4
TIME STUDY ITERATION# 5 LINE: CUSTOMER: ARTICLE # STYLE: CYCLE TIME DATE: SR# OPERATION OPERATOR M/C T1 T2 T3 T4 T5 Є BM SAM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

5th Iteration

Embed Size (px)

DESCRIPTION

time study iteration in a garments factory

Citation preview

Page 1: 5th Iteration

TIME STUDY ITERATION# 5LINE: CUSTOMER: ARTICLE # STYLE:

CYCLE TIME DATE: SR# OPERATION OPERATOR M/C T1 T2 T3 T4 T5 Є BM SAM CAP./HOUR

123456789

101112131415161718192021222324252627282930313233343536373839404142

Page 2: 5th Iteration

434445464748495051525354555657585960616263646566

TOTAL MINUTES AVAILABLE = M/C REQUIREMENTPIECES OFFLINE LAST DAY = SR# M/C TYPE NO.EFFICIENCY OF LAST DAY (%) = 1 SNLS

2 FLPROJECTED TARGET 3 O/L

TARGET PER SHIFT @100% 4 BTTARGET PER SHIFT @80% 5 BHTARGET PER SHIFT @70% 6 MNL

TOTAL