Presenter: 5G-PICTURE 5G Programmable Infrastructure Converging disaggregated neTwork and compUte REsources Jesús Gutiérrez IHP Microelectronics GmbH

5G Programmable Infrastructure Converging disaggregated ... · 5G-PICTURE ICT-07-2017 Nº 762057 Main Objectives •5G-PICTURE will design and develop an integrated, scalable and

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 5G Programmable Infrastructure Converging disaggregated ... · 5G-PICTURE ICT-07-2017 Nº 762057 Main Objectives •5G-PICTURE will design and develop an integrated, scalable and

Presenter:

5G-PICTURE5G Programmable Infrastructure Converging

disaggregated neTwork and compUteREsources

Jesús Gutiérrez

IHP Microelectronics GmbH

Page 2: 5G Programmable Infrastructure Converging disaggregated ... · 5G-PICTURE ICT-07-2017 Nº 762057 Main Objectives •5G-PICTURE will design and develop an integrated, scalable and

5G-PICTURE Introduction5G-PPP framework, Partners, Overall concept

14/03/2018 2

Page 3: 5G Programmable Infrastructure Converging disaggregated ... · 5G-PICTURE ICT-07-2017 Nº 762057 Main Objectives •5G-PICTURE will design and develop an integrated, scalable and

5G-PICTURE ICT-07-2017 Nº 762057

5G-PPP framework

14/03/2018 3

• PPP Structurehttps://5g-ppp.eu/

Source: European Commission

• Phase III (2017-2018)

• Large-scale trials

• Phase II (2016-2017)

• System optimisation and trials

• Ignition phase (2012-2013)

• Project METIS, 5GNOW, iJOIN, TROPIC, Mobile Cloud Networking, COMBO, MOTO, PHYLAWS...

• Phase I (2014-2015)

• Research (I) work

5G-PICTURE

Page 4: 5G Programmable Infrastructure Converging disaggregated ... · 5G-PICTURE ICT-07-2017 Nº 762057 Main Objectives •5G-PICTURE will design and develop an integrated, scalable and

5G-PICTURE ICT-07-2017 Nº 762057

Projects Phase-II

14/03/2018 4

https://5g-ppp.eu/5g-ppp-phase-2-projects/

Readiness to Verticals

5G Network Control and Management

Novel 5G Radio and SatCom 5G Fronthaul/Backhaul 5G Fronthaul/Backhaul

Novel 5G Radio and SatCom

5G Network Control and Management

Readiness to Verticals

Compl . EU-Taiwan 5G projects

Page 5: 5G Programmable Infrastructure Converging disaggregated ... · 5G-PICTURE ICT-07-2017 Nº 762057 Main Objectives •5G-PICTURE will design and develop an integrated, scalable and

5G-PICTURE ICT-07-2017 Nº 762057

5G-PICTURE Partners

14/03/2018 5

Page 6: 5G Programmable Infrastructure Converging disaggregated ... · 5G-PICTURE ICT-07-2017 Nº 762057 Main Objectives •5G-PICTURE will design and develop an integrated, scalable and

5G-PICTURE ICT-07-2017 Nº 762057

Main Objectives

• 5G-PICTURE will design and develop an integrated, scalable and open 5G infrastructure with the aim to support operational and end-user services for both ICT and “vertical" industries

• This infrastructure will rely on a converged fronthaul and backhaul solution, integrating advanced wireless access and novel optical network domains.

• To address the limitations of current solutions 5G-PICTURE will adopt the novel concept of Disaggregated-Radio Access Networks (DA-RANs)

• allows any service to flexibly mix-and-match and use compute, storage and network resources through HW programmability

• relies on network softwarisation to enable an open reference platform instantiating a variety of network functions

• adopts slicing and service chaining to facilitate optimised multi-tenancy operation

Page 7: 5G Programmable Infrastructure Converging disaggregated ... · 5G-PICTURE ICT-07-2017 Nº 762057 Main Objectives •5G-PICTURE will design and develop an integrated, scalable and

