Upload
krutika-desai
View
360
Download
14
Embed Size (px)
DESCRIPTION
abc
Citation preview
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 1/304
AC530 Actual costing/MaterialLedger
AC530
Release 470 04/11/2006
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 2/304
© SAP AG 2003
AC530 Actual cost ing/Material Ledger
THE BEST-RUN BUSINESSES RUN SAP
© SAP AG 2003
AC530Actual Costing / Material Ledger
SAP R/3 Enterprise 2003/Q4
Material number 50063840
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 3/304
© SAP AG 2003
Copyright
Copyright 2004 SAP AG. All rights reserved.
No part of this publication may be reproduced or t ransmit ted inany form or for any purpose without the express permission of SAP AG. The information contained herein may be changedwithout prior notice.
Some software products marketed by SAP AG and its distributors contain proprietary software components of
other software vendors. Microsoft, Windows, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.
IBM, DB2, DB2 Universal Database, OS/2, Parallel Sysplex, MVS/ESA, AIX, S/390, AS/400, OS/390, OS/400,
iSeries, pSeries, xSeries, zSeries, z/OS, AFP, Intelligent Miner, WebSphere, Netfinity, Tivoli, and Informix are
trademarks or registered trademarks of IBM Corporation in the United States and/or other countries. Oracle is a registered trademark of Oracle Corporation.
UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.
Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or
registered trademarks of Citrix Systems, Inc. HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide Web
Consortium, Massachusetts Institute of Technology.
Java is a registered trademark of Sun Microsystems, Inc. JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and
implemented by Netscape.
MaxDB is a trademark of MySQL AB, Sweden. SAP, R/3, mySAP, mySAP.com, xApps, xApp, and other SAP products and services mentioned herein as well as
their respective logos are trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. All other product and service names mentioned are the trademarks of their respective
companies. Data contained in this document serves informational purposes only. National product specifications
may vary. These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated
companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and
SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 4/304
Group products and services are those that are set forth in the express warranty statements accompanying such
products and services, if any. Nothing herein should be construed as constituting an additional warranty.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 5/304
© SAP AG 2003
z Cost and revenue element accountingz AC505 Product Cost Planning
(recommended)
z Basic knowledge of the interrelationshipsand value flows in controlling
Course Prerequisites
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 6/304
© SAP AG 2001
Target Group
z Participants:
Members of the project team
SAP consultants
Partners
z Length: 3 days
Note:
The course materials are not designed for a self-study program. They are only complete when
supplemented by the instructor‘s explanations. In your materials, you have room to note down this
additional information.
It is possible, that there is not enough time in the course to perform all of the exercises. The exercises
consist of additional examples to those covered in this course. Participants can also use these exercises
after the course to consolidate what they have learned.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 7/304
(C) SAP AG AC530 1-1
© SAP AG 2001
z Course Goal
z Course Objectives
z Table of Contents
z Course Overview Diagram
z Main Business Scenario
Contents:
Course Overview
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 8/304
(C) SAP AG AC530 1-2
© SAP AG 2001
This course will prepare you to:
z Configure and use the Actual Cost ingfunction in the Material Ledger.
z Revaluate inventories of raw materials,semifinished products, and fin ishedproducts at actual cost.
z Analyze actual costs us ing the actual cost
component split in CO-PC or CO-PA.
Course Goals
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 9/304
(C) SAP AG AC530 1-3
© SAP AG 2003
At the conclusion of this course, you will be
able to:z Explain the capabilities and limitations of traditional inventory
valuation methods without the material ledger.
z Understand the purpose and design of the material ledger.
z Explain how pri ce differences of materials can be included in theinventory value of products in which those materials were used.
z Explain the concepts of actual costing, periodic unit price, andactual cost component split in SAP R/3.
z Perform the postings for the period-end close in the material
ledger, including revaluation of the inventor ies with actual prices.z Understand how the material ledger is integrated with other SAP
applications, particularly MM, FI, and CO-PA.
z Use special functions such as alternative valuation run optionsand the distribution of consumption variances.
Topic Objectives
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 10/304
(C) SAP AG AC530 1-4
© SAP AG 2003
Unit 5 Structured ValueChains
Unit 6 Period-End Close
Unit 7 Special Functions
Unit 8 Summary
Unit 1 Course Overview
Unit 2 Fundamentals of Material Valuation
Unit 3 Design and Purpose of the Material Ledger
Unit 4 Recording BusinessTransactions
Introduction
Appendix
Course Content
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 11/304
(C) SAP AG AC530 1-5
© SAP AG 2003
Course Overview
AC530 Actual Costing/Material Ledger
Fundamentals of Material Valuation
Design and Purpose of the Material Ledger
Recording Business Transactions
Structured Value Chains
Period-End Close in Actual Costing
Special Functions
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 12/304
(C) SAP AG AC530 1-6
© SAP AG 2001
Cost Center:Label
Cost Center:Recording
Result (FI)
Cost Elements
ProductionCost Centers
Result (CO-PA)
Business Scenario
ProductionOrders
Act iv ityType
Act iv ityType
CD Label CD Blank
Demo CD
Stock Accounts
External Procur ement
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 13/304
(C) SAP AG AC530 1-7
© SAP AG 2001
z IDES management has decided to implementSAP's actual costing funct ion to be able tocalculate the variances of fluctuating raw materialprices and internal production for the fin ishedproducts (CD production). You want to know thetrue actual prices of your finished products andanalyze them with the actual cost componentsplit.
z You have been temporarily assigned to the projectteam to participate in the implementation andassist in making any required changes.
z Once the system is live, you wi ll be one of theprimary users of actual cost ing in the multilevelCD production process.
Main Business Scenario
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 14/304
(C) SAP AG AC530 2-1
© SAP AG 2001
z Overview of Material Valuation Strategieswithout the Material Ledger.
z Standard cost accounting and variances.
Contents:
Fundamentals of Material Valuation
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 15/304
(C) SAP AG AC530 2-2
© SAP AG 2001
z Explain the possib ilities and l imitations of theprice controls Standard price and Movingaverage price.
z Explain the value flow of standard costs anddifferences in the R/3 System without usingactual costing in the Material Ledger.
At the conclusion of th is un it, you will beable to:
Fundamentals of Material Valuation: Unit Objectives
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 16/304
(C) SAP AG AC530 2-3
© SAP AG 2003
Course OverviewCourse Overview
AC530 Actual Costing/Material Ledger
Fundamentals of Material Valuation
Design and Purpose of the Material Ledger
Recording Business Transactions
Structured Value Chains
Period-End Close in Actual Costing
Special Functions
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 17/304
(C) SAP AG AC530 2-4
© SAP AG 2001
z To begin, you will review several basicmaterial valuation pr incip les without the useof actual costing in the Material Ledger.
z You will recapitulate the advantages anddisadvantages of the price control techniquesstandard price (S Price) and moving averageprice (V Price), as currently used in your company.
Fundamentals of Material Valuation: Business Scenario
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 18/304
(C) SAP AG AC530 2-5
© SAP AG 2001
Valuation Strategies without the Material Ledger
Standard price(S Price):
- Constant- Recommended for finishedand semi-finished productsand raw materials (allmaterial types)
Moving average price(V Price):
- Adjusted with every receipt- Only recommends for rawmaterials and materials procuredexternally
Price control
Material Master
The valuation of materials in the SAP system (raw materials, semi-finished products and finished products) essentially depends on the price control that is set for the respective material in the
material master.
With moving average price control (V), a new material price is calculated after every receipt.The price is an average value calculated from the total inventory value and the total quantity of
the material in stock.
If the valuation of goods movements takes place at the standard price (S), this price remains
constant for at least one period. The standard price is typically the result of a standard cost
estimate for the material.
The main difference between both valuation procedures is that the moving average price (V)represents the current delivered price, while the standard price (S) is based on planned values
and does not account for any actual prices. Differences between the planned price and the
actual prices are not assigned to the material stock in Financial Accounting, but are collected ona price difference account. With the use of the moving average price (V), the material stock in
Financial Accounting should reflect the actual prices of a material.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 19/304
(C) SAP AG AC530 2-6
The differences between both of these procedures are further explained through the use of
posting examples in the following slides.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 20/304
(C) SAP AG AC530 2-7
© SAP AG 2001
Posting Example: Moving Average Price I
Stock GR/IR Account
Vendor
Procedure Stock Stock Value V Price
Beginning Inventory: 100 Pc at 2.00 100 200 2.00Goods Receipt: 100 Pc at 3.00 200 500 2.50
Invoice Receipt: 100 Pc at 4.00 200 600 3.00
Goods Issue: 150 Pc at 3.00 50 150 3.00
1
2
3
1 200
300
100
2
300 24
400
300
4
Raw Mat. Consumptio n
450
3
3
450
4
If the invoi ce receipt isfor 100 pieces, the
stock coverage
is 200 piecesall differences -> stock
3
Stock coverage
ok
The example above demonstrates how the material stock value and material price can mirror theactual prices of a material with a valuation at the moving average price (V).
With the scenario of invoice receipt after goods receipt, the GR/IR account is charged with the
goods receipt amount (300.00) as an offsetting entry to the inventory posting during goods
receipt.
The GR/IR clearing account is settled at the purchase price during invoice receipt, and the
vendor account is updated at invoice price (400.00).
During both receipt postings (goods receipt and invoice receipt), the moving average price (V)
in the material master is adjusted (2.00 to 2.50 to 3.00 UNI).
If a goods issue occurs now, this is valuated with the current moving average price (3.00 UNI).
The moving average price (V) is therefore, more useful if you want your material stock values
and material prices to reflect the most up-to-date data.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 21/304
(C) SAP AG AC530 2-8
© SAP AG 2001
With a delayedinvoice receipt of
100 PC the stock shortageis 50 Pieces
 price differences
despite moving average price
Posting Example: Moving Average Price II
stock
Price difference:
GR/IR Account
Vendor
Procedure Stock Stock Value V Price
Beginning Inventory: 100 200 2,00Goods Receipt: 100 Pc at 3.00 200 500 2.50
Goods Issue: 150 Pc at 2.50 50 125 2.50
Invoice Receipt: 100 Pc at 4.00 50 175 3.50
12
3
1 200
300
50
2
300 2
50
4
4400
300
4
Raw Mat. Consumptio n
3753
3 375
4
4
stock shortage
In certain cases the moving average price (V) in the material master can lead to price
difference postings.
The main disadvantage of using the moving average price is that the price used to valuate amaterial consumption is almost completely dependent on the time at which the goods issue is
posted in the system. If, for example, an invoice receipt is posted for an externally procured
material after a goods issue was entered, that invoice value is not reflected in the value of thematerial issued. For this reason, the issued material is not valuated at its actual procurement
cost.
This case of stock shortage is illustrated in the posting example above. The invoice receipt (4)
in this example is first posted after the material was already issued (3). After a subsequentsystem-internal stock coverage check, the price difference of 100.00 is only partially debited to
the material (50.00). The rest (50.00) flows into a price difference account.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 22/304
(C) SAP AG AC530 2-9
© SAP AG 2001
Posting Example: Moving Average Price III
Operation Stock Stock Value V Price
Beginning Inventory 100 200 2.00
Goods Receipts: 100 Pc at 2.20 200 420 2.10
Goods Receipts: 100 Pc at 2.40 300 660 2.20
Goods Issue: 200 Pc at 2.20 100 220 2.20
Invoice Receipts: 100 Pc at 3.00 100 300 3.00
Invoice Receipts: 100 Pc at 3.00 100 360 3.60
When multiple invoice receiptsare delayed there is adanger of incorrect valuation!
Even though allreceipts between
2.00 and 3.00 werevaluated!
? 80in stock
? 60in stock
stock coverage
In particular, the moving average price (V) can lead to unrealistic material prices in cases of multilevel
production or when there are variances that do not appear immediately. Such unrealistic prices occur, for
example, when, in the context of stock coverage, where a subsequent adjustment to material stock
takes place due to an incorrect base quantity being used.
In the current period, there are a number of goods receipts for a material that are valuated with the
Moving average price (V).
Afterwards, a goods issue occurs for 200 units of this material
Only then are the invoice receipts for the goods receipts above posted, so that in both cases, the invoice
price varies from the purchase order price.
Because there is stock coverage at the time of invoice receipt in both cases (stock quantity is at least as
large as the invoice quantity) , the price variances of all invoices are completely adjusted to stock. The
existing stock quantity is adjusted with a variance of 140 DM.
This results in a valuation of the remaining material stock and material consumption at an
unrealistically high price (3.60).
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 23/304
(C) SAP AG AC530 2-10
© SAP AG 2001
Characteristics of Price Control V
+The stock value is adjusted each t ime goods are received
+Real-time price fluctuations are posted to the stock
+Price differences only occur in exceptional circumstances
- Price fluctuations can not be adjusted to the finished products of higher levels (S-Price).
- Only recommended for raw materials or materials procuredexternally (real-time price for goods receipts known)
- False entries with severe consequences (compounded errors)
- Danger of incorrect valuations when invoice receipt is delayed
Moving Average Price
The illustrated situation demonstrates how the decision to use the moving average price (V) to have your
material stock values and material prices reflect the most up-to-date data can be a mistaken one.
For this reason, SAP recommends only using the moving average price (V) for material valuation of raw
materials and trading goods, as the delivered prices for these are usually known close to the time of the
goods receipt.
For materials produced in-house, such as semi-finished and finished products there is a great risk that,
at period-end closing, a large number of variances from order settlements (follow-up costs) are posted to
a relatively small stock which can lead to either price variances or faulty valuations.
A further disadvantage of the moving average price (V) is that incorrect entries (i.e. typing errorsduring posting) that are not noticed, can lead to an unrealistic stock value. Subsequent goods issues are
then valuated with these incorrect prices (compound errors).
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 24/304
(C) SAP AG AC530 2-11
© SAP AG 2001
Posting Example: Standard Price
stock
Price difference:
GR/IR Account
Vendor
Operation Stock Stock Value Standard Price
Starting Position: 100 200 2.00
Goods Receipts: 100 Pc at 2.40 200 400 2.00
Invoice Receipts: 100 Pc at 2.20 200 400 2.00
1
2
3
1 200
2002
240 2
2 40
3
3
320220
240
The following applies to valuations at the standard price:
All stock postings take place at standard price
Variances are posted to price difference accounts.
Variances are updated.
Price changes can be observed and monitored.
If a material has standard price control, the value of the material is calculated with the standard
price. For subsequent goods movements or invoice receipts where the price varies from the
standard price, the differences are posted to a price difference account.
The following situation is illustrated above. A goods receipt posting with a price of (2.40) that is
not the same as the standard price (2.00) leads to price variances that are carried on a price
difference account (+40.-). The subsequent invoice receipt with a varying price (2.20) is also
not posted to material stock; instead, the variance is written to the price difference account (-20.00).
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 25/304
(C) SAP AG AC530 2-12
© SAP AG 2001
Characteristics of Price Control S
+ Al l stock postings take place at standard pr ice
+Prices remain constant for at least one period
+Price fluctuations do not credit/debit the cost objects (e.g. orders)->
consistent controlling with the standard price as benchmark
+Calculation of the standard price with cost component splits
+Recommended for all material types
- Price differences can not be subsequently adjusted to the ending
inventories or the consumed products (sales, production withdrawals)
Standard Price
If the material valuation takes place at standard price, all goods movements are valuated with the same
price The standard price control makes consistent controlling of the production process possible;
variances within production are transparent. The use of a periodic price is particularly recommended for
periodic controlling.
The standard price can also be used as a benchmark by which you can measure different methods of
production, or compare the contribution margins of a material in different market segments in
Profitability Analysis (CO-PA).
One disadvantage of standard price control is that the variances or price differences cannot be
allocated to the subsequent production levels. This becomes increasingly problematic with each
additional production level in multilevel production. In this case, real-time cost controlling for thefinished product cannot be guaranteed.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 26/304
(C) SAP AG AC530 2-13
© SAP AG 2001
Period-End Close : Valuation Problems
Valuation period
Distribution ofPrice Differences?
Actual Prices?
Finished Goods
Ending Inventory Raw Materials
Raw material II
Raw Material I
While the danger exists of an incorrect valuation being carried out with the moving average price, both valuation strategies lead to variances, the assignment of which causes problems,
particularly at period-end. The material stock value does not reflect the current procurement
costs, as variances from the standard price are collected in a price difference account in
Financial Accounting and do not, therefore lead to a correction of the material stock account.
With multilevel production, the variances can no longer be assigned to the products that should
carry them. The assignment of these price differences to the ending inventories of rawmaterials, semi-finished products and finished products is just as impossible as a corresponding
assignment to the sold or discontinued goods.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 27/304
(C) SAP AG AC530 2-14
© SAP AG 2001
Standard Cost Accounting Variances
External Procur ement
Result (FI)
Order
Order
Cost Center Act iv ityType
V price
S price
S price
Result (FI)Variance categories Price difference account=
Cost Elements
ProductionCost Centers
Result (CO-PA)
Stock Accounts
Cost Center Act iv ityType
With a multilevel production structure, variances can appear on different objects.
With external procurement, variances appear as a result of a change in the market and vendor prices.
Inflation scenarios can particularly cause significant variances.
The variances of internal production can arise in the area of cost responsibility (cost centers) or in the
area of production (variances from cost objects, such as production orders).
Because these standard cost accounting variances cannot be posted to the material stock, they are posted
as price differences to Profitability Analysis. Even though they can be divided into different variance
categories (price variances, quantity variances, etc.) in Profitability Analysis, they cannot, however, be
assigned to their corresponding products.
In Financial Accounting, these variance categories correspond to the balance of a price difference
account that, from an external accounting point of view, cannot be proportionally allocated to ending
inventory (assets) or consumption (period expense). Standard cost accounting can be advantageous in that it enables you to carry out a consistent and
efficient controlling of the production procedures by comparing the current actual prices with their
respective standard prices.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 28/304
(C) SAP AG AC530 2-15
© SAP AG 2001
z Explain the possib ilities and l imitations of theprice controls Standard price and Movingaverage price.
z Explain the value flow of standard costs anddifferences in the R/3 System without usingactual costing in the Material Ledger.
You are now able to:
Fundamentals of Material Valuation: Summary
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 29/304
(C) SAP AG AC530 3-1
© SAP AG 2001
z Concept and Valuation Approaches of theMaterial Ledger.
z Concept of Actual Cost ing.
Contents:
Design and Purpose of the Material Ledger
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 30/304
(C) SAP AG AC530 3-2
© SAP AG 2001
At the conclusion of th is un it , you will be able to:
Design and Purpose of the Material Ledger: Unit Objectives
z Describe the concept and design of thematerial ledger.
z Describe and configure the currency andvaluation settings in the material ledger.
z Explain the concept of actual costing in thematerial ledger.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 31/304
(C) SAP AG AC530 3-3
© SAP AG 2003
Course Overview
AC530 Actual Costing/Material Ledger
Fundamentals of Material Valuation
Design and Purpose of the Material Ledger
Recording Business Transactions
Structured Value Chains
Period-End Close in Actual Costing
Special Functions
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 32/304
(C) SAP AG AC530 3-4
© SAP AG 2001
z You will now look at the basic settings for thematerial ledger in Customizing. Think aboutwhich valuations in the material ledger youwant to update, and how they interact withyour customizing settings in other modules.
z You will then think about the concept of actualcosting as provided by the material ledger.
Design and Purpose of the Material Ledger: Business Scenario
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 33/304
(C) SAP AG AC530 3-5
© SAP AG 2001
z Describe different multip le-currencyscenarios and how they are updated in thematerial ledger.
z Describe different mult iple-valuationscenarios and how they are updated in thematerial ledger.
z Describe how the valuation approaches inthe material ledger are configured, andconfigure them.
At the conc lusion of th is topic, you wi ll beable to:
Concept and Valuation Approaches of the Material Ledger:Topic Objectives
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 34/304
(C) SAP AG AC530 3-6
© SAP AG 2001
Group Legal Prof it Center
With possibleinventory revaluationusing actual prices
Analysis of actual costcomponent split
of value-addedprocess
Inventory
Actual Costing Transparency
Multiple CurrenciesTranslation usinghistorical exchange rates
Material Ledger
Multiple ValuationTransfer prices
Concept of the Material Ledger
Mat Wage Dep OH
The material ledger is a tool that collects data for materials that have master data stored in a material
master. The material ledger uses this data to calculate prices for the valuation of these materials. The
material ledger is the basis of actual costing and enables inventory to be valuated in up to three
currencies and/or valuations.
As a subsidiary ledger for materials, the material ledger is the prerequisite for multiple valuation of
material inventories. Without the material ledger, the inventory values of materials managed on a value
basis are updated in only one currency (company code currency). With the material ledger, the inventory
values can be carried in two additional currencies in the R/3 System. This is realized by updating all
goods movements in up to three currencies/valuations in the material ledger. The values are translated
into foreign currency amounts at historical exchange rates (at the time of the posting). The material
ledger can thus provide businesses located in high-inflation countries with additional information ontheir inventories in a hard currency. This reveals the influence of inflation on inventories.
The actual costing function takes the periodic values collected and automatically calculates new
inventory values and valuation prices independently of each other in the different currencies and
valuations.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 35/304
(C) SAP AG AC530 3-7
© SAP AG 2001
Material Ledger (Valuation Area)
40 Hard Currency USD
30 Group Currency UNI
Cost Management
(Controll ing Area)10 Local Currency
30 Group Currency UNI
Currency
Translation
Financial Accounting
(Company Code)10 Local Currency
30 Group Currency UNI
40 Hard Currency USD
C u r r e n c y t y p
e 2 0
c a n n o t b e
u s e d i n t h e
F i n a n c i a
l A c c o u n t i n g
c o m p o n e
n t
Material Ledger: Valuation Assignment
10 Local Currency
When monetary amounts are transferred between different components of the R/3 System, integration is
achieved by means of the currency type. The currency type is a key that describes a currency amount
regarding the role of the currency in the system (such as the currency of the company code) and – if
you are using the multiple valuation function – the valuation approach on which the amount is based
(legal valuation, group valuation, or profit center valuation).
In Customizing, you specify which currency types are used separately in the different applications. It is
important to make sure that the settings in Financial Accounting, Controlling, and Material Ledger
harmonize with each other.
If you want to use currency types that are defined in Financial Accounting, set the Crcy type indicator
in FI. In this case the currency types are taken from Financial Accounting automatically. In the standard
system, this setting is covered by material ledger type 0000. If you want to use a combination of the
currency types in Controlling and the currency types in Financial Accounting, set the Crcy type indicator in FI and the Crcy type indicator in CO. In this case you must check the settings manually.
Recommendation: To ensure integration of information between Materials Management, Financial
Accounting, and Controlling, specify the currency type of the group currency as the company code
currency.
If you want to use other currency types, set the Manual indicator and choose an individual value. You
can enter additional currency types beyond the currency type for the company code currency (10).
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 36/304
(C) SAP AG AC530 3-8
© SAP AG 2001
LegalLegal
GroupGroup
Profit center Profit center
Company codeCompany codecurrencycurrency
GroupGroupcurrencycurrency
HardHardcurrencycurrency
10
11
12
30
31
32
40
Multiple Currencies and Valuations
CurrencyCurrency
ValuationValuation
A total of three fields for currencies/valuations are available.
If you want to use only the functions for multiple currencies and not those for multiple valuation, the
currency type simply represents a currency amount. Such currency types end with a zero.
If you want to use the functions for multiple currencies and multiple valuations (for example, for
intercompany transfer prices), the currency type also contains information regarding the valuation on
which an amount is based.
The graphic illustrates this:
Currency type 10 is defined as the legal valuation in the currency of the company code (the local
currency).
Currency type 31 is a different currency, which is based on a valuation for the corporate group (to
eliminate internal profits).
Currency type 32 uses the same currency as currency type 31 but is based on profit center valuation.Internal transfers of goods and services between profit centers are valuated with a price for management
purposes.
For more information on multiple valuation, see the course AC650 Tranfser Prices.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 37/304
(C) SAP AG AC530 3-9
© SAP AG 2001
z Describe the concept of actual costing.
z Explain the dif ference between single-level and mult ilevel product ion scenarios.
At the conc lusion of th is topic, you wi ll beable to:
Actual Cost ing in the Material Ledger: Topic Object ives
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 38/304
(C) SAP AG AC530 3-10
© SAP AG 2001
Levels in the Production Process
Order
Order
Level 1
Level 2
Level 3
Cost Centers Cost Objects Inventory
Cost Center Act iv ityType
Cost Center Act iv ityType
External Procurement
Actual Costing/Material Ledger uses the terms single-level and multilevel.
The material ledger focuses on materials and their procurement. Material procurement is not
restricted to external procurement but also includes internal procurement (production, company transfer,
and so on).
The term single-level always refers to an individual material and its procurement process. This means
that all values and quantities that arise during the procurement of the material are collected on the basis
of that single level.
The above example shows three single levels: one for external procurement and two for internal
production.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 39/304
(C) SAP AG AC530 3-11
© SAP AG 2001
Preliminary Valuation Price
Order
Order
Standard Price
Standard Price
Standard Price
Actual costs
Preliminary Valuation
Actual costs
Preliminary Valuation
Cost Center Accounting Cost Object Controlling
External Procurement
Cost Center Act iv ityType
Cost Center Act iv ityType
Material Ledger
Mat Wage Dep OH
Mat Wage Dep OH
When you use actual costing, all materials are valuated with a preliminary periodic unit price. This
price must remain constant during a given period.
This price can be a price calculated in a standard cost estimate with a cost component split (standard
price), a manual price, or an actual price from the previous period.
Like the standard price, this price has the advantage that a closed standard cost accounting system can be
implemented without the problem of price fluctuations preventing cost controlling of the production
process.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 40/304
(C) SAP AG AC530 3-12
© SAP AG 2001
Cost Center Accounting Cost Object Controlling
External Procurement
Material Ledger
Updating Single-Level Variances
Order
Order
Inventor y Price Dif.
Inventory Price Dif.
Inventory Price Dif.
Inventory Price Dif.
Cost Center Act iv ityType
Cost Center Act iv ityType
Variances arise during the period for this preliminary valuation price (or standard price).
The material ledger posts these variances to a price difference account and updates them separately for
each material. Single-level variances are all variances incurred for a material for the direct procurement
of that material.
With raw materials, these variances are usually caused by price fluctuations in external procurement
from vendors.
For semifinished and finished products, single-level variances are usually caused by internal cost
fluctuations in production that are determined when the order is settled.
Single-level variances do not include the price differences of material from lower levels of production.
For example, price variances in the procurement of raw materials are not included in order settlement
because the raw materials are assigned to the order with their preliminary valuation.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 41/304
(C) SAP AG AC530 3-13
© SAP AG 2001
Cost Center Accounting Cost Object Controlling
External Procurement
Material Ledger
Single-Level Material Price Determination
Order
Order
Ending Inv. Price Dif.
Ending Inv. Price Dif.
Ending Inv. Price Dif.
Ending Inv. Price Dif.
Cost Center Act iv ityType
Cost Center Act iv ityType
At the end of the period, you can use the functions for single-level price determination to assign the
variances recorded for each material. This enables the cumulative price differences to be assigned
proportionally to the ending inventory quantity and the material consumption of the period.
The inventory can be revaluated with the actual price of the period (the periodic unit price). Price
differences allocated to consumption remain on the price difference account at this point.
When you settle an order, the system allocates the price differences that arise during the production
process to the materials.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 42/304
(C) SAP AG AC530 3-14
© SAP AG 2001
Cost Center Accounting Cost Object Controlling
External Procurement
Material Ledger
Order
Order
Ending Inv. Price Dif.
Ending Inv. Price Dif.
Ending Inv. Price Dif.
Ending Inv. Price Dif.
PeriodicUnit Price
Periodic Unit Price
Mul tilevel Material Price Determination
Cost Center Act iv ityType
Cost Center Act iv ityType
PeriodicUnit Price
Multilevel material price determination can also extrapolate the variances that flowed into higher
levels of the production process using a multilevel actual quantity structure.
This quantity structure, which can be thought of as a type of actual BOM, tells the system which
materials were used to manufacture which higher-level products. The prices of finished products can
then be calculated accordingly on the basis of the historical costs.
As a result, price differences (such as for raw materials) can be rolled up to the semifinished products
and then to the finished products.
When you complete multilevel material price determination you can see the actual prices of the
materials (raw materials, semifinished products, and finished products) at the end of the period. These
actual prices reflect the prices actually incurred for the output actually produced or procured during the
period.
As an option, you can revaluate your products or raw materials with these actual prices. This procedure enables you to use actual costing as a supplement to your standard cost system in
parallel, since the values from your standard cost system (cost centers, orders) are not changed by the
revaluation.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 43/304
(C) SAP AG AC530 3-15
© SAP AG 2001
Analyzing the Actual Cost Component Split
Order
Order
Actual costs
Preliminary valuation
Actual costs
Preliminary valuation
Cost Center Accounting Cost Object Controlling
External Procurement
Cost Center Act iv ityType
Cost Center Act iv ityType
Material Ledger
Mat wage dep OH
Mat wage dep OH
Mat wage Af A GKZ
Mat ´wag dep OH
In Release 4.6C you can have the system calculate an actual cost component split for all periodic unit
prices. This enables you to compare the cost components of the standard prices with the cost components
of the actual costs.
Analysis at the level of cost components makes it clear what caused the cost fluctuations. For example,
you can see how much of the cost of your finished product was incurred by labor, material, and external
processing.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 44/304
(C) SAP AG AC530 3-16
© SAP AG 2001
Actual Cost of Sales
Actual Cost of Sales in Profitabili ty Analysis
Contribution margin analysis
Actual costs broken down into cost components
Plan-actual variances
Plan Actual Var. % Var. (Abs.)Plan Actual Var. % Var. (Abs.)
