, using the

    inputs from the LUC analysis, adjusted according to

    time period of the liabliity, who controlled the land

    at time of clearance, and vegetationcoefficents in

    2005. See individual guidance for each cell within

    Box 5.1.

    Time of clearance

    Time of clearance

    1 Dec. 2007 to 31 Dec. 2009

    Jan 1 2010 - May 9, 2014 (introduction of the

    Compensation Mechanism)

    After May 9, 2014 ( introduction of theCompensation

    mechanism)

    Box 5.1 Determining final conservation liability (hectares)

    Hectares of raw liability (e.g. hectares cleared

    without prior HCV assessment) , divided into the

    timeframes provided based on when the clearing

    occured. Only report areas cleared until the end date

    of the time period of liability (do nto report clearing

    that occured after HCV assessment).

    Hectares of raw liability (e.g. hectares cleared

    without prior HCV assessment), divided into the

    timeframes provided based on when the clearing

    occurred and further divided according to vegetation

    coefficients based on November 200 5 land cover.

    See land use change guidance document for

    additional details. Note that not all areas reported

    here will result in final liability.

    Nov. 2005 to 30 Nov. 2007

    Ti

    eofClearance

    Potential loss of HCV 4-6 shall be assessed, either

    through existing evidence or a new process. Section9 and Annex 1 of the Remediation and

    Compensation Procedures provides additional

    details.

    v0-140120-ort

    page with guidance

    DRAFT ONLY

    FOR COMMENTS