5_Project Quality Management

Embed Size (px)

Citation preview

  • 7/31/2019 5_Project Quality Management

    1/53

    TCS Confidential & Proprietary

    1

    Project Quality Management

  • 7/31/2019 5_Project Quality Management

    2/53

    TCS Confidential & Proprietary

    2

    Change log

    Update date - Updated by - Log of changes

    31-Jan-02 - V.Selvakumar - Created the PPT

    10-Sep-02 - Krishnakumar(KK) - Updated as per PMBOK 2000version. Modified the organization and presentation of topics.

    26-Feb-03- Rama Ramesh- Removed some animation effects toimprove the presentation.

    05-Aug-03- Ashok Chawla-Minor changes to improve thepresentation.

    13-Apr-05 Sandeep Soni updated as per PMBOK 2004 version

    20-Feb-08 Srinivas Chennapragada -> More additions to PPT as

    per PMBOK

    27-Mar-09 Jeyakaran Jayaraj updated the ppt based onPMBOK Version 4

  • 7/31/2019 5_Project Quality Management

    3/53

    TCS Confidential & Proprietary

    3

    Project Quality Management

    Definition of Quality

    Quality is the totality of features and characteristics of a product or service that

    bear on its ability to satisfy the needs for which it was undertaken.

    Some goals of quality programs include:

    - Fitness for use. (Is the product or service capable of being

    used?). This is most important definition. This is acustomers definition of quality - customers view.

    - Fitness for purpose. (Does the product or service meet itsintended purpose?)

    - Customer satisfaction. (Does the product or service meet

    the customer's expectations?)- Conformance to the requirements. (Does the product or

    service conform to the requirements?) - producers view

  • 7/31/2019 5_Project Quality Management

    4/53

    TCS Confidential & Proprietary

    4

    Quality Vs Grade

    Project Management team must be careful not to confusequality with grade.

    Quality is The degree to which a set of inherentcharacteristics fulfill requirements.

    Grade is Category assigned to products or services

    having the same functional use but different technicalcharacteristics.

    Low quality is always problem, Low grade may not be.

    For example : Software product may be of

    - High quality (no obvious bugs, readable manual) and lowgrade (limited number of features)

    - Low quality (many bugs, poorly organized user doc) andhigh grade (numerous features).

    Determining and delivering the required levels of both quality andgrade are the responsibilities of project manager and projectmanagement team.

  • 7/31/2019 5_Project Quality Management

    5/53

    TCS Confidential & Proprietary5

    Quality Vs Grade

    Precision & Accuracy: If true value is 13.987 then if an instrumentgives outputs: 13.986, 13.983, 13.989, 13.985, 13.981 then wecan say Precision is up to two decimal places that 13.98. Meansconsistency that value of repeated measurements are obtained asoutput. Accuracy is the correctness of a measured value close toits true value

    Project Quality management is a subset of Project Managementthat includes the processes required to ensure that the project willsatisfy the needs for which it was undertaken. Qualitymanagement recognize the importance of :

    Customer Satisfaction

    Prevention over inspection

    Continuous improvement

    Management responsibility

  • 7/31/2019 5_Project Quality Management

    6/53

    TCS Confidential & Proprietary6

    Project Quality Management

    The major processes under this Knowledge area are

    Plan Quality ( Planning Project Management)

    Perform Quality Assurance( Executing ProjectManagement)

    Perform Quality Control (Monitoring and Controlling)

    Poor Quality Good QualityIncreases Risks Decreases Risks

    Decreases Productivity Increases Productivity

    Low Moral Increases Cost Effectiveness

    Low Customer satisfaction High Customer satisfaction

  • 7/31/2019 5_Project Quality Management

    7/53TCS Confidential & Proprietary7

    Quality Assurance Vs Quality

    Control

    Quality Assurance is the Managerial process for Quality which;

    Organizes

    Design programs / processes

    Sets objectives

    Provide resources

    Develops procedures

    Quality Control is the technical aspect of Quality which;

    Examines results

    Analyzes result

    Monitors conformance Provides reporting

  • 7/31/2019 5_Project Quality Management

    8/53TCS Confidential & Proprietary8

    Cost of Quality

    Cost of Quality is the total cost of all efforts related toquality throughout the product life cycle.

    This includes all work to build a product or service thatconforms to the requirements (cost of conformance) as wellas all work resulting from nonconformance to the

    requirements(cost of non-conformance).

    A typical project should have a goal of between 3-5% of thetotal value as the cost of a quality program depending onthe type of project and its total dollar value.

