8/10/2019 6 ReportingTemplate ForLUCC May2014
1/1
Re ortin Tem late for RSPO Historical Land Use Cover Chan e Anal sis and Com ensation Liabilit
Date of submission DD MM YYYY
Re ortin Guidance 1. COMPANY INFORMATION
Box 1.1 - Name of RPSO member
Box 1.2 - RSPO membershi number
Box 1.3 - Date of oinin RSPO DD MM YYYY
Box 1.4- Date of first RSPO certification
Box 1.5 - Total number of certified management
units
Separate reports should be filed for each
management unitBox 1.6- Name of subsidiary/management unit
Box 1.7 - Countr of subsidiar mana ement unit
Additional location details to be supplied in
supporting documents
Box 1.8 - Province and district of
subsidiar mana ement unit
2. COMPENSATION CASE
Is the compensation process for this
subsidiary/management unit self-initiated or a
product of a report or complaint?
Box 2.1 -Was this case initatied voluntarily or was it
reported/referred?
The means by which the entity was reported or
referred (if relevant) to the CTF (e.g. complaints
panel, certification body report, etc)
Box 2.2 - If case was reported/referred, through
which channel did this occur?
3. SUMMARY OF RAW LIABILITY
What was the nature of the liability? (E.g. land
clearing without prior HCV assessment)Box 3.1 - Description of liability
Period of liability begins at the November 2005
cutoff date through the date at which liability was
resolved. In most cases, the end of the liability
period would be the date of completion of the HCV
assessment.
Box 3.2 - Period of liability 11/2005-DD/MM/YYYY
Description of how the liability was resolved (e.g.
HCV assessment completed).Box 3.3 - Briefly explain resolution of liability
For the full period of liability, was the managementunit under control of a non-RSPO member, an RSPO
member with no certified management units, or an
RSPO member with certified management unit(s) at
the time of liability. Please explain any changes in
control that occured during the time period of
liability.
Box 3.4 - Controlling party of management unit
during time period of liability
Box 3.5 -Starting date of management control of unit
b re ortin com an
Box 3.6 - Total area of management unit (hectares)
Total area cleared during period of liability. In most
cases, this is the total area cleared without prior
HCV assessment.
Box 3.7- Total area of raw liability (hectares)
Box 3.8 - Sub-totals of raw liability, by timeframe (in
hectares
November 2005 to November 30, 2007December 1, 2007-December
31, 2009
January 1, 2010 - May 9, 2014 (date of introduction of
compensation mechanism)
Land clearing after May 9, 2014 (date of
introduction of compensation mechanism)
Box 3.9 - Any potential Social Impacts related to
losses of HCVs 4,5,or 6?
Y/N
Box 3.10 - Briefly explain specific
circumstances?+B51
4. HISTORICAL LAND USE/COVER CHANGE (LUC)
ANALYSIS
Answer yes if the company opts for compensation of
the total area of liability using the coefficient 1.0 , in
lieu of conducting a full land use change analysis.
Box 4.1 Use coefficient 1.0 for total area? Y/N
Box 4.2- LUC Analysis results (in hectares) before
multification coefficient
Vegetation CoefficientNovember 2005 to November
30, 20071 Dec.2007 to 31 December 2009
January 1, 2010 to May 9, 2014 (date of
introduction of the compensation
mechanism
Land clearing after May 9, 2014 (date of
introduction of compensation mechanism)
Coefficient 1.0
Coefficient 0.7
Coefficient 0.4
Coefficient 0
Sub-total (sum of rows)
Box 4.3- Was any of the land clearance non-
commercial?
Y/N
Explain any specific circumstances surrounding any
of the clearing listed in 04.2, such as instances of
non-commercial clearing, reference to additional
supporting documents that may help justify the
categorization of vegetation types used, etc.
Box 4.4 - Explanation of specific circumstances
Has any of the clearance without prior HCV
assessment occurred on areas specifically prohibited
by the P&Cs? Such areas must be identified and,
where appropriate, remediated.
Box 4.5 - Any clearance of areas where planting is
prohibited by P&Cs (e.g. riparian zones, steep slopes,
deep peat, areas prohibited by country-specific
legislation)?
Y/N
(Example: 5 0 hectares of riparian areas were cleared
in 2007 without prior HCV assessment. This area is
currently planted with palms and is under active
management)
Box 4.6 - Briefly describe any areas identified in Box
4.5, including hectare estimates and current
circumstances of such areas.
If the LUC analysis was conducted by an external
organization, please provide the name of this
organization. If the analysis was conducted
internally, "internal" is a sufficient response. Please
note that the CTF may request additional data
and/or information on methodology from whoever
conducted the LUC analysis.
Box 4.5 - Name of organization who conducted LUC
analysis
5. CALCULATION OF FINAL LIABILITY
Land controlled by a non-member at time of
clearance
Land controlled by an RSPO
member with no certified units at
time of clearance (Including land
aquired from RSPO members with
no certified management unit(s) at
the time of clearance)
RSPO member with at least one
certified unit(Inluding land aquired
from other RSPO members with
certified management unit(s))at
time of clearance.