Revenue:: $100,000Quantity sold: 1,000 pc
50.000 45.000 5.000 10 %Material costs 50 000 45 000 5000 10 %Material costs4.000 5.000 -1.000 - 25 %Production costs 4000 5000 -1000 - 25 %Production costs4.000 4.500 - 500 - 13 %Variable labor costs 4000 4500 - 500 - 13 %Variable labor costs
10.000 7.000 3.000 30%Process costs 10 000 7000 3000 30 %Process costs5.000 5.500 - 500 - 10 %Material-overhead 5000 5500 - 500 - 10 %Material overhead
6.00027.000 33.000 22 %Contribution margin I 600027 000 33 000 22 %Contribution margin I
10.000 10.000 0 0 %Fixed labor costs 10 000 10 000 0 0 %Fixed labor costs7.000 7.000 0 0 %Fixed production costs 7000 7000 0 0 %Fixed production costs
10.000 16.000 6,000 60 %Contribution margin II 10 000 16 000 6000 60 %Contribution margin II
You can use material ledger data for contribution margin analysis in CO-PA. This enables you to
determine the actual cost of goods manufactured for the products sold.
If you are using CO-PA, you must assign the actual cost component split to value fields in
profitability analysis and revaluate the invoices or settled orders. For more information, see the unit
Extended Customizing and CO-PA Integration.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 45/304
(C) SAP AG AC530 3-17
© SAP AG 2001
You are now able to:
Design and Purpose of the Material Ledger: Summary
z Describe the concept and structure of thematerial ledger.
z Describe and configure the currency andvaluation settings in the material ledger.
z Explain the concept of mult ilevel actualcosting in the material ledger.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 46/304
(C) SAP AG AC530 4-1
© SAP AG 2001
z Material Price Determination Control
z Preliminary Valuation
z Cost Components
z Price Differences
z Exchange Rate Differences
Contents:
Recording Business Transactions
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 47/304
(C) SAP AG AC530 4-2
© SAP AG 2001
Recording Business Transactions: Unit Objectives
z Explain the reporting of simple businesstransactions in the material ledger.
z Describe the Customizing settingsrequired for cost components.
z Explain the treatment of price andexchange rate differences for materials inthe material ledger.
At the conclusion of th is un it, you will beable to:
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 48/304
(C) SAP AG AC530 4-3
© SAP AG 2003
Course Overview
AC530 Actual Costing/Material Ledger
Fundamentals of Material Valuation
Design and Purpose of the Material Ledger
Recording Business Transactions
Structured Value Chains
Period-End Close in Actual Costing
Special Functions
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 49/304
(C) SAP AG AC530 4-4
© SAP AG 2001
z You review the concept of price determinationin the material ledger.
z You familiarize yourself with the pricedetermination structure display.
z You analyse actual values in the costcomponent view of the material ledger.
z For your first business transaction, you learn
how to analyse price and exchange ratedifferences using the material ledger.
Record ing Business Transactions: Business Scenario
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 50/304
(C) SAP AG AC530 4-5
© SAP AG 2001
Price Determination Control in the Material Ledger
SS VV
Standard Price Moving average price2Transaction-based
(as without th e Material Ledger)
Price control
price determin.
3Single/multilevel Standard PriceStandard Price
Actual cost ing Actual costing Actual cost Actual cost
component splitcomponent split
cannot be changedmanually
Mat . Wage Depr. OH.
Setting 2 for transaction-based price determination functions in the same way as the system without
the material ledger, but has the added advantage of allowing you to carry standard prices and moving
average prices in multiple currencies or valuations. This option is possible for materials with the price
control S or V.
With single-/multilevel material price determination (indicator 3 in the material master), a standard
price is used for preliminary valuation, and a periodic unit price is calculated for material valuation of
the closed period. This option is only possible for materials with the price control indicator S, and is only
recommended when you want to use actual costing in combination with multiple currencies or
valuations.
With single/-multilevel material price determination, the periodic unit price is updated for
informational purposes and can be used for material valuation of the closed period.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 51/304
(C) SAP AG AC530 4-6
© SAP AG 2001
Table view Edit Goto Selection criter ia Utilities System Help
Change View: Activation of Material Ledger
Valuation area ML active
1000
6000
6100
9000
Company code
1000
6000
6000
9000
Price determination
3
3
Price determination
mandatory
X
X
Customizing: Material Price Determination
Produ ctive Start-upz After the productive start up , change the pri ce determinat ion for materials t hat
should be included in actual costing from 2 (default) to 3!z Price control is t hen automatically changed to Sz This funct ion can lead to a revaluation.
During activation of the material ledger for your valuation area in Customizing, you can specify what
type of material price determination is defaulted for the materials in this valuation area during the
creation of a material.
You also have the option af specifying whether this price determination indicator is a mandatory setting
that can not be changed.
Warning: This default is ignored during production startup: the system automatically sets the indicator
2 in the material master of all existing materials.
If you want to change the indicator for a material retroactively, choose Accounting -> Controlling ->
Actual Costing/Material Ledger -> Tools -> Change Price Determination.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 52/304
(C) SAP AG AC530 4-7
© SAP AG 2001
Price Determination 2: Transaction based
Period 2Period 1
Moving average price
Standard Price
Mat.WageDepr.OH.
Mat .WageDepr.OH.
Transaction-based material price determination (control 2) corresponds to the functionality without
the material ledger, with the advantage that you can use multiple (up to three) currencies or valuations.
Price control 2 allows you to set the price control to standard price or moving average price.
If a material has price control 2, it cannot be included in actual costing. This means that a periodic unit
price will not be calculated for these materials. In the same way, no actual cost component split will be
generated.
The advantages and disadvantages of the standard price and moving average price have already been
explained in the "Fundamentals of Material Valuation" unit.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 53/304
(C) SAP AG AC530 4-8
© SAP AG 2001
Period 1Period 1
Preliminary Valuation: 100 MXN /Unit
Period 2Period 2
Price Determination 3: Preliminary Valuation
Preliminary Valuation: 110 MXN /Un.
Cumulated Differences: 500 MXN
Periodic Unit Price
Mat.WageDepr.OH.
For materials with price determination control 3 (recommended for actual costing), all valuation-
relevant transactions are always first valuated with the standard price.
During a period, the Material Ledger collects data for all activities that relate to the valuation of
materials. The preliminary valuation price (standard price) must remain constant during a period. It
can no longer be changed as soon as data in this period has been entered into the material ledger.
In the above example, the preliminary valuation price for the material is 100 MXN for Period 1, and 110
MXN for Period 2.
In addition to this, the differences between the preliminary valuation price and the actual price are
recorded, per material, for each posted activity. You can see the differences that were recorded during
the period as soon as they are entered.
In the above example, all activities in Period 1 were recorded with a preliminary valuation price of 100
MXN per unit. During the period, various price differences were entered forming a cumulativedifference of 500 MXN for all receipts. This difference could be the result of higher procurement prices
being collected than originally planned for the period.
Materials with price control 3 can be included in actual costing and the calculation of the actual cost
component split.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 54/304
(C) SAP AG AC530 4-9
© SAP AG 2003
Material ledger Display
Beginning Inventory
Receipts
Consumption
Ending inventory
Material ACT-LCD-##Valuation Area 6000
View: Price Det. Structure
Period 01.2001
Currency Company code curr ency MXN
Material Ledger: Price Det. Structure
Further data
500 2500 0 0 5,00
2000 500 30 0 26,50
0 0 0 0 0
500 2500 0 0 5,00
500 2500 0 0 5,00
PriceExch. rate diff.Price Diff.Preliminary ValuationQuantity
Cumulative inventory
Label for CDMexico Price control
Price determin.Period status:
CurrenciesPeriod
In the material ledger display "Material Price determination", you can see all valuation-relevant
transactions for a material.
In addition to branching between the various value records, you can also look at the data for various
periods.
The screen contains general data for the material and a price determination display that shows the
various quantities and values of recorded transactions in the columns and a listing of the business
transactions grouped into various categories in the lines.
This display gives you an overview of the value-added-relevant data for each material, period and
value record, one which you could not receive without the use of the material ledger.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 55/304
(C) SAP AG AC530 4-10
© SAP AG 2003
“ ” ”
Material Ledger: Categories
Beginning Inventory
Receipts
Consumption
Ending inventory
Material ACT-LCD-##Valuation Area 6000
View: Price Det. Structure
Period 01.2001
Currency Company code curr ency MXN
Display Material Ledger Data
Further data
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
PriceExch. rate diff.Price Diff.Preliminary ValuationQuantity
Cumulative inventory
Label for CDMexico
Carried forwardfrom previous
period
Documents for receipts that
determine prices
Beginning Inventory
+ All receipts
Documents for all issues
Cumulative inventory- all issues
The line display of the material ledger data groups various business transactions into categories.
The information for the category Beginning inventory is transferred from the previous period. Postings
from the previous period are also displayed
In the second category, all receipts such as goods receipts or invoice receipts for this period are
displayed .
The optional category Other receipts/consumption can be used to separately display specific goods
receipts or goods issues that should be included in the calculation of the periodic unit price.
The cumulative inventory (statistical) is the total of the beginning inventory and the collected receipts.
This is used during period-end closing to distribute price differences proportionally to the remaining
inventory and consumption
All goods issues are displayed in the category Consumption. Goods issues are always valuated with the
preliminary valuation price. The values of the category Ending inventory are calculated by subtracting the values of consumption
from the values of the cumulative inventory. The values of the ending inventory are transferred into the
category Beginning inventory of the next period through the period closing program.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 56/304
(C) SAP AG AC530 4-11
© SAP AG 2003
Material Ledger: Price Det. Structure
Beginning Inventory
Receipts
Purchase order
Consumption
Ending inventory
Material ACT-LCD-##Valuation Area 6000
Period 01.2001
Currency Company code curr ency MXN
Display Material Ledger Data
Further data
500 2500 0 0 5,00
500 2500 500 0 6,00
500 2500 500 0 6,00
0 0 0 0 0
1000 5000 0 0 5,00
1000 5000 500 0 5,50
PriceExch. rate diff.Price Diff.Preliminary ValuationQuantity
Cumulative inventory
Label for CDMexico
Differences betweenpreliminary valuationprice and actual price
Real-time valuationwith preliminary
valuation price
Averageactual price
for category
Exchange ratedifferences
between GR and IR
View: Price Det. Structure
The columns of the material ledger display are explained in the above example. The following
transactions were entered for a material that was valuated with a standard price of MXN 5:
In this period the beginning inventory was 500 pieces, valuated at a standard price of 5.
One or more postings appear under the category Receipts that were preliminarily valuated in real-time
with the standard price. The result of a preliminary valuation of the receipts for 500 units is MXN 2500
(500 units * MXN 5).
However, the actual costs for the receipts was MXN 3000, so a price difference of MXN 500 has been
recorded. An exchange rate difference (as a result of exchange rate fluctuations) has not appeared in the
valuation view.
In the Price column, a statistically calculated actual price is displayed for the first 4 (price-forming)
categories that contain receipts or stocks with quantity entries. This is provided (at first) for
informational purposes and is not updated by the system. In the Price column, you can see that anaverage price of MXN 6.00 ((MXN 2500 + MXN 500) / 500 units) has been incurred for the
category Receipts. In the Cumulative inventory column you can see that the average procurement
price taking into account the beginning inventory equals MXN 5.50.
These price differences are not assigned to consumption and ending inventory (at first). For this reason,
the ending inventory is valuated with the preliminary price of MXN 5.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 57/304
(C) SAP AG AC530 4-12
© SAP AG 2001
Standard CostEstimate
Material Master Material Ledger DocumentOverview
Document ItemsSource
DocumentDocument
Header AccountingDocuments
FIFIPPPP MMMM
MMMM COCO--PCPPCP
Period
COCOCOCO--COCO
Material Ledger Price determination
structure
Receipts 100 10000 1000 110
Cumulative inventory 170 17000 3400 120
Ending inventory 140 1,000 100
Consumption 30 3000 100
Beginning Inventory 20 2000 100
PrelimValCategory Quantity Price dif. Price
Interactive Information
You can go to the views displayed above from the material ledger display of the price determination
structure:
You can go to the accounting view of the material master.
You can display an existing standard cost estimate.
You can go to the material ledger document and, using variable display variants (ABAP List Viewer),
branch to:
y Header information for the material ledger document
y The source document (i.e. document for goods receipt)
y Various material ledger document items
y Additional accounting documents (CO-PA, FI, CO...)
In addition, you can look at the business transactions in the different value records and branch tosubsequent or previous periods.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 58/304
(C) SAP AG AC530 4-13
© SAP AG 2003
Material Ledger: Cost Component View
Beginning inventory
Receipts
Consumption
Ending inventory
Material ACT-LCD-##Valuation Area 6000
Period 01.2001
Currency Company code curr ency MXN
Material pri ce analysis
Further data
500 2500 2500 0 0 0
500 3000 3000 0 0 0
0 0 0 0 0 0
1000 5000 0 0 0 0
1000 5500 5500 0 0 0
OverheadsMachine CostsWagesValue:Quantity
Cumulative inventory
Label for CDMexico
Value: Actual value - Level & lower lev el-f ixed/variab leView: Cost component-main cost component split
Material
Mat. Wag e Depr. OH.
Cost component data as alternative for: Actual valuePreliminary valuationdifferencesPrice differencesExchange rate differences
You can analyze the results of an actual cost component split per material from the menu in the
Material Ledger. In addition to this, you can transfer the results of the actual cost component split to CO-
PA in the same way as you can for a cost component split for planned costs.
You can analyze the results of the cost component split according to different criteria in the Material
Ledger display. For example, you can view the fixed or variable To do this you can branch to fixed or
variable parts of the cost component split, or analyze the differences per material movement, between an
actual cost component split and cost component split for planned costs.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 59/304
(C) SAP AG AC530 4-14
© SAP AG 2001
Cost component
structure
Primary cost
component split
...
ML
MX
active Description
....
IDES Mexico
Primary costs
IDES MexicoX
Customizing: Activating Cost Component Structures
Product Cost Planning: Define cost component structures
X
X
Assignment: Organizat ional uni ts - Cost comp. struc ture
Company code Costing variant
6000 ++++
Plant
++++
Main cost
comp. split
ML
Auxiliary
cost comp. split
MX
Material Ledger: Activate actual cost component split
Valuation Area Company code
6000 6000
Activate actual cost
component split
X
COCO--PCPC--
ACT ACTCOCO--PAPA
P l a n
A c t u a l
COCO--PCPPCP
COCO--OMOM
=
The settings for cost components splits can be used for both actual and standard cost estimates. Material
cost estimates are created in Product Cost Planning (CO-PC-PCP). You can display cost components
in the standard cost estimate, analyse them using the information system and transfer them to
Profitability Analysis (CO-PA).
The cost component is arranged according to the results of the cost estimate, for example raw materials,
material overheads, services, set up costs, machine costs, personnel costs, production costs and other
costs.
If you have activated actual costing in the Material Ledger you can activate a actual cost component
split per valuation area. If you have defined several variants for the cost estimate, whereby you update
the standard price, you must have allowed marking of standard cost estimates. The component structurefor actual cost component splits is generated using the selected costing variant. If you want to start using
the Material Ledger, set the „activate actual costing“ indicator in this step.
If you are already using the Material Ledger and you want to start using actual cost component splits,
set the „activate actual cost component split“ indicator in this step. You must then execute report
"MLCCS_STARTUP" , which will create the data needed for the actual cost component split.
If you are already using actual cost components splits and change from price control 2 to 3, all existing
cost component split data will be deleted!
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 60/304
(C) SAP AG AC530 4-15
© SAP AG 2001
Cost component
structure
Primary cost
component split
ML
active Description
IDES Mexico
Customizing: Assigning Cost Components
Product Cost Planning: Define cost component structures
X
Assignment: Cost element -> component
Cost component
structure
From
cost element
ML 400000
Ch. Accts
INT
To cost element
409000
Component
10
Description
Material component
ML 420000INT 434000 20 Wages
ML 650000INT 655000 40 Overheads
... ...INT ... .. ...
Mat Wage Depr. OH.
Cost component splits provide a structure that arrangs costs of an activity type, a process or a material
according to cost components. In particular, a cost component split allows you to see the value added by
each manufacturing level during production.
Cost component splits can either be a cost component split for cost of goods sold, or a primary cost
component split (with transfer of original split costs from the cost center activity prices).
In order to be able to generate the cost component split, individual cost elements must be assigned to
the various cost components.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 61/304
(C) SAP AG AC530 4-16
© SAP AG 2003
Goods Issue
Beginning inventory
Receipts
Other receipts/consumption
Consumption
Ending inventory
Material ACT-LCD-##Valuation Area 6000
Period status Quantities and values enteredPrice control Standard pr ice
Period 01.2001
Currency Company code curr ency MXN
Display Material Ledger Data
Sales order stock
Further data
500 2500 0 0 5,00
500 2500 500 0 6,00
0 0 0 0 0
50 250 0 0 5,00
950 4750 0 0 5,00
1000 5000 500 0 5,50
PriceExch. rate diff.Price diff.Preliminary valuationQuantity
Cumulative inventory
Standard pric e MXN 5
Label for CDMexico
Consumption andending inventory are
valuated at standard price
Goods issues during a period are always valuated with the preliminary valuation price, regardless of
the prices with which the receipts were valuated.
Goods issues are displayed in the category Consumption.
The cumulative inventory minus all consumptions equals the ending inventory that is also valuated
with the preliminary valuation price during a period.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 62/304
(C) SAP AG AC530 4-17
© SAP AG 2001
Topic: Exchange Rate Differences
z Logistics Invoice Verification
z Calculation of exchange rate differences
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 63/304
(C) SAP AG AC530 4-18
© SAP AG 2001
Must be used with the Material Ledger
Differences to conventional invoice verification
Invoice verification across company codesDistributed scenarios Any number of purchase orders / deliveries in one t ransact ionManual invo ice reductionTotal-based invoice reductionSupports transfer prices
Logistics Invoice Verification
Goods Receipt
Invoice Receipt Logisti cs Invoice Veri fi cat ion
factually and mathematicallycorrect? Invoice documents updated inMaterials Management and
Accounting
Material Ledger
When using the Material Ledger, you must use Logistics Invoice Verification. The "old" invoice
verification does not work here.
Differences to conventional invoice verification
Logistics invoice verification was developed, because some requirements of invoice verification (i.e.
MM and FI on separate systems) are not realizable with conventional invoice verification for technical
reasons.
New functions are only available in logistics invoice verification, including multiple selection, manual
invoice reduction, total-based invoice reduction, background processing, invoices with instalment
conditions and cross company code invoice verification. Logistics invoice verification will replace the
conventionainvoice verification at some point in the future.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 64/304
(C) SAP AG AC530 4-19
© SAP AG 2001
Init ial entry of stock balances
(external value posted)
Transfers(standard price in other plants)
External procurement(order / invoice value)
Subcontracting(order / invoice value)
In-house production (settlement of
orders)
Material Debits/ Credits (MR22)
Price Differences
... a r i s e
t
h r o u g h
Price differences stored in the Material Ledger can occur in the cases mentioned above.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 65/304
(C) SAP AG AC530 4-20
© SAP AG 2001
Goods receipts for purchase order, if...
The exchange rate of the goodsreceipt and invoice receipt aredif ferent (standard)
The exchange rate at the point of invoice receipt is different to theplanned exchange rate (P)
Prerequisite: Activation of exchange rate differenceentry in Customizing for LogisticsInvoice Verification
Exchange Rate Differences
... a r i s e
t h r
o u g h
In order to enter exchange rate differences, you must activate the entry for exchange rate differences
in Customizing for Materials Management / Invoice Verification.
When the treatment of exchange rate differences is activated, the exchange rate valid at the time the
invoice is posted is compared with one of the following:
y the exchange rate valid at the time of the goods receipt
y the exchange rate which is set as a planned exchange rate (type P). This exchange rate is usually
used for planning purposes in Controlling. It is used to simulate and document currency fluctuations.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 66/304
(C) SAP AG AC530 4-21
© SAP AG 2001
Example: Calculation of Exchange RateDifferences
MXN
USD
3000 4000
P TypePlan exch. rate valid at IRMXN 100 = USD 10
M TypeExchange ratevalid at IRMXN 100 = USD 12
GR price IR price
480
Exch. rate difference:USD 80(4000* 0.12) - (4000* 0.10)
1."True"
Price difference:USD 120
(MXN 1000 * 0.12)
2.
360 Price difference:USD 40
(- Exch. rate diff. +
"True" pr ice difference)
3.
GR price
Planned exch. ratedrop
IR price
This example explains how exchange rate differences are calculated using exchange rate type P. The
numbers are based on the optional exercise in the course exercises for participants.
Explanation:
y 1) The price difference actually translated (the "true" price difference) is USD 120 (MXN 1000 price
difference * 0.12).
y 2) The invoice receipt of MXN 4000 shows a price difference of MXN 1000. Since the planned
exchange rate takes into account a fall in the exchange rate (MXN 100 drops from USD 12.00 to USD
10), an exchange rate difference of USD 80 is reported in the material ledger: (4000 * 0.12) - (4000
* 0.10) or USD 480 - USD 400 = USD 80.
y 3) The "true" price difference less the exchange rate difference results in a remaining price difference
of USD 40 (-USD 80 + USD 120). This price difference is reported in the material ledger.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 67/304
(C) SAP AG AC530 4-22
© SAP AG 2001
z Explain the reporting of simple businesstransactions in the material ledger.
z Describe the Customizing settings required for cost components.
z Explain the treatment of price and exchangerate differences for materials in the material
ledger.
Recording Business Transactions: Summary
You are now able to:
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 68/304
(C) SAP AG AC530 4-23
Recording Business Transactions: Exercises
Unit: Recording Business Transactions
At the conclusion of these exercises, you will be able to:
• Call up valuation-relevant information for the individual materialsusing the material ledger data display
• Determine which currencies and valuations are used in the SAPmodules relevant to material valuation
• Explain how the material ledger calculates price differences
• Use the material ledger to analyze actual prices for externally
procured materials and explain the cause of variances between actualand preliminary valuation prices
Your company has activated actual costing. You are responsible for the
production of a demo CD that your company sends to customers. In this
context, check the settings in your system that are relevant to valuation,and then carry out external procurement for one of the two input
materials: the labels for the CDs.
1 Display of Inventory Quantities and Values
Check the current inventory situation of the labels for your demo CD (material ACT-LCD-##) in the Mexico City plant (plant 6000). To do so, call up the material ledger data for
the label. To check the settings for the labels, also call up the material master and look for
the valuation data in the two additional currencies.
Current inventory: PC
Company code currency:
Standard price (S Price): MXN
Current inventory value: MXN
Group currency:Standard price (S Price): EUR
Inventory value: EUR
Hard currency:
Standard price (S Price): USD
Inventory value: USD
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 69/304
(C) SAP AG AC530 4-24
2 Currency Settings
Check which currency and valuation settings have been made in Customizing under the
relevant components FI; CO and ML (Note: the entry "0" appears as an empty/ blank field):
Financial Accounting: Settings in Company Code 6000
Currency Valuation Currency Type
1. Local currency
2. Local currency
3. Local currency
Controlling: Settings in Controlling Area 6000
Currency Currency Type
Currency setting
Material Ledger: Currency Types in Material Ledger Type 0000
Currency type from FI: ____ Currency type from CO: ____ Manual: ____
Which items are selected? What does this setting mean in the material ledger?
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
3 External procurement with price differences
3-1 Creation of an order
3-1-1 Order an additional 500 labels from the vendor 1096 Fabricas Mixtli. Use
the following data:
Purchase order type Standard purchase order
Vendor 1096 / Fabricas Mixtli S.A.
Purchasing organization IDES Mexico
Purchasing group Compras Mexico DF
Company code IDES Mexico
Material ACT-LCD-## (CD label)
Quantity 500 pc
Plant 6000 Mexico City
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 70/304
(C) SAP AG AC530 4-25
Storage location: 0001
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 71/304
(C) SAP AG AC530 4-26
3-1-2 Confirm your entries. The system automatically determines a purchase
order price. What is the price?
PO price: MXN Per PC
3-1-3 How is this price determined?
________________________________________________________ Save your purchase order and write down the purchase ordernumber. Purchase order number:
_____________________________________________
3-2 Goods Receipt and Price Differences
3-2-1 Post the goods receipt for your order (most of the data is taken from your order automatically): Enter your order number and select the OK button
in your item line.
Posting date Today's date
Purchase order number See previous exercise
Column/field OK Select
Plant 6000
Storage location 0001
Quantity As in the purchase order
Movement type 101
3-2-2 Then look at the data in the material ledger display (in company code
currency). How did these price differences occur? Reason: ________________________________________________________
________________________________________________________
________________________________________________________
3-2-3 Call up the material ledger document for the goods receipt, and branchfrom there to the original source document. What type of document are
you branching to?
Document type:
____________________________________________________
3-2-4 Call up the accounting document.
Amount of price differences: MXN
Price difference account number:
Price difference account text:
Return to the material price analysis.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 72/304
(C) SAP AG AC530 4-27
4 Cost Component for Price (Actual Cost Component Split and Cost Component Split for
Planned Costs)
4-1 Actual Cost Component Split
4-1-1 You are in the Price determination structure view of the material priceanalysis for your labels. Write down the following values for your goods
receipt:
Receipt quantity: PC
Preliminary valuation: MXN
+ Price differences: +.....................................................MXN
Total value: MXN
4-1-2 Go to the Cost Component view. Enter the following settings:
Period: current
Currency/valuation: Company code currency
Value: Actual value; level + lower level, fixed +variable
View: Cost component / main cost component
split
The value for your goods receipt is under the Receipts category.
What is the actual value of the receipts for the period?
_________________________
Under what cost component is this value? ____________________________
4-1-3 Change the value setting from the actual value to the preliminary valuation
price. What is the preliminary valuation price of the receipts for the
period?
_________________________________________________________
Under what cost component is this value?
____________________________
4-1-4 Change the value setting to differences. What is difference between the
preliminary and actual value for the receipts?
________________________________________________________
4-2 Planned Costs
4-2-1 Call up the current standard cost estimate for your label using the
following parameters (Product Cost Planning: Material cost estimate withquantity structure) for you ACY-LCD-## label
Costing variant: PPC1
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 73/304
(C) SAP AG AC530 4-28
Costing version: 1
Valid from: Today
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 74/304
(C) SAP AG AC530 4-29
4-2-2 Go to the Costs Tab and set the reference figure to the current actual
inventory quantity (user input). Call up the Cost component view.
What plan value was calculated for the current inventory?
__________________________
Under what cost component is this value?
__________________________
Change to the Itemization view. In which cost element is the value
updated?
__________________________
4-3 Customizing for Cost Components
4-3-1 Go to Configure Automatic Postings in Customizing for Materials
Management. The account for the goods movements relating to the order
is determined using the consumption cost element, as for the cost estimate.The consumption cost element is found using operation GBB (offsetting
entry for inventory posting) under modification VBR (consumption).Check which account or cost element was selected for the consumption of
your label in the INT chart of accounts. Plant 6000 is assigned to
valuation modification 0001, and your label is assigned to valuationclass 3000.
Which account is updated for operation GBB/VBR and material ACT-
LCD-##?
Debit: _____________________ Credit: _____________________
4-3-2 Go to Basic Settings for Material Cost Estimates in Customizing for
Product Cost Controlling. Maintain the cost component structures.
Which cost component structure is used in company code 6000 for the
standard cost estimate?
Cost component structure for main costcomponent split:
Cost component structure for auxiliary
cost component split:
4-3-3 Go to Customizing for Actual Costing/Material Ledger , and check whether
the actual cost component split is activated for the following valuation
areas:
Valuation Area 6000: Yes / No
Valuation Area 6100: Yes / No
Which cost component structure is used for the actual cost component
split? Is it possible to select a specific cost component split for the actualcost component split?
________________________________________________________
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 75/304
(C) SAP AG AC530 4-30
________________________________________________________
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 76/304
(C) SAP AG AC530 4-31
4-3-4 Return to the maintenance of cost component structures. Display the
components for the structure ML
Component Name
Component 10:
Component 20:Component 30:
Component 40:
Component 100:
Component 200:
Component 300:
4-3-5 Go to the A ssignment cost component - cost element interval function for
the ML structure. To which cost component is the cost element for theconsumption of your labels (see above) directed?
________________________________________________________
4-3-6 To summarize the exercise for cost element determination, complete the
following table:
Operation
(MM)→ Account/ Cost
Element→ Cost
Component
GBB/VBR → →
5 Consumption at Cost Center 5-1 Your cost center 1000 withdraws 50 labels for test purposes. Post this goods issue:
Material: ACT-LCD-##
Posting date Today's date
Movement type 201
Plant 6000
Storage location 0001
Receiver cost center 1000
Quantity 50 PC
Post.
5-2 Look at this goods issue in company code currency in the material ledger display
(view: price determination structure). With what price was the goods issue posted?
Price: MXN / PC
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 77/304
(C) SAP AG AC530 4-32
Optional Exercises
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 78/304
(C) SAP AG AC530 4-33
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 79/304
(C) SAP AG AC530 4-34
Unit: Recording Business Transactions
Optional: Invoice Verification and Exchange Rate
Differences
At the conclusion of these exercises, you will be able to:
• Use Logistics Invoice Verification
• Explain how the system calculates exchange rate differences
1 Invoice verification
1-1 You receive the invoice for the order of your labels. What type of invoice
verification do you select, and why?
Reason:
_______________________________________________________
1-2 Carry out invoice verification with the following data:
Invoice Date: Today
Posting date: Today
Amount: MXN 4,000
Purchase order: Your purchase order number
Confirm.
At item level, correct the default amount (order value) to MXN 4,000 and select the
item to "Posting OK"
Post the invoice. (Ignore the possible warning messages about exceeding the
tolerances by entering over them)
1-3 After saving the accounting document, call up the material price analysis in thematerial ledger again (view: price determination structure, company currency).
Write down the price differences that were posted with the invoice receipt.
Invoice price differences: MXN
2 Exchange Rate Differences
2-1 In the material ledger display, change the display currency to hard currency. Look
at the material ledger document for invoice verification. Have price/exchange ratedifferences occurred?
Price differences: USD
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 80/304
(C) SAP AG AC530 4-35
Exchange rate differences: USD
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 81/304
(C) SAP AG AC530 4-36
2-2 In Customizing (Materials Management / Logistics Invoice Verification), look at
the settings for the calculation of exchange rate differences. Are exchange ratedifferences calculated in company code 6000? If so, which exchange rate type is
used?
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
2-3 In Financial Accounting, check the exchange rates used to calculate exchange rate
differences. (Tip: use the Position pushbutton).
