Upload
sirish-chand-putla
View
215
Download
0
Embed Size (px)
Citation preview
7/28/2019 5th RRM on Dt 28TH Jan 2013 to 1st Feb 2013 Notification
1/8
JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY ANANTAPUR
ANANTAPUR-515 002 (A.P)***
RESEARCH AND DEVELOPMENT CELL
SCHEDULE OF 5th RESEARCH REVIEW MEETING (RRM-5)
Sl.
No.Discipline
Date of
RRM
Admn./H.T.No.
of the candidateVenue
1. Civil
Engineering
28-01-2013
(F.N)
11PH0101,102,103,104,105,106,107,108,109,110,
111,112,113,114,115,116,117,118,119,120.
(20)
(37) Civil Engg.
Department
Seminar
Hall
28-01-2013
(A.N)10PH0101,102,103,104,105,106 (06)
0900PH0102,103,104,105,106,107,108,109,
110,111,112,
(11)
29-01-2013
(F.N)0803PH0523,524,525,526,531 (05) (14)
0703PH0525,530 (02)
0603PH0513,516, (02)
0503PH0503,505 (02)
03Ph.D0103, 03Ph.D0106 (02)
2. Electrical
Engineering
28-01-2013
(F.N)
11PH0201,202,203,204,205,206,207,208,209,210,
211,212,213,214,215,216,217,218,219,220
(20)
(40)
Electrical
Engineering
Department
Seminar
Hall
28-01-2013
(A.N)
11PH0221,222,223,224,225,226,227,228,229,
230,231.
(11)
10PH0201,202,203,204,205,206,207,208,209, (09)
29-01-2013
(FN)
10PH0210,211,212,213,214,215,216,217,218,219,
220,221.
(12)
(41)
0900PH0201,202,203,204,205,206,207,208. (08)
29-01-2013
(AN)
0900PH0209,210,211 (03)
0803PH0775 (01)
0703PH0718,727, 730,731,734,737,748, (07)
0603PH0714,715,728,729,749,753,754,756 (8)0500PH0702 (1)
400744EE/PH (1)
3 Mechanical
Engineering
28-01-2013
(FN)
11PH0301, 302,303,304,305,306,307,308,309,
310,311,312,313,314,315,316,317,318,319,320.
(20) (40) Mechanical
Engineering
Department
Seminar
Hall
28-01-2013
(AN)
11PH0321,322,323,324,325,326,327,328,329,330. (10)
10PH0301,302,303,304,305,306,307,308,309,
310,
(10)
29-01-2013
(FN)
10PH0311,3 12,313,314,315,316,317,318,319,320,
321,322,323,324,325,326,327,328,329,330.
(20)
(40)
29-01-2013(AN) 10PH0331,332,333,334,336,337,338,339,340. (09)0900PH0301,302,303,304,306,307,308,309,310,
311.312,
(11)
30-01-2013
(FN)
0900PH0313,314,315,316,317,318,319,320,321.
322,323,324,325,326,327,328,329,330,
331,332.
(20) (40)
30-01-2013
(AN)
0900PH0333,334,,336,337,338,339,340,341.342.
343,344,345,346,347,348.
(15)
0803PH1511,1513,1514,1515,1521 (05)
31-01-2013
(FN)
0803PH1522,1532,1539,1546,1550,1551,1554,
1571,1577,1594,15A2.
(11)
(14)
Contd.....2
0703PH1524,1525,1526 (03)
31-01-2013
(AN)
06003PH1535,1541,1542,1545,1551,1554,1559,1570 (08)
(13)05Ph.D0301,0500PH01502 (02)
04Ph.D0334,04Ph.D0311, 0401580ME/PH (03)
7/28/2019 5th RRM on Dt 28TH Jan 2013 to 1st Feb 2013 Notification
2/8
-2-
4. E.C.E. 28-01-2013
(FN)
11PH0401, 402,403,404,405,406,407,408,409,
410,411,412,413.414,415,416,417,418,419,420,
(20)
(40)
ECE
Department
Seminar
Hall
28-01-2013
(AN)
11PH0421,422,423,424,425,426,427. (07)
10PH0401,402,403,404,405,406,407,408,409,
410,411,412,413.