5G-PICTURE ICT-07-2017 Nº 762057

Technical Approach• Τo address the limitations of Distributed-

RAN and Cloud-RAN will develop flexible functional splits

• Adoption of the notion of DA-RAN relying on resource disaggregation

• mixing-and-matching of resources

• Development of novel technology solutions and control & management platforms

• enhanced network and compute HW and SW modularity and flexibility

• Creation and deployment of programmable network functions and intelligent orchestration schemes suitable to support vertical industries

• service chaining

• slicing & multi-tenancy

mmWaveRRH

VIM VIM VIM

PON

VIM

RAM

VIM

Storage

VIM

Processing (specific)

VIM

Processing (general)

OPP

MPI

MPI

OPP

Tx

BVT/R

BVT/R

BV-WSS

BV-WSS

Fast Switch

module λ2

MUX

MUX

Fast Switch

module λ1

Fast Switch

module λΝ

MPI

BV-WSS

BV-WSS

Fast Switch

module λ2

MUX

MUX

Fast Switch

module λ1

Fast Switch

module λΝ

OPP

MPI

MPI

OPP

Tx

BVT/R

BVT/R

MPI

VIM VIM VIM VIM

NFV Orhestrator

5G-PICTURE OS

PNF(Synchronization)

PNF(Signal Processing/

massive MIMO)PNF(beam tracking)

PNF (FFT, iFFT)

VNF (vEPC)

VNF (vMME, vBBU)

VNF

VNF vCDN

VNF controller

VNF controller

SDN ControllerSlicing

Manager

Monitoring and Profiling

Operations and Support System(OSS)

a)

b) c)

d)

e)

Page 8: 5G Programmable Infrastructure Converging disaggregated ... · 5G-PICTURE ICT-07-2017 Nº 762057 Main Objectives •5G-PICTURE will design and develop an integrated, scalable and

5G-PICTURE ICT-07-2017 Nº 762057

5G-PICTURE Demonstration Activities

14/03/2018 8

City

z

mmWave

Central Οffice (Telecom)

RU RU RU RU

Mobile Network Operator #1

Mobile Network Operator #2

Super-Cell

vEPCvMMEvBBU

Railway

vEPC, vMME, vBBU

Multi-technology Transport

Optical Edge

mmWave

Optical Edge

Optical Edge

Optical Edge

s

VMVNFPNF

Stadium

Metro Metro Mid-DCs

Wireless

Frontlhaul

VNF

VNF

SSD

RAMGPP SPP

PNF

PNF

VNF SSD

RAMGPP SPP

PNF

PNF

VNF

VNF

Backhaul

vBBU vBBU

Frontlhaul

To validate the capabilities of the 5G-PICTURE three large scale experimental platforms will be deployed:

• a 5G-railway testbed located in Spain

• a 5G-smart city testbed at Bristol (BIO) to experimentally validate the DA-RAN through the support of BH and FH services

• a 5G-stadium testbed located in Bristol to address media services for ultra-high density users

Page 9: 5G Programmable Infrastructure Converging disaggregated ... · 5G-PICTURE ICT-07-2017 Nº 762057 Main Objectives •5G-PICTURE will design and develop an integrated, scalable and

Railway use caseBenefits of 5G, Overall architecture supporting the railway use case,

14/03/2018 9

Page 10: 5G Programmable Infrastructure Converging disaggregated ... · 5G-PICTURE ICT-07-2017 Nº 762057 Main Objectives •5G-PICTURE will design and develop an integrated, scalable and

5G-PICTURE ICT-07-2017 Nº 762057

Railway Use case – Impact of 5G

• New communications architecture with tangible benefits:

• 5G technology will demonstrate its suitability to build a new common infrastructure, communication-based service support

• A significant TCO reduction

• Enhance the interoperability between different railway signalling systems (track and train systems).

