Benefits of 5S
Cleaner and safer
work environment
Reduction in non-
value added time
Effective work
practices
Efficient processes
-Increase Revenues
-Drive Down Costs
-Stay Competitive in the Market
P = R - C
8/9/2019 5S_Safety.
3/55
The Visual Workplace VisionThe Visual Workplace Vision
Major Lean Goal: In a visual
workplace, anyone will know thewho, what, when, where, why, and
how of an area within five minutes.
Lean Manuf. is the Tool Box and
5S is one of the Tools..
8/9/2019 5S_Safety.
4/55
What Is 5S?
Foundation for all improvement programs
A focus on organization, simplification, and
waste reduction
8/9/2019 5S_Safety.
5/55
Seven Wastes
Correction: having to fix or repair an item
Over production: causes shortages
Motion
Material and information movement
Waiting
Inventory
Processing: doing things to a product notvalued by the customer
8/9/2019 5S_Safety.
6/55
What Are the 5Ss?
SHINE
STANDARDIZE
SORT
SUSTAIN
STORE
8/9/2019 5S_Safety.
7/55
What is Sort?Sorting the needed
from the unneededCreate Space
Tool- Red Tagging
Benefit - We nowlease out 200,000
square feet.
sorting means leaving only the bare essentials: When in doubt,
throw it out, or place it in a (planned) long-term storage area.
8/9/2019 5S_Safety.
8/55
Sort - Fixtures, Tools, Raw Materials,
Finished Goods
8/9/2019 5S_Safety.
9/55
StoreBefore
After
A place for everything
and everything in its
place
Simplify storing and
retrieval of parts, andmaterials
Tool: physical map
8/9/2019 5S_Safety.
10/55
Store Action Items
Determine a location for each item.
Outline locations of equipment, commonly used material,
safety equipment.
Labels with Min/Max
quantities.
Develop shadow boards.
8/9/2019 5S_Safety.
11/55
SHINEMisc. Dept
8/9/2019 5S_Safety.
12/55
Shine Action Items Establish acceptable levels of performance
How clean is clean?
Develop visual controls
Mark equipment locations
Who and when cleaning plan
8/9/2019 5S_Safety.
13/55
StandardizeStandardization is the
practice of setting,
communicating, following,
and improving standards.
Includes HMIS Labels
Includes Safetyconsiderations in PWIs.
Standardization promotes
consistency.
Creativity over Capital
8/9/2019 5S_Safety.
14/55
Standardize Action Items Training Everyone must understand
Document the new approach Verify items are being handled in similar ways
Drive out opportunity for errors
Share best practices between depts. And facilities.
8/9/2019 5S_Safety.
15/55
SustainKeeping the gains and
further progress
Audit
Maintaining the first4 Ss
Plan-do-check-act
Weekly Safety Audit
Weekly 5S Audits(Internal & External)
8/9/2019 5S_Safety.
16/55
Sustain Action Items Determine desired level of achievement
Perform routine checks Photos Before and after
Develop action plans from audits
Measure progress and plan for continuous improvement
8/9/2019 5S_Safety.
17/55
Summary
Sort: What is needed not needed
Store: Place for everything always
Shine: Clean and keep clean
Standardize: Monitor and maintain
Sustain: Stick to the rules
8/9/2019 5S_Safety.
18/55
Oasis Kaizen BlitzSteel Shop Set-Up Reduction
P8AM Nose DieAugust 25 29, 2003
8/9/2019 5S_Safety.
19/55
What is a Kaizen Blitz?An accelerated improvement process focused on
speed and agility. Process focused on producing
step function performance improvement - e.g.
20%- 90% - in a short time, in a targeted area.
OASIS has found it to be an opportunity fordiscovery of both production and safety needs.
Kaizen (Japanese) - to make better continuous, incremental
improvement of an activity to create more value with less waste.
Blitz(German) - lightning a fast hit to achieve a tactical
objective.
8/9/2019 5S_Safety.
