MINISTRY OF NATURAL RESOURCES AND EMVIRONMENT CENTER OF WATER RESOURCES PLANNING AND INVESTIGATION DIVISION FOR WATER RESOURCES P&I FOR THE SOUTH OF VN Address: 59, Street 2, Binh An Ward, District 2, HCMc Tel: 08. 8992133 - 8999042 Fax: 08.8999044 Email: [email protected] Website: http://www.liendoan8.com.vn HCM city, 2009

6 capacity profile

Embed Size (px)

DESCRIPTION

MINISTRY OF NATURAL RESOURCES AND EMVIRONMENT CENTER OF WATER RESOURCES PLANNING AND INVESTIGATION DIVISION FOR WATER RESOURCES P&I FOR THE SOUTH OF VN

Citation preview

Page 1: 6 capacity profile

MINISTRY OF NATURAL RESOURCES AND EMVIRONMENT CENTER OF WATER RESOURCES PLANNING AND INVESTIGATION

DIVISION FOR WATER RESOURCES P&I FOR THE SOUTH OF VN Address: 59, Street 2, Binh An Ward, District 2, HCMc Tel: 08. 8992133 - 8999042 Fax: 08.8999044

Email: [email protected] Website: http://www.liendoan8.com.vn

HCM city, 2009

Page 2: 6 capacity profile

INTRODUCTION

The forerunner of Division for Water Resources Planning and Investigation for the South of Viet Nam is:

- Division of Hydrogeology No8 (Division 8 for short) was established by Decree 152 /HĐBT dated 10/12/1981 of Council of Ministers;

- Decision 895 /QĐ-TCCB dated 20/6/1997 of Minister of Ministry of Industry about renaming of Division of Hydrogeology No8 to Division of Hydrogeology and Engineering Geology for the South of Viet Nam;

- Decision 1233 /QĐ-BTNMT dated 12/6/2008 of Minister of Ministry of Natural Resources and Environment about renaming of Division of Hydrogeology and Engineering Geology for the South of Viet Nam to Division for Water Resources Planning and Investigation for the South of Viet Nam.

Division for Water Resources Planning and Investigation for the South of Viet Nam has functions:

a) Setting up and realizing projects of water resources planning, investigation and production; projects of ground water mapping, investigation, production and asking license (including mineral water). Building of ground water production units, drinking and waste water treatment plants, water supplying systems for domestic use and industry.

b) Setting up and realizing projects of engineering geological investigation, drilling, soil testing, processing of fundament of building construction; geological, hydrogeological, engineering geological, environmental geological mapping.

c) Carrying out research projects of water resources planning, investigation and monitoring, assessing geological, hydrogeological, engineering geological hazards.

d) Investigation, setting up projects, technical design for land surveying and mapping, surveying, setting up topographical maps; measuring and setting up cadastral maps on various scales; establishing database for land survey.

e) Implementing geophysical methods for ground water exploration and others purposes.

f) Investigation and assessing reverses of minerals and setting up projects for asking exploitation license.

g) Consulting on designing and supervising in many aspects such as water resources, engineering geology, geophysics, geodesic and others according to the Laws.

h) Import-exporting equipment and materials using for purposes of water resources, geotechnics and mining; repairing, producing mechanical accessories for geologic production and social demands.

i) Water, soil and air samples analysing. k) Carrying out many kinds of services according to the Laws.