  • 7/31/2019 5_Project Quality Management

    9/53TCS Confidential & Proprietary9

    Cost of Conformance

    Cost of Conformance :

    - Planning

    - Training and indoctrination

    - Process control

    - Field testing

    - Product design validation

    - Process validation

    - Test and evaluation

    - Quality audits- Maintenance and calibration

  • 7/31/2019 5_Project Quality Management

    10/53TCS Confidential & Proprietary10

    Cost of Non-Conformance

    Cost of Non-Conformance

    - Scrap

    - Rework

    - Expediting

    - Additional material or inventory

    - Warranty repairs or service

    - Complaint handling

    - Liability judgments

    - Product recalls- Product corrective actions

  • 7/31/2019 5_Project Quality Management

    11/53TCS Confidential & Proprietary11

    Cost of non-quality

    Cost of non-quality is estimated to be 12-20% of sales

    It includes

    - Waste of time and materials

    - Rework of poor quality products

    - Additional material- Delays in schedule

    - Product and service image

    - Corporate image

  • 7/31/2019 5_Project Quality Management

    12/53TCS Confidential & Proprietary12

    Cost Categories

    1)Prevention Cost - Cost to plan quality- Training.

    - Process capability studies.

    - Surveys of vendors/suppliers.

    - Surveys of subcontractors.

    2) Appraisal Cost -Cost of evaluating processes/outputs.

    - Inspection/Testing or the products.

    - Maintenance of inspection/test equip.

    - Cost to process and report inspection data humanresources, equip, time.

    - Design reviews- between owner and project.- Internal design reviews and walk throughs peer

    reviews.

    - Expense reviews budgeted to actual.

  • 7/31/2019 5_Project Quality Management

    13/53TCS Confidential & Proprietary13

    Cost Categories

    3)Internal Failure Cost Defects corrected before customer sees- Scrap and rework-costs to correct defects/external

    expertise

    - Charges related to late payment of bills failure to take

    advantage of discounts- Inventory costs that are a direct result of defects

    - Engineering change costs related to correcting a designerror when original design flawed, not related tocustomer scope change

    - Infant mortality

    - Correcting documentation

  • 7/31/2019 5_Project Quality Management

    14/53TCS Confidential & Proprietary

    14

    Cost Categories

    4) External Failure Cost Defects not seen before product goes tocustomer

    - Warranty cost cost of repair or replacement

    - Field service personnel training cost

    - Recall costs- Product liability suits

    - Complaint handling

    - Future business losses

    5) Measurement and Test equipment- Capital cost of equipmentused to perform prevention and appraisal activities.

  • 7/31/2019 5_Project Quality Management

    15/53TCS Confidential & Proprietary

    15

    Project Quality Management

    Plan Quality:

    Identifying which quality standards are relevant to the project anddetermining how to satisfy them.

    Tools & Techniques

    Cost-Benefit AnalysisControl charts

    Statistical sampling

    Flowcharting

    Proprietary quality methodologies

    Benchmarking

    Design of Experiments (DOE)

    Cost of Quality (COQ)

    Additional Quality planning tools

    Quality Planning

    Enterprise environmental

    factor

    Risk register

    Schedule base line

    Cost performance baseline

    Stake holder resgister

    Scope baseline

    Organizational process

    assets

    Project scope statement

    Project management plan

    Quality management plan

    Quality metrics

    Quality checklists

    Process improvement plan

    Quality baseline

    Project management plan (updates)

  • 7/31/2019 5_Project Quality Management

    16/53

    Inputs in Plan Quality

    Scope Baseline: This includes the Scope Statement, WBS, and WBS

    dictionary. Stakeholder Register:The stakeholder register indentifies

    stakeholders with a particular interest in, or impact or quality.

    Cost Performance Baseline: Refers the accepted time phase used tomeasure cost performance.

    Schedule Baseline: Refers the accepted schedule performancemeasures including the start and finish dates

    Risk Register

    Enterprise Environmental Factors: Like governmental regulations,Rules, Standards or guidelines etc., Some other points to consider areworking/operating conditions of the project/product which may affect the

    project quality. Organizational Process Assets: Like Organizational quality policy,

    procedures, policies, guidelines, Historical database, Lessons learnt fromprevious projects, Quality policy as endorsed by senior management.

