Upload
avapittman
View
218
Download
0
Embed Size (px)
Citation preview
7/29/2019 5yr plan 12-16
1/21
7/29/2019 5yr plan 12-16
2/21
7/29/2019 5yr plan 12-16
3/21
7/29/2019 5yr plan 12-16
4/21
7/29/2019 5yr plan 12-16
5/21
7/29/2019 5yr plan 12-16
6/21
7/29/2019 5yr plan 12-16
7/21
7/29/2019 5yr plan 12-16
8/21
7/29/2019 5yr plan 12-16
9/21
7/29/2019 5yr plan 12-16
10/21
7/29/2019 5yr plan 12-16
11/21
7/29/2019 5yr plan 12-16
12/21
7/29/2019 5yr plan 12-16
13/21
7/29/2019 5yr plan 12-16
14/21
7/29/2019 5yr plan 12-16
15/21
7/29/2019 5yr plan 12-16
16/21
7/29/2019 5yr plan 12-16
17/21
7/29/2019 5yr plan 12-16
18/21
7/29/2019 5yr plan 12-16
19/21
7/29/2019 5yr plan 12-16
20/21
7/29/2019 5yr plan 12-16
21/21
5-Year Capital PlanFY 2012-FY 2016
Capital Renewal Projects (8%)
Facility Requirements FY 2012 * FY 2013 FY 2014 FY 2015 FY 2016
Whale Branch MS Fit Sta 5 - remove & repl timbers, add gravel $1,232
Whale Branch MS Fit Sta. 10 rem & repl timbers - add gravel typ all 10 stations $5,748
Whale Branch MS Rm A11 - renovate all Casework $5,748
Whale Branch MS Rm A12 - renovate casework $5,748
Whale Branch MS Paint Corridors - 3 year plan $76,496
Whale Branch MS Replace partitions in girls & boys group toilet $109,172
Whale Branch MS
Main corridor is ramped between the B Wing and the C Wing. Code required handrails have not beenProvided at the ramp and the floor surface at the ramp area is not slip resistant. $10,313
Whale Branch MS
Signage is mounted at varying heights throughout the school and some is mounted too high for ANSI/ADArequirements. Some spaces have not been Provided with room signage at all. Some spaces have been
incorrectly identified $14,265Whale Branch MS Renovate girls locker room $52,293
Whale Branch MS Install sound panels in gym $31,376
Whale Branch MS Replace drinking fountain at SW to ball field $4,106
Whale Branch MS Install new sound system for stage $29,113
Whale Branch MS UPS batteries and system Replacement (complete) $2,160
Whale Branch MS Renovate expansion joints with new sealant @ all sidewalk conditions $4,358
Whale Branch MS Remodel Media Center windows $91,513
Whale Branch MS
The toilet area of the Boys Locker Room is not fully HC accessible: stall door opens in wrong direction anddoes not self-close; no vert grab bar; flush valve is too high; clear floor space is not Provided at urinal; no sinkpipe wrap; etc. $23,134
Whale Branch MS
The group toilets at the D, F, E, and A classrooms wings are not fully HC accessible: inadequate floor spaceat urinal; flush valve is too high, no vert grab bar; no sink pipe wrap $38,557
Whale Branch MS Create 4 - 5 life labs $174,311
Whale Branch MS Replace restroom sinks $115,672
Whale Branch MS Paint Entire Building Interior - 6 year plan $305,484
Facilities Planning and Construction
November 2010
* FY 2012 Projects approved by the Board 07/24/10. Subsequent years require Board approval during annual budget period. 21 Note: All project budgets include design fees, PM fees and contingency.