Page 3: 6 capacity profile

Part I

GENERAL INFORMATION

I. ADMINISTRATION PROFILE Name: Division for Water Resources Planning and Investigation for the South of Vietnam (DWRPIS) Head office : 59 Street 2 - Binh An Ward - District 2 - HCM city Telephone: 08.8.3992.431 - 08.8.3980.470 - 08.8.3999.042 - 08.8.3992.115 Fax: 08.8.3999.044 Website: liendoan8.com.vn E-mail : [email protected] Tax code : 0 3 0 1 1 7 0 5 2 7

II. STRUCTURE AND LABOUR OF DIVISION 1. Structure diagram:

Deputy Director of the Technical

General Director

Deputy Director of the Interior

Admin Section

Planning Section

Financial Section

Technical Section

Personnel Section

Sub. Divison

801

Sub. Divison

802

Sub. Divison

803

Sub. Division

804

Sub. Divison

805

Sub. Division

806

LAB

Center for production

Center for Infortechnic

Page 4: 6 capacity profile

2. Subordinate Units:

Sub. Division WRPI 801: Long Binh Tan - Bien Hoa - Dong Nai Sub. Division WRPI 802: Thu Dau Mot Town - Binh Duong. Sub. Division WRPI 803: Trung Luong - My Tho - Tien Giang. Sub. Division WRPI 804: Vinh Long Town - Vinh Long. Sub. Division WRPI 805: Binh An Ward - District 2 - HCM city Sub. Division WRPI 806: Binh An Ward - District 2 - HCM city Center for Analysing and Testing for the South of Vietnam: Binh An Ward - District 2 - HCM city Center for Informatics and Technological Application: Binh An Ward - District 2 - HCM city

Center for Geological Services and Construction: Binh An Ward - District 2 - HCM city

3. Labour of Division: TOTAL OF LABOUR:(person) In which :

374

− Doctors: 1− Masters: 8− Engineers : • Hydrogeological - Engineering Geological • Geological • Geodesic • Mapping • Geophysicist • Drilling • Construction • Analysis • Others

12665

7424722

33

− Middle-ranking: 74− Drillers: 144− Others: 21

III. FUNCTIONS, TASKS AND AUTHORITIES OF THE DIVISION 1. Submit long term, five-year and annual plans to the Director of Center for

Water Resources Planning and Investigation for approval according to the functions and tasks of the Division regarding water resources planning and investigation, carrying out these plans after being approved.

2. Planning for water resources protection, production, development and preventing, overcoming damaging effects caused by water.

3. Water resources investigation, inventorying actual status of water resources quantity, quality and water production, using situation; assessing extent and risk of water resources regression, pollution.

4. Setting up, managing and operating water resources monitoring network; providing water resources information and data according to the Laws; participating in synthesizing results of water resources investigation and completed planning projects;

Page 5: 6 capacity profile

setting up water resources information system and database as assigned by Director of the Center.

5. Implementing all the programs, projects; applying, transferring scientific and technological results regarding water resources as assigned by Director of the Center.

6. Training on water resources planning and investigation; participating in propaganda and popularizing for improving awareness of community about water resources policy and laws as assigned by Director of the Center.

7. Implementing tasks of thermal, mineral water investigation and research; engineering geological investigation for management purposes as assigned by Director of the Center.

8. Participating in establishing standards, technical rules, technico-economic norms for water resources planning, investigation, monitoring and other concerned documents.

9. Consulting/participating in appraising water resources planning, investigation projects, projects of displacing water between big river basins, investment projects regarding water resources exploitation, discharge of waste water and waste matter into water sources.

10. Performing international cooperation in water resources planning and investigation as assigned by Director of the Center.

11. Analyzing water, soil, rock and air samples. 12. Implementing services regarding water resources planning and

investigation, geology, minerals and others according to the Laws, such as: a) Setting up and realizing projects of water resources planning, investigation

and production; projects of ground water mapping, investigation, production and asking license (including thermal and mineral water). Building of ground water production units, drinking and waste water treatment plants, water supplying systems for domestic use and industry.

b) Setting up and realizing projects of engineering geological investigation, drilling, soil testing, processing of fundament of building construction; geological, hydrogeological, engineering geological, environmental geological mapping.

c) Carrying out research projects of water resources planning, investigation and monitoring, assessing geological, hydrogeological, engineering geological hazards.

d) Investigation, setting up projects, technical design for land surveying and mapping, surveying, setting up topographical maps; measuring and setting up cadastral maps on various scales; establishing database for land survey.

e) Implementing geophysical methods for ground water exploration and others purposes.

f) Investigation and assessing reverses of minerals and setting up projects for asking exploitation license.

g) Consulting on designing and supervising in many aspects such as water resources, engineering geology, geophysics, geodesic and others according to the Laws.