20/55
SS Kaizen Blitz Schedule Monday Train, film current state setup
Tuesday Initiate ideas requiringtime/resources, analyze film, generateand prioritize ideas, selectimplementation ideas
Wednesday Execute implementation ideas
Thursday Execute idea set, re-film setup,assess, develop and present results
8/9/2019 5S_Safety.
21/55
Revised Set-up Process
Elapsed Time 17 minutes 08 seconds
Time Reduction 45% (Machine availability)
No. of Set-up Associates One
Increased Availability 100%
Total Distance Traveled 80 Feet
Distance Reduction ~ 92%
Before After
No. Assoc 2 1
Distance 1,075 ft 80 ft
Time 31.3 min. 17.1 min.
8/9/2019 5S_Safety.
22/55
SUMMARY OF ACCOMPLISHMENTS
Installation of Andon Lights and CommunicationsBoard
- Wait and Go-Get
Hand jack, tools at press, bolt organization, and printavailability
- Wait and Go-Get
Revised procedure for stopping flywheel
- Install, Remove, Wait and Adjust
Coordinated die removal/installation
- Wait and Adjust
Script for revised process- Install, Remove, Adjust, Wait, and Go Get
Gain of 65+ noses due to reduction in overall
machine downtime
8/9/2019 5S_Safety.
23/55
HAND TRUCK AT PRESS
ORGANIZED BOLT
STORAGE AT FRONT
AND BACK OF PRESS
PRINTS AT
PRESS
8/9/2019 5S_Safety.
24/55
ANDON LIGHT
COMMUNICATION
BOARDS
8/9/2019 5S_Safety.
25/55
Flywheel Stoppage PWI
8/9/2019 5S_Safety.
26/55
Major Accomplishments
Define/develop Job Packet Requirements
Define/establish draft die inspection procedure
8/9/2019 5S_Safety.
27/55
DRAFT PROCEDURE DIE INSPECTION
The die must be checked for the following items when it is about
to be removed from a press
Inspect the following for cracks, chips, damage, or missing
punches or current operation (when accessible)
1) Punches
2) Die sections
3) Gages Crowders
4) Springs
5) Stripper Pads
Inspect the following for excessive wear, galling, or abuse (when
accessible)
1) Shoulder bolts
2) Strippers
3) Pressure pads
8/9/2019 5S_Safety.
28/55
Major Accomplishments
Define/develop Job Packet Requirements
Define/establish draft die inspection procedure
Establish procedure for end of job clean-up
8/9/2019 5S_Safety.
29/55
Major Accomplishments
Define/develop Job Packet Requirements
Define/establish draft die inspection procedure
Establish procedure for end of job clean-up Establish standardized Class 1 set-up procedure
8/9/2019 5S_Safety.
30/55
PROCEDURE FOR CLASS 1 SET-UP
Obtain job packet
Stage die
Inspect die per die inspection procedure
Scan die / Fill out die card Switch to inch mode
Ram to bottom
Stop flywheel per machine specific flywheel stoppingprocedures
Clear area behind press (machine specific)
Unbolt front bolts
Unbolt rear bolts
Turn on ram motor
Raise ram inch
If incoming die taller, set ram
Raise ram with flywheel
Stop flywheel per machine specific flywheel stopping
procedures
8/9/2019 5S_Safety.
31/55
Major Accomplishments
Define/develop Job Packet Requirements Define/establish draft die inspection procedure
Establish procedure for end of job clean-up
Establish standardized Class 1 set-up procedure
Establish material handler procedure for Class 1 set-up Developed bolt storage board, limiting amount of bolts available
at press
Developed safety guard instructions for posting
at press
8/9/2019 5S_Safety.
32/55
Major Accomplishments Define/develop Job Packet Requirements
Define/establish draft die inspection procedure
Establish procedure for end of job clean-up
Establish standardized Class 1 set-up procedure
Establish material handler procedure for Class 1 set-up Developed bolt storage board, limiting amount of bolts available
at press
Developed safety guard instructions for posting at press
In process of developing machine specificflywheel stopping procedures
8/9/2019 5S_Safety.
