    Outline

    ADB and the Pacific OperationsAchievement and partnershipsOperational priorities for 2016-2018

    Energy and transport priorities2016 Project and TA ProgramProcurement information (energy and transport)

    2

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    3/21

    The Pacific Region

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    4/21

    ADB’s Pacific Department

    ADB offices in the Pacific

    HQ inManila

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    5/21

    Pacific Operations(1-3% of ADB Total Loan/Grant Approval)

    -

    2,000

    4,000

    6,000

    8,000

    10,000

    12,000

    14,000

    2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

    U S

    $ b i l

    l i o n

    PACIFIC 14

    ADB

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    6/21

    Pacific Operational Priorities

    Improved connectivityBroadened access to quality servicesExpanded resilience

    Increased public sector capabilities

    6

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    7/21

    Achievements:Growing Portfolio (Lending and Grant Operations)

    7

    +103%

    -17%

    +298%

    +105%

    % change2009-2015

    -

    500

    1,000

    1,500

    2,000

    2009 2010 2011 2012 2013 2014 2015

    $ m i l l i o n

    Papua New Guinea Timor-Leste Fiji Other countries

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    8/21

    Including ADB-administered co-financing

    4143

    45

    57

    68

    6360

    64

    73

    85

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    -

    500.00

    1,000.00

    1,500.00

    2,000.00

    2,500.00

    3,000.00

    3,500.00

    2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

    N u m

    b e r

    $ m i l

    l i o n

    REG

    SOL-VAN

    KIR-RMI-FSM-NAU-PAL-TUV

    COO-SAM-TON

    FIJ-PNG-TIM

    No. of Projects

    Achievements:Growing Portfolio (Lending and Grant Operations)

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    9/21

    Achievements:Growing portfolio focused on infrastructure and services

    9

    +60%

    +13%

    +228%

    +107%

    % change2009-2015

    -

    500

    1,000

    1,500

    2,000

    2009 2010 2011 2012 2013 2014 2015

    $ m i l

    l i o n

    Transport & ICT Energy Water and Urban Services Other sectors

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    10/21

    Strengthened Partnerships:Increased cofinancing in project portfolio

    10

    -

    200

    400

    600

    800 1,000

    1,200

    1,400

    1,600

    1,800

    2,000

    2009 2010 2011 2012 2013 2014 2015

    $ m i l

    l i o n

    ADF & OCR Other partners

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    11/21

    Strengthened Partnerships:Increased cofinancing in technical assistance portfolio

    11

    -

    25

    50

    75

    100

    125

    150

    175

    200

    2009 2010 2011 2012 2013 2014 2015

    $ m i l

    l i o n

    Technical Assistance Special Fund Other funds

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    12/21

    Priority Sectors, 2016-2018*

    12

    PublicSectorMgt.

    FIJKIRNAUPNGRMISOLTONREG

    Energy

    COOFIJFSMPNGRMISOLTIMTONVAN

    Transport

    FIJFSMNAUPNGSAMSOLTIMTUV

    WaterSupply

    and OtherMunicipal

    Infra.Services

    FIJKIRPNGRMITIMTONVAN

    ICT

    COOSOLTONREG

    Finance

    PNG

    Education

    REG

    Industryand

    Trade

    FSM

    Healthand

    SocialProtect-

    ion

    PNG

    Agri.and

    NaturalResources

    REG

    * Loans and Grants only

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    13/21

    Energy priorities

    Increase renewable energy penetrationIncrease energy efficiency

    Rehabilitate infrastructureExpand access to modern energy servicesIncrease private-sector participation in

    delivery of energy services

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    14/21

    • Improved connectivity• Broadened access to services• Resilient infrastructure• Improved capacity of public sector

    Transport priorities

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    15/21

    2016 Lending and Grant Pipeline

    15

    Transport

    $464.71 million

    PNG Highlands Region Road ImprovementInvestment Program, Tranche 3

    PNG Civil Aviation Development InvestmentProgram, Tranche 3

    PNG Bridge Replacement for Improved RuralAccess Sector Project (addl. cofinancing)

    SOL Sustainable Transport InfrastructureImprovement Program

    TIM Road Network Upgrading Project(additional financing)TUV Outer Island Maritime Infrastructure

    Project

    Water Supply andOther MunicipalInfra. Services

    $181.77 million

    FIJ Urban Water Supply and WastewaterManagement Project

    KIR South Tarawa Sanitation ImprovementProject (additional financing)