Page 6: 6 capacity profile

h) Import-exporting equipment and materials using for purposes of water resources, geotechnics and mining; repairing, producing mechanical accessories for geologic production and social demands.

i) Water, soil and air samples analysing. k) Carrying out many kinds of services according to the Laws. 13. Managing finance and assets of Division, implementing all responsibility of

administrative unit of grade III for subordinate units directly under Division as assigned by the Laws.

14. Carrying out administrative innovation according to the administrative innovation program, plan of Ministry of Natural Resources and Environment as assigned by Director of the Center.

15. Managing personnel staff of Division as arranged by the Center. 16. Periodic and ad hoc reporting on implemetation of assigned tasks as

required. 17. Implementing other tasks assigned by Director of the Center. VI. EXPERIENCE IN MAIN ACTIVITIES

Geotechnical investigation: since 1982 Hydrogeological exploration: since 1982 Hydrogeological - engineering geological mapping: since 1982 Ground water monitoring: since 1982 Drilling ground water wells: since 1984 Building treament plants for domestic use since 1990

waste water, water supply system for industry and domestic use:

Land survey: since 1982 Trading in specislist materials: since 1982

V. LEGAL DOCUMENTS OF DIVISION Decree No 152/HDBT dated on December, 10th 1981 issued by Council of

Ministers about establishment of Division of Hydrogeology No8 (now is called Division of Water Resources Planning and Investigation for the South of Viet Nam);

Decision No 895/QD-TCCT dated on June, 20th1997 issued by Minister of Ministry of Industry about renaming Division of Hydrogeology No8 into Division of Hydrogeology and Engineering Geology for the South;

Decision No 1233/QD-BTNMT dated on June, 12th 2008 about renaming three Divisions under Center of Water Resources Planning and Investigation;

Decision No 1675/QD-BTNMT dated on August, 25th 2008 of Minister of Ministry of Natural Resources and Environment about assigning function, tasks, authority and structure of Division of Water Resources Planning and Investigation for the South of Viet Nam;

Decision No 43/QD-QHDTTNN dated on September, 01st 2008 of Center of Water Resources Planning and Investigation allowing Division of Water Resources Planning and Investigation for the South of Viet Nam to perform economic contracts on water resources, geology, engineering geology, environmental geology, land survey fields;

Work permit of drilling ground water wells, building treatment system... No 2849/QĐ-TCCB dated on December, 03rd 1999 issued by Ministry of Industry;

Page 7: 6 capacity profile

Work permit of land surveying and mapping No 031 dated on August, 05th 2004 issued by Department of Surveying and Mapping;

Decision No 444/QĐ-BXD dated on March, 21st 2007 of Minister of Ministry of Construction recognizing testing capacity of Laboratory under Division of Hydrogeology and Engineering Geology for the South, code LAS-XD 261.

(All mentioned legal documents are enclosed)

Part II CAPACITY OF FINANCE - TASK PERFORMANCE

1. Financial data: On the basis of the audited report on financial situation in three years (copies of

reports on audited finance enclosed), a summarized table of assets and liabilities of Division was compiled as bellow.

Category 2005 2006 2007

1- Total of assets 108,487,203,100 60,382,755,418 62,823,057,287

2- Total of accounts payable 34,598,403,665 29,208,961,417 40,702,942,220

3- Working capital 39,460,504,295 34,458,041,183 47,858,663,735

4- Proceeds 56,649,910,732 49,077,535,704 64,861,791,382

5- Profits before tax 1,426,534,833 1,567,277,604 1,722,508,364

6- Profits after tax 1,268,378,783 1,412,272,874 1,481,118,879

2. List of projects, works completed:

Page 8: 6 capacity profile

Part III

Page 9: 6 capacity profile

I. CAPACITY OF DRILLING TECHNOLOGY - EQUIPMENT 1. Hydrogeological exploration drilling Hydrogeological exploration drilling aims at supporting hydrogeological study

by taking soil samples for lithological analysis, creating holes for well logging and carrying out pumping tests.