Guidance
Remediation and/or compensation required only for
Social HCVs if there is insufficient proof (e.g. SEIA) of
appropriate negotiation process and/or outcomes
(Based on LUC above, final liability will always be zero
hectares, social liability is addressed separately)
Remediation and/or compensation is
required only for Social HCVs if there is
insufficient proof (e.g. SEIA) of appropriate
negotiation process and/or outcomes (
Based on LUC above, final liability will
always be zero hectares , social liability is
addressed separately)
N.A. (no certified areas in existence yet)
Final Liability (Ha) 0 0 N.A.
Guidance
Remediation and/or compensation required only for
Social HCVs if there is insufficient proof (e.g. SEIA) of
appropriate negotiation process and/or outcomes (
Based on LUC above, final liability will always be zero
hectares, social liability is addressed separately)
Sum of: all areas cleared commercially
without prior HCV assessment X
vegetation coefficients in Nov 2005. Final
liability
=(Hectares)X(1.0)+(Hectares)X(0.7)+(Hecta
res)X(0.4)+(Hectares)X(0) for
commercially cleared areas.
Sum of: all areas cleared without prior HCV
assessment X vegetation coefficients in Nov
2005. Final liability
=(Hectares)X(1.0)+(Hectares)X(0.7)+(Hectares)X(0.4)+(Hectares)X(0) for all areas
cleared.
Final Liability (Ha) 0 (hectares) (hectares)
Guidance
Sum of: all areas cleared commercially without prior
HCV assessment X vegetation coefficients in Nov 2005.
Final liability
=(Hectares)X(1.0)+(Hectares)X(0.7)+(Hectares)X(0.4)+(He
ctares)X(0) for commercially cleared areas.
Sum of: all areas clearedwithout prior HCV
assessment X vegetation coefficients in
Nov 2005. Final liability
=(Hectares)X(1.0)+(Hectares)X(0.7)+(Hecta
res)X(0.4)+(Hectares)X(0) for all areas
cleared.
Twice the sum of: all areas clearedwithout
prior HCV assessment X vegetation
coefficients in Nov 2005. Final liability
=(2)X((Hectares)X(1.0)+(Hectares)X(0.7)+(He
ctares)X(0.4)+(Hectares)X(0)) for all areas
cleared.
Final Liability (Ha) (hectares) (hectares) (hectares)
Guidance
1. Sum of all areas cleared without prior HCV
assessment X their Nov 2005 vegetation coefficient(s).
2. All cleared land owned by members shall be
managed in full accordance with the RSPO standard and
certified as soon as possible.
3. When land cleared is certified, palm products from
areas with a vegetation coefficient < 0.4 in Nov 20 05
may be sold as certified.
4. Palm products from land cleared with vegetation
coefficients > 0.4 in Nov 2005 may not be claimed as
RSPO-certified even though the management unit is
certified (must be either part of mass balance or kept
out by physical segregation).
5. RSPO members acquiring new areas of land after [date of introduction of the Remediation and
Compensation Procedures ] shall commit in writing not
to instigate, encourage or support, directly or indirectly,
any land clearing without prior HCV assessment.
6. Expulsion* of member or application of membership
rejected if all requirements above are not m et.
Expel from RSPO* Expel from RSPO*
Final Liability (Ha) (hectares)N.A. (Any clearance needs to be explained
separately)
N.A. ( Any clearance needs to be explained
separately)
Total sum of the final liability calculations from Box
5.1 in hectares. Compensation/remediation for
social HCVs calculated separately.
Box 5.2 Final conservation liability (hectares)
*The RSPO BHCV-CP may review exceptional cases of accidental and limited land clearing without prior HCV assessment
Control of LandFinal liability will be calculated in hectares, using the
inputs from the LUC analysis, adjusted according to
time period of the liabliity, who controlled the land
at time of clearance, and vegetationcoefficents in
2005. See individual guidance for each cell within
Box 5.1.
Time of clearance
Time of clearance
1 Dec. 2007 to 31 Dec. 2009
Jan 1 2010 - May 9, 2014 (introduction of the
Compensation Mechanism)
After May 9, 2014 ( introduction of theCompensation
mechanism)
Box 5.1 Determining final conservation liability (hectares)
Hectares of raw liability (e.g. hectares cleared
without prior HCV assessment) , divided into the
timeframes provided based on when the clearing
occured. Only report areas cleared until the end date
of the time period of liability (do nto report clearing
that occured after HCV assessment).
Hectares of raw liability (e.g. hectares cleared
without prior HCV assessment), divided into the
timeframes provided based on when the clearing
occurred and further divided according to vegetation
coefficients based on November 200 5 land cover.
See land use change guidance document for
additional details. Note that not all areas reported
here will result in final liability.
Nov. 2005 to 30 Nov. 2007
Ti
eofClearance
Potential loss of HCV 4-6 shall be assessed, either
through existing evidence or a new process. Section9 and Annex 1 of the Remediation and
Compensation Procedures provides additional
details.
v0-140120-ort
page with guidance
DRAFT ONLY
FOR COMMENTS