Exchange Rate
Type
From Currency To Currency
Current type M MXN 100 USD
Current type P MXN 100 USD
2-4 To calculate exchange rate differences, the system translates the values of the
transaction currency (Mexican pesos) into the hard currency. To understand the
calculation of exchange rate differences, fill out the following table:
Currency Invoice Value
Mexican pesos MXN
USD for type M USD
USD for type P USD
Exchange rate differencein USD:
USD
The difference between the two values in USD is the exchange rate difference thatthe system calculates on the basis of the settings. You can see this difference in the
material ledger display.
2-5 The total value in hard currency is arrived at using the following logic: The
accounting value of the material cannot be changed by the calculation of exchangerate differences, because only a fictional exchange rate (the planned exchange rate)
is used. For this reason, the calculated exchange rate differences must be canceled
out by the inverse value. This is done by making a price difference posting.
The total value of the Price differences column results from two values: The inversevalue for the exchange rate differences and the "true" price differences that are
posted with invoice receipt.
Now, calculate the "true" price differences:
Price differences in MXN MXN
Exchange rate (type M)
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 82/304
(C) SAP AG AC530 4-37
“True” price difference in USD: USD
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 83/304
(C) SAP AG AC530 4-38
2-6 Hence, the sum of the "true" price differences and the inverse (negative) value of
the exchange rate differences is the value that can be seen in the Price differences
column:
Inverse value of the exchange rate
differences
USD
"True" price differences USD
Total price differences USD
This amount can be seen in hard currency as price differences for the invoice receipt
in the material ledger display and the accounting documents for invoice receipt.
This posting logic makes it possible to separate price and exchange rate differences
and assign them to the areas of responsibility.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 84/304
(C) SAP AG AC530 4-39
Recording Business Transactions: Solutions
Unit: Recording Business Transactions
The following menu paths are used in the exercises and solutions:
ACT/ML: Accounting→ Controlling→ Product Cost Controlling→
Actual Costing/Material Ledger
IMG: Tools→ Customizing→ IMG→ Edit Project→ SAP
Reference IMG
1 Display of Inventory Quantities and Values
Material Ledger Display
ACT/ML: Material Ledger→Material price analysis
Material: ACT-LCD-##
Plant: 6000
Period/Year: Current period/current year
→ Goto→ Material Master
Current inventory: 500 PC
Company code currency: Mexican pesos (MXN)
Standard price (S Price): MXN 5
Current inventory value: MXN 2500
Group currency: EUR
Standard price (S Price): EUR 0.60
Inventory value: EUR 300
Hard currency: USD
Standard price (S Price): USD 0.60
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 85/304
(C) SAP AG AC530 4-40
Inventory value: USD 300
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 86/304
(C) SAP AG AC530 4-41
2 Currency Settings
You learn how to make currency settings in the Implementation Guide.
Company code settings:
IMG:→ Financial Accounting→ Financial Accounting Global Settings→ Company
Code→ Multiple Currencies→ Define Additional Local Currencies
Select company code 6000
Financial Accounting: Settings in Company Code 6000
Currency Valuation Currency
Type
1.
L
o
calc
u
rr e
nc
y
MXN Legal
val.
10
2.
L
oc
al
cu
rr
en
cy
EUR Legal
val.
30
3.L
o
cal
cu
rr
e
USD Legalval.
40
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 87/304
(C) SAP AG AC530 4-42
nc
y
The valuation view “legal” is the setting “0”. Note that this character is displayed as a
blank.
Controlling Area Settings:
IMG:→ Controlling→ General Controlling→ Organization→ Maintain Controlling
Area
Maintain Controlling Area
Select controlling area 6000
Go To Details
Controlling: Settings in controlling area 6000
Currency Currency Type
Currency setting EUR 30
Settings for the Material Ledger
IMG:→ Controlling→ Product Cost Controlling→ Actual Costing / Material Ledger
→ Assign Currency Types to Material Ledger Type
Material Ledger: Currency Types in Material Ledger Type 0000
Currency typefrom FI: X
Currency typefrom CO: X
Manual: ____
With this setting, you specify that when the material ledger is activated, it copies thecurrency and valuation settings from Financial Accounting and Controlling. In addition,
the material ledger checks whether the settings in these modules correspond to each other.
Type 0000 has been activated for plants 6000 and 6100.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 88/304
(C) SAP AG AC530 4-43
3 External procurement with price differences
3-1 Creation of an order
You create orders in Materials Management :
Logistics→ Materials Management→ Purchasing→ Purchase Order→ Create
→ Vendor/Supplying Plant Known
Make the following entries: Header data:
Purchase order type Standard purchaseorder
Vendor 1096 / Fabricas MixtliS.A.
Purchasingorganization
6000 IDES Mexico
Purchasing group 600 / Compras MexicoDF
Company code 6000 / IDES Mexico,SA de CV
Item overview
Material ACT-LCD-## (CDlabel)
Order quantity 500 PC
Delivery date: Today's date
Plant 6000 Mexico City
Storage location: 0001
3-1-2 Confirm your entries. The system automatically determines a purchase
order price.
PO
price:
MXN
6
Per
piece
3-1-3 This price is determined from a purchasing info record.
Save your purchase order and write down the purchase ordernumber.
Purchase order number:
________________________________________
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 89/304
(C) SAP AG AC530 4-44
3-2 Goods Receipt and Price Differences
3-2-1 Post the goods receipt for your purchase order:
Logistics→ Materials Management→ Inventory Management→
Goods Movement→ Goods Receipt→ For Purchase Order→ PO
Number KnownEnter your purchase order number and confirm with enter . The system
determines the following information. Check whether this information iscomplete and matches that of the purchase order. Complete the
information as necessary (the information is in the line for the purchase
order item).
Posting date Today's date
Purchase order
number
See previous
exercise
Plant 6000
Storage
location
0001
Quantity As in the purchase
order
Movement
type
101
Set the flag in the OK column (column to the right of the material or in
item details)
OK field Select
Post.
3-2-2 Material Ledger Display:
ACT/ML: Material Ledger→Material price analysis
Material: ACT-LCD-##
Plant: 6000
Period/Year: Current period/current yearPrice differences:
The purchase order value of the product is MXN 3000. The value at the
current valuation price (S price) is MXN 2500. The difference of MXN500 is shown in the column for price differences.
3-2-3 Calling up the source document from the material ledger document:
Open the category Receipts→ Open the process category Purchase
Order→ Double click on the material ledger document
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 90/304
(C) SAP AG AC530 4-45
Go from the material ledger document to the source document:
Goto→ Source Document
The source document is the document that was created for the goods
receipt. A Materials Management document.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 91/304
(C) SAP AG AC530 4-46
3-2-4 Calling up the accounting document from the material ledger document:
Go from the material ledger document to the accounting document:
Goto→ Accounting documents Accounting document
Amount of pricedifferences:
MXN 500
Price difference
account number:
231000
Price difference
account text:
Loss from price
differences -external
4 Cost Component for Price (Actual Cost Component Split and Cost Component Split for
Planned Costs)
4-1 Actual Cost Component Split
4-1-1 Data for goods receipt:
ACT: Material Ledger→ Material price analysis
Material: ACT-LCD-##
Plant: 6000
Period/Year: Current period/current year
View: Price Det. Structure
Receiptquantity: 500 PC
Preliminary
valuation:
MXN 2,500
+ Price
differences:
+ 500 MXN
Total value: MXN 3,000
4-1-2 Cost Components
View: Cost ComponentsConfirm
Value setting: Actual value
Period: current
Currency/valuation: Company code
Value: Actual value; level
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 92/304
(C) SAP AG AC530 4-47
+ lower level, fixed + variable
View: Cost component /main cost
component split
Actual value for periodic receipts: MXN 3,000
Cost component in which the value exists: “Materials Components”
4-1-3 Value setting: Preliminary Valuation Price
The preliminary value for periodic receipts
equals: MXN 2,500
Cost component in which the value exists: “Materials Components”
4-1-4 Value setting: Differences
The difference between the preliminary and actual value for the receipts
equals: MXN 500
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 93/304
(C) SAP AG AC530 4-48
4-2 Planned Costs
4-2-1 Standard cost estimate for your labels
Accounting.→ Controlling→ Product Cost Controlling→ Product
Cost Planning→ Material Costing→ Cost Estimate with Quantity
Structure→ Display
Material: ACT-LCD-##
Plant: 6000
Costingvariant:
PPC1
Costingversion:
1
Valid from: Today
4-2-2 In the upper right section of the interface, select the tab "Costs" and enter the quantity of the periodic inventory in the "Costs based on" field by
changing Costing Lot Size to User Entry.
Call up the Cost component view.
A planned value of MXN 5000 is displayed for the current inventory
quantity of 1000 pieces.
This value exists in cost component 10/ Materials Components.
In the "Itemization" view, you can see that the value is updated under the
cost element 400000.
4-3 Customizing for Cost Components
4-3-1 Account determination (1)
IMG:→ Materials Management→ Valuation and Account
Assignment→ Account Determination→ Account Determination
without Wizard → Configure Automatic Postings
Execute and close the dialog box by canceling Click on the Account
Assignment button, open the Offsetting entry for inventory posting line,
INT chart of accounts, and scroll down to general modification VBR and
valuation class 3000.
The offsetting entry for the inventory posting (modification VBR) forthe label is updated to account 400000 (credit and debit).
4-3-2 Maintaining the Component Structure
IMG:→ Controlling→ Product Cost Controlling→ Product Cost
Planning→ Basic settings for Material Costing→ Define Cost
Component Structure
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 94/304
(C) SAP AG AC530 4-49
In the Assignment dialog structure: Choose Organizational units - Cost
component structure The following structure is used in company code6000:
Cost componentstructure for main cost
component split:
ML
Cost component
structure for auxiliary
cost component split:
MX
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 95/304
(C) SAP AG AC530 4-50
4-3-3 Activating Actual Cost Component
IMG:→ Controlling→ Product Cost Controlling→ Actual
Costing/Material Ledger→ Actual Costing→ Activate Actual Cost
Component Split
The actual cost component split is activated for the following valuation
areas:
Valuation Area6000:
Actual costcomponent split
activated
Valuation Area
6100:
Actual cost
component split
activated
The actual cost component split uses the same structures as the
standard cost estimate: ML and MX. It is not possible to use
structures for actual costing that are different from product costplanning.
4-3-4 Cost component structure ML
IMG:→ Controlling→ Product Cost Controlling→ Product Cost
Planning→ Basic settings for Material Costing→ Define Cost
Component Structure
Select the cost component structure ML and choose the dialog structure
Cost component structure → Components with Attributes
Component Name
Component
10:
Materials Components
Component
20:
Prod. Labor / Setup
Component
30:
Production Machines
Component
40:
Logistics Processes
Component
100:
Material Overhead
Component200:
Admin + SalesOverhead
Component300:
Other Costs
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 96/304
(C) SAP AG AC530 4-51
4-3-5 Cost component for material consumption
In the dialog structure, double click on cost component structure, selectthe structure ML and choose Cost component with Attributes. Select Cost
component 10, then choose → Assignment : Cost Component - Cost
Element Interval
The cost element 400000, created for the consumption of raw materials,
is assigned to cost component 10 Material Components.
4-3-6 To summarize the exercise for cost element determination, complete the
following table:
Operation → Account/
Cost
Element
GBB/VBR → 400000
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 97/304
(C) SAP AG AC530 4-52
5 Consumption at Cost Center
5-1 Goods Issue Posting:
Logistics→ Materials Management→ Inventory Management→ Goods
Movement→ Goods Issue
Posting date Today's date
Movement type 201
Plant 6000
Storage location 0001
Confirm in order to get to the next screen:
Receiver cost center 1000
Material: ACT-LCD-##
Quantity 50 PC
Post.
5-2 Material Ledger Display:
ACT/ML: Material Ledger→ Material price analysis
Material: ACT-LCD-##
Plant: 6000
Period/Year: Current period/current year
View Price determination structure
Open the category Consumption→ Open the process category Cost Center →
Document "### GI for Cost Center 1000".
Price: MXN5/pc
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 98/304
(C) SAP AG AC530 4-53
Solutions for Optional Exercises
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 99/304
(C) SAP AG AC530 4-54
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 100/304
(C) SAP AG AC530 4-55
Unit: Recording Business Transactions
Optional: Exchange Rate Differences
The following menu paths are used in the exercises and solutions:
ACT/ML: Accounting→ Controlling→ Product Cost Controlling→
Actual Costing/Material Ledger
IMG: Tools→ Customizing→ IMG→ Edit Project→ SAP
Reference IMG
1 Invoice verification
1-1 Type of invoice verification: You use logistics invoice verification because
conventional invoice verification cannot be used when the material ledger is active.
1-2 Logistics Invoice Verification
Logistics→ Materials Management→ Logistics Invoice Verification→
Document Entry→ Enter Invoice
Enter the following data under Basic data above the item lines:
(CompanyCode) (6000)
Invoice date today
Posting date today
Amount MXN 4,000
Purchaseorder
Your purchaseorder number
At item level, correct the default amount (order value) to MXN 4,000 and select the
item to "Posting OK"
Ignore the warning messages generated due to the tolerance value being exceeded
and post the invoice
1-3 Material Ledger Display:
ACT: Material Ledger→ Material price analysis
Material: ACT-LCD-##
Plant: 6000
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 101/304
(C) SAP AG AC530 4-56
Period/Year: Current period/current year
Company code currency (MXN)
Open the category Receipts→ Open the process category Purchase Order→
Document "### Invoice …"
Invoice price
differences:
MXN 1,000
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 102/304
(C) SAP AG AC530 4-57
2-1 Price and exchange rate differences:
In the material ledger display, change the display currency to hard currency (USD).
Price differences: USD 40
Exchange rate
differences:
USD 80
2-2 Checking the settings for handling exchange rate differences in the ImplementationGuide:
IMG:→ Material Management→ Logistics Invoice Verification→ Incoming
Invoice→ Configure How Exchange Rate Differences Are Treated:
Exchange rate differences are calculated at the time of the invoice receipt. The two
values used for calculation are:
The invoice receipt value calculated with the exchange rate valid on the day of
invoice verification, and
Invoice receipt value calculated with the planned exchange rate (first column: “X”)using exchange rate type P (second column: “P”)
2-3 Exchange rates:
Accounting→ Financial Accounting→ General Ledger→ Environment→
Current Settings→ Enter Translation Rates
(Tip: use the "Position" key or the selection function and enter data for the
exchange rate type and currencies criteria to find the correct position quickly)
Exchange
RateType
From Currency To
Currency
Current
type M
MXN 100 USD
12.0
0
Current
type P
MXN 100 USD
10.00
Exchange rate type P, for example, is used in the planning cycle to translate the
result of a standard cost estimate from controlling area currency to the companycode currency.
2-4 Calculation of the exchange rate differences:
Currency Calculation/exchangerate
Invoicvalue
Mexican pesos
MXN4000
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 103/304
(C) SAP AG AC530 4-58
USD for type M
(MXN4000) *
(USD12.00/MXN100)
USD480
USD for
type P
(MXN4000) * (USD
10.00/MXN100)
USD
400
Exchangerate
difference in USD:
USD80
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 104/304
(C) SAP AG AC530 4-59
2-5 "True" price differences:
Price differences in
MXN
MXN 1000
Exchange rate (type M) MXN 100 = USD 12.00
“True” price differencein USD:
MXN1000 * (USD 12.00 /MXN100) = USD 120
2-6 Price differences:
Negative value of exchange ratedifferences
USD (-) 80
"True" price differences USD 120
Price Differences USD 40
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 105/304
(C) SAP AG AC530 5-1
© SAP AG 2001
z Controlling Levels and Procurement Alternatives
z Production Scenarios
z Plant Transfers, Sales and Analysis of the Actual CostComponent Split
Contents:
Structured Value Chains
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 106/304
(C) SAP AG AC530 5-2
© SAP AG 2001
z Explain the components concept of the actualquantity structure in the material ledger.
z Explain and configure the Controlling areas for amaterial.
z Carry out a a product ion scenario and explain thevariances displayed in the material ledger.
z Sell manufactured products and analyse theresults in CO-PA.
At the conclusion of this unit, you wil l be able to:
Structured Value Chains: Unit Objectives
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 107/304
(C) SAP AG AC530 5-3
© SAP AG 2003
Course Overview
AC530 Actual Costing/Material Ledger
Fundamentals of Material Valuation
Design and Purpose of the Material Ledger
Recording Business Transactions
Structured Value Chains
Period-End Close in Actual Costing
Special Functions
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 108/304
(C) SAP AG AC530 5-4
© SAP AG 1999
z In order to structure the most important productioncost information, you set up differentiatedcontrolling levels for your materials and work withprocurement alternatives.
z You carry out production of your demo CDs withproduct ion orders and calculate overhead andvariances periodically on the relevant product costcollector.
z When product cost collectors are settled, single-
level variances arise that can be displayed in thematerial ledger, but do not yet contain the variancesof lower-levels.
z In addition, you become acquainted with thehandling of material updates through stock transfersto other plants and materials.
Structured Value Chains: Business Scenario
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 109/304
(C) SAP AG AC530 5-5
© SAP AG 1999
z Describe the structured reporting of quantitystructures in the material ledger.
z Explain and set the controll ing levels of materials.
z Use the process types, characteristics of controlling levels and procurement alternatives for the display of a structured value chain for specificpurposes.
At the conclusion of this, you wil l be able to:
Controlling Levels and Procurement Alternatives:Objectives
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 110/304
(C) SAP AG AC530 5-6
© SAP AG 2001
Product Cost Controlling: Components
Material Movements
Material settlement Actual pr ice
Value structure
Actual Cost ing/Material Ledger
Quantity Structure:
Material Movements
Plannedcosts
Actualcosts
Order
Material $Int. $OH $Process $Total
Final CostingPeriod-End Close
Preliminary Costing
Simultaneous Costing
Cost Object Controlling
BOM routingrouting
Material pr ices
Activi ty pr icesProcess pr icesOverhead
Product Cost Planning
Value structure
Quantity Structure:
PP Master data
Standard Price
Material Int. OH Process
Price diff.Standard Price
Material Ledger
Process
Work in Progress
Scrap Variances
Variances
Settlement
Material Int. OH Process
Product Cost Planning is an area of Product Cost Controlling in which non-order-related cost planning
and price setting for materials are carried out. It accesses the master data of other R/3 applications, that is
BOMs, routings and work centers from Production Planning, and cost centers, activity types and
business processes from Overhead Cost Controlling. The goal of Product Cost Planning is to update the
standard price and create a cost component split to supply basic information for other R/3 applications
such as Cost Object Controlling, Profitability Analysis, and Sales and Distribution.
Cost Object Controlling offers constant and real-time controlling for the cost of goods manufactured.
You can carry out lot-based or periodic cost object controlling. Standard costing is the basis of Cost
Object Controlling in the R/3 system. With this, the actual quantity produced is multiplied by the
standard costs per unit in order to calculate the target costs. This value is compared with the actual costs
during cost analysis. If you have set price control S (standard price) in the material master record for
semi-finished and finished products, this means that, in Cost Object Controlling, all materials produced are valuated with the standard price when they are delivered to stock. During settlement of the cost
object, variances to this standard price are posted to Financial Accounting (price difference) and
Profitability Analysis (variance categories).
The component Actual Costing / Material Ledger makes it possible to calculate a period price of the
previous period. After you have determined the actual price you have the option revaluating the stocks.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 111/304
(C) SAP AG AC530 5-7
© SAP AG 1999
Actual Quantity Structure
Material Ledger
zOrder settlement,different pr oductionscenarios
zGoods / invoice receipts,different vendors
FERT
HALB1 HALB2
ROH1 HAL B1-1 ROH2-1 ROH2-2
ROH1-1 ROH1-2
Transparencyof
Value-Added
To make the most of Product Cost Controlling; it may be necessary to differentiate between the various
methods of procurement for a material. This can help you find the most cost-effective procurement
method.
In addition, it may be necessary to analyze the costs of an entire value chain. For this, the actual
quantity and value flows for each material must be reported in a structured manner. This reporting can
take place in the material ledger and offers the basis for a later rollup of the existing variances.
With this, for example, the price differences from the purchase order of a raw material can be rolled up
to the semi-finished and finished products in whose production the raw material was entered during the
period.
In order to carry out a specific analysis of possible procurement alternatives, a structured display of
procurement alternatives can be configured in the material ledger. The level of detail of such an analysis
can be specified for each material. This is referred to as the controlling level of the material.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 112/304
(C) SAP AG AC530 5-8
© SAP AG 2001
Procurement Process for Materials
Version1
Version2
e.g. Process categories:- Production- Stock Transfer - Purchase order - Subcontracting
Output Materials
Procurement Alternative
Procurement/Production process
Input Materials
The central element in the value chain is the procurement process. Procurement processes are used in
Product Cost Controlling to determine and show procurement costs. Procurement processes characterize
the procurement transaction for a material or possibly for multiple materials. The system uses process
categories to differentiate between the different types of procurement. Procurement processes deal with
both internal and external procurement. Examples of procurement processes are sub contracting, in-
house production, stock transfers or orders.
Process categories differentiate between the different types of procurement or consumption of
materials. There are, for example, the process categories Production or Purchase Order. The different
types of procurement and consumption are handled by the system in different ways; in other words,
different data is updated. The system uses this data to derive characteristics that can be used for the
creation of procurement processes, procurement alternatives and consumption alternatives.
Upon goods movements, the system determines the process category automatically depending on the
movement type. Depending on the process category, there is a single-level or multilevel procurement
process. For example, Purchase Order is a single-level procurement , and Production is a multilevel
procurement.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 113/304
(C) SAP AG AC530 5-9
© SAP AG 1999
Possible Procurement / Production Processes
Material
ProcurementProcurementalternativealternative
Procurement /production process
Cyclicalproduction
Hierarchystructure
Multipleprocurement
methodsJoint
production
A procurement alternative presents the different options for procuring a material. Procurement
alternatives are situated hierarchically above process categories. A single procurement process can
produce multiple materials (such as with joint production), while the procurement alternative represents
the production of just one material.
The procurement process for the process category Production is called production process. If the
material ledger is active with multilevel actual costing, every production order is assigned to a
production process. If a goods receipt from an order is posted to a material, that goods receipt is then
assigned to the associated procurement alternative.
You can choose the level of detail used to create the procurement alternative by defining the
Controlling level. Through the Controlling level, you specify for each material which of these
characteristics is used for the creation of procurement alternatives or processes.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 114/304
(C) SAP AG AC530 5-10
© SAP AG 2001
Process Types for Procurement
Material ACT-LCD##Valuation Area 6000
Period status: Quantities and Values entered
Price control Standard Price
Period 01.2001
Currency Company code curr ency MXN
Display Material Ledger Data
PriceExch. rate diff.Price diff.Preliminary ValuationQuantity
Standard Price MXN 5
Label for CDMexico
Price unit 100 PC
Beginning inventory
ReceiptsProduction
Purchase order
Procurement Process
TypesPurch ase order
Material Transfer Postin g
Production
Subcontracting
Transfer posting - specialinventory
Stock Transfer
Procurement
Stock Transfer
Subcontracting
Upon goods movements, the system determines the process category automatically depending on the
movement type. Depending on the process category, there is a single-level or multilevel procurement
process. For example, Purchase Order is a single-level procurement , and Production is a multilevel
procurement. This system-internal differentiation plays a role in actual costing.
During procurement, the system distinguishes between the process categories mentioned above and
automatically updates them in the material ledger display.
See the section Extended Customizing for detailed information on how and under what conditions you
can make adjustments to this view, if necessary.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 115/304
(C) SAP AG AC530 5-11
© SAP AG 2003
Controll ing Level of Material
Processcategory
Purchase order
Subcontracting
Stock transfer
Transfer posting/Material
Production
Plant/material
Purchasing organization/vendor
Plant/material
Purchasing organization/vendor
Plant/material
Withdrawal plant
Plant/material
Withdrawal plant/material
Plant/material
Production p lant/planning p lant
BOM/routing
Production version
Procurement
alternatives
Characteristics of the controlling level
...
...
...
...
...
Vendor A,Vendor B,etc.
Maintainowntexts
The level of detail for a procurement process can be determined by choosing the controlling level. The
controlling level determines the characteristics with which the procurement alternatives and
procurement processes are generated, and for which data is updated. In product cost planning (mixed
costing), the controlling level determines the characteristics of the procurement alternatives that are used
for calculating a mixed price. In periodic product cost controlling, you use a controlling level when
creating a product cost collector or using a production process, which is to be assigned to the lowest
node of a cost object hierarchy. In the material ledger, the controlling level is used to analyze actual
costs is the master data display.
If you have not explicitly set the controlling level, the system automatically sets the Plant/Material
level. You should take into account that the data volume on your computer increases if you select a
higher level of detail for the controlling level. Once you have defined a controlling level, it applies to all
application components. To change a controlling level, choose Edit controlling level of material. Enter a plant and a material and select a controlling level from the selection window.
You cannot change a controlling level if procurement alternatives or procurement processes are already
being used for this controlling level. In the display, a controlling level that cannot be changed is
identified by the locked padlock symbol.
In Enterprise release, the controlling level can also be changed in collective processing.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 116/304
(C) SAP AG AC530 5-12
© SAP AG 2003
Structured Value Added
Material ACT-LCD-##Valuation area 6000
Period status Quantities and values entered
Price control Standard pr ice
Period 01.2001
Currency Company code curr ency MXN
Display Material Ledger Data
PriceExch. rate diff.Price diff.Preliminary valuationQuantity
Standard pric e MXN 5
Label for CDMexico
Beginning inventory
ReceiptsProduction
Purchase order
Processcategory
Category
Procurement Alternative
Goods Movements,Invoice Differences
Vendor A/ PurOrg. 1
Vendor B/ PurOrg. 1
....IR..
....GR...
In the material ledger, the detailed reporting of the quantity structure is not just used for the periodic
rollup of costs. Rather, you can break down and evaluate the information in real-time, structured
according to individual aspects, in the material ledger display.
With the material ledger, the process category for goods movements is determined automatically
depending on the movement type.
When working with a detailed Controlling level, every goods movement is automatically assigned to
a procurement alternative. In the example above, the Controlling level Purchasing
Organization/Vendor has been selected for the process category Purchase Order. For this reason, a
goods receipt is automatically assigned to the related procurement alternative (in this example: Vendor
B).
The procurement alternatives are, as shown in the slide, hierarchically arranged under the process
categories
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 117/304
(C) SAP AG AC530 5-13
© SAP AG 1999
Production: Objectives
z Explain the possible scenarios of Cost ObjectControlling.
z Create and confirm a cost object and allocateoverhead.
z Settle a cost object and analyze its effects in thematerial ledger.
At the conclusion of this, you wil l be able to:
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 118/304
(C) SAP AG AC530 5-14
© SAP AG 2001
Cost Object Controlling: Scenarios
Order - BasedControlling
Production order Product Cost Collector
PeriodicControlling
Product line
Work center 1
lot -size orientated
Product lin e
WarehoWarehouseuse
WarehoWarehouseuse
Work center 2 Work center 3
Sales Order
SDSD
Production order
WarehoWarehouseuse
Sales order Controlling
z Collection of cos ts/revenues per sales order item, independent fr omproduction scenario
z Actual sal es and ad min is trationcosts to sales order items
z special direct costs fr om sales per sales order item
z Monitoring of funds co mmitment
z Work in progress or transport andprovisions thr ough results analysis
z High production rate
z stabil production envir onment
z No/ low set up c osts
z Lot-based controlling i s not required
z Cost collection to product costcollectors
z Example: repetitive manufacturing
z Flexible product ionenvironment
z High set up costs
z Complete assigment of costsper order is required
z Controlling per production lotrequired
z Example: Production order,process order
Cost Object Controlling offers order and period based controlling for the cost of goods manufactured
and plants.
In order-related product cost controlling you use manufacturing orders as cost objects. The costs updated
on the manufacturing order are normal analysed and settled by lot. This means that variances are
calculated after the total quantity planned for production has been delivered to the warehouse.
Periodic Cost Controlling collects costs over a longer period of time, using a cost object, whereby
debits and credits are considered for each period. In periodic product controlling, you use a product cost
collector as the cost object which allows the collection of costs at production level, regardless of the
production type. Regardless of whether you use order-related, process or repetitive manufacturing, you
can update costs to the product cost collector and also analyze these periodically. You can use cost
object hierarchies to create costs, that can not be directly assigned, to highler levels (cost object nodes in
the hierarchy). Make-to-order production means that materials are produced in accordance to a sales order item. Such
materials are called made-to-order materials or individual requirements. In this case, the cost object is a
cost and revenue bearing sales order item.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 119/304
(C) SAP AG AC530 5-15
© SAP AG 2001
IDES Scenario: CD Production
ACT-LCD6000 ACT-BCD6000
ACT-DCD6000
ORDERORDER
Deliv1097
Deliv1098
PV02PV01
PRODCOST
500 PC 500 PC 500 PC
900 PC900 PC
50 PC
800 PC
BI: 500 PC
This diagram shows us the planned production scenario that will be completed in the exercises for the
unit. After you have procurred the raw materials, the "slug" using two procurement alternatives, the
finished product is completed.
To do this, we use a product cost collector, that uses a specific production version. In production, 100
pieces are scrapped, so that from 900 input materials only 800 finished CDs are produced.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 120/304
(C) SAP AG AC530 5-16
© SAP AG 2003
Production Scenario: Relationship betweenProduct Cost Collectors and Production Orders
$$$$
Trgt Act. WIP Var.
PPPP--SFCSFC
COCO--PCPC
ProductionProcess
DataHeade
r Production process
Profit center
Business area:
Costing variant plan
Costing variant actual
Costing sheet
Overhead key
Results analysis key
Variance key
Name of production process
Company code
Material
Order type
Order
System status FREI ABGR ANRV ABWE
Name of production process
Production process no.