(13)
29-01-2013
(FN)
10PH0414,415,416,417,418,419,420,421,422,423. (10)
(40)0900PH0401,402,403,404,405,406,407,408,409,410.(10)
29-01-2013
(FN)
0900PH0411,412,413,414,415,416,417.418,419,
420,421,422,423,424,425,426,427,428.
(18)
0803PH08A1,08A18, (02)
30-01-2013
(FN)
0803PH08A20,08A36,08A38,08A39,08A49,
0859,868,0885,0886,0888,0890
(11)
(23)
0703PH0830,841,845,851,860 (05)
0603PH0824,845,851,859,862 (05)
05Ph.D0407 (01)
03Ph.D0406 (01)5. C.S.E. 28-01-2013
(FN)
11PH0501, 502,503,504,505,506,507,508,509,
510,511,512,513,514,515,516,517,518,519 (39)
CSE
Department
Seminar
Hall
28-01-2013
(AN)
10PH0501,502,503,504,505,506,507,508,509,
510,511,512,513,514,515,516,517,518,519,520.
29-01-2013
(FN)
10PH0521,522,523,524,525,526 (6)
(34)0900PH0501,502,503,504,505,506,507,508,509,
510,511,512,513,514
(14)
29-01-2013
(AN)
0900PH0515,516,517,518,519,520,521,523,
524,525,526,527,529,530
(14)
30-01-2013(FN) 0803PH0612,668 (02) (10)0703MS0614, (01)
0703MS615,0703PH0623,674 (03)
0603PH0602,617 (02)
0503PH0613,0500PH0601 (02)
6. Chemical
Engg.
28-01-2013
(FN)
11PH0601, 602,603,604,605,606,607. (07)
(19)
Chemical
Engg.Dept.
Seminar Hall10PH0601,602,603,604,605,606,607,608 (08)
0900PH0602,603,604 (03)
0703MS0311 (01)
7. Bio-Tech. 28-01-2013
(FN)
11PH1101,102,103,104,105,106,107,108,109,110. (10)
(31)
Chemical
Engineering
Department
Seminar
Hall
10PH1101,102,103,104,105,106,107,108,110,111 (10)
28-01-2013
(AN)
0900PH1101,102,103,104,106,107,108 (07)
0803PH0236 (01)
0703PH0240 (01)
0603PH0245,253 (02)
8. English 28-01-2013
(FN)
11PH1401,1402,1403,1404,1405,1406. (06)
(10)
Mgt.Dept.
Seminar
Hall10PH1401,10PH1402 (02)
0900PH1009,1010 (02)
9. Mathe-
matics
28-01-2013
(FN)
11PH0902,903,904,905,906,907,908,909,
910,911,912,913,914,915,916,917,11MP0901(M.Phil)
(17)
(33)
Science
Block
Seminar
Hall
Contd.....3
10PH0901,902,903, (03)
28-01-2013
(AN)
10PH0904,905,906,907,908,909,
910,911,10MP0901(M.Phil)
(09)
0900PH0903,905 (02)
0803PH1413,0803PH1414 (02)
7/28/2019 5th RRM on Dt 28TH Jan 2013 to 1st Feb 2013 Notification
3/8
-3
10. Physics 28-01-2013
(FN)
11PH0701, 702,703,704,705,706,707,708,709,
710,711.
(11)
(25)
Science
Block
Seminar
Hall
28-01-2013
(AN)
10PH0701,702,703,704,705,706,707,708,709,
710,711,712.