33/55
Why does the Safety Department
like 5S so much?
Safer Working Conditions
We can find all the fire extinguishers
Eye wash stations are accessible
Reduced slip, trip and fall hazardsBetter organization reduces Associate
travel time and distance, thus reducing
the opportunities for accidents.
Aisles are clear for emergency egress
8/9/2019 5S_Safety.
34/55
Safety Programs will have limited success
without Upper Management Support.
5S/Lean Manufacturing has the highest level of
support from OASIS management. Companies invest 100s of thousands of dollars
(or more) in consultants, employee time andtraining, supplies and equipment to support
implementation of the program. Management actively and openly supports Lean
Principles because it makes companies morecompetitive in the market place.
OASIS has imbedded numerous SafetyPerformance Objectives into the 5S program.
5S is a Production Driven program.
8/9/2019 5S_Safety.
35/55
Bronze Level 5S Safety Performance Standards
1. Use the one-page safety inspection form to review conditions throughout the department.
2. Post the completed inspection form when done. Send old forms to SC for filing.
3. Post and use the Daily Safety Checks poster.
6. HMIS Posters need to be posted in a conspicuous location.7. All chemicals need to have HMIS labels or appropriate markings (refer any questions to SC).
8. MSDS books need to be kept up to date. See SC for latest inventory and help.
10. Evacuation Monitors (and back-ups) assigned for each shift.11. Assembly Area Attendance form readily available.
12. Tornado maps need to be posted in a conspicuous location.
13. Emergency phone #s and communication procedures posted next to phones
Regular weekly safety inspections and management of basic Hazard Communication and
Emergency Procedures information:
4. During the weekly inspections, check the condition of fire extinguishers; eye wash stations and other
emergency equipment in your areas. (are they visible, accessible, undamaged, charged, and in working
order?). Initial the monthly fire extinguisher
5. Any action items found during the safety inspections need to be listed on your PAL. Check with SC
to determine the appropriate schedule for each action item.
9. Evacuation maps need to be posted in a conspicuous location, and assembly areas highlighted. See
SC for new copy if needed.
8/9/2019 5S_Safety.
36/55
Silver Level 5S Safety Performance Standards
Safety Procedures Documented, Posted and Communicated:
1. Safety procedures include:
Forklift Rules of the Road
LO/TO requirements for eligible machines posted/attached to the machine.
PPE requirements for the department posted
Emergency procedures for special equipment shut down (if applicable)
Guarding and safety device descriptions for machines
Safety and warning signs posted on machines and in appropriate areas.
2. Machine guarding needs identified and reflected on PAL
4. Identify workstations/jobs needing safety and ergonomic assessment (referrals to SC)
5. Assist SC in accident investigation and corrective actions, with any action items listed on the PAL.
3. Communication of safety topics and procedures should be through documented toolbox meetings
and visual aids/postings.
Develop and implement checklists incorporating safety, set-up and operating criteria andsettings for machines (e.g., SS power presses set-up checklist)
Other department-specific safety procedures, signs, posters, etc. For example, STW
has the regulations and guidelines for shade levels for welding shields.
8/9/2019 5S_Safety.
37/55
HOUSEKEEPING: Aisles, floors, work areas free from obstructions, slipping
and tripping hazards? Tools, equipment, materials stored properly when not in
use? Waste materials stored in appropriate containers and
disposed of in a safe manner?
MATERIAL HANDLING AND STORAGE: Manual material handling equipment in good condition?
Powered material handling equipment in good condition?
Hazardous and toxic materials handled, stored, transported inaccordance with regulatory requirements?
Cylinders transported and stored in upright position; properlysecured?
Slings in good condition, and inspected EACH DAY of use?
HAND AND PORTABLE POWER TOOLS: Correct tools provided?
Hand tools and power equipment in good condition?
Guards in place, properly adjusted?
Grinding wheel tongue guard and tool rest properlyadjusted?