Production plant
Planning plant
Production version
Costing lot sizeOrders/PV Cost estimate
Settlement rule
Material Plant ACT-LDC- ## 6000
100032914
6000
FV01
Pversion: 0001Pversion: 0001
ACT-DC05
6000
RM01
701737
PREM
PPP3
COGM
000001
000003
6000
Characteristics
Production
order 1
Productionorder 2
Productionorder 3
PKOSA
Product Cost Collector Product Cost Collector
A product cost collector can be created independently of the production type. This means that you can
collect costs on a product cost collector during order-related production, process manufacturing and
repetitive manufacturing. The assignment of the production order to the product cost collector takes
place through a production process. The system automatically generates the production process when
the product cost collector is created. Manufacturing orders that are linked to product cost collectors
receive the status PCC. This status prevents costs from being posted to the production order. The status
of the product cost collector is relevant for period-end closing in Cost Object Controlling.
If you are working with the Controlling level Production Version, the product cost collector is created
for the characteristics material/production plant/planning plant/production version. SAP recommends
using this Controlling level whenever you are working with production versions. Alternatively, you can
also use the Controlling levels BOM/routing or production plant/planning plant.
If you have already created a product cost collector, then the system directly generates a link to the product cost collector when a production order is created for the corresponding characteristic values.
The costing variant Planned that was defined in the production order is not transferred from the product
cost collector, but rather continues to be defaulted from the order. It can be used, if necessary, to create
a temporary planned order cost estimate that cannot be saved.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 121/304
(C) SAP AG AC530 5-17
© SAP AG 2001
Actual Costing/Material Ledger (CO-PC-ACT)
Material Ledger
Profitability Analysis(CO-PA)
Cost Object Controlling(CO-PC-OBJ)
Variance categories
Price 0 MXNQuantity 2 MXNStructure 2 MXNScrap 2 MXNLot size 0 MXNOutput price var. 0 MXNTotal: 6 MXN
Cost Objects
Material: ACT-DCD##
Quantity: 100 PC
Material 13
Production 9
OH 5
Process 4
TotalTotal 3131
Product Cost Planning(CO-PC-PCP)
Material master: ACT-DCD
Standard Price:
Cost Estimate
Material: ACT-DCDLotsize 100 pc.Price: MXN 25
Mat.12
Prod.7
OH.3
Proc.3
25 MXN Variances -6 MXN
Stock -25
Cost Object Controlling: Value Flow
Price Update
Inventory
25
Price diff.
6
Mat.13
Prod.9
OH5 Pr oc.4
For materials with price control S, the goods receipt in the warehouse takes place at the standard price
at completion of production. Generally, this results from a standard cost estimate that was released. The
cost object is credited with the quantity delivered to the warehouse multiplied by the standard price.
When the goods are received, the system automatically debits the inventory account and credits the
inventory change account in Financial Accounting.
The value of the total variance is posted to a price difference account in Financial Accounting during
settlement. Furthermore, the value of the total variance is updated in the material ledger. At the same
time the actual cost component split is determined from the cost elements for the settlement and
registered in the material ledger.
You can settle the variance categories to costing-based Profitability Analysis (CO-PA). Only the
variances calculated with target cost version 0 are relevant for settlement to Profitabiliy Analysis. You
settle to costing-based Profitability Analysis by variance categories and cost element groups. Youcontrol the variance categories through the value fields in Profitability Analysis.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 122/304
(C) SAP AG AC530 5-18
© SAP AG 2001
Material Ledger
Single-level pri ce differences
Credit:
Goods Receipts: Credit withstandard price
Work in Progress-WIP at actualcosts (total settlement)-WIP attarget costs (period ic settlement)
Debit
Material cost s: Actual quantity*standardprice
Internal activity: Actual quantity*planprices (revaluation with actual pricespossible)
Overheads Actual overhead according tocosting sheet
Process costs: Actual process quantitieswith plan prices according to pr ocesstemplate (revaluation wi th actual process
possible)
Production Variances in the Material Ledger:
Cost Objects
Inventory
25
Price Diff .
6
Mat.13
Prod.9
OH5
Proc.4
Cost Component sp litacc. to Actual Costs
Variances:Debit - Goods receipt - WIP
All actual postings in the system that are related to a product cost collector, immediately debit the
product cost collector. Logistical functions, such as goods issue postings and confirmations continue to
be carried out with reference to manufacturing orders (or in repetitive manufacturing: production
versions). The resulting costs are updated on the product cost collector. You can carry out goods issues,
confirmations and goods receipts independently of each other. However, you can also ascertain that
activity allocations and goods issues and/or goods receipts are automatically carried out during
confirmations. You make the necessary settings for this in Logistics. You can confirm order headers or
individual operations. When calculating work in process in Product Cost by Period, it is best to perform
confirmations at the level of operations.
The period-end closing activities of Cost Object Controlling make the following possible: regular
periodic reporting, revaluation of activities at actual activity prices, periodic allocation of overhead and
process costs, as well as the calculation of work and process and the variances between target and actualcosts.
During the settlement and transfer of the calculated data to other objects and application components,
single-level price differences of the material are generated in the material ledger that contain the
variances of the product cost collector, but not price variances of lower levels, such as those from the
raw materials entered.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 123/304
(C) SAP AG AC530 5-19
© SAP AG 2001
Consumption
z Sales
z Transfer to Other Plants
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 124/304
(C) SAP AG AC530 5-20
© SAP AG 2001
Overview of Data Flow to Profi tability Analysis
OverheadManagement
Product CostControlling
Profitability AnalysisProfitability Analysis
COCO
RevenueDiscounts
CostObject
COCO--PAPA
SDSD
•Processes•Cost Centers•Internal Orders
Mat. Wage OH Proc.Cost and revenue element accounting
COCO--PCPCCOCO--OMOM
FIFI
Profitabilitysegment
Standard Cost Estimate
The data from sales component (SD) is one of the most important sources of information for Profitability
Analysis.
Sales data is transferred to costing-based CO-PA from two main sales order processing tasks: Creating
or changing an order (optional) and Billing.
Sales data is transferred to account-based CO-PA from two main sales order processing tasks: Goods
issues and Billing.
Costs from other areas in CO can be transferred to CO-PA periodically, using activity and template
allocation, settlement and stock transfers.
In addition, it is also possible to carry out manual direct account assignments from FI to CO-PA.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 125/304
(C) SAP AG AC530 5-21
© SAP AG 2001
Sales Order Processing
t
Customer
Process chainLogistics
SDSD
1
1
SalesOrder 1
2
Delivery. 1
3
Billing/Settlement
1
4
Payment
FIFI
Effective sales order processing requires the integrated processing of all activities relating to the
customer. The R/3 component SD (Sales and Distribution) is the perfect instrument to do this. R/3 uses
documents that are linked together, which are then used to start the respective workflows. The SD
component begins with the processes before the actual sale and ends with the processing of the customer
payment for the goods or services purchased. Each process takes place using an electronic document,
that is linked to the previous or next document.
Sales order processing begins with the creation of a sales document.
When the goods are delivered a delivery document is created, and a billing document is generated to
invoice the customer.
When the customer payment is received, the money for the order is received and you post the incoming
payment in FI.
The linked document flow in the R/3 System simplifies sales order processing for both you and your customers.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 126/304
(C) SAP AG AC530 5-22
© SAP AG 2001
Delivery and Bill ing
X
X
X
Revenue
Receivables
Rebate
X
Actual Co st of Sales
X
Inventory
Quanti ty +Revenue +
Rebate +CoS +
1
SalesOrder
2
Delivery
3
Billing/SettlementQuantity Flow
COCO--PAPA
(costing based)
SD
FIFI
ECEC--PCAPCA
t
Accting AcctingCOCO--PAPA
MLML
Data is updated in CO-PA for accounting purposes at the same time that data is posted in Financial
Accounting. This means, the system creates corresponding line items in CO-PA, at the same time that it
creates the accounting documents for goods issue and billing, Note, that a line item will be created in
CO-PA for each individual cost/revenue element. The number of received line items is identical to the
number of items posted in FI. At this point, no line items are created for incoming orders, as these do not
result in postings to FI.
The values in account-based CO-PA are assigned to profitability segments and are saved in the
cost/revenue element, specified in MM (for goods issues) or SD (billing documents). Note, that the data
is only transferred to account-based CO-PA if the general ledger account in FI is defined as a cost or
revenue element in CO. (for more information, see the notes for general posting logic in Controlling).
A business transaction is usually ended in SD with a billing document. The Billing data is automatically
transferred to FI, where the Revenue and receivables postings are made at the same time. When creating a billing document, SD calculates all revenues, sales deductions and other values (e.g
standard costs) using the costing sheet, and stores these values in condition types. These condition
types are assigned to value fields in costing-based Profitability Analysis, so that the System can
automatically transfer these values to CO-PA.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 127/304
(C) SAP AG AC530 5-23
© SAP AG 2001
Sales of Goods and Services
COCO--PCPC
Mat. CostEstimate
COCO--PAPA
Profitability Analysis
Bil ling Doc/ Order Settlement
Manufacturing
costs
Sales Order
Item. 10
ACT-DCD600 pieces
Mat500
Prod.250
OH177
Proc.300
Actual revenue
Planned Costs
Material Ledger Mat.600
Prod.300
OH100
Proc.400
?
Scenarios:
The sales item is based on products from make-to-stock production. The production process delivers the
finished goods, for example controlled by a production order, for sale to unrestricted-use stock. In this
case, the sales order item is not a cost object. If the sales order item is not a cost object, the revenues
from billing are transferred directly to Profitability Analysis (CO-PA). Posting of costs of goods
manufactured in CO-PA can be based on a cost estimate, already created in Product Cost Planning.
Possible variances can be transferred to CO-PA when the production order is settled.
If the sales order item is a cost object, the cost of goods manufactured for the sales are only transferred
to CO-PA at order settlement.
If you have activated the material ledger, it is possible to revaluate the billing document or order
settlement at period-end close using actual costs. This option is discussed in the Unit "CO-PAIntegration".
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 128/304
(C) SAP AG AC530 5-24
© SAP AG 2001
Process Types for Consumpt ion
Material ACT-DCD##Valuation Area 6000
Period status: Quantities and Values entered
Price control Standard Price
Period 01.2001
Currency Company code curr ency MXN
Display Material Ledger Data
PriceExch. rate diff.Price Diff.Preliminary ValuationQuantity
Standard Price 21.60 MXN
Label for CDMexico
Price unit 100 pc
Cumulative inventory
Consumption
Stock Transfer
Sales Order
Plant A
Plant B
700 15120 0 0 21.60
600 12960 0 0 21.60
100 2160 0 0 21.60
60 1296 0 0 21.60
40 864 0 0 21.60
800 17280 2400 0 24.60
ConsumptionCategories:Preliminary valuation atstandard pri ce
Process Types for Consumption
AssetsSales Order
Cost Center
Material Transfer Posting
Production
Subcontracting
Transfer Posting - SpecialInventory
Stock Transfer
When materials are consumed, the data is categorized (in the same way as for procurement) according
to different process categories.
The consumption alternative represents the different ways a material can be consumed and is used in
the application component Actual Costing/Material Ledger for display in the material ledger master data
display.
In multilevel processes, the consumption alternative and the procurement alternative are the same; in
other words, the consumption alternative of a raw material is also the procurement alternative of a semi-
finished product.
All consumed material quantities, such as those for sales orders, stock transfers or consumption of cost
centers, are valuated with the standard price.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 129/304
(C) SAP AG AC530 5-25
© SAP AG 2001
IDES Scenario: CD Production all Postings
ACT-DCD6000
ORDERORDER
Del.1097
Del.1098
PROD ORDER
SALE TRANS
ACT-DCD6100
COST
1000 PC
500 PC 500 PC
900 PC900 PC50 PC
600 PC
200 PC800 PC
100 PC
PV02
PV01
ACT-LCD6000
ACT-BCD6000
The above diagram shows an overview of the postings already made, along with the corresponding
quantity data. This data corresponds with the participant exercises completed during this course.
The aim of period-end close in the material ledger is to subsequently adjust the actual costs or
variances to the standard cost.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 130/304
(C) SAP AG AC530 5-26
© SAP AG 2001
You are now able to:
Structured Value Chains: Unit Summary
z Explain the components concept of the actualquantity structure in the material ledger.
z Explain and configure the Controlling areas for amaterial.
z Carry out a a product ion scenario and explain thevariances displayed in the material ledger.
z Sell manufactured products and analyse theresults in CO-PA.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 131/304
(C) SAP AG AC530 5-27
Structured Value Chains: Exercises
Unit: Structured Value Chains
At the conclusion of these exercises, you will be able to:
• Understand how value chains are structured by the materialledger
• Master the settings for controlling levels of a material
• Explain how the Material Ledger and Cost Object Controlling
(product cost collectors) are integrated
Your company has decided that it wants detailed costinformation for the second input material (CD blanks) and
the demo CDs. In procurement controlling, the
capabilities of the material ledger are to be utilized and more detailed controlling levels determined.
You produce the demo CDs and post goods issues.
1 Change Settings for Controlling Levels
1-1 Look at the Controlling levels of your CD labels and blank CDs. Which
characteristics are updated with these settings when goods are received for the process purchase order category? What are the settings?
Controlling Level for Purchase Orders: ACT-LCD-##
Characteristic 1
Characteristic 2
Controlling Level for Purchase Orders: ACT-BCD-##
Characteristic 1
Characteristic 2
1-2 You want to carry out procurement controlling for your blank CDs at a greater
level of detail. To do so, change the setting for the Controlling level for purchase
orders for your blank CD ACT-BCD-## to Purchasing organization/vendor .
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 132/304
(C) SAP AG AC530 5-28
2 External Procurement
2-1 Creation of Two Purchase Orders
2-1-1 Order 500 blank CDs ACT-BCD-## from Puebla Digital and another 500
from Productos Argentinos. Use the following data:
Purchase
Order1
Purchase
Order2
Purc
hase
orde
r type
Standa
rd
purcha
seorder
Standar
d
purchas
e order
Ven
dor
1097
(PueblaDigital
S.A.)
1098
(ProductosArgenti
nos)
Purc
hasi
ngorga
nization
6000 IDES Mexico
Purchasi
ng
grou p
600 Compras Mexico
Com pany
code
6000 IDES Mexico
Mate
rial
ACT-BCD-## (blank CD)
Qua
ntity
500 pc each
Plant 6000
Stor
agelocat
0001
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 133/304
(C) SAP AG AC530 5-29
ion:
When you confirm your entries, the system pulls the
valid prices from the vendor info record.
Price MXN
_____
____ /100PC
MXN
______
___ /100 PC
Save your purchase order and write down the purchase order
number.
Purchase order 1:
__________________________________________
Purchase order 2:
__________________________________________
2-2 Goods Receipts
2-2-1 Post the goods receipt for the first purchase order (most of the data is
automatically taken from the purchase order):
Posting
date
Today's date
Purchaseorder
number
See previous exercise
OK field Select
Plant 6000
Storage
location
0001
Quantity As in the purchase
order
Movement
type
101
Repeat this procedure for the second purchase order.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 134/304
(C) SAP AG AC530 5-30
2-2-2 Then look at the ACT-BCD-## data in the material ledger display.
You now have more detailed information for the procurement
alternatives. What names do the procurement alternatives have? Double-
click on the lines of the procurement alternatives. Specific characteristics
have been defined for the procurement alternatives. Which characteristic
values do the procurement alternatives have in these cases?
Procurement Alternative 1
Name:
Characteristic Value
Process category
Controlling level
...
...
Procurement Alternative 2
Name:
Characteristic Value
Process category
Controlling level
...
...
3 Change Procurement and Consumption Alternatives
3-1 You want to change the names of the procurement alternatives for ACT-BCD-## in the material ledger display. To do so, maintain the names of the twoprocurement alternatives with the following two texts.
Name of procurement
alternative 1097/6000
1097: Puebla
Digital
Name of procurement
alternative 1098/6000
1098:
ProductosArgentinos
Then look at the data for ACT-BCD-## in the material price analysis.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 135/304
(C) SAP AG AC530 5-31
4 In-House Production
Basic data for in-house production
You now want to begin production of the demo CDs. You have decided to cost the
products by period and create a product cost collector for the demo CD. Later you willcreate a production order for this product cost collector and complete processing.
The following data is available:
Cost Center Group:
CCG530-##
Cost centers: CC530-##
Work centers: WP530-
##
Activity types: ATL-
##;ATR-##
Production
version:
0001
newmachine
4-1 Controlling level of the demo CD
Display the Controlling level of your demo CD for the process category Production
(material ACT-DCD-##):
Controlling level
4-2 Product Cost by Period with Product Cost Collectors
4-2-1 Create a product cost collector for your demo CDs.Enter the following data in the dialog box:
Material
ACT-DCD-##
Plant 6000
Order type
RM01
Controlling
level
Productionversion
Planni
ng
6000
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 136/304
(C) SAP AG AC530 5-32
plant
Produc
tionversion
01
Maintain the following entries in the Data tab:
Profit
center:
No entry
Business
area:
7000
Costingvariant
plan:
PREM
Costing
variantactual:
PPP3
Costingsheet:
COGM
Overhead key:
SAP10
Resultsanalysis
key:
No entry
Variance
key:
000003
When you save, the system asks if you want to create a preliminary costestimate. Answer Yes.
Create
preliminarycost
estimate?
Yes
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 137/304
(C) SAP AG AC530 5-33
Write down the purchase order number of the product cost collector.
Order number of product costcollector:
___ ___
___
___
___
Look at the cost estimate. What is the cost of goods manufactured for thedemo CD?
Cost of goods mfd for DEMO
CD: per 100 pc
MX
N
4-3 Production of the demo CDs
4-3-1 Create a production order for the production of the demo CDs (ACT-
DCD-##). Use the following data:
Material ACT-DCD-##
Order type PP08
Production plant 6000
Quantity 900 PC
Finish (date) today
Release the order and save. Write down the order number:
_____________________________________________________
4-4 Actual Postings for the Production Order
4-4-1 Create a final confirmation for your production order. Use the followingdata:
Confirmation type
Finalconfirmati
on
Yield to
confirm
800 PC
Confirme
d Scrap
100 PC
Posting
date
today
The Goods Movements icon displays information on which goods issues
and goods receipts the system will perform when you save theconfirmation.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 138/304
(C) SAP AG AC530 5-34
Goods receipt ACT-DCD-##:
80
0P
C
Goods issue ACT-LCD-##:
90
0
PC
Goods issue ACT-BCD-##:
90
0P
C
(Do not confirm more than 950 pieces of the raw material, otherwise youwill not have enough materials available.)
Check that all goods movements are correct and save your confirmation as
a final confirmation.
4-4-2 Call up the material ledger display for all of your materials. Do pricedifferences exist for the goods receipt for the order? Why?
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 139/304
(C) SAP AG AC530 5-35
4-5 Update the Cost Component Split for Goods Issue
Go to the material price analysis for your demo CD ACT-DCD-##, and choose
view Cost component. Display the actual and then the preliminary values. Enter the values in the following table:
Cost
Component
Act
ualvalue
Preliminar
y Valuation
Material
component:
Production
setup:
Machine
production:
Materialoverheads:
Miscellaneouscosts:
Why are the cost component split values the same at this point in time (excluding
possible rounding errors)?
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
4-6 Period-End Closing in Cost Object Controlling
It is the end of the period, and you want to settle the product cost collector for ACT-DCD-##. To do this, perform the following steps using the data in the
corresponding tables.
4-6-1 Calculation of Overhead
Controllingarea
6000
Material ACT-DCD-##
Plant 6000
Period/Fisca
l year
Current period
Background
processing
_ (no)
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 140/304
(C) SAP AG AC530 5-36
Test run _ (no)
Dialog
display
X (yes)
Detail list X (yes)
Which type of overhead is calculated? What is the amount?
Type of overhead:
Overhead rate: %
Amount:
Currency:
Click the Change Display Variant icon to display the amount in object
currency (MXN)
Overhead: MXN ________________
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 141/304
(C) SAP AG AC530 5-37
4-6-2 Variance Calculation
Material ACT-DCD-
##
Plant 6000
Period/Fiscal year Current period
Selected target costversions
000
Test run __ (no)
Detail list X (yes)
How high are the calculated variances?
Target costs
Actual costs
Variances(Act. cost - alloc. act. costs
- scrap)
4-6-3 Settlement
Material ACT-DCD-##
Plant 6000
Settlement period Current period
Background
processing
_ (no)
Test run _ (no)
Detail lists X (yes)
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 142/304
(C) SAP AG AC530 5-38
Check transactiondata
_ (no)
Go to the detail list and make a note of the settled values: You can see the
values in local currency by changing the display variant.
Amount/currency
Sender
Settled to
material
EUR _____________ / MXN ____________
Settled to
profit
ability
segment
EUR _____________ / MXN ____________
Go to the material ledger display and write down the price variances incompany code currency.
PriceDiffere
nces
MXN
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 143/304
(C) SAP AG AC530 5-39
4-7 Actual Cost Component Split: Updating the Cost Components after Settlement
4-7-1 Go to the material price analysis for your demo CD, and choose Cost
components view. Display the actual and then the differences. Enter thevalues in the following table:
Cost
Component
Ac
tualval
ue
D
if fer
e
nc
es
Input materials:
Productionsetup:
Machine production:
Material
overheads:
Miscellaneous
costs:
How can you explain the differences that did not exist before the
settlement of the product cost collector?
________________________________________________________
________________________________________________________
________________________________________________________
4-7-2 In Material Price Analysis, go to Evaluated Quantity Structure by
selecting the relevant button. Change the base quantity to price unit 1.
Answer the following questions:
Price difference per CD EUR ______
Label quantity per CD ______ PC
Blank quantity per CD ______ PC
Recording quantity per CD ______ H
Labeling quantity per CD ______ H
5-1 Create a Sales Order
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 144/304
(C) SAP AG AC530 5-40
Create a sales order with the following data:
On the selection screen:
Order type: OR
Sales
Organization:
6000
Confirm the entries and enter the following data:
Sold-to-party 6666
Purchase order
number:
Order ## (your group
number)
Material: ACT-DCD-##
Quantity: 600 PC
Confirm your entries.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 145/304
(C) SAP AG AC530 5-41
The system automatically determines a sales price using price and account
determination. What is the price?
_________________________________________________/ PC
Save the order and write down the order number:
__________________
5-2 Delivery for Sales Order
Post the delivery for your order. Make the following entries:
On the selection screen:
Shipping point: 6000
Selection date: A date in the next month
Order: Your sales order number
Confirm your entries.
On the Picking tab, enter the suggested delivery quantity (total quantity of your
order) as the picking quantity. Click on the post goods issue icon.
Write down the number of the delivery:
____________________________
Go to the price determination view of the material price analysis of your demo CD
and check the data for your delivery. At what unit price was the delivery valuated?
MXN __________________________________
5-3 Billing the Sales Order
In order to be able to see the revenue generated by the sale in Profitability Analysis(CO-PA), you must create a billing document.
5-3-1 Create a Billing document for your delivery and save the document. Writedown the document number:
_____________________
5-3-2 Execute report IDES-530 in the information system for CO-PA. Make the
following entries:
From period:
Current period (MM.YYYY)
From/to
product:
ACT-DCD-##
Currency:
10 Company code currency
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 146/304
(C) SAP AG AC530 5-42
How does the system find the differentiated values for material
component, wages, etc. ?
_____________________________________________________
Why do no actual values for contribution margin accounting exist at this
time?
______________________________________________________
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 147/304
(C) SAP AG AC530 5-43
Enter the following values in the table:
Sales revenue: MXN
Total costs of
goods
manufactured intarget:
MXN
Contributionmargin II - target:
MXN
6 Further Goods Movements for the Demo CD
6-1 External Procurement of the Demo CD
6-1-1 Because your production capacity has been used up and the demand for
the demo CD has not yet been met, you decide to get the demo CDs from
vendor Studio Chapultepec. Create a purchase order with the followingdata:
Purchase
order type
Standard purchase
order
Vendor 1099 (Studio
Chapultepec)
Purchasing
organization
IDES Mexico
Purchasinggroup
Compras Mexico
Companycode
IDES Mexico
Material ACT-DCD-## (demoCD)
Quantity 200 PC
Price According to the purchasing info record
Plant 6000
Storage
location:
0001
When you confirm, the system issues a warning message. Ignore the
message. Which price was taken from the purchasing info record?
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 148/304
(C) SAP AG AC530 5-44
PO price: MXN / PC
Save your purchase order.
Purchase
ordernumber:
6-1-2 Post the goods receipt for your purchase order:
Posting
date
Today's date
Purchase
order
number
See previous exercise
OK field Select
Plant 6000
Storagelocation
0001
Quantity As in the purchaseorder
Movementtype
101
Post the goods issue.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 149/304
(C) SAP AG AC530 5-45
Then look at the data in the material ledger display. You can now analyze
whether external procurement or in-house production is cheaper for you.
External procurementprice:
MXN / PC
In-house production
price:
MXN /
PC
Average receipt price: MXN /
PC
However, note that the price of in-house production does not contain the
price differences of the raw materials used at this point in time.
6-2 Transferring part of your demo CD
6-2-1 The manager of your second plant in Mexico has advised you that there is
an urgent need for demo CDs. Therefore, you place part of your inventory
at his disposal and enter the following posting:
Posting date Today's date
Movementtype
301 (Transferposting, plant to
plant)
Plant 6000
Storage
location
0001
Receiverplant/
storagelocation
6100/0001
Material ACT-DCD-##
Quantity 100 PC
6-2-2 After saving the transfer posting, look at the data in the material ledger
display again. Display the data for plant 6000 and look at the accountingdocument for the posting. Then switch to the data display for plant 6100.
What is the cause of the price differences?
________________________________________________________
________________________________________________________
Display the cost structure in plant 6100. Where do the different cost
component split values come from?
________________________________________________________
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 150/304
(C) SAP AG AC530 5-46
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 151/304
(C) SAP AG AC530 5-47
Structured Value Chains: Solutions
Unit: Structured Value Chains
The following menu paths are used in the exercises and solutions:
ACT/ML: Accounting→ Controlling→ Product Cost Controlling→
Actual Costing/Material Ledger
IMG: Tools→ Customizing→ Edit Project→ SAP Reference IMG
1 Settings for the Controlling Level
1-1 Display Controlling Level
ACT/ML→ Environment→ Edit Controlling Level for Material
In the table, you see that the checkmark for the process category Purchase Order isnext to the characteristics Plant/Material.
Controlling Level for Purchase Orders: ACT-LCD-##
Characteristic 1 Plant
Characteristic 2 Material
Controlling Level for Purchase Orders: ACT-BCD-##
Characteristic 1 Plant
Characteristic 2 Material
1-2 Change Controlling Level
Select the process category Purchase Order for ACT-BCD-## and click on the iconChange Controlling Level. Choose the setting Purchasing Organization/Vendor as
the new Controlling level. The checkmark is now next to the set level. The
characteristics purchasing organization and vendor are now updated in addition to
the previous characteristics.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 152/304
(C) SAP AG AC530 5-48
2 External Procurement
2-1 Creation of Two Purchase Orders
Logistics→ Materials Management→ Purchasing→ Purchase Order→ Create
→ Vendor/Supplying Plant Known
First Order: Header data:
Purchase order type Standard purchase order
Vendor 1097 / Puebla Digital S.A.
under Organization data:
Purchasing organization 6000 IDES Mexico
Purchasing group 600 / Compras Mexico DF
Company code 6000 IDES Mexico
First Order: Item overview
Material ACT-BCD-## (blank CD)
Order quantity 500 PC
Plant 6000
Storage location: 0001
Confirm your entries. The system automatically calculates the purchase order pricefrom the purchasing info record.
PO price: MXN 11 1 pc each
Save the order!
Purchase order number 1: __________________________________________
Second Purchase Order: Header data:
Purchase order type Standard purchase order
Vendor 1098 / Productos Argentinos Imp. S.A.
under Organization data:
Purchasing organization 6000 IDES Mexico
Purchasing group 600 / Compras Mexico DF
Company code 6000 IDES Mexico
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 153/304
(C) SAP AG AC530 5-49
Second Purchase Order: Item overview
Material ACT-BCD-## (blank CD)
Order quantity 500 PC
Plant 6000
Storage location: 0001
Confirm your entries. The system automatically calculates the purchase order price
from the purchasing info record.
PO price: MXN 14 1 pc each
Save the order!
Purchase order number 2: __________________________________________
2-2 Goods Receipts
2-2-1 Goods receipt for the first purchase order:
Logistics→ Materials Management→ Inventory Management→
Goods Movement→ Goods Receipt→ For Purchase Order→ PO
Number Known
Enter your purchase order number and confirm. The system determines
the following information. Check this information in the line for the purchase order item.
Posting date Today's date
Purchase order number See previous exercise
Plant 6000
Storage location 0001
Quantity As in the purchase order
Movement type 101
Set the flag in the OK column (column to the right of the material)
OK field Select
Save.
Repeat this procedure for the second purchase order.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 154/304
(C) SAP AG AC530 5-50
2-2-2 Procurement alternatives in the material ledger display:
ACT/ML: Material Ledger→ Material price analysis
Material: ACT-LCD-##
Plant: 6000
Period/Year: Current period/current yearOpen the category Receipts→ Open the process category Purchase
Order
By adding the characteristics purchasing organization and vendor, thecorresponding procurement alternatives are generated and shown in the
material ledger display. For more information, double-click on the procurement alternatives.
Procurement Alternative 1
Description Vendor:0000001097 Purchasing Org.:6000
Characteristic Value
Process category BB purchase order
Controlling level purchase order purchasing
organization/vendor
Purchasing
organization
6000 IDES Mexico
Vendor 1097 Puebla Digital S.A.
Procurement Alternative 2
Description Vendor:0000001098 Purchasing Org.:6000
Characteristic Value
Process category BB purchase order
Controlling level purchase order purchasing
organization/vendor
Purchasingorganization
6000 IDES Mexico
Vendor 1098 Productos Argentinos
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 155/304
(C) SAP AG AC530 5-51
3 Change Procurement and Consumption Alternatives
ACT/ML→ Material Ledger→ Edit Procurement Alternatives/Consumption Alternatives
Enter material ACT-BCD-## and plant 6000. Select the first procurement alternative and click on the icon Display/Change. Enter a name in the field Changeable name. Click on
Confirm. Then double-click on the second procurement alternative and enter a text there as
well. Then save.
Name of procurement alternative 1097/6000 1097: Puebla Digital
Name of procurement alternative 1098/6000 1098: Productos Argentinos
In the material ledger display, open the category Receipts for ACT-BCD-## and then the
process category Purchase order . The procurement alternatives are now shown with your maintained text.