(12)
0900PH0701,702 (02)
11. Chemistry 28-01-2013
(FN)
11PH0801,802,803,804,805,806,11MP0801(M.Phil) (07)
(39)
Science
Block
Seminar
Hall
10PH0802,803,804,805,806,807,808,809,
810,811,812,813,
(12)
28-01-2013
(AN)
10PH0814,815,816,817,818,819,820, 821,822,
823,824.
(11)
0900PH0802,805,806,811,812,813,815,
816,817.
(09)
30-01-2013
(FN)
0900PH0818,819,820. (03)
(15)0803PH04A9,439. (02)
0803PH0482,485,496 (03)
0703PH0424,434,472 (03)
0603PH0415,478,488,490 (04)
12. Manage-ment 28-01-2013(FN) 11PH1001,002,003,004,005,006,007,008,009,010 (10)
(29)
Manage-ment
Departme
Seminar
Hall
10PH1001,002,003,004,005,006,007,008,009,010 (10)
28-01-2013
(AN)
0900PH1003,004,005,006,007,008, (06)
0803PH01363 (01)
0703PH1319,1320 (02)
13. Energy
Systems
28-01-2013
(FN)
0803PH0911, (01)
(02)
EEE Sem.
Hall0603PH0912 (01)
14 Food-Tech 28-01-2013
(FN)
11PH1201,202,203,204,205,206,207 (07)
(40)15. Pharmacy 28-01-2013
(FN)
11PH1301, 302,303,304,305,306,307,308,309,
310,311. (11)
Science
Block
Seminar
Hall
Contd.....4
10PH1301,302,303,304,305,306,307,308,309. (09)
28-01-2013
(AN)
10PH1310,311,312,313,314,315,316,317,318,319,32 (11)
10PH1321,323,324,325,326,327,328,329, 330, (09
29-01-2013
(FN)
10PH1331,332,333,334,335,336,337,338,339,
340,341.
(11)
(40)10PH1342,343,344,345,346,347,348,349,352 (09)
29-01-2013
(AN)
10PH1353,354,355,356,357,358,359,360 (08)
0900PH1301,302,303.
1304,305,306,307,309,310,311,312,313,
(12)
30-01-2013
(FN)
0900PH1314,315,316,317,319,320,321,322.323,32
325,326,329,330,331,332,333,334,335,336.
(20)
(40)
30-01-2013
(AN)
0900PH1337,338, 339,340,341, 343,345,346. (08)
1347,348,349,350,351,352,353,354,355,
356,357,358,
(12)
31-01-2013
(FN)
0900PH1359,360,361,362,363,364,365,366.
1367,368,369,370,371,372,373,374,
376,377, 378, 379,
(20) (39)
31-01-2013
(AN)
0900PH1380,381,382,383,384, 385,386,387,
388,390,391,392,393,394,395,397,398
(17)
0803PH22A41,0803PH2242, (02)
7/28/2019 5th RRM on Dt 28TH Jan 2013 to 1st Feb 2013 Notification
4/8
- 4 -Pharmacy 01-02-2013
(FN)
0803PH2243,297,
0803PH22A19, 0803PH22A61,22A87
(06) (17) Science
Block Seminar
Hall01-02-2013
(AN)
0803PH22B50,22B85, 22C26 (03)
0703PH2228,231,245,262,22A62,
22B3, 2283
(07)
0603PH0212, (01)
Note: 1. The review meetings will be held in the Forenoon (FN) session from 9.30am to
1.00pm and in the afternoon (AN) session from 2.00pm to 5.00pm on the specified
dates.
2. All Scholars must bring the hard copy of the Research Scholars Progress
Report/Review Form duly signed by the Supervisors (as per the format enclosed
available on the University website:www.jntua.ac.in).
3. All Research Scholars are requested to make their own arrangements for boardingand lodging during the above period. Scholars are advised to stay one more day,
if required.
4. If the research scholars does not attend two consecutive meetings and if the
reports are not satisfactory in two consequent meetings, the admission is liable
for cancelled.