    TCS Confidential & Proprietary16

  • 7/31/2019 5_Project Quality Management

    17/53TCS Confidential & Proprietary

    17

    Quality Planning Tools

    Quality Tools & Techniques Benefit / Cost analysis

    less rework, higher productivity, lower cost

    meet or exceed customer satisfaction/expectation

    payback, ROI

    continually comparing quality program

    Benchmarking

    comparing actual/planned project practices

    visiting other organizations

    continually comparing quality program

    Control Charts:Are used to determine whether or not a process is stable or haspredictable performance. Upper and lower specification limits are based on

    requirements of the contract.

  • 7/31/2019 5_Project Quality Management

    18/53TCS Confidential & Proprietary

    18

    Quality Planning Tools

    Design of Experiments: It is a statistical method that determines whichvariables have the most influence on the outcome. It also plays a role in theoptimization of products or processes.

    Bench Marking: It involves comparing actual or planned project practices tothose of comparable projects to indentify best practices, generate ideas forimprovement, and provide a basis for measuring performance.

    Flowcharting: It is a graphical representation of a process showing therelationships among process steps.

    Proprietary quality Management methods: Include six sigma, CMMI etc.,

    Additional Quality Planning Tools:

    Other quality planning tools are also often used to help better define the

    situation and help plan effective quality management activities. These includebrainstorming, affinity diagrams, force field analysis, nominal group techniques,matrix diagrams, flowcharts, and prioritization matrices.

  • 7/31/2019 5_Project Quality Management

    19/53TCS Confidential & Proprietary

    19

    Quality Planning Tools

    Outputs

    Quality Management Plan

    The quality management plan describes how the project management teamwill

    implement the performing organizations quality policy.

    Operational Definition (Metrics)

    what something is and how it is measured spec limit

    Checklists

    tool - usually activity specific

    Process Improvement plan

    The process improvement plan details the steps for analyzingprocesses that will facilitate the identification of waste and non-valueadded activity, thus increasing customer value

    Project Document updates

    Inputs to other processes

  • 7/31/2019 5_Project Quality Management

    20/53

    TCS Confidential & Proprietary20

    Project Quality Management

    Perform Quality Assurance (QA) :

    Quality Assurance (QA) is the application of the planned,systematic quality activities to ensure that the project will employall processes needed to meet requirements.

    Tools & Techniques

    QP Tools & Techniques

    Quality Audits

    Process Analysis

    Perform QualityAssurance

    Project management plan

    Quality metrics

    Work performanceinformation

    QC measurements

    Requested changes

    Project Document updates

    Organizational process assets(updates)

    Project management plan (updates)

  • 7/31/2019 5_Project Quality Management

    21/53

    Perform Quality Assurance: Inputs

    Project Management Plan: This includes

    Quality Management plan How quality assurance will beperformed in the project and

    Process improvement Plan Details the steps for analyzingprocesses to identify activities which enhance their value.

    Quality Metrics

    Work Performance Information: Its a routine collection process inthe some of the areas like

    Technical Performance measures

    Project Deliverables status

    Schedule Progress and

    Cost incurred

    Quality Control Measurements

    TCS Confidential & Proprietary21

  • 7/31/2019 5_Project Quality Management

    22/53

    TCS Confidential & Proprietary22

    Quality Assurance Tools

    Quality Planning Tools and Techniques

    The quality planning tools and techniques also can be used for QA

    Quality Audit

    Scheduled/ Random

    Internal/Third Party Structured review that provides evidence about the Quality

    System Performance

    Provides Lessons Learned

    Quality audits confirm the implementation of approved changerequests, corrective actions, defect repairs, and preventiveactions

  • 7/31/2019 5_Project Quality Management

    23/53

    TCS Confidential & Proprietary23

    Quality Assurance Tools

    Process Analysis

    Follows process improvement plan to identify needed improvements

    Examines problem / constraints experienced and Non value addedactivities

    Includes root cause analysis to determine the causes

    Create preventive actions for similar problems.

  • 7/31/2019 5_Project Quality Management

    24/53

    Quality Assurance Outputs

    Organizational Process Assets(updates): This include theorganizational quality standards.

    Change Request: Quality improvement includes taking action toincrease the effectiveness and/or efficiency of the policies,

    processes and procedures of the performing organization.

    Project Management Plan Updates: This includes

    Quality management Plan.

    Schedule Management Plan.

    Cost Management Plan.

    TCS Confidential & Proprietary24

  • 7/31/2019 5_Project Quality Management

    25/53

    TCS Confidential & Proprietary25

    Project Quality Management

    Perform Quality Control (QC) :

    The process of monitoring specific project results to determine ifthey comply with relevant quality standards and identifying waysto eliminate causes of unsatisfactory performance. Also theorganizational unit that is assigned responsibility for qualitycontrol.