Exploration drilling is carried out by drilling rigs such as YPБ-3AM-500, YPБ-2,5A...Division has capacity to drill exploration wells with core to the depth of 500m.

Drilling Rig YPБ-3AM-500 at the site

2. Production drilling Besides direct circulation

drilling method, for production drilling, at that time, Division mainly uses reverse circulation drilling method. This is the drilling technology suitable for water wells with large capacity, drilling in soft sediments as in Nam Bo area. Reverse circulation drilling technology is applied widely in developed countries because of many advantages in comparison with others drilling methods, these advantages are:

- Large diameter wells can be drilled quickly.

- Aquifers are relatively undisturbed during drilling because of using fluid having small gravity.

- Well are straight and pumps can be easily installed. - Improve well efficiency.

Diagram of RCD

Page 10: 6 capacity profile

Reverse circulation drilling is carried out by using drilling rig DRILLCON, innovated 1БA-15B and YPБ-3AM-500 rigs (done by Division). These drilling rigs can drill production wells with depth of 500m, diameter of hole to 800mm.

Drilling rig DRILLCON at site in VBL

Innovated rig with RC at the site in Bac Lieu

3. Drilling for geotechnical investigation Geotechnical investigation drilling is performed by using drilling rigs such as

XY-100, XY-1A, YГБ-50M. These drilling rigs can drill holes to the depth of 100 to 150m. Division can realize drilling investigation in river, lake, shallow sea and make testing in field and in laboratory according to the ASTM, BS…standards

Page 11: 6 capacity profile

Drilling rig YГБ-50 for investigation for Ben Cat landfill - Binh Duong Drilling on river Rig GJ-200 for checking concrete panel of Can Tho bridge

II. CAPACITY OF GEOPHYSIC TECHNOLOGY AND EQUIPMENT 1. Well logging The digital well logging station MGX-II made in USA has been used for

determining geological strata, location of aquifers and aquitars and their quality due to interpretation some parameters such as: resistivity of formation nearby the hole, resistivity of drilling fluid, SP, gamma, temperature, diameter of hole....It can do logging in hole with depth to 700m.

Page 12: 6 capacity profile

Well logging equipment and an example of result 2. Vertical electric sounding (VES) Vertical electric sounding is used for determining the boundary between soft

sediment and bed rock and also the boundary between zones containing fresh-saline water by area and depth of distribution, it can also define potential water bearing location in soft sediment, basalt, weathered and fractured rock. Besides, VES is used for engineering geological investigation and environmental research. Layout of poles Equipment ABEM SAS 4000

VES profile at Dak Min – Dak Nong

Page 13: 6 capacity profile

Map of fresh-saline water distribution and geological- geophysical section 3. Well surveying Well working status can be determined by GeoVision – the well surveying

camera with brand new technology and high density

GeoVISION Jr Micro TM for well surveying

III. CAPACITY OF GEODESIC TECHNOLOGY AND EQUIPMENT Design, realize, check, handover topography mapping, land survey mapping,

map of actual state in construction planning in many scales.

Design, perform surveying work for industry and domestic construction, construction of transportation and irrigation, monitoring of variation of construction.

Digital mapping by using specialist software such as MapInfo Microsation, Arcview...according to the standard issued by General Department of Land Survey

Creating topographical map for industry and domestic construction, construction of transportation, irrigation and bridge designing, urban planning. Creating land surveying map for certification land and house using in Ho Chi Minh city and others provinces.