4 In-House Production
Cost Center Group: CCG530-##
Cost centers: CC530-##
Work centers: WP530-##
Activity types: ATL-##; ATR-##
Production version: 0001 new machine
4-1 Controlling level of the finished demo CD
ACT/ML→ Environment→ Edit Controlling Level for Material
Enter material ACT-DCD-## and plant 6000.
Controlling level Production Production version
The controlling level cannot be changed if product cost collectors have already
been created, or if a mixed costing uses a controlling level. In the current example,
the standard price of the demo CD has been updated with a mixed costing.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 156/304
(C) SAP AG AC530 5-52
4-2 Product Cost by Period with Product Cost Collectors
4-2-1 Create product cost collectors.
Accounting→ Controlling→ Product Cost Controlling→Cost Object
Controlling→ Product Cost by Period → Master Data→ Product Cost
Collector→ Edit
Enter your material ACT-DCD-## and plant 6000, and click on the CreateProduct Cost Collector icon.
Enter the following data in the dialog box:
Material ACT-DCD-##
Plant 6000
Order type RM01
Controlling level Production version
Planning plant 6000
Production version 01
Click on icon Confirm.
Maintain the following entries in the Data tab:
Profit center: No entry
Business area: 7000
Costing variant plan: PREM
Costing variant actual: PPP3
Costing sheet: COGM
Overhead key: SAP10
Results analysis key: No entry
Variance key: 000003
Save your entries and create a preliminary cost estimate for the productcost collector.
Order number of product cost collector:
You display the preliminary cost estimate for the product cost collector byclicking on the Cost Estimate button on the Header Tab.
Cost of goods mfd for DEMO CD: per 100 pc MXN 2066.67
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 157/304
(C) SAP AG AC530 5-53
4-3 Production of the demo CDs
4-3-1 Creation of a production order for the demo CDs ACT DCD-##
Logistics→ Production→ Production Control → Order→ Create
→With Material
Material ACT-DCD-##Order type PP08
Production plant 6000
Confirm the entries.
Quantity 800 PC
Finish (date) today
Click on the Release order icon and save your order. Order number:
_______________________________________
4-4 Actual Postings for the Production Order
4-4-1 Confirmation for the production order:
Logistics→ Production→ Production Control → Confirmation→
Enter→ For Order
Enter your order number and confirm.
Confirmation type Final confirmation
Yield to confirm 800 PC
Confirmed scrap 100 PC
Posting date today
Enter.
Click on the Goods movements icon. The following goods movements are performed when you save the confirmation:
Goods receipt ACT-DCD-##: 800 PC
Goods issue ACT-LCD-##: 900 PC
Goods issue ACT-BCD-##: 900 PC
(Do not confirm more than 950 pieces of the raw material, otherwise you
will not have enough materials available.)
Save the confirmation. Note the message in the status bar: Confirmationsaved, Goods Movements: 3, Errors: 0
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 158/304
(C) SAP AG AC530 5-54
4-4-2 Material Ledger Display:
ACT/ML: Material Ledger → Material price analysis
Material: ACT-DCD-##
Plant: 6000
Period/Year: Current period/current yearOpen the category Receipts → Open the process category Production
The order was delivered according to price control S at the standard
price. Possible higher follow up costs are only posted at order settlement
or material ledger settlement. There are, therefore no price differences at
this time.
4-5 Update the Cost Component Split for Goods Issue
ACT/ML: Material Ledger→ Material price analysis
Material: ACT-DCD-##
Plant: 6000
Period/Year: Current period/current year
View: Cost Component
Value: Actual value
and then Value: preliminary valuation
Cost Component Actual value Preliminary valuation
Material Components: MXN 13,200 MXN 13,200
Prod. Labor / Setup: MXN 900 MXN 900Production Machines: MXN 2100 MXN 2100
Material Overhead: MXN 1,080 MXN 1,080
Other costs: MXN 0 MXN 0
As the material has price control S, the goods issues are valuated at the standard
price. The standard price is also used to determine the preliminary value, which
means that there can be no differences in the cost component split.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 159/304
(C) SAP AG AC530 5-55
4-6 Period-End Closing in Cost Object Controlling
4-6-1 Calculation of Overhead
Accounting→ Controlling→ Product Cost Controlling→Cost Object
Controlling→ Product Cost by Period → Period-End Closing→ Single
Functions: Product cost collector→Overheads→ Individual Processing
Controlling area 6000
Material ACT-DCD-##
Plant 6000
Period/Fiscal year Current period
Background processing _ (no)
Test run _ (no)
Dialog display X (yes)
Detail list X (yes)
Execute. You see the costing structure.
Type of overhead: Material overhead
Overhead rate 10%
Amount: 162.00
Currency: EUR
Click the Layout icon to add the fields Value in Obj Currency and Object
Currency.
Overhead: MXN 1350.00
Click on the green arrow to return to the menu.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 160/304
(C) SAP AG AC530 5-56
4-6-2 Variance Calculation
Accounting→ Controlling→ Product Cost Controlling→Cost Object
Controlling→ Product Cost by Period → Period-End Closing→ Single
Functions: Product cost collector→ Variances→ Individual Processing
Material ACT-DCD-##
Plant 6000
Period/Fiscal year Current period
Selected target cost versions 000
Test run __ (no)
Detail list X (yes)
Execute.
On the variance calculation list, you see the amount of the variances. You
can have this amount displayed in the different currencies.
Amount(controlling
area)
Amount(company code)
Target costs ≈EUR 1984.00 ≈MXN 16533.36
Actual costs ≈EUR 2231.00 ≈MXN 18600.00
Variances(Act. cost - alloc. act. costs -
scrap) .
≈EUR 160.00 ≈MXN 1320.00
Click on the green arrow to return to the menu.
For more detail, choose the Cost Types report and the Variance Category
layout. There you can see that the main variances are quantities, structure,
and mixed variances.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 161/304
(C) SAP AG AC530 5-57
4-6-3 Settlement
Accounting→ Controlling→ Product Cost Controlling→Cost Object
Controlling→ Product Cost by Period → Period-End Closing→ Single
Functions: Product cost collector→ Settlement→ Individual
Processing
Material ACT-DCD-##
Plant 6000
Settlement period Current period
Background processing _ (no)
Test run _ (no)
Detail lists X (yes)
Check transaction data _ (no)
Execute.Click on the detail list icon on the basic list for settlement and write downthe settled values:
Amount/currency
Sender The number of your product cost collector
Settled to material EUR 160 / MXN 1320
Settled to profitability segment EUR 160 / MXN 1320
Material Ledger Display:
ACT/ML: Material Ledger→ Material price analysis
Material: ACT-DCD-##
Plant: 6000
Period/Year: Current period/current year
View: Price Det. Structure
Open the category Receipts → Open the process category Production
Price differences: ≈
MXN 1320
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 162/304
(C) SAP AG AC530 5-58
4-7
4-7-1 Actual Cost Component Split: Updating the Cost Components after
Settlement
ACT/ML: Material Ledger→ Material price analysis
Material: ACT-DCD-##
Plant: 6000
Period/Year: Current period/current year
View: Cost Component
Value: Actual Value, Differences
Cost Component Actual value Differences
Material Components: MXN 13,500 MXN 300
Prod. Labor / Setup: MXN 1,125 MXN 225
Production Machines: MXN 2,625 MXN 525Material Overhead: MXN 1,350 MXN 270
Other Costs: MXN 0 MXN 0
When settling the product cost collector, the difference between the actual
debits and target credits are determined as variances, and are transferred
into the material ledger using the different cost elements. The differencesare a result of the variances between the values for the actual cost
component split, and the cost component split for planned prices.
4-7-2 Material Price Analysis:
Button: Show/ Hide Evaluated Quantity Structure
Scroll the the right to choose
Button: Change Base Quantity
Select Price Unit and Confirm
Price difference per CD EUR 1.65
Label quantity per CD 1.125 pc
Blank quantity per CD 1.125 pc
Recording quantity per CD 0.011 H
Labeling quantity per CD 0.011 H
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 163/304
(C) SAP AG AC530 5-59
5 Sales Order Processing
5-1 Create a Sales Order
Logistics→ Sales and Distribution→ Sales→ Order→ Create
On the selection screen:
Order type: OR
Sales Organization: 6000
Confirm the entries and enter the following data:
Sold-to-party 6666
Purchase order number: Order ## (your group number)
Material: ACT-DCD-##
Quantity: 600 PC
Confirm your entries.Choose Item Conditions icon
The sales price for your demo CD is MXN 30 / 100 pieces.
Save the order and write down the order number:
__________________
5-2 Delivery for Sales Order
Logistics→ Sales and Distribution→ Sales→ Order→Subsequent Functions→
Outbound Delivery
On the selection screen:
Shipping point: 6000
Selection date: A date in the next month
Order: Your sales order number
Confirm your entries.
On the Picking tab, enter the suggested delivery quantity (total quantity of your
order) as the picking quantity. Click on the post goods issue icon.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 164/304
(C) SAP AG AC530 5-60
Valuation price for goods issue:
ACT/ML: Material Ledger→ Material price analysis
Material: ACT-DCD-##
Plant: 6000
Period/Year: Current period/current yearView: Price determination structure
The delivery is valuated at the standard price - 21.60 MXN per piece.
5-3 Billing the Sales Order
5-3-1 Billing Document
Logistics→ Sales and Distribution→ Sales→ Order→Subsequent
Functions→ Billing
Enter the document number for your delivery and save. The billing
document is created.
5-3-2 CO-PA Report IDES-530
Controlling→ Profitability Analysis→ Information System→ Execute
Report (Operating Concern IDEA, Costing-based Profitability Analysis)
Choose Report IDES-530
From/to period Current Period
From/to product: ACT-DCD-##
Currency: 10 Company code currency
How does the system find the differentiated values for materialcomponent, wages, etc.?
From the cost elements that were transferred from the standard costestimate.
_____________________________________________________
Why do no actual values for contribution margin accounting exist at this
time?
The actual cost component split values have not been transferred yet.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 165/304
(C) SAP AG AC530 5-61
Enter the following values in the table:
Sales revenue: MXN 18,000
Total costs of goods
manufactured in target:
MXN 12,960
Contribution margin II -target: MXN 5,040
6 Further Goods Movements for the Demo CD
6-1 External Procurement of the Demo CD
6-1-1 Create Purchase Order
Logistics→ Materials Management→ Purchasing→ Purchase Order
→ Create→ Vendor/Supplying Plant Known
Header data:
Purchase order type Standard purchase order
Vendor 1099 / Studios Chapultepec
Purchasing organization 6000 IDES Mexico
Purchasing group 600 / Compras Mexico DF
Company code 6000 IDES Mexico
Item overview
Material ACT-DCD-## (CD label)Order quantity 200 PC
Plant 6000
Storage location: 0001
Confirm your entries. The system automatically calculates a purchaseorder price from the purchasing info record.
PO price: MXN 30 1 pc each
Save your purchase order and write down the purchase order number.
Purchase order number:
________________________________________
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 166/304
(C) SAP AG AC530 5-62
6-1-2 Goods Receipt for Purchase Order:
Logistics→ Materials Management→ Inventory Management→
Goods Movement→ Goods Receipt→ For Purchase Order→ PO
Number Known
Enter your purchase order number and confirm. The system determines
the following information. Check this information in the line for the purchase order item.
Posting date Today's date
Purchase order number See previous exercise
Plant 6000
Storage location 0001
Quantity As in the purchase order
Movement type 101
Set the flag in the OK column (column to the right of the material or initem details)
OK field Select
Post.
Material Ledger Display:
ACT/ML: Material Ledger→ Material price analysis
Material: ACT-LCD-##
Plant: 6000Period/Year: Current period/current year
Procurement price analysis:
External procurement price: MXN 30.00 / PC
In-house production price: MXN 23.25 / 1 pc
Average receipt price: MXN 24.60 / 1 pc
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 167/304
(C) SAP AG AC530 5-63
6-2 Transferring Part of Your Demo CD
6-2-1 Post Goods Issue/Receipt
Logistics→ Materials Management→ Inventory Management→
Goods Movement→ Transfer Posting
Posting date Today's dateMovement type 301
Plant 6000
Storage location 0001
Confirm.
Receiver plant/storage location 6100/0001
Material ACT-DCD-##
Unit of Entry 100 PC
Post.
6-2-2 Material Ledger Display:
ACT/ML: Material Ledger→ Material price analysis
Material: ACT-DCD-##
Plant: 6100
Period/Year: Current period/current year
Open the category Receipts→ Stock Transfer → Double-click on the
material ledger documentBranch from the material ledger document to the accounting document.
Goto→ Accounting documents
Accounting document
The material is delivered to plant 6100 with the value calculated in plant
6000 (standard price: MXN 21.60). In plant 6100, a preliminary valuation
takes place with the standard price valid there (MXN 20.00). Thedifference between these two value bases is displayed as the price
difference.
The cost component split is transferred from the delivering plant.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 168/304
(C) SAP AG AC530 6-1
© SAP AG 2003
z Actual Price Determination
z Concept of the Periodic Unit Price
z Costing Run for the Multi-Level Actual Costing:
Contents:
Period-End Close in Actual Cost ing
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 169/304
(C) SAP AG AC530 6-2
© SAP AG 2003
z Explain actual price determination
z Explain how the periodic unit price is calculated
z Run the period-end close with or withoutrevaluation
z Create a costing run for multilevel actual costing,execute it, and analyze it
At the conclusion of this unit, you wil l be able to:
Period-End Close in Actual Costing: UnitObjectives
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 170/304
(C) SAP AG AC530 6-3
© SAP AG 2003
Course Overview
AC530 Actual Costing/Material Ledger
Fundamentals of Material Valuation
Design and Purpose of the Material Ledger
Recording Business Transactions
Structured Value Chains
Period-End Close in Actual Costing
Special Functions
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 171/304
(C) SAP AG AC530 6-4
© SAP AG 2001
z Once the period closing program has been run, youcan carry out the period-end closing activities inthe material ledger.
z We will first concentrate on the posting logic. Youwill analyze the effects of the closing entry in thematerial ledger depending on whether the option torevaluate was chosen.
z Then you'll work with the multilevel actual costingfunction across multiple plants. You'll learn how to
create a costing run, execute it, and analyze it.
Period-End Close in Actual Costing: Business Scenario
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 172/304
(C) SAP AG AC530 6-5
© SAP AG 2003
z Explain actual price determination
z Explain how the periodic unit price is calculated
z Determine single-level material prices
z Generate closing entries with and withoutrevaluation of the ending inventory
z Analyze price difference post ings
At the conclusion of this topic, you wil l be able to:
Periodic Unit Price and Closing Entries: TopicObjectives
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 173/304
(C) SAP AG AC530 6-6
© SAP AG 2003
Cost Object Control ling Mater ial Ledger Cost Center Accounting
Cost Center
External Procur ement
Order
Order
Cost Center
Act iv ityType
Act iv ityType
Standard p rice
Standard p rice
Standard price
Period-End Close in Cost Center Accounting
Planned pr ices(= Planned costs/Actual
costs)
Planned pr ices(= Planned costs/Actual
costs)
Actual pr ices(= Actual costs/Actual
activity)
Actual pr ices(= Actual costs/Actual
activity)
$
$
?
?
Cost center accounting is used to valuate all cost objects (orders) at a preliminary planned price. This
price can be set manually, or it can be the result of planned price determination with a cost component
split.
Like the standard price, this planned price has the advantage that a closed standard cost accounting
system can be implemented without the problem of price fluctuations preventing cost controlling of the
production process.
However, if actual costs and actual activity are known at the end of the period, you can determine the
actual price in cost center accounting and use this price to revaluate the cost objects, if appropriate.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 174/304
(C) SAP AG AC530 6-7
© SAP AG 2003
Energy:
Actual costs: 77.000,-
2 0 0 0
k w h
5 0 0 0 k w h
5 0
S er H
2 0 S e r H
Service:
Actual costs: 24.500,-
CD Production:
Actual costs: 52.000,-
100 SerHSerH
ATRkwh
ATL
Actual Pr ice Determination
50 h labeling
200 h recording
$
$
$
$
When calculating actual prices, the system takes into account all activity flows between cost centers
and determines the price in an iterative process by dividing actual costs by actual activity. Actual
prices are determined as follows:
First divide primary costs by the activity quantity. Use the resulting preliminary price to revaluate the
activity input of other cost centers.
In the following steps, the prices determined are used to calculate other activity flows in an iterative
process, until the exact price has been determined for a cost center.
Price calculation procedure:
The periodic differentiated price is determined by dividing the costs of each period by the activity
quantities of the period. Use of this method means that different prices can occur in different periods.
The cumulated price is determined by dividing the cumulated costs of the current and previous
periods by the cumulated activity quantities. This method smoothes price fluctuations in the course of
the fiscal year. In the current period adjustments are made for activity allocations posted in previous
periods. This method ensures that the sender cost center is fully credited at the end of each period. The
cumulated price can only be used in actual.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 175/304
(C) SAP AG AC530 6-8
© SAP AG 1999
Activate Actual Costing / Activ ity Type QuantityUpdate
Cost center Act iv itytype
Order
1.) Activity type quantity update
Act iv it ies:- "380h recording"- with plan or actual pricefrom order
Optional actual price revaluation
Order
2.) Activity type quantity update,price relevant
Act iv it ies:- "380h recording"- direct actual price
Actual prices, price relevant
norevaluation
Cost center Act iv ity-type
With Release 4.6, it is possible to update activity consumptions of cost centers as well as process
consumptions of business processes (that are necessary for the production of a material) in the
quantity structure of Actual Costing/Material Ledger. You have the following possibilities:
You can have the system update the activity quantities without including them in price determination.
You can use this setting if you want to receive information about the complete actual quantity structure.
Through revaluation of the actual activity price, you can later debit the respective cost object with the
variances between the planned price of the cost center/activity type or the process and the actual price
calculated at the end of the period.
If you choose the setting relevant to price determination, the variances between the planned price of
the cost center/activity type or business process and the actual price calculated at period end are
recalculated. The cost center or process is credited and the material (for which consumption took place)
is correspondingly debited. If you choose this setting, you can no longer revaluate actual prices in period-end closing of Cost Object Controlling, because the variances of the cost centers/processes are
debited directly to the material. If you have made this setting, all allocations to manufacturing orders,
that are settled to the material, are posted with a price that remains constant throughout the period. A
price change that occurs during the period is not accounted for in allocations to orders settled to the
material.
You can deactivate actual costing at anytime in order to, for example, avoid larger activity quantities
during the update of actual quantity structures. In this case, you must do without the functions of actual
costing for the respective period. The indicator for the updating of activity types must not be changed or
deleted within a period. This would lead to false material debits during price determination.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 176/304
(C) SAP AG AC530 6-9
© SAP AG 2001
Period Status in the Material Ledger
New Period openedNew Period opened(Period Closing Program)(Period Closing Program)
Single-Level Price Determination
Multilevel price determination
Closing entry performed(Deletion possible)
O l d P e r i o d
Period status:
Price changes madePrice changes made
Quantities and values enteredQuantities and values entered
Material Ledger data is automatically assigned a period status. This status shows which functions have
been completed for the material and which functions can still be completed. The Material Ledger
recognises whether valuation relevant operations have been completed for the material or whether the
period closing program has run.
The status Period opened registers the funcctions of the period closing program and allows valuation
relevant operations to be created for the period opened.
The status price changes made, documents that the valuation price for a material has been changed.
Valuation relelvant operations can only be created using this changed price.
Quantities and values created means that valuation relevant operations have already been posted. It is no
longer possible to change the price in the current period.
Status single-level price determination completed shows that a single-level price has already been
calculated. Further values can still be entered and the price can still be redetermined. This status is a prerequisite for multilevel material price determination.
The "Multilevel price determination" status allows the entry of further valuation-relevant transactions
for the closed posting period. Multilevel price differences are calculated for the material.
The "Closing entry performed" status prevents the entry of further valuation-relevant transactions for
the closed posting period. However, the closing entry can be reversed and repeated (status Closing entry
reversed)
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 177/304
(C) SAP AG AC530 6-10
© SAP AG 2001
Determination of the Periodic Unit Price
ReceiptsReceiptsPeriod openedPeriod opened
(Beginning Inv.)(Beginning Inv.)
SingleSingle--levellevel
price determin.price determin.
Variances
(Act. cost - alloc. act. costs - scrap)
Preliminary valuation of the cumulated inventory + cumulated variancesCumulative inventory
= Periodic Unit Price
The periodic unit price is determined once a period has ended. It reflects the actual costs of a material
for the closed period.
To determine the periodic unit price, the system uses the cumulative inventory (all goods received plus
beginning inventory) and the cumlative difference (all differences between the standard price and the
entered price for all goods received and the beginning inventory).
You have to set the material price determination for each period (in the "Organizational tasks" menu
or directly from a "costing run").
Single-level material price determination includes variance amounts from differences in price, exchange
rates and revaluation differences that have arisen due to the (single-level) procurement of a material in
this period.
Once a period has been closed, the cumulative differences are added to the cumulative inventory for
that period. The system uses this to calculate the weighted average price, which can be used for valuating the ending inventory. The valuation for the current period remains unchanged during
single-level material price determination.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 178/304
(C) SAP AG AC530 6-11
© SAP AG 2001
Periodic Unit Price: Assigning Single-Level Variances
Receipts 500 2500 1500 8,00
Cumulative inventory 1000 5000 1500 6,50
Ending inventory 50 250 6,5075
Other receipts/consum. 0 0 0 0
Consumption 950 4750 1425 6,50
Preliminary ValuationQuantity
Beginning Inventory 500 2500 5,00
PriceDifference
Price
Notallocated
- Period status: determined single-level- Price control: S price- Standard price: 5.00 MXN- Inventory value: MXN 250 (50 pc)
- Periodic unit price = MXN6.50 ( also in material master)
N e w!
N e w!
Material: ACT-LCD
Material price determination is the step that calculates the periodic unit price. The moving price field
in the material master is updated with the calculated price. The price control of the material remains set
to S.
The periodic unit price is also used to calculate a statistical total value. This value is for informational
purposes only and reflects the value of the material in inventory at the current periodic unit price.
Single-level material price determination sets the status determined single-level . Price determination
can be repeated as many times as you want.
The line Not allocated is inserted under the consumption category because with single-level
determination, the price differences cannot be attributed to the different consumptions.
The functions of single-level material price determination serve as the basis for multilevel actual
costing.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 179/304
(C) SAP AG AC530 6-12
© SAP AG 2001
Account Assignment: Valuation Grouping Code
ValuationGrouping Code
300000 400000
xxxxxx
Valuation Area 2
Valuation Area 3
Valuation Area 4
Valuation Area 1
281000 231000
• Valuation Grouping Code of the Valuation Area
If you want automatic account determination within a chart of accounts to proceed differently for
particular company codes or plants (valuation areas), you assign different account grouping codes to
those valuation areas.
You must define automatic account determination separately for each valuation grouping code within a
given chart of accounts. Automatic account determination applies to all valuation areas that are assigned
to that valuation grouping code.
If the user specifies a company code or plant when he enters a transaction, the system derives the
valuation area and the valuation grouping code from that information.
Automatic account determination can be performed simultaneously for valuation groups (called
valuation grouping codes) with multiple valuation areas.
All valuation areas that use the same automatic account determination should be assigned to the same
account grouping codes. This simplifies the maintenance of automatic account determination.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 180/304
(C) SAP AG AC530 6-13
© SAP AG 2001
Account Assignment: Movement Types > Trans Keys
Movement typeGoodsreceipt
Items
BSXPRD
...
Transaction Key
Generalized
posting lines
Material inventory accountsPrice diff erences (external)
...
When transactions in inventory management and invoice verification are relevant to accounting, the
system posts the G/L accounts in financial accounting and cost accounting automatically. When users
enter goods movements, they do not need to specify a G/L account because the R/3 System finds the
account automatically based on the following data: When the user enters a transaction and specifies a
company code or plant, the R/3 System automatically finds the chart of accounts valid for the company
code. You must define automatic account determination separately for each chart of accounts.
• Transaction key: The posting procedures for the accounting-relevant transactions in inventory
management and invoice verification are predefined. Posting records are assigned to each relevant
movement type in inventory management and each transaction in invoice verification. These posting
records are generalized in what are called value strings. Rather than actual G/L account numbers, the
value strings contain keys for the posting procedure (such as a stock posting or consumption posting).You do not need to define these transaction keys, as they are automatically derived from the transaction
(invoice verification) or the movement type (inventory management). You only need to assign to each
posting procedure the G/L account to be posted.
• Account grouping (only for offsetting entries for stock postings, consignment liabilities, and price
differences). If you want to post price differences for goods receipts for purchase orders, goods receipts
for production orders, and other movements to different price difference accounts, you can define
different account groupings for the transaction key.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 181/304
(C) SAP AG AC530 6-14
© SAP AG 2001
Automatic Account Determination
Accounting 1
Valuation class
3000
3001
3030
7900
7920
300000 Rawmaterials 1
300010 Rawmaterials 2
303000 Operating supplies
790000 Semif inishedproducts
792000 Finished products
Example: Transaction BSX= Mat. inventory accountsMaterial
Master
Valuation Grouping Code
ValuationClasses
Each material master record contains a valuation class that plays a role in G/L account determination.
Automatic account determination is defined separately for each valuation grouping code. Different
accounts are assigned to the valuation class for each valuation/transaction key.
The slide shows the account determination for valuation/transaction key BSX (stock posting). This
transaction assigns material inventory accounts to stock postings. This assignment is based on the
valuation class specified in the material master record.
The valuation class enables you to define automatic account determination differently depending on the
material. For example, you can post the receipt of a raw material to a different inventory account than
the receipt of a trading good even though the user enters the same transaction in each case.
You can achieve this by assigning different valuation classes to the materials and then assigning a
different G/L account to the transaction for each valuation class.
If you don't want automatic account determination to be differentiated by valuation class for a
transaction, you don't need to specify a valuation class for the corresponding posting procedure.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 182/304
(C) SAP AG AC530 6-15
© SAP AG 2001
Special Account Determination using the Material Ledger
The fol lowing tasks should be maintained in the material ledger The fol lowing tasks should be maintained in the material ledger for for
account determination:account determination:
PRD for pr ice difference post ings ( invoices, order sett lement,... )PRY For single-level pr ice di fferences (closing entr ies in the mater ial ledger )PRV For mul til evel pri ce di fferences (closing entr ies in t he mater ial l edger )
KDM for transaction-based exchange rate difference postings (invoices, order settlement)
KDV for exchange rat difference postings (closing entries in material ledger)
LKW for al l dif ference postings from the closing entr ies without inventoryrevaluation
GBB/AUI For the revaluation of actual prices and actual process prices in thematerial ledger (modi fication AUI)
Above, you can see the operation keys that must be maintained when using actual costing.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 183/304
(C) SAP AG AC530 6-16
© SAP AG 2003
Closing Entries: Process Steps
Collect Price and Exchange Rate Differencesz In price dif ference accounts, or within categories in material ledger
Period Closing Programz Opens new period
Release Future Pricesz Standard cost estimate or marked actual price
Execute Price Determinationz Single-level, later multi-level
z Determines V price (repeat as required)
Post Closing Entryz Mandatory for every period
z Reverse posting not possible
z Deletion possib le
z With Revaluationz Price differences posted proportionally t o remaining stock
z Price control (old period) on V price? Revaluation
z Without Revaluationz Price differences posted p roportionally to accruals account
z Price control remains with S price
Mark future price
?Clos
ed
During period 1, the system provisionally evaluates all transactions with the standard price. The
periodic unit price is not determined during the period, rather it is calculated during material price
determination. Thus, the system registers all preliminary valuation price differences in price and
exchange rate difference accounts, and updates them in specific categories in the material ledger data.
During period end closing, you run the period closing program. You can then release a marked future
price for period 2 (for example, from a standard cost estimate), or the valuation price remains unchanged
for preliminary valuation. In period 2, you make postings for the previous period 1 where necessary.
Material price determination updates the periodic unit price in the material master record (in the
company code currency) as a statistical valuation price for the period being closed (period 1). Price
determination creates no entries in Financial Accounting.
You check the results, post them as closing entries and determine whether you need to revaluate the
material inventories for period 1. The closing entry must be made for each period. After you post closingentries, it is no longer possible to post to the previous period.
In the following slides, you see the effects of closing entries. These can vary depending on whether a
revaluation takes place.
(PRC – AVR/activity price differences)
(PRC – AVR price diff. )
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 184/304
(C) SAP AG AC530 6-17
© SAP AG 2003
Material ConsumptionCo 4750
Inventory4750 CoBI 2500
Re 2500
GR/IR Account
IR 3000 3000 RE
Vendor
4000 IR
Price diff.
RE 500IR 1000
Example of Entry Before Closing Entries
Re
IR
Co
Re
ReIR IR
IR
Co
CoRe
Inventory value:MXN 250
Standard price (S Price): MXN 5Per. unit pr ice: MXN 6.50
Material: ACT-LCD
Beginning Inventory: 500 pc / MXN 2500
Goods Recpt/Purch. Order: 500 pc / MXN 3000
Invoice Receipts: for 500 pc / MXN 4000
Consumption: 950 pc / MXN 4750
Ending Inventory: 50 pc
?
Closing entries at the end of the period result in postings to accounts. The example above shows data for
material ACT-LCD-## at the end of the period and the corresponding accounts before closing
entries.
The price difference account shows variances that arise during the period: MXN 10 was entered as price
differences for goods receipts, MXN 20 for invoice receipts. The material was more expensive than the
price used for the posting of the goods receipt (standard price).
950 pieces were consumed from the cumulative inventory of 1000 pieces, resulting in an ending
inventory of 50 pieces.