5. The Research Scholars those who have not atended two consecutive RRMs are
hereby informed that they are being given a final chance and if they do not
attend for this RRM their admission stands cancelled.
Sd/-
Director i/c
Research & Development Cell
7/28/2019 5th RRM on Dt 28TH Jan 2013 to 1st Feb 2013 Notification
5/8
Mobil.No.9000 551420
E-mail:[email protected] Phone: 08554-273006
JAWAHAR LAL NEHRU TECHNOLOGICAL UNIVERSITY ANANTAPUR
ANANTAPUR-515 002 (A.P)RESEARCH AND DEVELOPMENT CELL
Office of the Director
R & D Cell,
JNTUA,
Anantapur 515 002
Rc.No.R & D Cell/5th RRM/Notification/2012-13 Dt.12-11-2012
IMPORTANT CIRCULAR/NOTICE
It is hereby informed that the Research Review Meeting (RRM) will be scheduled from Dt:
28/01/2013 to 01-02-2013.
All the research scholars admitted during 2011-12,2010-11 & 2009-10, and others who
were admitted prior to 2009 with erstwhuile JNT University and opted to this University, are
hereby informed to attend the RRM without fail and come prepared for presentation of their work.
They have to inform their Supervisor and Co-supervisor also to attend the meeting without fail as
it is mandatory. Also get the hard copies of your publications, if any, which are to be submitted
along with the progress review form. The detailed schedule is enclosed herewith.The detailed schedule is enclosed herewith.
Note: 1. All the research scholars must bring the hard copy of the Research Scholars
Progress Report/Review Form duly signed by the Supervisor and Co-supervisor
per the format available with schedule on the University website: jntua.ac.in).
2. All Research Scholars are requested to make their own arrangements for boarding
and lodging during the above period. Scholars are advised to stay one more day,
required.
3. The supervisor and co-supervisor also should attend the meeting along with the
candidate and the candidates have to bring this to the notice of their supervisorco-supervisor as it is mandatory. No TA/DA will be paid to the Supercvisor/
Co-supervisor.
4. If the research scholar does not attend two consecutive meetings or if the progress is not
satisfactory in two consequent meetings, the admission is liable to be cancelled.
Sd/-
Director i/c
Research & Development Cell
7/28/2019 5th RRM on Dt 28TH Jan 2013 to 1st Feb 2013 Notification
6/8
JAWAHAR LAL NHERU TECHNOLOGICAL UNIVERSITY ANANTAPUR
ANANTAPUR-515 002 (A.P)
RESEARCH & DEVELOPMENT CELL
Rc.No.JNTUA/R & D Cell/5th RRM/2012-13 Dated: 12-11-2012
5th Research Review Meeting held from28-01-2013 to 01-02-2013
TO WHOMSOEVER IT MAY CONCERNED
Sir,
As per the norms of the University the Supervisors and Co-supervisors of the Research
Scholars are supposed to attend the 5th
Research Review Meeting as and when conducted. Hence it is
hereby informed to the Supervisors and Co-supervisors to attend the 5th
Research Review Meetings
along with their research student(s) on the specified dates, which are being conducted between
28-01-2013 to 01-02-2013, as per the schedule enclosed.
However e-mail/SMS is also sent to the Supervisors/Co-supervisors where ever data is available
and others are requested to attend the meeting by considering this as personal letter.
Sd/-
DIRECTOR i/c
R & D Cell
Encl: Schedule of the 5th
RRM.