Stored tools locked or secured?
MACHINERY/ELECTRICAL: Motors clean, free of oil, grease and dust?
Equipment in safe operating condition, point of operationguards provided and functioning properly?
PERSONAL PROTECTIVE EQUIPMENT: Safety glasses/face shield/goggles?
Foot protection? Clothes?
Hand protection? Head protection?
Respiratory protection?
Hearing protection?
ADMINISTRATIVE CONTROLS: Proper safety signs/labels/posters posted?
Associates rotated as necessary?
8/9/2019 5S_Safety.
38/55
Develop safe work procedures
5S helps get production staff involved in
identifying needs and developing safework procedures as part of the process
work instructions. (e.g., parts washer
cleanout procedures which include aconfined space and LO/TO component).
8/9/2019 5S_Safety.
39/55
PD PARTS WASHER LOCKOUT/TAGOUT
SAFE ENTRY PROCEDURE
Before entering the parts washer complete the following steps:
1. Notify all affected employees that the machine is going to beshut down, locked out and the reason why.
2. Review the Confined Space Entry Permit for entering thewasher. Modify the permit requirements and safety precautions
based on the job to be performed, chemicals used, etc.
3. Do not enter the washer unless there is another person outsideto monitor and assist you.
4. Shut off the main conveyor by the normal stopping procedure.Throw the disconnect switch located at C-1 and set to the offposition.
5. Open the washer doors (D1, D2, D3, D4, D5) to promote goodair circulation.
6. Make sure the Entrance Fan and Exit Fan are both on.Check their status at the Electrical Disconnect Panel to makesure they are in the On position.
7. Throw the Pump Disconnect switches Nos 1, 2, 3, 4, 5, 6, and7. to the Off positions.
8. If you enter Door #1 (D1) Lock and Tag pump switches 1 and 2.9. If you enter Door #2 (D2) Lock and Tag pump switches 3 and 4.10. If you enter Door #3 (D3) Lock and Tag pump switches 4 and 5.11. If you enter Door #4 (D4) Lock and Tag pump switches 5 and 6.12. If you enter Door #5 (D5) Lock and Tag pump switches 6 and 7.
Oasis Corporation
8/9/2019 5S_Safety.
40/55
Oasis CorporationSAFETY LOCKOUT
MACHINE INFORMATION Common Name: Press
Machine Number: 623 Manufacturer Name: Bliss
Energy Location of Disconnect Method of Lockout Procedure to Release
Source Energy#1- Electrical Operator control panel Hasp and lock Turn off, lockout, turn on,
480V-3 Phase turn off.
#2-Compressed Left rear of machine Ball valve c over and lock Turn off, lockout, bleed pressure
Air
#3-Gravity Die area Install safety blocks under the Flywheel has stopped, machine
slide is off, place safety blocks
#4-Electrical Overhead bus bar, directly over machine Hasp and lock Turn off, lockout, turn on,
480V-3 Phase turn off.
Electrical Air Water Gravity Hydraulic Natural Gas
#1#2
#3#3
#4
8/9/2019 5S_Safety.
41/55
Develop a system of inspecting andauditing each department machine and
process
Traditional Hazard Assessments are
performed by safety & compliance staff.
Weekly 5S Safety Audits are done bydepartment staff to evaluate safety
issues along with production systems.
Weekly internal and external 5S Audits
are performed.
Department: Month/Year ___________
8/9/2019 5S_Safety.
42/55
Inspector(s):
This list is intended only as a reminder. Please report any usafe acts or conditions. The current copy of this form must
be completed and posted on your 5S Board. Please forward old copies to Safey & Compliance
CATEGORY OK = Y Not OK = N Wk1 Wk2 Wk3 Wk4 Wk5 DATEInspection Date (day): Location/Comments FIXED
FIRE PROTECTION
Is extinguishing equipment accessable & undamaged?
Monthly visual inspection completed/documented for
ALL fire extinguishers in your area?
Exits and stairs clear, signs visible, evacuation maps
posted?