    Tools & Techniques

    Cause & effect diagramControl ChartsFlowcharting

    HistogramPareto chartRun chart

    Scatter diagramStatistical sampling

    InspectionApproved Change requests

    review

    Perform Quality Control

    Project management plan

    Quality metrics

    Quality checklists

    Organizational process assets

    Work performanceinformation

    Approved change requests

    Deliverables

    QC Measurements

    Validated changes

    Change requests

    Recommended defect repair

    Organizational process assets(updates)

    Validated deliverables

    Project management plan(Updates)

  • 7/31/2019 5_Project Quality Management

    26/53

    TCS Confidential & Proprietary26

    Quality Control Inputs

    Work Performance Measurements used to produce project activity metrics toevaluate actual progress as compared to planned progress. These metricsinclude

    Planned Vs. Actual technical performance

    Planned Vs. Actual schedule performance

    Planned Vs. Actual cost performance

    Approved Change Requests Approved change requests can includemodifications such as revised work methods and revised schedule. The timelycorrect implementation of approved changes needs to be verified.

  • 7/31/2019 5_Project Quality Management

    27/53

    TCS Confidential & Proprietary27

    Quality Control Terms

    Team should know the following differences :

    Prevention (keeping errors out of process) and Inspection(keeping error out of hands of the customer)

    Attribute sampling (yes or no decision i.e. results conforms or it

    does not) and Variable sampling (result is rated on a continuousscale that measures the degree of conformity)

    Special causes(unusual events) and Random causes (normalprocess variation)

    Tolerances (the result is acceptable if it falls within the range

    specified by the tolerance) and Control limits (the process is incontrol if the result falls within the control limits)

  • 7/31/2019 5_Project Quality Management

    28/53

    TCS Confidential & Proprietary28

    Statistical Quality Control(SQC)

    Statistical Quality Control: Method used to measure variability in a product forevaluation and corrective actions.

    Statistical sampling involves choosing part of a population of interest forinspection. Appropriate sampling can often reduce the cost of quality control.

    Normal Distribution Curve :

    +/- 6 sigma encompass 99.99% of area (defect of 2/ billion)

    +/- 3 sigma encompass 99.73% of area

    +/- 2 sigma encompass 95.46% of area

    +/- 1 sigma encompass 68.26% of area

  • 7/31/2019 5_Project Quality Management

    29/53

    TCS Confidential & Proprietary29

    Quality Control Tools

    Pareto Diagram

    Cause & Effect Diagram

    Control Chart

    Flow Charting

    Histogram Run Chart

    Scatter Diagram

    Statistical Sampling

    Inspection

    Defect Repair Review

  • 7/31/2019 5_Project Quality Management

    30/53

    TCS Confidential & Proprietary30

    Pareto Diagram

    Pareto diagram is a histogram, ordered by frequency ofoccurrence that shows how many results were generated by typeor category of identified cause.

    Rank ordering is used to guide corrective action.

    Pareto diagrams are conceptually related to Paretos law, which

    holds that a relatively small number of causes will typicallyproduce a large majority of the problems or defects.

    Also called 80-20 rule and vital-few. 80 percent of the problemsare accounted to 20 percent of the causes.

    areto agram

  • 7/31/2019 5_Project Quality Management

    31/53

    TCS Confidential & Proprietary31

    areto agram -Example

  • 7/31/2019 5_Project Quality Management

    32/53

    TCS Confidential & Proprietary32

    Cause and Effect Diagram The cause and effect diagram is called Fishbone diagram

    (because of its appearance) and also called Ishikawa

    diagram after the man who popularized its use in Japan. Analyzes the inputs to a process to identify the causes of

    errors.

    Used for root-cause Analysis.

    CauseandEffect Diagram

    ProblemCauses Effect

    Time Machine Method Material

    Major

    Defect

    Energy Measurement Personnel nvironmen

  • 7/31/2019 5_Project Quality Management

    33/53

    TCS Confidential & Proprietary33

    Control Chart

    Control charts are graphic display of the results, over time of a process. They

    are used to determine if the process is in control.

    When a process is in control, the process should not be adjusted. The processmay be changed in order to provide improvements.

    Quality Control charts display a characteristic of a product / service againstthe Control limits based on 3 Standard deviation in each direction. So in aStandard control chart, distance between the control limit is 6 sigma

    Control charts may be used to monitor any type of output variable. Such as

    Schedule variances, Volume and frequency of scope changes, errors in projectdocuments or other management results to help determine if the Project

    Management Process is in control.