The cumulative variance of MXN 1500 is added to the preliminary valuation for the cumulative
inventory (MXN 5000) and distributed to the cumulative inventory of 1000 pieces via material price
determination. This results in a periodic unit price of:
MXN 1500 + MXN 50001000 pieces = MXN 6.50
Closing entries are created using this periodic unit price.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 185/304
(C) SAP AG AC530 6-18
© SAP AG 2001
Beginning Inventory (BI): 500 pc / 2500 MXN
Goods Recpt/Purch. Ord er: 500 pc / 3000 MXN
Invoice Receipts: 500 pc / 4000 MXN
Consumption: 950 pc / 4750 MXN
Ending Inventory: 50 pc
Material: ACT-LCD
Price Diff. (PRY)
Inventory47502500
2500
Price Diff. (PRD)
5001000
Closing Entr ies With Revaluation
Status: Closing Entry Performed
Price control: V (prev. period on ly)V price: 6.50 MXN
75
Inventory value:325 MXN
(50 PC * 6.50= +75 MXN)
75BI
BI
locked
N e w! N e w
!
u n c h a n
g e d
During the revaluation process, the system makes the following postings:
y The material stock account is debited with the proportional price differences (75 MXN).
y The price difference account (transaction key PRY) is credited with the same amount.
Note, only part of the price differences are posted to material stock. Prices differences that must be
assigned to consumption remain in price difference accounts (at least for single-level calculation).
The system changes the price control for the material in the previous period from S to V. Thus the
periodic unit price (calculated during material price determination) becomes the valuation price for the
previous period.
In the Accounting view for the material master record, you can see the periodic unit price and price
control V for the closed period. The standard price remains unchanged and can still be displayed.
The example above shows data for material ACT-LCD## at the end of the period and the corresponding
debits and credits for the accounts involved.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 186/304
(C) SAP AG AC530 6-19
© SAP AG 2003
Accrual ML (LKW)
Closing Entries Without Revaluation
Beginning Inventory (BI): 500 pc / MXN 2500
Goods Recpt/Purch. Ord er: 500 pc / MXN 3000
Invoice Receipts: 500 pc / 4000 MXN
Consumption: 950 pc / MXN 4750
Ending Inventory: 50 pc
Material: ACT-LCD
Price diff . (PRY)
Inventory47502500
2500
Price diff . (PRD)
5001000
Status: Closing entry performed
Price control: SS price: MXN 5.00
75
Inventory value:MXN 250
(50 PC * 5.00)
BI
locked
u n c h a n
g e d75BI
u n c h a n g e d
If you decide not to revaluate your materials at period end, the periodic unit price of the closed period
is purely for information. Price control remains on S. No changes are made to the material master
record. The periodic unit price is also used to calculate a statistical total value. This value is for
informational purposes only and reflects the value of the material in inventory at the current periodic unit
price.
The "Closing entry performed" status prevents the entry of further valuation-relevant transactions for
the closed posting period. However, the closing entry can be reversed and repeated (status Closing entry
reversed)
Closing entries at the end of the period result in postings to accounts. The example above shows data
for material ACT-LCD-## at the end of the period and the corresponding accounts. The price difference
of MXN 75, proportionally allotted to the ending inventory ((MXN 6.50 - MXN 5.00) * 50 units), is
posted to price difference account ML accrual (transaction key LKW) in this case. If you decide not to revaluate your materials with the actual price, the amount which would have been
posted to the material stock account is posted to another price difference account using posting key
LKW. It is up to you which account you chose for this posting.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 187/304
(C) SAP AG AC530 6-20
© SAP AG 2001
Closing Entries: Next Period
Receipts 0 0 0 0
Cumulative inventory 700 175 75,00 6,50
Ending inventory 50 250 00
Other receipts/consum. 0 0 0 0
Consumption 0 0 0 0
PreliminaryValuation
Quantity
Beginning Inventory 50 250 6,5075,00
PriceDifference
Price
Closing entry performed.- Doc. incl. offsetting entryfor prev. period
N e x t P e r
i o d- Status: Quantities and values entered- Price control: S price
- Standard price: 5.00 MXN- Inventory value: 250 MXN- Period. V price = 6.50 MXN
Before a period is closed, the ending inventory value of period 1 is transferred to the category Beginning
inventory in the subsequent period. In the example above, the standard price was 25.00 MXN as in the
previous period. Generally, the first material movements were also posted at this standard price, so that
it can no longer be changed.
After closing the revaluated period 1, the beginning inventory of period 2 is still valuated using the
preliminary valuation price (standard price of 5.00 MXN). In the system, the revaluation posting of the
old period is no longer valid when the date becomes the first day of the current period.
However, as the actual price (periodic unit price of period 1) is known (6.50 MXN), the difference
between the preliminary valuation price and the periodic unit price of period 1 (175 MXN) is entered as
a price difference in the Beginning inventory category.
In this way, actual price determination does not change the preliminary valuation of the beginning
inventory.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 188/304
(C) SAP AG AC530 6-21
© SAP AG 2001
Costing Run for Multilevel Actual Costing: Topic Objectives
z Create and execute a costing run for mult i-levelactual costing.
z Analyze the run resul ts.
At the conclusion of this topic, you wil l be able to:
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 189/304
(C) SAP AG AC530 6-22
© SAP AG 2003
Actual Cost ing: Process Steps
Costing run AC530 AC530: Plant s 6000 & 6100
Period 01 2000
Costing Cockpit: Actual Costing
General data Process steps Results
Process step Parameter Execute Status Successful With errors Still open
Selection:
Determine sequence
Single-level price determin.
Multi-level price determin.
Revaluation of consumption
Perform closing entry
Mark material price
0
0 0 0
0 0 0
0 0 0
Redeterminestatus data
1. General data:
- Assign plant2. Process steps:- Choose selection criteria- Execute
3. Results:- Status- Log- Results overview- Mater ial l is t
You can execute multilevel actual costing for one or more plants in the costing run. The differences
between the preliminary valuation price for the material and the material inventory and consumption are
calculated. This is done using single-level or multilevel material price determination. The actual prices
calculated by these steps can then be used to revaluate the closed periods and also for future valuations.
You can display selected periods under general data. Here you can see which plants were assigned to
the costing run, which plants can still be assigned to the costing run and which plants you can not assign
to the costing run.
The Process view shows you the status of the corresponding process steps for single or multilevel price
determination or the closing entries. Status data for the hierarchy display is not automatically created
when entering the costing results or after executing a costing function. In order to display the most up to
data information, you should regenerate the status data. The other views display the number of materials,
for which each step was successful or unsuccessful, or is still outstanding or was not included. The results of the costing run are displayed, in a hierarchical overview under results. You can use the
costing run display to display materials that have errors, and/or for log evaluation. You can select
various filters for the material list display, for example, you can display all materials that contain errors,
or only materials with goods movements.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 190/304
(C) SAP AG AC530 6-23
© SAP AG 2003
Plants
Selection:
Process step Parameter Execute Status Successful With errors Still open
Selection:
Determine sequence
Single-level price determin.
Multi-level price determin.
Revaluation of consu mption
Perform closing entry
Mark material price
1088
0 0 0
0 0 0
0 0 0
General data
Process steps
Results:
Selected materials:only price control 3
Log
Before performing multilevel actual costing, select the relevant plants from the selection screen
Available plants. You can assign each plant to exactly one costing run for each period. If you have
already carried out a process step for a costing run, the plant assignment can no longer be changed. You
can only change the plant assignment, if you completely delete the costing run.
Select the parameters under Process and Selection. Specify the method of processing. With larger
volumes of data, you can have the system carry out the function in the background.
When you Execute, you see a list of the relevant plants with information on how many materials were
selected. You can find additional information on the materials for each plant displayed in hierarchy
form. Note that only materials with price determination control 3 (single-level/multilevel) in the
material master are selected here that.
You can also see the log for further information. Check the results, remove possible errors and, if
necessary, select again. Next, determine the costing sequence.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 191/304
(C) SAP AG AC530 6-24
© SAP AG 2003
Determine the sequence for the costing runassigns
Process step Parameter Execute Status Successful With errors still open
Selection
Determine sequence
Single-level price determin.
Multi-level price determin.
Revaluation of consu mption
Perform closing entry
Mark material price
1088
1088
0 0 1088
0 0 588
Results overview Material li st
ACT-BCD-## 6000 1
ACT-LCD-## 6000 1
ACT-DCD-## 6000 2 ACT-DCD-## 6100 3
...
Plant Level Single-level MultiMaterial Closing
Material ledger display
Process steps
AC530 1088
Level 0 50 notmoved
Level 1 450 procured, but not multilevelLevel 2 550 Procured, multilevel
Level 3 38 " (higher levels)
....
When you determine the sequence, the system generates the costing level and assigns the selected
materials to these levels. The sequence is determined using material ledger data, in other words the
periodic update of goods movements and other material related operations.
The following costing levels are generated:
y Level 0: All materials that have been assigned price control 3 in the material master but for which no
values or quantities have been created in the period.
y Level 1: All materials for which quantities and/or values have been created during the period but that
were not procured on a multilevel basis. Multilevel procurement occurs if you use one material in
order to procure another (example: if you use a raw material to produce a semi-finished product).
y Level 2 and higher: All selected materials that were procured on a multilevel basis.
This results in a list of all costing levels (for example level 1 raw materials, level 2 semi-finished goods
and so on) with information about the assigned materials. From the level overview you can go to the
other overviews.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 192/304
(C) SAP AG AC530 6-25
© SAP AG 2003
Single-Level Price Determination
Process step Parameter Execute Status Successful With errors still open
Selection
Determine sequence
Single-level price determin.
Multi-level price determin.
Revaluation of consu mption
Perform closing entry
Mark material price
1088
1088
1088 0 0
0 0 588
AC530 1088
Lev el 0 50Level 1 450Level 2 550
Lev el 3 38....
Results overview Material li st
Plant LevelSL ML BI
Status:Price determined single-level
Process steps
S price Per.V priceMaterial % var.
ACT-BCD-## 6000 1 10.00 12.50 25.00
ACT-LCD-## 6000 1 5.00 6.50 30.00
ACT-DCD-## 6000 2 21.60 24.60 13.89 ACT-DCD-## 6100 3 20.00 21.60 8.00
...
Tolerances can be set
Before you use single-level price determination, you need to enable the material price determination.
This is only relevant for materials that have material price determination 3. To display the allowed tasks,
see Allowed tasks. If necessary, set material price determination. After this, you can run the multi-level
and the single-level material price determination for the cost run in the specified period.
The system calculates periodic allocation prices for the processed period and updates them in the
material ledger data for information purposes in all currencies.
Multi-level price determination is based on single-level price determination for all materials. Check the
results of the single-level material price determination and then run the multi-level price determination.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 193/304
(C) SAP AG AC530 6-26
© SAP AG 2003
Multi-Level Price Determination
Process step Parameter Execute Status Successful With errors still open
Selection
Determine sequence
Single-level price determin.
Multi-level price determin.
Revaluation of consu mption
Perform closing entry
Mark material price
1088
1088
1088 0 0
588 0 0
AC530 1088
Lev el 0 50Level 1 450Level 2 550
Lev el 3 38....
Results overview Material li st
Material Plant LevelSL ML BI
Status:Price determined multi-level
Process steps
S price Per.V price % var.
Tolerances can be set
ACT-BCD-## 6000 1 10.00 12.50 25.00
ACT-LCD-## 6000 1 5.00 6.50 30.00 ACT-DCD-## 6000 2 21.60 29.45 47.25 ACT-DCD-## 6100 3 20.00 29.4536.34...
During multi-level price determination, the results of the single-level material price determination are
used to calculate new prices for all materials in costing level 2 and above.
The multi-level material price determination works consecutively through the costing levels, starting at
the lowest one. This enables the calculated actual prices of materials from the lower levels to be included
in the price determination of higher levels. The price variances of, for example, raw materials are thus
transferred to semi-finished products and then in turn to finished products.
When the results of multi-level material price determination are checked, the system provides you with
a hierarchical overview of the costing run results. You can use the costing run display to display
materials that have errors, and for log evaluation.
You can use the display of master data for Material Ledger for an overview of the goods movements
and to navigate into the relevant documents.
The overview provides the statuses of the single-level or multi-level price determination. The other views display the number of materials for each level, for which each action was successful or
unsuccessful, or is still outstanding or was not intended. You can select various filters for the material
list display, for example, you can display all materials that contain errors, or only materials with goods
movements.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 194/304
(C) SAP AG AC530 6-27
© SAP AG 2003
Revaluation of consumption
Process step Parameter Execute Status Successful With errors still open
Selection
Determine sequence
Single-level price determin.
Multi-level price determin.
Revaluation of consumption
Perform closing entry
Mark material price
1088
1088
1088 0 0
588 0 0
1088 0 0
Process steps
Single-level consumption:
Assignheader accountor originalaccount
For closing entry:Revaluate
FI G/L accounts(optional with CO account ass.)
As an option, you can adjust the single-level consumption values in actual costing with the periodic unit
price in all value records. Make the adjustment at the end of the period. The actual costing run
determines the relevant amounts and records the results in a document. In the closing entry you can post
the amounts determined for the revaluation of consumption to financial accounting, in addition to the
other transactions. As part of this process, the material price determination allocates the differences
incurred to the categories Consumption and Ending inventory in proportion to quantities.
In the revaluation of consumption, the portion allocated to the category Consumption is allocated to the
individual consumption alternatives in proportion to quantities consumed. The allocation is made only to
single-level consumption alternatives because multilevel consumption amounts have already been
revaluated as part of multilevel price determination. You can perform the revaluation of consumption on
original and on collective account assignment.
Revaluation on original account assignment
Here the original account assignment objects (the FI account posted on goods issue) are updated as key
features of the consumption alternative. To do this, you have to specify in customizing which movement
types are relevant for revaluation in this way. The amounts determined in revaluation of consumption
can now be recalculated for these consumption alternatives of the original account assignment. As an
option, you can additionally specify in customizing whether you also want to perform a recalculation
in the CO account assignment.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 195/304
(C) SAP AG AC530 6-28
Revaluation on collective account
For all consumption alternatives not marked as relevant for revaluation, the revaluation amounts
determined are posted to a collective account during closing entry. The collective account must be
stored in the customizing of the account determination for transaction key COC.
When the closing entry is made, the relevant documents of consumption revaluation are posted in
financial accounting.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 196/304
(C) SAP AG AC530 6-29
© SAP AG 2003
Closing Entries
Process step Parameter Execute Status Successful With errors still open
Selection
Determine sequence
Single-level price determin.
Multi-level price determin.
Perform closing entry
Mark material price
1088
1088
1088 0 0
588 0 0
1088 0 0
AC530 1088
Lev el 0 50Level 1 450Level 2 550
Lev el 3 38....
Results overview Material li st
Plant LevelSL ML BI
Status:Closing entry performed
Process steps
S price Per.V price % var.
FIFI
COCOPAPA
Material
ACT-BCD-## 6000 1 10.00 12.50 25.00
ACT-LCD-## 6000 1 5.00 6.50 30.00
ACT-DCD-## 6000 2 21.60 29.45 47.25 ACT-DCD-## 6100 3 20.00 29.45 36.34
...
qRevaluateqTest runqReversalqConsumptionqSelect CO account assignment
Before you can make closing entries, you need to enable closing entries. To do so, double-click on the
closed padlock, which will then be opened.
After you post closing entries for period 1, it is no longer possible to post to the previous period. You
check the prices determined, post them as closing entries and determine whether you need to revaluate
the material inventories for period under review. The closing entry must be made for every period and
can only be made for the previous period. Different results and documents are generated depending on
whether a revaluation takes place (also see the beginning of the unit).
You can reverse the results of the closing entry. However, you can only do this for the last posting
period.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 197/304
(C) SAP AG AC530 6-30
© SAP AG 2003
Analysis of the Variances
AC530 1088
Level 0 50Level 1 450Level 2 550
Lev el 3 38....
Results overview Material li st
Material Plant LevelSL ML BI S price Per.V price % var.
1000 3000 4850 29,45
700 900 29,453395
1250 3000 4850 29,45
0 2100 1455 29,45
Single-leveldifference
Quantity
0 0 00
Multileveldifference
Price
Beginning inventory
Receipts
Production
Version1
Version 2
....IR..
....GR...
850 3000 4850 29,45
Document: Receipt from lower levels (costed actual BOM) ACT-DCD-## FVersion01
Qty Sing.-lev. Multilev.Process 0001: 800 PC - 4850.00
ACT-LCD: 900 PC 1350.00 0.00 ACT-BCD: 900 PC 2250.00 0.00Labeling 9 H 347.34 0.00Recording 9 H 902.66 0.00
ACT-BCD-## 6000 1 10.00 12.50 25.00
ACT-LCD-## 6000 1 5.00 6.50 30.00
ACT-DCD-## 6000 2 21.60 24.60 13.89 ACT-DCD-## 6100 3 20.00 21.60 8.00
...
Actual BOM
To analyze actual costs, you can jump to the material list directly from the costing run. From there you
can go directly to the material ledger display.
The material ledger display provides more comprehensive means of analyzing the variances of your
materials. With multilevel procurement and variances, you can jump to the origin of the procurement
with the Actual BOM button.
There you see an overview showing the quantities of materials, activity types, or business processes that
were required to produce a particular output. You can also see the single-level or multilevel price
differences for each receipt or consumption that resulted from the subsequent adjustment.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 198/304
(C) SAP AG AC530 6-31
© SAP AG 2001
You are now able to:
Period-End Close in Actual Costing: Unit Summary
z Explain how the periodic unit price is calculated.
z Run and analyze the period-end close with or without revaluation.
z Create a costing run for multilevel actual costing,execute it, and analyze it.
z Analyze price difference post ings.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 199/304
(C) SAP AG AC530 6-32
Period-End Closing in Actual Costing: Exercises
Unit: Period-End Close in Actual Costing
At the conclusion of these exercises, you will be able to:
• Perform single-level period-end closing for the material ledger
• Create a run for multilevel actual costing
• Analyze the results of multilevel actual costing
Your cost accounting manager carries out a run for multilevel actual
costing. He is not happy as different actual prices have resulted for your
CDs.
Period-end closing of the material is performed for the previous posting period. You can complete the first step, material price determination, asoften as you want, and at any time. The second step, however, in which
you post period-end closing as accounting-relevant, can only be carried
out for the previous posting period.
Your trainer will now close the current posting period and begin a
new one. As a result, the current month (the period in which you
have carried out all postings) becomes the previous posting period.This allows you to make closing entries.
The next month becomes the current posting period.
Period-end closing of the material ledger in release 4.0 is carried out withthe two steps Single-Level Price Determination and Post Closing. This
function does not take into account any multilevel price or exchange rate
differences.
During this exercise, you will perform and analyze the closing for one of your materials using the menu path that contains the functions of release
4.0.
Later, your trainer will perform multilevel actual costing for all course
participants' materials.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 200/304
(C) SAP AG AC530 6-33
1 Preparation for Close in Cost Center Accounting
1-1 Cost Center Situation before Period-Close
Enter the following settings for the cost center information system in your user
parameters:
Cost center group: CCG530-##Controlling area 6000
Report time period Current period in current fiscal year
Report currency: Object currency
Save.
1-1-1 Call up the report to analyze the plan/actual variances for your cost center.
Controlling area: 6000
Period/fiscal year: Current month
Plan version: 0
Cost center group: CCG530-##
Cost element: No entry
Why does your cost center have planned costs but no actual costs? Why?
________________________________________________________
What is the amount of the activity output for your cost center?
Activity types Plan/Actual Quantity
Plan HoursATL-##
Actual Hours
Plan HoursATR-##
Actual Hours
1-1-2 Under which activity was the actual activity posted?
________________________________________________________
1-2 Posting of Actual Costs to Cost Centers
Create a G/L account document. Use the template AC530 and make the followingchanges:
(To do this, you should make sure you are in company code 6000)
Document date: Today's date
At item level Replace cost center CC530-30 with your cost center
CC530-##.
Post the document.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 201/304
(C) SAP AG AC530 6-34
1-3 Actual Price Determination
1-3-1 Call up a report that displays the existing prices for the activity types of
your cost center. Make the following entries:
Cost center: CC530-##
Activity type: -Version: 0
Period/fiscal year: Posting period
Price indicator No entry
Price unit: 1
Display all selected prices
A price is displayed for each activity type. Fill out the following table.
Activitytypes
Total price Currency Price indicator
AT-##:
ATR-##:
What is the meaning of the price indicator? What type of price is it used for?
_______________________________________________________
Display the cost component split for the planned price of ATL-##. Is there
a cost component split?
_________________________________________________________
1-3-2 Complete actual price determination for your cost center group.
Cost centers: Cost center group CCG530-##
Business processes: No business processes
Parameters: Current period
Process control: • No background processing
• No test run
• Detail lists
Execute, post and then leave screen. You will analyze the prices in the
next exercise.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 202/304
(C) SAP AG AC530 6-35
1-3-3 Call up the price report again, using the same parameters as before:
Cost center: CC530-##
Activity types: -
Version: 0
Period/fiscal year: Previous posting period
Price indicator: No entry
Price unit: 1
Only display the prices to be allocated
A further price with the indicator 5 is displayed for each of the activity
types. Complete the table:
Activity
types
Total price Currency Price indicator
ATL-##: 5
ATR-##: 5
What is the meaning of the price indicator? What type of price is it used
for? Does a cost component split exist now?
________________________________________________________
________________________________________________________
________________________________________________________
The difference between the planned and actual prices can be calculated in
a later step of period end close in actual costing.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 203/304
(C) SAP AG AC530 6-36
2 Period-End Closing in the Material Ledger (Single-Level Actual Costing)
2-1 Organizational Measures (Menu Path: ACT/ML Periodic Material Valuation)
Check whether single-level material price determination and the closing entry are
allowed for the previous posting period (current month) in plant 6000. If not,establish the allowance to do this.
2-2 Single-Level Calculation of Material Prices for Your Labels
2-2-1 Check to see which standard price and moving average price is valid for
the previous posting period and which is valid for the current posting period. You can find this information by choosing the Prices and
inventory value icon in the material ledger display for your labels (ACT-LCD-##, plant 6000). When doing so, fill out the following table.
Values before pricedetermination
Previous postingperiod
(current month)
Current postingperiod
Period status:
S price: MXN MXN
V price: MXN MXN
Price control:
Current inventory value: MXN MXN
Inventory value
(statistical):
MXN MXN
2-2-2 Open the category Consumption for the previous posting period so that
you can see the values for the process categories (production, cost center).Write down the amount of the price differences and the prices of the
following lines:
Price differences Price
Category Cumulative inventory: MXN MXN
Category Consumption: MXN MXN
→ Process category Production: MXN MXN
→ Process category Cost
center :
MXN MXN
Category Ending inventory: MXN MXN
Leave this session and open a new session for the following exercises.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 204/304
(C) SAP AG AC530 6-37
2-2-3 Carry out single-level material price determination for your labels in your
second session. Use the following data:
Material: ACT-LCD-##
Plant: 6000
Treating materials already processed: Process again
Period/fiscal year: Previous posting period
Warning when variance larger than:
1%
Error when variance larger than: No entry
Check against: S price
Background processing: No
Save log: Yes
Execute. Are there warning messages?
Reason for the warning:
__________________________________
2-2-4 Look at the material ledger data for the previous posting period (current
month). Were there any changes as a result of price determination? Under Prices and Inventory Values, you can see which standard price and whichmoving average price is valid for the previous period and which is valid
for the current posting period. Fill out the following table.
Values after pricedetermination
Previous postingperiod
(current month)
Current postingperiod
Period status:
S price: MXN MXN
V price: MXN MXN
Price control:
Inventory value: MXN MXN
Inventory value (statistical): MXN MXN
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 205/304
(C) SAP AG AC530 6-38
2-2-5 Previous posting period in the material ledger display: How are the price
differences now distributed and at which price are the lines valuated?
Category Cumulative inventory: MXN MXN/pc
Category Consumption: MXN MXN/pc
→ The line Not allocated: MXN MXN/pc→ Process category
Production:
MXN MXN/pc
→ Process category Cost
center :
MXN MXN/pc
Category Ending inventory: MXN MXN/pc
What does the line Not included mean?
________________________________________________________
________________________________________________________ ________________________________________________________
________________________________________________________
________________________________________________________
2-2-6 Look at the material ledger document that was written for price
determination (you find it if you open the category Ending inventory in a
second session). Go to the detail screen of the document.
Was an accounting document written for the price determination?
Yes/no:
_______________
Reason:
________________________________________________________
________________________________________________________
________________________________________________________
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 206/304
(C) SAP AG AC530 6-39
2-3 General Ledger Account Balance before Closing Entry
2-3-1 First check to which account the price differences for goods receipts,
invoices and settlement were posted. The activity that the accountdetermination from material management uses to find the price difference
account is PRD. Plant Mexico is assigned to the valuation grouping code0001. To which account in the INT chart of accounts is this activity
posted?
Account Determination MM - Activity PRD
Material Valuation class Account/debit
Account/credit
ACT-LCD-## 3000
ACT-BCD-## 3000
ACT-DCD-## 7920
2-3-2 For the raw materials: Call up the balance for both PRD accounts for the previous posting period (use multiple selection):
Accounts Balance
231000 and 281000 MXN
2-3-3 Go to the line item overview for the balance of the current month, and choose display variant G/L Account Standard.
Document type for posting
2-3-4 Check which account the price difference for activity PRY - Single-level
price differences/Material Ledger - are posted to.
Account Determination MM - Activity PRY
Valuation class Account
No differentiation S: H:
2-3-5 Display the balance of the accounts for the previous (current) posting period.
Account Balance
231520 and 281520 MXN
How do you explain this balance?
________________________________________________________
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 207/304
(C) SAP AG AC530 6-40
2-4 Making Closing Entries for Your Labels (with Revaluation)
2-4-1 Make the closing entries with revaluation for your labels. Use the
following data:
Material ACT-LCD-##
Plant 6000Treating materials already
processed:
Process again
Period/Fiscal year Previous posting period
Revaluate material X (yes)
Revaluate consumption No
Select CO account assignment No
Background processing No
Test run No
Save log Yes
Execute.
2-4-2 Call up the material ledger display for your labels for the previous posting
period. Which period status does the material have now?
________________________________________________
2-4-3 Go to the Accounting 1 view in the material master. Fill out the followingtable:
Previousposting period
Currentposting
period
Change throughclosing entry
Yes/no?
S price: MXN MXN
V price: MXN MXN
Price control:
Stock value: MXN MXN
Value per unit
price:
MXN MXN
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 208/304
(C) SAP AG AC530 6-41
2-4-4 The closing entry revaluates the ending inventory, whereby the price and
exchange rate differences are posted to the inventory stock account. Gointo the previous posting period in the material ledger display. Click on
the Closing doc. icon and go from there to the accounting documents.
Choose the accounting document with the lowest number and choose Goto
– Display as List - display variant 530 Demo. Write down the following
data:
Posting date
Account Activity Amount
Was the account, that the price differences were originally posted to (G/L
account 231000 / Activity PRD) created by the closing entry?
___________________________________________________
Which activity was used by the closing entry for the stock revaluation?
____________________________________________________
2-4-5 Display the balance of the accounts for activity PRY again and call up the
line item overview for the current period. Which document type was used
for the posting?
Document type for posting:
2-4-6 In order to fully understand how the periodic price differences aredistributed to FI accounts at period-end, and to be able to explain the line
"not included" (material price analysis), complete the following sentence:
Of the periodic price difference amount of MXN ______________ posted,
MXN ___________ could be assigned to the period close inventory of the
raw materials. The remaining price difference amount of MXN
___________ is consumed by the material quantity used during the period
and remains in single level actual costing as price differences.
2-4-7 Now, choose the accounting document with the highest document number.
What posting date does this document have?
Posting date
How do you explain this second posting?
________________________________________________________
________________________________________________________
________________________________________________________
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 209/304
(C) SAP AG AC530 6-42
2-4-8 Materials that have the period status Closing Entry Posted are not included
in multilevel actual costing.
To check the period status of your materials, call up the appropriate reportin the information system of the material ledger. Select all materials that
start with ACT*. Which status do your labels have?
________________________________________________________ 2-4-9 Reversal of Closing Entries
Now reverse the closing entries for your material ACT-LCD-##.
To check the period status of your materials and make sure that they are
included in multilevel actual costing, call up the Listing of Materials by
Period Status report with the same selection criteria again.
Which status do your labels now have?
________________________________________________________
3 Period-End Closing in the Material Ledger (Multilevel Actual Costing)
When carrying out multilevel actual costing, you cannot selectindividual materials. You can only select by plant. For this reason,
your trainer will carry out multilevel actual costing for all course
participants' materials. Your task is to understand the posting logic
and analyze the results.
3-1 Multilevel Actual Costing: General Data for the Run
Go into the costing run AC530 for the previous posting period. Which plants areassigned to the run?
Plant 1
Plant 2
3-2 Multilevel Actual Costing: Process Steps
3-2-1 Selection: Look at the process steps for multilevel actual costing. Howmany materials were selected for the run? What are the criteria that
determine whether a material is selected?
Number of selected materials
All materials are selected that
________________________________________________________
________________________________________________________
3-2-2 Parameters: Check the parameters for single-level price determination.During price determination, which prices can you check to see whether a
variance of a certain amount should lead to warning or error messages?
Price 1
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 210/304
(C) SAP AG AC530 6-43
Price 2
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 211/304
(C) SAP AG AC530 6-44
3-3 Multilevel Actual Costing: Costing Results:
3-3-1 Select the view Costing run overview and the hierarchy setting Costing
run/level/cycle number . Which costing levels were determined? Howmany materials are assigned to the levels?
Level Number of Assigned Materials
Level 0
Level 1
Level 2
Level 3
When are the materials assigned to level 0?
________________________________________________________
________________________________________________________
When are the materials assigned to level 1?
________________________________________________________
________________________________________________________
When are the materials assigned to the other levels?
________________________________________________________
________________________________________________________
3-3-2 Set the hierarchy to Costing Run/Plant/Material Type/Valuation
Class/Origin Group and check whether the material types were
successfully included in the costing run.
Level Materialtype/number
Status of single-level
settlement
Status of multilevel
settlement
Status of closing
entry
Raw materials
Semi finished products
Plant 6000
Finished product
Plant 6100 Finished product
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 212/304
(C) SAP AG AC530 6-45
3-3-3 Now select the top hierarchy node (the number of the run) and display the
material list for the run. Use the filter Only materials with goods
movements. For a better overview, hide the results list in the left portion
of the screen and enlarge the material list display. Which status do your
materials have?