• This new network will be neutral from each stakeholder point of view

14/03/2018 10

Page 11: 5G Programmable Infrastructure Converging disaggregated ... · 5G-PICTURE ICT-07-2017 Nº 762057 Main Objectives •5G-PICTURE will design and develop an integrated, scalable and

5G-PICTURE ICT-07-2017 Nº 762057

Railway Use Case – Overall Solution

11

Data Centers

InternetEPC

PDN-GW

Data Centers

vBBU

vBBU

RRH

RRH

Mobile Network Operator #1 Mobile Network Operator #2

LTE

z

LTE LTE WiFi

Multi-technology Access Network

P-S GW/GSN

Metro/Core Optical

RRHRRH Heterogeneous Transport

Network

EventsWeather

Facilities

Sensors

Devices

MQTT, AMQP, STOMP

Rest APIs CoAP

Storage Processing

Analytics

Data Management Platform

1

2

3

LTE Macro cell

SDN Controller Management & Orchestration Services

Control

• The rail use case aims at experimentally validating the 5G-PICTURE solution is terms of

density, mobility and cost

Page 12: 5G Programmable Infrastructure Converging disaggregated ... · 5G-PICTURE ICT-07-2017 Nº 762057 Main Objectives •5G-PICTURE will design and develop an integrated, scalable and

5G-PICTURE ICT-07-2017 Nº 762057

Railway Use case & Demonstration

• The user case chosen for this vertical is represented by Ferrocarrils de la Generalitat de Catalunya (FGC)

• FGC encompasses both the rail infrastructure administrator role and the passenger rail operator role, including urban metro activity in Barcelona, Barcelona suburban area commuter transport and rural rail in some districts of Catalunya.

• Selected parts of their infrastructure will be available to realize this experimental demonstration

14/03/2018 12

Page 13: 5G Programmable Infrastructure Converging disaggregated ... · 5G-PICTURE ICT-07-2017 Nº 762057 Main Objectives •5G-PICTURE will design and develop an integrated, scalable and

5G-PICTURE ICT-07-2017 Nº 762057

Rail Use Case - Demonstration (I)

14/03/2018 13

RU

Massive MIMO

vBBU

Fiber

vBBUSuper Cells

Data

Voice Operational Data

CCTVFleet ManagementVOICEPassenger Information

VOICE

CBTC

TETRA

IEEE 802.11

Radio

5G-PICTURE

a) b) c)

Rec

eive

d

sign

al

• It will exploit a 5G-railway testbed deployed across three lines of FGCs network, each one addressing

different transportation needs

• Line 1: large volume of passengers that are carried over short distances

• Line 2: long reach transportation features using high speed trains

• Line 3: very diverse environmental terain (including tunnels)

• To address the high density scenario, the massive MIMO mmWave RAN, enchanced with advanced beam

tracking and beamforming features, will be coupled with FGCs trackside optical fiber network to

interconnect the RUs with the vBBU

• This will enable efficient coordination of RUs allowing the creation of super cells thus reducing the

frequency of handovers to address the high mobility requirements of Line 2

Page 14: 5G Programmable Infrastructure Converging disaggregated ... · 5G-PICTURE ICT-07-2017 Nº 762057 Main Objectives •5G-PICTURE will design and develop an integrated, scalable and

5G-PICTURE ICT-07-2017 Nº 762057

Rail Use Case - Demonstration (II)

• Multi-tenant capabilities through network slicing that 5G-PICTURE offers, providing service

continuity and guaranteed QoS across the track

• Cost benefits through sharing of a common virtual infrastructure across a variety of railway

services

• Services currently relying on multiple technology specific communication networks will be

multiplexed over a common infrastructure:

• Communications Based Train Control CBTC, Voice and data between central Command & Control and

driver/cabin, streaming of surveillance video inside train and along rail infrastructure, monitoring of

infrastructure devices, fleet management etc,

14/03/2018 14

RU

Massive MIMO

vBBU

Fiber

vBBUSuper Cells

Data

Voice Operational Data

CCTVFleet ManagementVOICEPassenger Information

VOICE

CBTC

TETRA

IEEE 802.11

Radio

5G-PICTURE

a) b) c)

Rec

eive

d

sign

al

Page 15: 5G Programmable Infrastructure Converging disaggregated ... · 5G-PICTURE ICT-07-2017 Nº 762057 Main Objectives •5G-PICTURE will design and develop an integrated, scalable and

Thanks for your attention!

5G-PICTURE ProjectProject Coordinator: Eckhard Grass ([email protected])Technical Manager: Anna Tzanakaki ([email protected])

http://www.5g-picture-project.eu/index.htmlhttps://twitter.com/5G_PICTURE