  • 7/31/2019 5_Project Quality Management

    34/53

    TCS Confidential & Proprietary34

    Control Chart

    Following are very important terms that are related to control chart

    - Upper Control Limit (UCL)

    - Lower Control Limit (LCL)

    - Specification Limit

    - Rule of Seven

    - Assignable Cause

    - Out of Control

    These terms are well depicted in the control chart example givenin the next slide

  • 7/31/2019 5_Project Quality Management

    35/53

    TCS Confidential & Proprietary35

    Control Chart - Example

    Specification limit

    UCL

    LCL

    Specification limit

    Rule of sevenOut of control

    Assignable cause

    Out of

    control

    Normal distribution curve

  • 7/31/2019 5_Project Quality Management

    36/53

    TCS Confidential & Proprietary36

    Control ChartsVisual patterns indicating out-of-control state or a condition that

    requires attention:

    1. Outliers: a sample point outside the control limits

    2. Hugging control limit: a series (run) of points that are close to a control

    limit. Requires correction to prevent data points from goingoutside the

    control limit.

    3. Cycle: A repeating pattern of points.

    4. Trend: A series of consecutive points which reflect a steadily

    increasing or decreasing pattern.

    5. Run: A series of consecutive points on the same side of the average.

    Rule of thumb: considered abnormal if 7 consecutive points, 10 of 11,

    12 of 14 data points are above or below the process average.

  • 7/31/2019 5_Project Quality Management

    37/53

    TCS Confidential & Proprietary37

    Sampling

    Statistical Sampling: Sampling is the method of determining thevalue of a product or service when it is not practical to examinethe total number of products or services produced.

    Attribute Sampling : It is the number of defects of one or more ofthe product attributes (weight, size, function etc.) deemedacceptable before a lot of parts are rejected. Under attributeinspection, Characteristics of the units of product are consideredon a yes or no basis, go or no go, defective or non-defective,within tolerance or out of tolerance.

    Variable Sampling : A variable is a characteristic or property,which can be measured, and the measurement expressed in terms

    of some continuous scale. For e.g.Time in seconds, minutes, orhours; length in feet, meters; or weight in grams or pounds.Product is evaluated using a numerical, continuous scalemeasurement. Most efficient means of product quality inspection.

  • 7/31/2019 5_Project Quality Management

    38/53

    TCS Confidential & Proprietary38

    Sample Flowchart

    Sample Process Flowchart

    Yes ProceedNo

    Design Review

    Revise

    OK?

  • 7/31/2019 5_Project Quality Management

    39/53

    TCS Confidential & Proprietary39

    Absolutes of Quality

    Four Absolutes of Quality

    Definition

    System

    Performance Standard

    Measurement

    Generalized approach should also compatible with

    Proprietary approaches to Quality Management suchas those recommended as Deming, Juran, Crossby

    and others. Non proprietary approaches such as TQM, Continuous

    Improvement and others

  • 7/31/2019 5_Project Quality Management

    40/53

    TCS Confidential & Proprietary40

    Summary of Quality Tools

    Plan Quality Quality Assurance Quality Control

    Cost-benefit analysis QP tools & Techniques Cause & effect diagram

    Benchmarking QC tools & Techniques Control charts

    Design of Experiments Quality Audits Flowcharting

    Cost of Quality Process Analysis Histogram

    Pareto chart

    Run chart (for Trend

    analysis)Scatter diagram

    Statistical sampling

    Inspection

    Defect repair review

    Other tools: Brainstorming,

    affinity diagram, force field

    analysis, Nominal grouptechniques, matrix

    diagrams, flowcharts and

    prioritization metrics

  • 7/31/2019 5_Project Quality Management

    41/53

    Perform Quality Control: Outputs

    Organizational Process Assets(updates): This include the

    Completed Checklists and Lessons Learned Documentation. Change Requests

    Project Management Plan(Updates): Includes QualityManagement Plan and Process Improvement Plan.

    Project Document (Updates): Includes the Quality Standards.

    Quality Control Measurements: Results of quality controlactivities in the format specified during quality planning.

    Validated Changes: Any Changed or repaired items are inspectedand will be either accepted or rejected before notification of thedecision is provided. Rejected Items may require rework.

    Validated Deliverables: The results of the execution of qualitycontrol processes are validated deliverables. Validateddeliverables are an input to verify scope for formalizedacceptance.