Material Status of single-level
settlement
Status of multilevel
settlement
Status of closing
entry
ACT-LCD-##
ACT-BCD-##
ACT-DCD-## (6000)
ACT-DCD-## (6100)
3-3-4 Choose the display variant Movement Data. Which material has the largest
receipt quantities?
________________________________________________________
3-3-5 Choose the display variant Price Analysis. According to which criterionare the materials sorted here?
Sorting criterion:
________________________________________________________
How high are the price variances for your materials?
Material Standard
price
Periodic unit
price
Absolute
var.
Relative
var.
ACT-LCD-## MXN MXN MXN %
ACT-BCD-## MXN MXN MXN %
ACT-DCD-## (6000) MXN MXN MXN %
ACT-DCD-## (6100) MXN MXN MXN %
3-3-6 You want to analyze the origin of the price differences of your demo CD
in plant 6100. Go to the material ledger display for your demo CD in plant
6100 by double clicking. Select the display variant Single-Level and
Multilevel Price Differences. Are the price differences of the product
primarily single or multilevel in nature?
Cumulated Price Differences
Single-level MXN
Multilevel MXN
Look at the material ledger document for the multilevel price differences.From which material do these differences originate?
Input material with multilevel price differences:
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 213/304
(C) SAP AG AC530 6-46
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 214/304
(C) SAP AG AC530 6-47
3-3-7 Evaluated Quantity Structure (Multilevel)
Use the Evaluated Quantity Structure (Multilevel) to analyze the amountof difference for each resource. Which input resources have yielded the
highest differences for one CD?
Resource Difference
1.
2.
3.
4.
3-3-8 Analyze the closing document of the material ledger. For which of your materials in plant 6000 has consumption be recalculated?
Material Consumption price differences
_____________________ _______________________
_____________________ _______________________
_____________________ _______________________
3-3-9 Which account was the price difference posted to? Now select Display as
list and layout /530 Demo in the FI document.
Account for transaction key COC
__________
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 215/304
(C) SAP AG AC530 6-48
Period-End Close in Actual Costing: Solutions
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 216/304
(C) SAP AG AC530 6-49
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 217/304
(C) SAP AG AC530 6-50
Unit: Period-End Close in Actual Costing
The following menu paths are used in the solutions:
ACT: Accounting→ Controlling→ Product Cost Controlling→
Actual Costing/Material Ledger
IMG: Tools→ Customizing→ IMG→ Edit Project→ SAP
Reference IMG
1 Preparation for Close in Cost Center Accounting
1-1 Cost Center Situation before Period-Close
Enter user parameters:
Accounting→ Controlling→ Cost Center Accounting→ Information system→
User settings
On the Basic data / Report Objects tabs enter Cost center group CCG530-## and
controlling area 6000.
On the tab Report Time Period set the current period and current fiscal year.
On the tab Report Currency set the currency to object currency. Save.
1-1-1 Report to Analyze Actual / Plan Variances:
Accounting→ Controlling→ Cost Center Accounting→ Information
System→ Reports for Cost Center Accounting → Plan/ Actual
Comparisons→ Cost Centers: Actual/Plan Variances
Controlling area: 6000
Period/fiscal year: Current month / Current year
Plan version: 0
Cost center (value): CCG530-##
Cost element: No entry
No actual debits exist for your cost center because no actual costs have
been entered.
______________________________________________________
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 218/304
(C) SAP AG AC530 6-51
Activity output for your cost center:
Activity types Plan/Actual Quantity
Plan 10 hoursATL-##
Actual 9 hours
Plan 10 hoursATR-##
Actual 9 hours
1-1-2 The activity output is posted to the production order during confirmation.
1-2 Posting of Actual Costs to Cost Centers
Accounting→ Financial Accounting→ General Ledger→ Document entry→
Enter G/L Account Document.
Choose template AC530 from the templates for the item and make the followingentries/changes:
(You may need to change to company code 6000 via "Environment" before you dothis)
Document date: Today's date
At item level: Replace cost center CC530-30 with your cost
center CC530-##.
Post the document.
1-3 Actual Price Determination
1-3-1 Current planned prices
Accounting→ Controlling→ Cost Center Accounting→ InformationSystem→ Reports for Cost Center Accounting → Prices→ Cost
Centers: Activity Type Prices
Cost center: CC530-##
Activity types: -
Version: 0
Period/fiscal year: Posting period
Price indicator: No entry
Price unit: 1
Display all selected prices
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 219/304
(C) SAP AG AC530 6-52
The following values are displayed:
Activity types Total price Currency Price indicator
ATL-##: 15 EUR 1
ATR-##: 35 EUR 1
Price indicator 1 means that the displayed price is an iterative plan price(planned costs / planned activity).
The planned prices have a cost component split as they were determined
iteratively (price indicator 1) and because the cost component structure is
active for the version. This cost component split will be transferred using atransfer structure to the auxiliary cost component split (primary cost
component split), the cost estimate and to the material ledger.
1-3-2 Actual Price Determination
Accounting→ Controlling→ Cost Center Accounting→ Period End-
Closing→ Single Functions→ Price Calculation
Cost center group: Select the radial button cost center group,
enter only your group CCG530-##
Business processes: No business processes
Parameters: Current period
Process control: • No background processing
• No test run
• Detail lists
Execute. This posts the prices.
1-3-3 Accounting→ Controlling→ Cost Center Accounting→ Information
System→ Reports for Cost Center Accounting→ Prices→ Cost
Centers: Activity Type Prices
Call up the price report again, using the same parameters as before:
A further price with the indicator 5 is displayed for each of the activity
types. Complete the table:
Activity types Total price Currency Price indicator
ATL-##: 19.23 EUR 5
ATR-##: 47.43 EUR 5
Price indicator 5 means that the displayed price is an iterative actual price(actual costs / actual activity). These prices also have a cost component
split, which you can display (goto - cost component split).
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 220/304
(C) SAP AG AC530 6-53
2 Period-End Closing in the Material Ledger (Single-Level Material Price Determination)
2-1 Organizational Measures
ACT/ML: Periodic Material Valuation→ Organizational Measures→ Display
Allowed Tasks
Plant: 6000, Fiscal year: current
2-2 Determine single-level material prices
2-2-1 Data before price determination
Material Ledger Display:
ACT/ML: Material Ledger→ Material price analysis
Material: ACT-LCD-##
Plant: 6000
Period/Year: Current period/current year
Click on the Prices and Inventory value icon to receive the following data.You can use the arrows to switch between periods.
Values before pricedetermination
Previous postingperiod
(current month)
Current postingperiod
Period status: Quantities and
values entered
Period opened
S price: MXN 5 MXN 5
V price: MXN 5 MXN 5
Price control: S S
Current inventory value: MXN 2500 MXN 2500
Inventory value(statistical):
MXN 2500 MXN 2500
2-2-2 Open the category Consumption:
Price differences Price
Category Cumulativeinventory:
MXN 1,500 MXN 6.50
Category Consumption: MXN 0.00 MXN 5.00
Process category Production:
MXN 0.00 MXN 5.00
Process category Cost
center:
MXN 0.00 MXN 5.00
Category Ending
inventory:MXN 0.00 MXN 5.00
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 221/304
(C) SAP AG AC530 6-54
Keep this session open as it is and open a second session.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 222/304
(C) SAP AG AC530 6-55
2-2-3 Single-level material price determination for your labels:
ACT/ML: Periodic Material Valuation→ Determine Material Prices
(Single-Level)
Material ACT-LCD-##
Plant 6000Treating materials already processed:
Process again
Period/fiscal year Previous posting period
Warning when variance larger than:
1%
Error when variance larger than: No entry
Check against S price
Background processing No
Save log Yes
Execute.
Material price determination issues three warnings: The calculated price
varies from the comparison price by more than the threshold value (1%) inall three currencies. Amount of variances (in company code currency):
30% (MXN 6.50)
2-2-4 Changes through Price Determination
ACT/ML: Material Ledger→ Material price analysis
Material: ACT-LCD-##
Plant: 6000
Period/Year: Previous period/current year
Click on the Prices and Inventory Values icon to receive the following
data. You can use the arrows to switch between periods.
Values after price
determination Previous posting
period(current month)
Current posting
period(next month)
Period status: Price determined single-level
Period opened
S price: MXN 5.00 MXN 5.00
V price: MXN 6.50 MXN 6.50
Price control: S S
Inventory value: MXN 250 MXN 250
Inventory value MXN 325 MXN 325
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 223/304
(C) SAP AG AC530 6-56
(statistical):
The price calculated through material price determination is updated as the
V price in the material master and the material ledger.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 224/304
(C) SAP AG AC530 6-57
2-2-5 Distribution of Price Differences
ACT/ML: Material Ledger→ Material price analysis
Material: ACT-LCD-##
Plant: 6000
Period/Year: Previous period (current month)/current yearOpen the category Consumption:
Price differences Price
Category Cumulative inventory: MXN 1,500 MXN 6.50
Category Consumption: MXN 1,425 MXN 6.50
The line Not Allocated: MXN 1,425 MXN 0.00
Process category Production: MXN 0.00 MXN 5.00
Process category Cost center : MXN 0.00 MXN 5.00
Category Ending inventory: MXN 75 MXN 6.50
What does the line Not included mean?
The price differences that cannot be settled to consumption are written in
the line Not included . No revaluation of higher material levels takes placein single-level material price determination. For this reason, all price
differences of consumption have not yet been assigned to the individual
process categories, in other words, have not yet been distributed.
2-2-6 Documents for Price Determination
No accounting document is written for the price determination document, because no postings are carried out during material price determination.
All calculations of material price determination are only statistical.
2-3 General Ledger Account Balance before Closing Entry
2-3-1 Account Determination for Price Difference Account
IMG:→ Materials Management→ Valuation and Account Assignment
→ Account Determination→ Account Determination without Wizard →
Configure Automatic Postings
Execute and close the dialog box by canceling. Click on the button
Account assignment, open the line Cost (Price) Difference PRD, INT
Chart of accounts
Account Determination MM - Activity PRD
Material Valuation class Account/
debit
Account/ credit
ACT-LCD-## 3000 231000 281000
ACT-BCD-## 3000 231000 281000
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 225/304
(C) SAP AG AC530 6-58
ACT-DCD-## 7920 231500 281500
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 226/304
(C) SAP AG AC530 6-59
2-3-2 Account Balance for Raw Materials
Accounting→ Financial Accounting→ General Ledger→ Account→
Display Balances
Enter both accounts 231000 and 281000, using multiple selection, select
using company code 6000 and the current fiscal year. The account balance
depends on the number of participants and can, therefore not be given as asolution.
2-3-3 Line Item Overview
Double click on the field balance in the column for the current period.Then choose layout G/L Account Standard . The following document types
were posted to the account
Document type for posting • WE (goods receipt)
• RE (invoice)
2-3-4 Account Determination MM - Activity PRY
IMG:→ Materials Management→ Valuation and Account Assignment
→ Account Determination→ Account Determination without Wizard →
Configure Automatic Postings
Execute and close the dialog box by canceling. Click on the button
Account assignment, open the line Cost (Price) Differences (MaterialLedger), INT chart of accounts.
Account Determination MM - Activity PRY
Valuation class Account
No differentiation 231520, 281520
2-3-5 Display the account balances:
Accounting→ Financial Accounting→ General Ledger→ Account→
Display Balances
Enter the account, select company code 6000 and the current fiscal year.
Account Current period account balance
231520 and 281520 MXN 0
(unless the instructor has performed a closing entry!)Activity PRY is only used during the closing entry for the material ledger.As no closing entries have been made, no postings have occurred for the
current month.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 227/304
(C) SAP AG AC530 6-60
2-4 Making Closing Entries for Your Labels (with Revaluation)
2-4-1 Make the closing entries for your labels. Use the following data:
ACT/ML: Periodic Material Valuation→ Post Closing
Material ACT-LCD-##
Plant 6000
Period/fiscal year Previous posting period
Revaluate material X (yes)
Revaluate consumption No
Select CO account assignment No
Background processing No
Test run No
Save log Yes
Execute.
2-4-2 Through the closing entries, the material receives the status Closing entry
performed .
2-4-3 Material master: In the material ledger display, click on the Material
Master icon. This takes you to the Accounting 1 view. Fill out the
following table:
Previous
posting period
Current
posting
period
Change through
closing entry
Yes/no?S price MXN 5.00 MXN 5.00 No
V price: MXN 6.50 MXN 6.50 No
Price control V S Yes
Stock value: MXN 325 MXN 250 Yes
Value per unit
price
MXN 325 MXN 325 No
The price control for the previous period was changed during the closing
entries. In the previous posting period, the material now has price control
V . The material is valuated with the periodic unit price of this posting
period. The standard price is not changed through the material ledger closing entries in any of the periods.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 228/304
(C) SAP AG AC530 6-61
2-4-4 Closing document:
If you specify that the material inventory should be revaluated, the
following postings take place:
1. The sum of the price and exchange rate differences for the endinginventory is posted to the balance sheet account to revaluate the
inventory of the closed posting period 1 in line with the calculated periodic unit price for posting period 1.
2. The differences for consumption initially remain on the correspondingdifference accounts. In multilevel material price determination, you
can adjust the portion of consumption that was used for the productionof other materials.
To see these postings, click on the Closing document icon in the material
ledger display. Next, click on the Accounting Documents icon and open
the accounting document with the lowest document number. ChooseGoto – Display as List – and then layout 530 Demo.
Posting date Last day of previous posting period
Account Activity Amount
300000 Raw materials 1 BSX MXN 75
281520 ML price differences PRY (-) MXN 75
280000 Exchange rate difference KDM MXN 0
The price differences for activity PRD (231000) are not posted by the
closing entry in the material ledger, instead the account for activity PRY
(281520) is used.2-4-5 Account Balance for Activity PRY
Accounting→ Financial Accounting→ General Ledger→ Account→
Display Balances
Enter the accounts 231520 and 281520, select via company code 6000 and
the current fiscal year.
Document type for posting:
ML - Material Ledger
2-4-6 Distribution of Price Differences
Accounting→ Financial Accounting→ General Ledger→ Account→
Display Balances
Complete the following sentence:
Of the periodic price difference amount of MXN 1.500 posted MXN 75
could be assigned to the period close inventory of the raw materials. The
remaining price difference amount of MXN 1.425 is consumed by the
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 229/304
(C) SAP AG AC530 6-62
material quantity used during the period and remains in single level actual
costing as price differences.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 230/304
(C) SAP AG AC530 6-63
2-4-7 The inventory postings in posting period 2 are automatically reversed so
that the material valuation in posting period 2 is left unchanged.
Posting date First day of current period
How do you explain this second posting?
The second posting causes the beginning inventory to be valuated again atstandard price for accounting purposes. If the standard price is identical in
both periods, the second document contains the same values as the firstdocument but with the opposite sign.
2-4-8 Information system: Period status of materials
ACT/ML: Information System→ Object List→ Materials by Period
Status
Selection: All materials that start with ACT*.
Period status of the labels (ACT-LCD-##): Closing entry completed.
2-4-9 Reversal of closing entries ACT/ML: Periodic Material Valuation→ Post Closing
Material ACT-LCD-##
Plant 6000
Period/fiscal year Previous posting period
Revaluate material X (yes)
Background processing No
Test run NoSave log Yes
Reverse with:
Menu: Closing Entry→ Reverse
Call up the period status report again for your material ACT-LCD-##.Your material now has the status Closing entry reversed .
3 Period-End Closing in the Material Ledger (Multilevel Actual Costing)
3-1 Multilevel Actual Costing: General Data for the RunCosting run:
ACT/ML: Actual Costing→ Edit Costing Run
Costing run: AC530, previous posting period.
Under General Data:
Plant 1 6000
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 231/304
(C) SAP AG AC530 6-64
Plant 2 6100
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 232/304
(C) SAP AG AC530 6-65
3-2 Multilevel Actual Costing: Process steps:
3-2-1 Selection: Line selection, create/edit column (Note: Update the status data
by clicking on the button Execute directly).
Number of selected materials 128
The system selects all materials that have price determination controlsingle/multilevel (3).
3-2-2 Parameters: Single-level price determination line, icon in the first parameters column
Prices against which you can check:
Price 1 Standard price in posting period
Price 2 Periodic unit price in previous posting period
3-3 Multilevel Actual Costing: Costing Results3-3-1 Select the view Costing run overview and the hierarchy setting Costing
run/level/cycle number .
Level Number of Assigned Materials
Level 0
Level 1
Level 2
Level 3
Depends on the number of course
participants
First, all materials are selected (see process steps below) that have price
determination control 3. All of these materials are assigned to a level.
Level 0: All selected materials for which no goods movements took placeduring the posting period.
Level 1: All selected materials for which goods movements took placeduring the posting period that were not procured on a multilevel basis.
Multilevel procurement exists when other materials are entered into a
material.
Remaining levels: All selected materials that were procured on a
multilevel basis. For example, the demo CDs in plant 6000 are procured on a multilevel basis because input materials are used in their production.
The demo CDs in plant 6100 are assigned to a higher level because they
were procured from plant 6000. For this reason, the demo CDs in plant6000 represent a lower level.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 233/304
(C) SAP AG AC530 6-66
3-3-2 Participation in costing
Hierarchy: Costing run/plant/material type/valuation class/origin group
Use the Display Legend icon to display the meanings of the status icons.
Level Material
type/number
Status of
single-levelsettlement
Status of
multilevelsettlement
Status of
closingentry
Finished
product
Successful Successful Successful
Semi-
finished product
Successful Not
implemented
Successful
Plant
6000
Rawmaterials
Successful Notimplemented
Successful
Plant
6100
Finished
product
Successful Successful Successful
3-3-3 Material list: The material list shows information on the selected materials, while the hierarchy only displays the data on a summarized
level.
Select the top hierarchy node (the number of the run) and click on the iconfor the material list (on the left). Choose the following from the dropdown
list:
Display material list with filter→ Materials with goods movements
Maximizing of the material list display: The icons Hide hierarchy and
Increase size.
Status of your materials:
Material Status of
single-level
settlement
Status of
multilevel
settlement
Status of
closing
entry
ACT-LCD-## Successful Notimplemented
Successful
ACT-BCD-## Successful Not
implemented
Successful
ACT-DCD-## (6000) Successful Successful Successful
ACT-DCD-## (6100) Successful Successful Successful
3-3-4 Layouts: Transaction data
Click on the layout icon in the material list and select Transaction data (/MOVEMENTS). The material with the highest receipt quantity appears
at the top of the list.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 234/304
(C) SAP AG AC530 6-67
3-3-5 Layouts: Price analysis
Choose the variant Price Analysis. The materials are sorted according to
the size of the relative variances between the periodic unit price and thestandard price.
(You will receive the figures shown in the table if you have carried out the
exercises exactly. If you have posted other quantities or values, thefigures may be different.)
Material Standardprice
Periodic unitprice
Absolutevar.
Relativevar.
ACT-DCD-##
(6100)
MXN 20.00 MXN 29.45 MXN 9.45 47.25 %
ACT-DCD-##
(6000)
MXN 21.60 MXN 29.45 MXN 7.85 36.34 %
ACT-LCD-## MXN 5.00 MXN 6.50 MXN 1.50 30.00 %
ACT-BCD-## MXN 10.00 MXN 12.50 MXN 2.50 25.00 %
3-3-6 Cause of the price differences
In the column Material in the material list, double-click on your demo CD
in plant 6100. This takes you to the Material Ledger display. Chooselayout Single- and multilevel price differences through the corresponding
icon.
In the line Cumulative inventory:
Cumulated Price Differences
Single-level MXN 160Multilevel MXN 785
Open the category Receipts and the process category Stock Transfer .
Double click on the document for multilevel material price determination
( Receipts from lower levels).
Origin of multilevel price differences
Input material with multilevel price differences:
ACT-DCD-## / plant 6000
All price differences from plant 6000 that were attributed to the demo CD
in plant 6100 are multilevel price differences. To analyze how the price
differences in plant 6000 arose, you must switch to the material ledger
display in plant 6000: Use the green arrow to return to the costing run. Inthe column Material in the material list, double-click on your demo CD in
plant 6000. This returns you to the material ledger display again.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 235/304
(C) SAP AG AC530 6-68
3-3-7 Evaluated Quantity Structure (Multilevel)
Change to the display for ACT-DCD-## in plant 6000. Select the Evaluated Quantity Structure icon and then base quantity: 1 pc.
Resource Difference
1. CD Blank MXN 2.81
2. Label for CD MXN 1.69
3. CD Recording MXN 1.14
4. CD Labeling MXN 0.39
3-3-8 From the material price analysis (CKM3), call up the closing document for
one of your materials in plant 6000.
Material Consumption price differences
ACT-LCD-## MXN 75
ACT-DCD-## MXN 4,710
3-3-9 Now select the FI document from the closing document, select Select
Accounting Documents and layout /530 Demo.
Account for transaction key COC: 231099
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 236/304
(C) SAP AG AC530 7-1
© SAP AG 2003
z Integrated Profitability Analysis in CO-PA
z Price Update
z Production Startup
z Alternative Valuation Run
Contents:
Special Functions
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 237/304
(C) SAP AG AC530 7-2
© SAP AG 2003
z Set up an integrated connection to CO-PA andanalyze the prof itabili ty reports.
z Describe the update of future prices.
z Describe the extended options such as thealternative posting run
z Prepare and execute production startup for the
material ledger.
At the conclusion of this unit, you wil l be able to:
Special functions: Unit Objectives
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 238/304
(C) SAP AG AC530 7-3
© SAP AG 2003
z Once you are familiar with the functions of thematerial ledger, you examine the extendedfunctions that you can implement in Customizing.
z You also see the settings required to transfer calculated actual costs to profitability analysis, andto include the costs as actual costs of sales.
Special Functions: Business Scenario
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 239/304
(C) SAP AG AC530 7-4
© SAP AG 2003
Course Overview
Fundamentals of Material Valuation
Design and Purpose of the Material Ledger
Recording Business Transactions
Structured Value Chains
Period-End Close in Actual Costing
Special Functions
AC530 Actual Costing/Material Ledger
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 240/304
(C) SAP AG AC530 7-5
© SAP AG 2003
Profitability AnalysisProfitability Analysis
Actual Cost ing and CO-PA Integration
Profitability segment
COCOPCPC
Plan CostComponent Split
Material valuationduring the period
Actual Co stComponent Split
Optio nal Revaluationat Period clo se
Financial AccountingFIFI
Standard Cost Estimate Actual Cost ing/Material Ledger
Mat Lohn AfA GKZ Mat Lohn AfA GKZ
COCOPAPA
Customer order
In Financial Accounting goods movements (for example sales) are valuated with the standard price. In
Profitability Analysis the billing documents are normally valuated with the cost component split for
the standard price (Target costs: Actual quantity * planned costs).
Actual costing in the material ledger calculated the actual costs for the finished products (or other
materials). Actual costs are determined periodically, and contain all follow-up costs and lower level
material components.
As the actual cost component split already contains the variances for all materials, it is no longer
necessary to subsequently allocate the production variances to the results each month. You can use a
periodic revaluation with actual cost component split to analyze actual costs.
As with the cost component split for planned costs, CO-PA can decide for the actual cost component
split whether, a main or auxiliary cost component split will be used for the valuation. This allows the
actual cost component split to use the actual prices for the cost center (Primary Cost ComponentSplit).
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 241/304
(C) SAP AG AC530 7-6
© SAP AG 2001
Customizing CO-PA: Actual Cost ing Assignment
CO-PA access to actual costing/material ledger:Define valuation view Transfer cost
Transfer Main or auxiliary cost component split component split
Ass ign value fields for transfer of average price and average price
Assign Cost ing Key to Material TypesPoint of valuation Activity Material type02 Periodic revaluation Billing FERT02 Periodic revaluation Billing HALB... ... ...
Assign Value Fields Cost Component Structure MLPoint of Val. Cost component Fix/Var.... In value field02 Periodic revaluation 10 Raw materials Variable 100 Material Costs Actual variable02 ... 20 Fixed Salaries Fix VV120 Personnel Costs Actual Fix... ... ...... ... ...
C o s t c o m p o n e n t
s t r u c t u r e a s i n
s t a n d a r d c o s t
e s t i m a t e
A c t u a l c o s t c o m p o n e n t s p l i t
a c t i v e :
Access to the periodic unit price and the actual cost estimate in the material ledger is defined by
maintaining the costing keys. Valuation of your sales quantities using the periodic unit price/actual cost
estimate, usually takes place in CO-PA within a periodic revaluation at period close.
This assignment determines for which point of valuation, which activity type and for which plan version
the specific product costing (decided through the costing key) for a material type will be read.
The value fields for an operating concern can be assigned to the individual components of the relevant
cost component structure for actual costing using the assign value fields function. It is important to note
that the value fields must be assigned separately for each point of valuation in profitability analysis.
It is possible to differentiate between variable and fixed cost portions when transferring the costcomponents to profitability analysis.
More than one cost component can be included in a single value field for each cost estimate (N:1
Relationship). The values from the cost components are then cumulated and transferred to profitability
analysis.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 242/304
(C) SAP AG AC530 7-7
© SAP AG 2001
Period Close in CO-PA
Periodic Revaluation in CO-PA menu:Time Point 02: Periodic Revaluation
From Period 003.2001To Period 003.2001
Activity types Order Settlement
Test run Al l value fi elds modifi able
Selection Criteria Value Fields
Own value fieldsor
Delta documents(old value fields)
Characteristic for Revaluation- Customer *- Article *- Column *... *
Periodic valuation enables you to select actual data that has already been posted, and revaluate it using a
self defined valuation strategy for the point of valuation 02 (Periodic Revaluation - Act). This can be
applied for activity types A (Customer order receipt), F (Billing data as well as for all user defined
activity types.
For example, periodic revaluation allows you to revaluate line items, that were posted in profitability
analysis at the start of the period using the standard cost of goods manufactured, using actual costs or the
actual cost of goods manufactured. The difference between the original value of the line items and the
newly determined value is updated as Delta in a new line item. If periodic valuation is carried out more
than once for a line item, a new delta line item will only be created if a difference occurs. The updated
values from the periodic valuation can be seen in the Information System.
Alternatively, if you use the valuation with material cost estimate, you also have option to explicitly
display the periodic values along side the original values. In order to do this you must create your own
value fields, in which the values of the periodic valuation can be stored. In theory it is also possible to
recalculate values that were determined outside of the valuation in CO-PA. On the other hand this
means that, quantity and value fields used, according to the value field assignment for the SD interface,
to transfer sales orders and billing documents remain unchanged.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 243/304
(C) SAP AG AC530 7-8
© SAP AG 2003
Actual Cost of Sales in Profitabili ty Contribution Margin Analysis Actual costs broken down into cost components Target/Actual Variances
Profitability Reports in CO-PA
Target Actual Var. % Abs. var.
Revenue: $100,000
Quantity sold: 1,000 PC
50,000 45,000 5,000 10 %Material cost s
4,000 5,000 -1,000 - 25 %Production costs
4,000 4,500 - 500 - 13 %Variable labor costs
10,000 7,000 3,000 30%Process costs5,000 5,500 - 500 - 10 %Material OH
6,00027,000 33,000 22 %Contribution margin I
10,000 10,000 0 0 %Fixed labor costs
7,000 7,000 0 0 %Fixed production costs
10,000 16,000 6,000 60 %Contribution margin II
The goal of cost of sales accounting is to display the costs for the quantity sold, divided up into useful
sections.
The planned costs of goods sold for a material is determined in product cost planning. You can access
the cost of goods sold from Product Cost Planning in Profitability Analysis within the valuation.
In Customizing, you can determine which cost estimates from product cost planning are used for the
valuation of actual or plan data in profitability analysis. To do this you have to define a costing key. The
costing key characterizes a specific set of access parameters, which are used to control access to the
costing data from product cost planning during the valuation.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 244/304
(C) SAP AG AC530 7-9
© SAP AG 1999
Maintain future price
Material li st
Material Plant Level S price Per.unit price % var.
ACT-BCD00 6000 1 750.00 745.00 -0.67 ACT-LCD00 6000 1 25.00 26.50 6.00
ACT-DCD00 6000 2 1177.50 1429.50 21.40
ACT-DCD00 6100 3 1250.00 1177.50 -5.80
...
Costing run
Manual maintenance
Selection according to...- Plant- Material type- Material numbers...
Future date
Rules
Manual individualmaintenance
Future valuation price
$...
from 1.1...
o r
Through the function Marking, the new future valuation prices are updated in all currencies or
valuations in the material ledger data.
To mark the calculated moving prices (V) as the valid valuation prices for future periods, you can either
mark an entire costing run or individual materials.
Through individual maintenance, you select the materials whose future valuation prices you want to
maintain (for example, all raw materials). If you want to maintain or control the future valuation prices
manually, set the indicator Manual individual maintenance. Otherwise, the future valuation prices
calculated by the system are used. In addition, enter the date for which the future valuation price should
be valid. Under Rules, you can specify the criteria for determination of the future valuation price for
each currency or valuation:
y The currency and/or valuation from which the translation should take place
y The existing price from which the translation should take placey The date and exchange rate type with which translation should take place (only with different
currencies)
y The factor by which the result should be multiplied (for example, with a factor of 0.5 the price will be
reduced by half)
If you have set the indicator Manual individual maintenance, check the new future prices and the
respective date and change anything if necessary. After choosing Save, you receive information on the
price change.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 245/304
(C) SAP AG AC530 7-10
© SAP AG 2001
Releasing Prices
Futurevaluation price
backgroud processing Tolerances can be set
Dynamic pr ice release- activate for each valuation area
Manual ReleaseSelection according to ...
- Plant
- Material type- material numbers
...
CurrentStandard Price
first goods movement/material
from 1.1...
During the release, the system updates the valid future prices in the respective currencies or valuations as
the current standard prices. If necessary, the relevant stock quantity is revaluated. The prerequisite is
that planned prices exist in the system that are valid for the time period. If such valid planned prices are
not available, the former valuation price is still used. The following additional prerequisites exist for
materials with material price determination 3. The status of the material ledger data for the current
period must be Period opened or Price change effected. This means that no goods movement, invoice or
order settlement have been posted after the period-end closing program. In addition, the closing entries
for material price determination have not yet been made.