    TIM Urban Services Improvement ProjectVAN Port Vila Urban Development

    (additional financing)

    Energy$100.91 million

    COO Renewable Energy Sector Project(additional financing)

    PNG Town Electrification InvestmentProgram, Tranche 2

    SOL Solar Power Development ProjectTON Outer Island Renewable Energy Project

    (additional financing)VAN Energy Access Project

    ICT

    $39.00 million

    FIJ Fiji Cyclone Emergency ResponseProject

    NAU Fiscal Sustainability Reform ProgramSOL Economic Growth and Fiscal Reform

    ProgramTON Building Macroeconomic Resilience,

    Subprogram 1

    Public SectorManagement

    $22.60 million

    REG Higher Education in thePacific InvestmentProgram, Tranches 2 & 3

    Education

    $15.40 million

    SOL Improving Internet Connectivityfor Cook Islands

    SOL Broadband for DevelopmentProject (additional financing)

    * Amounts include other special funds and cofinancing

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    16/21

    2016 Technical Assistance Pipeline

    16

    Public SectorManagement

    $11.08 million

    KIR Strengthened Public FinancialManagement

    SOL Strengthening Capacity ofMinistry of InfrastructureDevelopment

    TIM Fiscal Policy for ImprovedService Delivery

    TIM Capacity for Regional Economic

    IntegrationVAN Institutional Strengthening forEnvironmental Safeguards

    REG Building ProjectImplementation Capacity

    REG Pacific Financial TechnicalAssistance Center, 2017-2021

    REG Promoting Evidence-BasedPolicy Making for GenderEquity in the Pacific (Phase 2)

    REG Strengthening Public FinancialManagement in PDMCs

    (additional financing)

    Energy

    $7.00 million

    RMI Integrated StrategicPlanning forInvestments inRenewable Energy

    TIM Preparing theElectricity SystemStrengthening and

    Sustainability ProgramREG Increasing Access to

    Renewable EnergyREG Establishment of the

    Pacific RegionInfrastructure FacilityCoordination Office(additional financing)

    Water Supply andOther MunicipalInfra. Services

    $ 2.88 million

    KIR Preparing the South Tarawa WaterSector Development Program

    PNG Water Supply and SanitationInstitutional Strengthening

    TON Preparing the Urban DevelopmentProject

    REG Strengthening Urban Infrastructure

    Investment Planning in the Pacific

    Transport

    $ 2.60 million

    PNG Preparing the Multi Partner FinancingFacility for Highlands Highway

    SOL Strengthening the Solomon IslandsMaritime Safety Administration

    VAN Supporting the Office of the MaritimeRegulator

    ICT

    $ 0.34 million

    REG Preparing the e-Pacific: RegionalProject for ICT Development in thePacific

    Finance

    $0.35 million

    NAU Strengthening FinancialInclusion and Financial SectorDevelopment

    Education

    $0.20 million

    REG Preparing the ImprovingQuality of Basic EducationProject

    * Amounts include other special funds and cofinancing

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    17/21

    Procurement information (Energy)

    17

    Description Country Type Value Contact2016

    Construction of 4 solarPV power plants in Atiu,Mauke, Mangaia, Mitiaro

    COO Goods andWorks

    $ 7.00 W. Lee

    Rouna 1 & SirinumuHydropower PlantRehabilitation & Upgrade

    PNG Goods andWorks $ 26.80 H. Haider

    Aircraft Pavementupgrading at MomoteAirport

    PNG Works TBA H. Haider

    Fuluasou Small HydroProject

    SAM Goods andWorks

    $ 8.40 W. Lee

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    18/21

    Procurement information (Energy)

    18

    Description Country Type Value Contact2016

    Design, Supply andInstallation of Smartmeters and OperatingSystem

    SAM Goods andWorks

    TBA G. King

    2017 Fiu River HydropowerPlant (Operation &Maintenance)

    SOL Goods andWorks

    $1.30 A. Maxwell

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    19/21

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    20/21

    Procurement information (Transport)

    20

    Description Country Type Value Contact2016

    Improvement of Pangia-Wiru Loop

    PNG Works $25.00 S. Khan

    Improvement of Gewa-Gemboji Road

    PNG Works $ 32.00 S. Khan

    Improvement of Nipa-Minihu Road

    PNG Works $ 25.20 S. Khan

    Improvement ofHenganofi-Nupuru

    PNG Works $ 24.70 S. Khan

  • 8/19/2019 6 Energy PARD by ONorojono 14Mar2016 Rev

    21/21