Page 14: 6 capacity profile

All the work has been done by using equipment having high accuracy such as GPS and devices made in Japan, Germany. GPS Trimble 4600 Surveying in field

Data processing by specific software

IV. ANALYSING AND TESTING Division has a laboratory for analyzing water, soil samples, including: total content, microelement content, soil pollution, determining physico-mechanical parameters of soil samples, clay and material for construction. Analyzing and testing are done by using modern equipment and according to the standard selected by client.

Water samples analysis

Page 15: 6 capacity profile

Equipment for soil and rock samples analysis

V. INFORMATION AND DATA PROCESSING 1. Apply specific software for information processing and managing

ground water Apply specific software such as Visual MODFLOW: MODFLOW, MODPATH and

MT3D; GMS (Groundwater Modeling System): (MODFLOW, MT3DMS, RT3D, SEAM3D, MODPATH, SEEP2D, FEMWAER, NUFT and UTCHEM); Rockwork, Groundwater for Windows; Aquifer Test, MapInfo...for data processing and ground water studying and management.

Page 16: 6 capacity profile

Specific software and their application

2. Devices for information

Division is now equipped with computer network system with latest version, internet ADSL, devices for data processing, printing such as digital table, printer size A0, color laser printers...so products of Division are always of high quality and best form. Digital table Color printer A0

Page 17: 6 capacity profile

Computer network

Page 18: 6 capacity profile

DRILLING RIGS AND EQUIPMENT

Equipment Capacity Specification Made in Year

of prod.

Owner Quantity Actual status Price

Drilling rig YPБ- 3AM-

500 and 1bA-15b

Drilling depth 500m. Max. drilling diameter

D800mm

Exploration - production

drilling. Russia

1980 to

1986 Division 10 sets Good 1.500 mil /

01 set

Drilling rig WR/25/TM

Drilling depth 500m. Max. drilling diameter

D1500mm

RCD production drilling Holland 1999 Division 01 set Good 7.000 Mil /

01 set

Drilling rig THD - 25

Drilling depth 350m. Max. drilling diameter

D800mm

Production drilling Australia 1996 Division 01 set Good 1.700 Mil /

01 set

Drilling rig YPБ 2,5A

Drilling depth 250m. Max. drilling diameter

D500mm

Exploration - production

drilling. Russia 1982

1986 Division 03 sets Good 1.100 Mil / 01 set

Drilling rig G9 Drilling depth 120m. Geotechnical

drilling China 1998 Division 01 set Good 600 Mil / 01 set

Page 19: 6 capacity profile

Drilling rigs XY and XJ Drilling depth 120m. Geotechnical

drilling China 1995

to 2002

Division 10 sets Good 100 Mil / 01 set

Drilling rig XY-1A Drilling depth 150m. Geotechnical

drilling China 2005 Division 03 sets Good 130 Mil / 01 set

Auger AG 30 Drilling depth 30m. Geotechnical

drilling China 1985

to 1998

Division 05 sets Good 15 mil / 01 set

Compressor DK9 9 Kg/cm2

Well development, pumping test

Russia 1986 Division 05 sets Good 220 Mil/set

Compressor PDS-655,

Holman 400

9 - 12 Kg/cm2 Well

development, pumping test

Japan, Holland

1986 2001 Division 03 sets Good 500 Mil/set

CompressorAIRMAN PDS-390S

7 Kg/cm2 Well

development, pumping test

Japan 2003 Division 03 sets Good 500 Mil/set

Page 20: 6 capacity profile

Geodesic Mix station elevation, coordinate

Japan, Germ. 1999 Division 08 sets Good 200 Mil/set

Russia 1985 01 st Good 450 mil/st Well

logging Depth 500 m Well logging

USA 1999

Division

01 st Good 586 mil/st

Russia 1985 02 st Good 30 mil/st VES station AB max 5.000m VES

USA 1999

Division

01 st Good 150 mil/st

Laboratory analysis 6000 samp/year analysing and testing

Russia - China

1982-1999 Division 01 Lab Good 1.500 mil

Map station

GIS, Database...

Mapping, information... 1999 Division 01 set Good 300 mil