Other?
MATERIAL HANDLING AND STORAGE
Manual material handling equip. in good condition?Powered material handling equipment in good
condition?
Hazardous and toxic materials handled, stored,
transported in accordance with reg. requirements?
Cylinders transported and stored in upright position;
properly secured?
Racking and shelving in good working order, with
load limits specified and adhered to?
Other?
ELECTRICAL
Cover plates for outlets and switches in place?
Electric cords properly placed?
Electrical outlets properly grounded?
Circuit fuses/breakers in clean, closed boxes?
Circuits & switches properly identified/labeled?
Approved extension cords in good condition?
Electric circuits & tools GFCI protected?(if required)
Other?
FIRST AID/EMERGENCY COMMUNICATIONEye wash/emergency showers condition?
Eye wash/emergency showers working OK?
Employees aware of injuiry reporting & procedure?
Emergency communication procedures posted?
Other?
HMIS PROGRAM
Chemicals properly labeled?
HMIS poster posted?
HMIS cards being carried?
Proper PPE being used per label?MSDSs readily available?
Miscellaneous/Comments:
8/9/2019 5S_Safety.
43/55
M i t i hi h t d d f
8/9/2019 5S_Safety.
44/55
Maintain a high standard of
housekeeping in all departments at alltimes.
The 5Ss - Sort, Store, ShineStandardize, and Sustain
The goals of these Lean Tools are to
implement and sustain goodorganizational and housekeeping
practices.
8/9/2019 5S_Safety.
45/55
Ireland Blow Molding Before week 24 03
8/9/2019 5S_Safety.
46/55
After
8/9/2019 5S_Safety.
47/55
8/9/2019 5S_Safety.
48/55
Develop a program to handle
emergencies in the facility
Departments are required to identify
and post emergency procedures,evacuation and tornado shelter maps,
and identify their evacuation monitors.
Evacuation attendance forms are also
required to be readily available.
8/9/2019 5S_Safety.
49/55
Involve employees in the safety
program Operational Excellence (OE) Teams meet weekly
to identify problem areas (multidisciplinary) and
to do problem solving. OE Teams can fulfill the role of safety
committees without additional/separate meetings,provided there is some structure and SC input.
Often times safety issues are discussed at OEmeetings, especially at the beginning of 5Simplementation.
Employees take turns performing the 5S safety
inspections. It is very important for the safety professional to
spend as much time with employees to provideguidance and appreciation to production staff.
R d ti f Ph i l d M t l
8/9/2019 5S_Safety.
50/55
Reduction of Physical and Mental
StressErgonomic improvements have been
developed during 5S activities.When employees have problems on the
line, they have the ability to STOP the
line to correct the problem.
Pull production system (One-Piece-
Flow) instead of a Push system.
8/9/2019 5S_Safety.
51/55
Used tohave to
reach up
and across
track to getto wires.
Used to be inboxes on floor
8/9/2019 5S_Safety.
52/55
More Benefits.
Raises the levels of employeeParticipation and Awareness
Results in safer working conditions
Reduces Lost Time Accident Rates
Reduces OASIS Costs of Accidents
(Direct & Indirect) OASIS is Self-Insured.
8/9/2019 5S_Safety.
53/55
8/9/2019 5S_Safety.
54/55
Accident Costs 2001 vs. 2002Direct Cost of
Accidents
($) (a)(b)
Indirect Costs
of Accidents
$ (c)
Total Cost of
Accidents
$
2001 73,017 91,271
28,737
164,288
2002 22,990
68% less
51,727
Notes: (a) Direct annual costs do not include payments made for previous years
accidents.
(b) Source Gates/McDonald
(c) Multiplier of 1.25 used to represent indirect costs.
8/9/2019 5S_Safety.
55/55
Conclusions
Not enough data to see dependable, long-
term trend, but immediate results look
promising.
Most costly accidents (recordable injuries)have dramatically decreased overall.
No correlation between department incident
rates and their 5S scores.