Note: No TA/DA & Accommodation is provided to the Supervisors/Co-supervisors forattending the meeting
7/28/2019 5th RRM on Dt 28TH Jan 2013 to 1st Feb 2013 Notification
7/8
JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY ANANTAPUR
ANANTAPUR-515 002.(A.P.) INDIAResearch and Development Cell
Administrative Block, ANANTAPUR-515 002
RESEARCH SCHOLARs PROGRESS REPORT - REVIEW FORMDate of 5
thRRM: / /2012
1). Name of the Candidate:
2) A) Present Official Address:
B) Address for Communication:
E-mail:
Tel: (O): ( R): (M)
3). Degree Registered: M.S. / M.Phil / Ph.D. (Tick the program)
4). Faculty/Department with which registration is made: (Tick the appropriate faculty)
5). Year of Registration: __________ Admn./H.T.No.:__________________
6). Name of the Supervisor with Contact Address and E-mail:
Name: Designation:
Address:
Email: Phone:
7).Name of the Co-Supervisor, if any, with Contact Address and E-mail:
Name: Designation:
Address:
Email: Phone:
8). Title of Research Work (as registered, at the time of Admission) :
9). Is there any Change of Title orChange of Topic orChange of Supervisor (s)?(YES/NO)If so, give details on separate sheet, attaching the copy of the letter for such permission(s)
(ENCLOSED/ NOT ENCLOSED)
10).Details of subjects selected for the pre Ph D Examination:
S.No Subj. Code Title of the Subject Status/year of completion
1.
2.
CIVIL ENGG / EE/ ECE/ CSE/ CHEMICAL ENGG/ MECH ENGG/ BIO-TECH/FOOD-TECHNOLOGY/ PHARMACY/ ENERGY SYSTEMS/MATHS/ PHYSICS/
CHEMISTRY / ENGLISH/MANAGEMENT
7/28/2019 5th RRM on Dt 28TH Jan 2013 to 1st Feb 2013 Notification
8/8
11).whether fee paid upto date: (If so enclose receipts):-
12). Status of work of the Research Work and Progress:A) LITERATURE SURVEY:
% covered so for :___________________ No. of Technical Papers Referred (relevant to the topic) :___________________ List of Referred Technical Papers (with Journal Name, Vol. No.,
Issue No., Year/Month of Publication, Page Nos. etc) to be shown. (YES/NO)
Remarks :________________________________________________________________________________________________________________________________
B) Type of Research Work & Progress :
EXPERIMENTAL WORK/ THEORETICAL STUDY /SIMULATION / SYNTHESIS/ orANY OTHER VARIATION
(Tick mark one or mention if combinations are considered) %age of work COMPLETED SO FOR :__________________________________ Remarks:___________________________________________________________________
___________________________________________________________
C) Nos. of Technical Publications (relevant to Research Topic) :(Publications should contain Research Scholars Contributions alone, afterDate of Registration for Ph.D./M.Phil./M.S.)
in INTERNATIONAL JOURNALS :_____________
in NATIONAL JOURNAL :_____________
in INTERNATIONAL CONFERENCES :_____________
in NATIONAL CONFERENCES :_____________(Attach the LIST OF PUBLICATIONS in a SEPARATE SHEET listing the Journal Name,
vol. No., Issue No., Year/ Month of Publication, Page Nos. etc): (YES/NO)
D) EXPECTED TIME OF COMPLETION :* Within 6 months * Within One Year * More than One Year(Tick mark one or add your requirement)
Date: SIGNATURE OF THE CANDIDATE
E) CERTIFICATION by the Supervisor (s) :1) It is hereby certified that the INFORMATION, and DETAILS presented above are TRUE
to the best of our knowledge.
2) The Performance and Progress of Research Work of the Scholar are SATISFACTORY/NOT-SATISFACTORY.
Signatur e of Co-Supervisor Signatur e of Supervisor
with Seal and Date with Seal and Date
NOTE:
1. The Research Scholar should submit the above REPORT to the Research ReviewCommittee on the Day of RRM, for their endorsement and comments, and further onward
transmission to the Director, R&D Cell.
2. All Research Scholars are requested to make their own arrangements for boarding and lodgingduring the above period. Scholars are advised to stay one more day, if required.
3. If the research scholar does not attend two consecutive meetings or if the reports are notsatisfactory in two consequent meetings, the admission is liable to be cancelled.