    TCS Confidential & Proprietary41

    Q li L d Phil h

  • 7/31/2019 5_Project Quality Management

    42/53

    TCS Confidential & Proprietary42

    Quality Leaders-Philosophy

    Various Quality Leaders-Philosophy:

    According to Taguchi,

    Quality should be designed into the product, not inspectedinto it.

    Quality should be achieved by minimizing the deviation fromtarget.

    Cost of Quality should be measured as a function of deviationfrom standard.

    DEMINGJURAN

    CROSBY

    DefinitionConformantospecs

    Fitnessfor us ConformancetoRequirements

    System Prevention Prevention PreventionPerformanStandard

    ZerodefectsMinimizeofof Quality

    Zerodefects

    Measure Directmeasures

    Cost of qualitydata

    Cost of Non-Conformance

    M Q lit C t

  • 7/31/2019 5_Project Quality Management

    43/53

    TCS Confidential & Proprietary

    43

    More Quality Concepts

    In addition Quality improvement initiatives undertaken by performingorganization (e.g. TQM, Continuous Improvement and others) can improvethe quality of the Project Management as well as the quality of the projectproduct.

    T Q M- Manage the entire organization to excel in all dimensions of(product / Service) quality.

    Just In Time (J I T) - Require high levels of quality for

    incoming goods and Reduce inventory to zero level.

    KAIZEN KAIZEN means continuous improvement KAIZEN guidesorganization to continuously improve their ability to meet expectations ofhigh quality, low cost, and on-time delivery.

  • 7/31/2019 5_Project Quality Management

    44/53

    TCS Confidential & Proprietary

    44

    Supplier Quality

    Suppliers also affect the Project Quality.

    Customers should require Suppliers to have Quality Managementsystem.

    Long term contracting provides incentives to Suppliers to implementQMS.

  • 7/31/2019 5_Project Quality Management

    45/53

    TCS Confidential & Proprietary

    45

    P D C A Cycle

    Plan

    Do

    Check

    Act

    Plan

    Q&A

  • 7/31/2019 5_Project Quality Management

    46/53

    TCS Confidential & Proprietary

    46

    Which of the following is NOT a correct statement:

    a) Low quality is always a problem but low grade may not

    b) High grade will not always results in high quality

    c) Grade is a category assigned to the product or services having samefunctional use but different technical characteristics

    d) Low grade will always result in low quality

    Q&A

    Q&A

  • 7/31/2019 5_Project Quality Management

    47/53

    TCS Confidential & Proprietary

    47

    All the following are correct EXCEPT:

    a) Precision is consistency that value of repeated measurements

    b) Accuracy is correctness that measured value is close to true value

    c) Precise measurements are accurate

    d) Accurate measurement is not necessarily precise

    Q&A

    Q&A

  • 7/31/2019 5_Project Quality Management

    48/53

    TCS Confidential & Proprietary

    48

    Action taken to bring a defective or nonconforming item into

    compliance with requirements called

    a). Internal failure

    b). Rework

    c). Prevention

    d). Assurancee). None of the above

    Q&A

    Q&A

  • 7/31/2019 5_Project Quality Management

    49/53

    TCS Confidential & Proprietary

    49

    In acceptance sampling, consumer's risk and producers risks

    are

    a). Directly correlated

    b). Positively correlated

    c). Inversely correlated

    d). Not correlatede). None of the above

    Q&A

    Q&A

  • 7/31/2019 5_Project Quality Management

    50/53

    TCS Confidential & Proprietary

    50

    In acceptance sampling, consumer's risk and producers risks

    are

    a). Directly correlated

    b). Positively correlated

    c). Inversely correlated

    d). Not correlatede). None of the above

    Q&A

    Q&A

  • 7/31/2019 5_Project Quality Management

    51/53

    TCS Confidential & Proprietary

    51

    A process goes out of control when

    a). there are special causes of variation

    b). there are common cause of variation

    c). there are random and non-assignable cause of variation

    d). SPC does not apply

    e). None of the above

    Q&A

    Useful URLs

  • 7/31/2019 5_Project Quality Management

    52/53

    TCS Confidential & Proprietary

    52

    Useful URLs

    -General Mathematical Definitions

    http://www.animatedsoftware.com/statglos/statglos.htm

    -Sampling Technique

    http://www.stats.gla.ac.uk/steps/glossary/sampling.html

    Information Technology Project Management by Kathy Schwalbe

    ISBN 0-7600-1180-x

  • 7/31/2019 5_Project Quality Management

    53/53

    53

    Thank You !!!!