In addition to this, in Customizing, you can specify for each valuation area that a planned price is
released as the valuation price with the first goods movement in a new period if the validity date of the
planned price is attained. This dynamic price release is useful if it is, from an organizational point of
view, difficult for you to release the planned prices between the period closing program and the first
goods movement. In this case, use the dynamic price release so that the materials that were moved in
this period of time are valuated with the new price. Nevertheless, you must release the planned prices
before the end of the period for materials not moved in this period of time. A dynamic price release
takes place with order settlements, the entry of an invoice and every goods movement of a material. You
should, therefore implement both the dynamic price release and the conventional price release
methods.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 246/304
(C) SAP AG AC530 7-11
© SAP AG 2003
Customizing: Material Ledger/Actual Costing
Material Ledger Typefor each valuation area
Activate Actual Costingfor each valuation area
Material PriceDetermination(new materials)
Transaction-
based
Single/multilevel
Activate Material Ledger for each valuation area
Material Ledger
Maintain ML Number Ranges
Activate Dynamic Price Changes(optional for each valuation area)
Al ternative Update Structure(optional for each valuation area)
Production Startup...
Assigns currencies and valuationsStandard: Transfer FI/CO (0000)
Optionalactivity type update
No
Yes, quantities
only
Yes, w/ act.prices
Acti vating CostComponent Structures
The first step is to activate the material ledger. If you activate the material ledger for a given plant, you
should also activate it for all other plants in the company code. This assures proper reconciliation of
accounts between financial accounting and materials management.
You use material price determination to control whether material prices are determined on a
transaction basis or a single-level/multilevel basis. You can define a default value or a mandatory value
with which the materials to be created are valuated. Make sure that all materials have transaction-based
price determination after production startup. You can change the material price determination and the
price control of the relevant material or materials in the material master and in the material ledger data.
The next step is to create material ledger types and assign a maximum of three currency types to
each of these material ledger types. The standard system contains material ledger type 0000, which uses
the currency types from Financial Accounting.
Check whether the ML number ranges meet your requirements. Check whether the document type ML
supplied in the standard system for material ledger documents is maintained. Check whether the number
ranges of the accounting documents are maintained. In the standard system, the number range starting
with 47 is intended for accounting documents for material ledger documents. A group for material ledger
documents exists for each relevant transaction type in the standard system. Each group is assigned a
number range of 100,000,000 numbers. It is generally not necessary to add new groups.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 247/304
(C) SAP AG AC530 7-12
© SAP AG 2001
In the Material Ledger menu (Uti lit ies)
Creates Material Ledger master records
Calculates Material Ledger stock values from
FI stock values (2nd and 3rd currency)
Sets ML indicators in all material master records
Sets the material price determination indicator in material
master records for 2nd currency (can be changed in 3rd)
Fixes the currencies used
Sets the productive indicator
Production Startup
Production StartupProduction Startup
Before production startup, you should have completed and checked all preparation work. From an
organizational point of view, make sure that no material postings are necessary during conversion in the
relevant plants during conversion. Between activation and production startup, the relevant plants are
locked. Please read note 108374 about resetting data for production startup of the material ledger.
The production startup function prepares data for the material ledger.
After production startup of the material ledger, you cannot change the currencies, currency types and
material ledger types. Ensure that the material type attributes are correct in Customizing for Logistics -
General. Conversion is only possible for materials that have a material type that allows the update of
values. In Customizing, ensure that all valuation areas in which you want to use the material ledger are
flagged as active for the material ledger. Additional valuation areas can be set subsequently as active and
productive. From an organizational point of view, ensure that the accounting view for the relevant
material has been created in the material master record. If you worked with the material ledger in your production system prior to Release 4.0A, read note
0081463 in the OSS system.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 248/304
(C) SAP AG AC530 7-13
© SAP AG 2003
The Idea Behind the Alternative Valuation Run
In addition, up to 999 alternative valuation runs can be created for
each periodic actual costing run.
z Simulation on the basis of actual data by means of
Cumulation: Material prices based on time windows spanningmore than one period
Al ternative valuation: Cost accounting based on alternativevalue records for internal purposes
The alternative valuation run (AVR) is a tool foralternative costing based on the periodic actual quantitystructures. An AVR makes a copy of the actual data of selected periods. Each AVR performs calculations on itsown data copy. The main periodic calculation steps,single and multilevel price determination, are alsoavailable to the AVR. Unlike periodic actual costing, whichonly pertains to the special analysis of periodic data, theAVR can be used to analyze several related periods. Their quantity and value structure is summarized whilethe data is copied and thus lead to different results aftersingle or multilevel price determination.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 249/304
(C) SAP AG AC530 7-14
Unlike periodic actual costing, which only carriesoperational standard prices, the AVR offers alternativevaluation rules for determining material prices.
If in periodic costing the same periodic average price isused for valuating consumption and ending inventoryduring single-level valuation, the AVR permits alternativeallocation rules to allocate the differences to consumptionand ending inventory.
Finally, in the AVR the plants taking part in multilevelprice determination can be combined in an alternativeway to structure the periodic actual costing, thus allowingusers to get a full view of value chains that are brokendown in periodic costing, and a broken-down view of value chains that are end-to-end in periodic costing.
Up to 999 alternative valuation runs can be created foreach period. Each of these runs works on its own data
copy and administrates the results in its own data area.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 250/304
(C) SAP AG AC530 7-15
© SAP AG 2003
Uses
z Cumulation
Smoothing of seasonal or accidental periodic fluctuations
Minimizing the influence of work in progress, the periodassignment problem, beginning and ending inventories
Credits to cost centers even during months when orders did notsupply goods to stock
z Al ternative valuation
Support of alternative accounting policies under IAS, US GAAP,
HGB, etc.
Performing calculations wi th simulated prices as an alternative toperiodic actual costing
The results of an AVR provide information of a different nature than that of periodic costing. The
calculation of the AVR depends on the costing parameters set and is therefore indirectly subject to the
users' intention, who are likely to pursue their own costing purposes by setting parameters. Possible uses
of the cumulation function of the AVR include calculating year-based actual prices, minimizing the
problem of period assignment, smoothing seasonal fluctuations, including the (optional) crediting of cost
centers on the basis of activity consumption of the adjusted value added. Another possible use is the
analysis of the production volume for a whole fiscal year, and comparing such volumes for different
fiscal years.
The alternative valuation function of the AVR permits the use of parallel accounting standards with
alternative material prices and activity prices, for example under HGB, IAS, or US GAAP. Price
components for which legislation prohibits capitalization can be included in the calculation, and theeffects of changed wage costs on the value added of finished goods can be simulated. Depending on the
quantity structure, beginning inventories can also be deleted and the cost flow to production costs can be
restricted for a certain period.
This function of being able to include any other material prices as an alternative to standard prices for
valuation permits users to simulate the effect on the value added of changed raw material prices.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 251/304
(C) SAP AG AC530 7-16
© SAP AG 2003
Cumulation across time windows of any length
Period
1 2 3 4 5 6 7 8 9 10 11 12
Year to date
... Quarters
Time windows of any length can be cumulated. The same time windows can be cumulated in several
alternative valuation runs. In each AVR, the periods to be cumulated are defined from new and
independently of other costing runs. Time windows can straddle the fiscal year end. If material prices or
activity prices change in the course of a cumulation period, these price changes are taken into account
when the data is summarized. If there are price changes, the preliminary valuation within the AVR is
standardized to the price of the first cumulation period, unless the user specifies different standard prices
to be used.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 252/304
(C) SAP AG AC530 7-17
© SAP AG 2003
Cumulation of periods in AVR
120400200EI
3010050Co
150500250CUM140300150Re
10200100BI
Diff Vvalue
Quantity
JAN
40200100EI
80400200Co
120600300CUM
0200100Re
120400200BI
Diff Vvalue
Quantity
FEB
54600300EI
36400200Co
901000500CUM
50800400Re
40200100BI
Diff Vvalue
Quantity
MARCH
50600300EI
150900450Co
2001500750CUM
1901300650Re
10200100BI
Diff Vvalue
Quantity
CUM
January
February
March
Diff(CUM) := Diff( BI(Jan)) + Diff (Re(Jan-March))
200 := 10 + (140 + 0 + 50)
BI Beginning inventory
Re Receipts
CUM MI + Re or Co + EI
Co Consumption
EI Ending inventory
Several periods are summarized during data copy, and in the AVR the summarization is performed
during the cumulation step. Unless the user has defined specific rules, the summarization is performed as
follows:
The given beginning inventory of the first cumulation period is used as the beginning inventory (BI) of
the cumulation period .
The receipts (Re) of the cumulation period are the total of periodic receipts of all cumulation periods.
The cumulative inventory of the cumulation period is the total of cumulative beginning inventory and
cumulative receipts.
The quantity and preliminary value of consumption of the cumulation period is the total consumption of
all periods. The differences allocated to the consumption of consumption equal zero at the time the data
is summarized. They are calculated later, during single-level price determination in line with the
proportion between cumulative and consumed quantity.
The ending inventory (EI) of a cumulation period is the ending inventory quantity of the last period of
the cumulation period. The differences are set to zero during data summarization. They are calculated
later, during single-level price determination, in line with the proportion between cumulative and ending
inventory quantity.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 253/304
(C) SAP AG AC530 7-18
The cumulative ending inventory differences do not normally equal the ending inventory differences of
the last cumulation period. The reasons for this are complex. The above simple example explains the
difference as resulting from the simple fact that the proportion of consumed and ending inventory
quantity changes periodically and does not correspond to the cumulative proportion of 450 over 300 for
every period.
During data summarization, only the single-level differences, i.e. single-level price and exchange ratedifferences, are summarized. The multilevel differences are, however, set to zero and calculated later by
multilevel price determination.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 254/304
(C) SAP AG AC530 7-19
© SAP AG 2003
Cumulation ? Periodic average
Period 1 Period 21000
90KG 10KG
100900
100
10KG 90KG
9010
Product A Product B Product A Product B
Product A
1100
100 KG 100 KG
190910
Product B
Average (per. 1 & 2)
Product A
1100
100 KG 100 KG
550550
Product B
Cumulation (per. 1 & 2)
The differences on the cumulative inventories are not simply the sum of differences incurred in all
periods, but are determined from new on the basis of the cumulative quantity structure. In the above
example, the same material is used in the production of two different products. In line with the
cumulative consumption proportions of 1:1, the costs are allocated in equal proportions, and therefore
more evenly than in the periodic calculation. There product A (possible unfairly) carries most of the
costs incurred, because in the same period in which the highest usage costs were incurred, the goods
receipt of product A, which was decisive for the quantity, also occurred.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 255/304
(C) SAP AG AC530 7-20
© SAP AG 2003
Alternat ive valuation in AVR:
z Material valuation is controlled through the settings of thecosting run:
Alternative Prices:
Planned prices (CO Version > 0)
Periodic actual prices
Cumulated actual prices:
Different valuation between consumption and endinginventory via BADI BADI_ENDING_INV
Transfer of planned prices from material master or other
externally specified prices for f inal inventory valuation
Transfer of alternative cost component splits for endinginventory valuation
Call-up of BADI CKMLAVR_SIM to manipulate quantity andvalue structure (valuation and simulation)
Alternative valuations can be modeled using several settings. When creating an AVR, alternative prices
can be set for valuating the activity consumption. All plan prices known in cost center accounting are
available in addition to the periodic actual prices. But a plan price that is to be used in the AVR must be
available in all valuation views used for calculation in the material ledger and have been specified via
the material ledger type set. In addition the activities consumed can be valuated with cumulative actual
prices.
BADI BADI_ENDING_INV can be used to valuate the ending inventories with freely definable prices
as an alternative to the average price. Unless they are covered by the externally specified ending
inventory valuation, the cumulative differences are allocated to consumption and charged further during
price determination.
After data summarization, which is performed during the cumulation step, the cumulative data structure
can be modified by calling up BADI CKMLAVR_SIM. In this way, depending on the material type or
other criteria, alternative prices can be set for revaluating the cumulative inventories and for further
charging. In addition, the quantity structure can be reduced with this BADI, for example to remove
irrelevant beginning inventories, receipts or consumption from the calculation.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 256/304
(C) SAP AG AC530 7-21
© SAP AG 2003
You are now able to:
Special Functions:Unit Summary
z Set up an integrated connection to CO-PA andanalyze the prof itabili ty reports.
z Describe the update of future prices.
z Prepare and execute production startup for thematerial ledger.
z Implement extended Customizing options, such
as activity type updates and individual materialupdate structures.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 257/304
(C) SAP AG AC530 7-22
Special Functions: Exercises
Unit: Special Functions
Topic Results Analysis
At the conclusion of these exercises, you will be able to:
• Analyze the results of multilevel actual costing
• Customize CO-PA so that you are able to use the results of actualcosting effectively.
• Mark the calculated actual prices as future valuation prices
You have been asked to analyze the results of multilevel actual costing in
detail.
In addition, you will mark the calculated actual prices for the inputmaterials as valuation prices for the subsequent period.
As the cost component split is only known after the multilevel pricedetermination, these values have to be subsequently entered into CO-PA.
This occurs during periodic revaluation, which will be executed for you
by the course leader.
1 Multilevel Actual Costing: Integrated Analysis using Profitability Analysis (CO-PA)1-1 Contribution Margin Accounting in CO-PA
1-1-1 First call up the CO-PA report IDES 530 using the following parameters:
• Currency type 10
• Current period
1-1-2 The report shows you the contribution margin accounting for your demo
CD with target and actual values. Fill out the following table.
Target Actual
Quantity
Revenues:
Variable costs
Fixed costs
Total costs
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 258/304
(C) SAP AG AC530 7-23
2 Origin of the Target Values in Contribution Margin Accounting
2-1 How were the target values for contribution margin accounting determined?
________________________________________________________
________________________________________________________
2-2 From the CO-PA report, call up the standard cost estimate for your demo CD. Go tothe costs tab and set the base quantity for the displayed costs to the total cost of
sales quantity (see previous task). Now display the cost component and fill in the
following table:
Base quantity: As above (total cost of sales quantity)
Total variable costs:
Total fixed costs:
Total:
Compare the values in the standard cost estimate with those from CO-PA.
Go back to the CO-PA report.
3 Origin of the Actual Values in Contribution Margin Accounting
3-1 From the CO-PA report, call up the "Cost Component for Price" report.
Enter the following settings:
Period/year: Previous posting period
Currency/valuation: Company code currency
Type of price: Periodic unit price
Base quantity: User entry: Sales quantity (see above)
Fill out the following table.
Base quantity: As above (total cost of sales quantity)
Total variable costs:
Total fixed costs:
Total:
Compare the values in the standard cost estimate with those from CO-PA.
3-2 Customizing CO-PA for the Transfer of the Actual Cost Component Split
Go to Customizing for Profitability Analysis (CO-PA).
3-2-1 In the section "Define access to actual costing/material ledger": Which
costing key does CO-PA access to copy the actual data from the materialledger?
________________________________________________________
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 259/304
(C) SAP AG AC530 7-24
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 260/304
(C) SAP AG AC530 7-25
3-2-2 In the section "Costing Key →Material Types": Which costing key isused for the periodic revaluation IST?
___________________________________________________
3-2-3 In the section "Define Value Fields": Which value fields form the cost
element "material component" that is controlled by the cost componentstructure that we are using?
Operating Concern IDEA, Cost Component Structure ML
Point of valuation: Value field for materialcomponent
Actual data transfer - transaction-
based:
Periodic revaluation - actual:
3-2-4 CO-PA report AC530 is defined using form AC530. Check and see howthe line material component is defined in the form:
Value field for line material
component :
Value field for Material Component
cell (in Actual Data column):
4 Detailed Analysis of Actual Values in Contribution Margin Accounting
4-1 Material Prices
Contribution Margin Accounting shows you that the material price variances are
responsible for the highest contribution to your negative result. In the followingtasks, you will analyze the cause of these variances.
4-1-1 You are in the contribution margin report for your material (demo CD in plant 6000). Call up the material ledger display. Using the data, determine
why the demo CD has such large price differences.
Amount of price differences from receipts:
Price differences from purchase orders: MXN
Price differences from production: MXN
Which vendor can already be seen to be the cause of the high pricevariances?
________________________________________________________
4-1-2 Which of the two categories has single and multilevel price differences?Use the display variant Single- and multilevel differences.
________________________________________________________
Where do the single level price differences for this category come from?
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 261/304
(C) SAP AG AC530 7-26
________________________________________________________
Where do the multilevel price differences for this category come from?
________________________________________________________
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 262/304
(C) SAP AG AC530 7-27
4-1-3 What is the portion of single- and multilevel price differences from
production?
Single-level price differences / production MXN
Multilevel price differences / production MXN
Using the multilevel material ledger document, check which of the inputmaterials is of greatest significance for multilevel actual costing.
Multilevel price differences due to label: MXN
Multilevel price differences due to blank CD: MXN
4-1-4 In order to identify the source of the high price variances, call up the
material ledger display for the material component with the highest price
variances. Which vendor sold you the material at a high price?
Vendor Price
1096 / Fabricas Mixtli: MXN
1097 / Puebla Digital: MXN
1098 / Productos Argentinos: MXN
1099 / Studio Chapultepec: MXN
You have identified both vendors that are directly and indirectly
responsible for the high price of your finished product, and can now takeappropriate action.
4-2 Actual Values from Cost Center Accounting
Contribution Margin Accounting shows you that the wages and salaries variancesare the second largest contributor to your negative result.
4-2-1 Call up the report to analyze the plan/actual variances for your cost center.Make the following entries:
Controlling area: 6000
Period/fiscal year: Previous posting period
Plan version: 0
Cost center (value): CC530-##
Cost element: No entry
Analyze the actual cost variances: Which cost element has particularly
large variances between plan and actual?
________________________________________________________
4-2-2 Under which cost element has the material ledger balanced the cost center
in actual?
________________________________________________________
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 263/304
(C) SAP AG AC530 7-28
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 264/304
(C) SAP AG AC530 7-29
5 Maintain Prices
5-1 Scope of the exercise
In this exercise, you will maintain the future price for both of your input materials.
These prices can no longer be released in the current period. Why?
_________________________________________________________
_________________________________________________________
5-2 Maintenance of the Future Valuation Price of Both of Your Input Materials
Call up price maintenance from the material ledger menu. Make the following
entries:
Materials ACT-LCD-## and ACT-BCD-##
Plant 6000
Manual individual maintenance X (yes)
Date of the future price First day of the month after nextClick on the Maintain Rules icon. Make the following entries:
Use Periodic unit price
In currency/valuation: Company code currency
Conversion date Today's date
Exchange rate type M
Additional factor 1.00000
What does the setting “Use: Periodic unit price” mean?
_________________________________________________________
_________________________________________________________
_________________________________________________________
5-3 Save your entry and check the result.
Go into the material ledger display for one of the two materials look at theadditional data. Has the future valuation price been maintained? Also check the
material master after this entry ( Accounting 1).
6 Value Flow Monitor
In the info system of the material ledger, call up the Value Flow Monitor report for all
materials in company code 6000 last period.
Write down the distribution of price differences for each valuation class.
Valuation class Cumulative RoC Allocated Ending Inv
3000 __________ ______ _________ _____
7900 __________ ______ _________ _____
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 265/304
(C) SAP AG AC530 7-30
7920 __________ ______ _________ _____
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 266/304
(C) SAP AG AC530 7-31
Special functions: Solutions
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 267/304
(C) SAP AG AC530 7-32
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 268/304
(C) SAP AG AC530 7-33
Unit: Special Functions
Topic Results Analysis
The following menu paths are used in the solutions:
ACT: Accounting→ Controlling→ Product Cost Controlling→
Actual Costing/Material Ledger
IMG: Tools→ Customizing→ Edit Project→ SAP Reference IMG
1 Multilevel Actual Costing: Integrated Analysis using Profitability Analysis (CO-PA)
1-1 Contribution Margin Accounting in CO-PA
1-1-1 CO-PA Report IDES-530
Controlling→ Profitability Analysis→ Information System→ Execute
Report (Operating Concern IDEA, Costing-based Profitability Analysis)
Choose Report IDES-530
Currencytype
10
From/to period
Current period
1-1-2 The report shows you the contribution margin accounting for your demo
CD with target and actual values. Fill out the following table.
Target Actual
Quantity:
Revenue:
Variable
costs:
Fixed costs:
Totalcosts:
(Write down the costs here:)
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 269/304
(C) SAP AG AC530 7-34
2 Origin of the Target Values in Contribution Margin Accounting
2-1 The target values are determined through the valuation of the sales quantity at plan
price.
2-2 Determining the Target Values
From the CO-PA report, call up the standard cost estimate for your demo CD,
and complete the following data:
Material: ACT-DCD-##
Plant: 6000
Costingvariant:
PPC1
Costingversion:
1
Valid from: Today
In the upper right-hand section of the interface, select the "Costs" tab and enter the
quantity used (600 pieces) in the "User entry" field.
Base quantity:
Total variable
costs:
Total fixed
costs :
Total:
The values equal the target values in CO-PA.
Go back to the CO-PA report.
3 Origin of the Actual Values in Contribution Margin Accounting
3-1 From the CO-PA report, call up the "Cost Component for Price" report.
Enter the following settings, if required:
Period/year: Previous posting period
Currency/valuation: Company code currency
Type of price: Periodic unit price
Base quantity: User entry: Sales quantity (see
above)
Fill out the following table.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 270/304
(C) SAP AG AC530 7-35
Basequantity:
Total
variablecosts:
Total fixed costs :
Total:
The values equal the target values in CO-PA.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 271/304
(C) SAP AG AC530 7-36
3-2 Customizing CO-PA for the Transfer of the Actual Cost Component Split
The Customizing entries for the following questions are found under the following
menu nodes:
IMG: Controlling→ Profitability Analysis→ Master Data→ Valuation
3-2-1 Define access to actual costing/material ledger:
IMG: ...→ Set Up Valuation using Material Cost Estimate→ Define
Access to Actual Costing/ Material Ledger
For actual costing, CO-PA accesses the costing key ACT, whereby the
data from the legal valuation is transferred.
3-2-2 Costing Key → Assign Material Types
IMG: ...→ Set Up Valuation using Material Cost Estimate → Costing
Key→ Assign Material Types
Point of Valuation 02: Costing key ACT is used for all activities and
materials.
3-2-3 Assign Value Fields
IMG: ...→ Set Up Valuation with Material Cost Estimate → Assign
Value Fields
Operating Concern IDEA, Cost Component
Structure ML
Point of valuation:
Value field for materialcomponent
Actual datatransfer
Transaction-
based BZ 01
VV150(Total from fixed andvariable amounts)
Periodic
revaluation -
actual
BZ 02
VV151(Total from fixed and
variable amounts)
3-2-4 Form AC530 for CO-PA Report
IMG: Controlling→ Profitability Analysis→ Information System→
Report Components→ Define Forms→ Define Forms for Profitability
Reports
Choose Display Form, and the select Form IDES 530.
Double Click on the material component field, a dialog box appears that
shows the value field displayed in the line.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 272/304
(C) SAP AG AC530 7-37
Value field for line
material
component :
Value field VV150
material
component
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 273/304
(C) SAP AG AC530 7-38
In the same line, double click on the actual value field. In the first dialog box you see that this value field is different to the one defined for the line.
Confirm. You now see which value field is read for this report field:
Value field
for material
component cell (in Actual Data column):
Value field
VV151
MaterialComponent
ACT
4 Detailed Analysis of Actual Values in Contribution Margin Accounting
4-1 Material Prices
Contribution Margin Accounting shows you that the material price variances are
responsible for the highest contribution to your negative result. In the following
tasks, you will analyze the cause of these variances.4-1-1 You are in the contribution margin report for your material (demo CD in
plant 6000). Call up the material ledger display. Using the price
determination structure, determine why the demo CD has such large pricedifferences.
Amount of price differences from receipts:
Price differences from purchase orders:
MXN
Price differences from
production:
MXN
Which vendor can already be seen to be the cause of the high price
variances?
Vendor 1099 (Studios Chapultepec) delivered at a price of MXN _____
and caused a price variance of MXN _____.
4-1-2 Which of the two categories has single and multilevel price differences?
Use the display variant Single- and multilevel differences.
Category "Production" has single and multilevel price differences.
Where do the single level price differences for this category come from?
The single-level price differences for production come from order
settlement.
Where do the multilevel price differences for this category come from?
The multilevel price differences come from the material component price
variances during the manufacturing process.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 274/304
(C) SAP AG AC530 7-39
4-1-3 What is the portion of single- and multilevel price differences from
production?
Single-level price differences / production
MXN
Multilevel price differences / production
MXN
Using the multilevel material ledger document (receipts from lower
levels), check which of the input materials is of the greatest significance
for multilevel actual costing.
Multilevel price differences due tolabel:
MXN
Multilevel price differences due
to blank CD:
MXN
4-1-4 In order to identify the source of the high price variances, call up thematerial ledger display for the material component with the highest price
variances. Which vendor sold you the material at a high price?
Vendor Price
1097 / Puebla Digital MXN
11
1098 / Productos Argentinos MXN14
You have identified that vendors Productos Argentinos and StudiosChapultepec are responsible for most of the price variances of your Demo
CD.
4-2 Actual Values from Cost Center Accounting
4-2-1 Plan/Actual Variances for Cost Center
Accounting→ Controlling→ Cost Center Accounting→ Information
System→ Reports for Cost Center Accounting→ Plan/ Actual
Comparisons→ Cost Centers: Actual/Plan Variances
Make the following entries:
Controlling area: 6000
Period/fiscalyear:
Previous posting period
Plan version: 0
Cost center
(value):
CC530-##
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 275/304
(C) SAP AG AC530 7-40
Cost element: No entry
Cost element 43000: Wages has particularly high variances. This confirmsthe result that you got from the contribution margin structure: High wage
and salary costs have had a negative effect on your results.
4-2-2 The cost center is credited under cost element 895000: Plant activity.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 276/304
(C) SAP AG AC530 7-41
5 Maintain Prices
5-1 No more price releases can take place in the current posting period. For materials
with price control 3, a standard price can only be changed if the material ledger hasnot updated any data yet.
5-2 Maintenance of the Future Valuation Price of Both of Your Input Materials
ACT/ML→ Material Ledger→ Set Prices→ Maintain Future Prices
Materials ACT-LCD-## and ACT-BCD-##
(Multiple selection, not the to/from
fields)
Plant 6000
Validity
date
Date entered manually: First day of the
month after next
Click on the Maintain rules icon and choose the tab for company code.
Use Periodic unit price
In
currency/valuation:
Company code currency
Conversiondate
Today's date
Exchange
rate type
M
Additional
factor
1.00000
Enter the same parameters for all three currencies.
The “Use periodic unit price” setting means that the future valuation price isdetermined from the periodic unit price in the respective currency. The columns for
currency conversion ( Translation date and Exchange rate) are only of meaning if
the price in one currency should be calculated into another currency.
The results of price maintenance are seen in the Manual individual maintenance
area. If necessary, you can overwrite these results.
Execute.
5-3 Results of Price Maintenance
Go into the material ledger display for one of the two materials and look at the
additional data. The future valuation price is updated with the price maintenancedata.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 277/304
(C) SAP AG AC530 7-42
6 ACT/ML→ Info System→ Object List Value Flow Monitor
Company code 6000
Period Previous
Execute materials All
Valuation class Cumulative RoC Allocated Ending Inv
___________________ __________ ______ _________ _____
___________________ __________ ______ _________ _____
___________________ __________ ______ _________ _____
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 278/304
(C) SAP AG AC530 8-1
© SAP AG 2001
Summary
Fundamentals of Material Valuation
Design and Purpose of the Material Ledger
Recording Business Transactions
Structured Value Chains
Period-End Close in Actual Costing
Extended Customizing and CO-PA Integration
AC530 Actual Costing/Material Ledger
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 279/304
(C) SAP AG AC530 8-2
© SAP AG 2001
Course Objectives
z Explain the possiblities and limits of traditional stockvaluation without the material ledger.
z Understand the purposes and structure of the materialledger.
z Explain how material price differences can flow into thestock value of products for which these materials wereused.
z Explain actual costing and the determination of the
periodic unit pri ce.z Carry out the postings for period-end closing in the
material ledger, including the revaluation of stocks withactual prices.
z Understand the integration of the material ledger with other SAP applications.
You are now able to:
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 280/304
(C) SAP AG AC530 8-3
© SAP AG 1999
Recommended Follow-Up Courses
z AC650 Transfer Prices
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 281/304
(C) SAP AG AC530 8-4
© SAP AG 1999
Recommended Follow-Up Activ ities
z Repeat the exercises! Use the IDES dataor your own data when doing so.
z Read the online documentation!
z Read the IMG documentation!
z Read the release notes!
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 282/304
(C) SAP AG AC530 9-1
© SAP AG 2003
z Addi tional slides for:
z Currency and Valuation Examples
z Details for determining the costing sequence for multilevel actual costing.
z Material Update Structure
z Allocation of consumption differences
z Manual Change of Actual Cost Component Split
z Details on AVR
Contents:
Append ix
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 283/304
(C) SAP AG AC530 9-2
© SAP AG 2001
Example for one single currency
US-Based GroupLocal currency
Requirements
nUS dol lars
Settings in FI
10: US dollars
Settings in CO
10: US dollars
Requirements
nUS dollars
Settings in FI
10: US dollars
Settings in CO
10: US dollars
Company in Detroit
Material Ledger
1 data record
Material Ledger
1 data record
Price / Material
10: USD 100
Price / Material
10: USD 100
Company in Chicago
Actual Costing Actual Costing
In this example, the group is based in the USA. The group consists of two companies. One company is
based in Detroit and the other in Chigago.
The headquarters must report in US dollars to comply with legal requirements in the United States.
As both companies are situated in the USA you only require one currency. Both companies and the
headquarters use the same valuation approach. This means that only one valuation appraoch is required.
In turn, this means that only one currency is required in the SAP Accounting and Controlling
components This currency will use currency type 10: Local Currency, Legal Valuation
In the material ledger, actual costing can be used to calculate actual costs for materials and if necessary
to revaluate for legal valuation.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 284/304
(C) SAP AG AC530 9-3
© SAP AG 2001
US-Based GroupLocal currency
Group valuationHard currency
Example for Mult iple Valuation
Requirements
nUS dol lars
nUS dol lars
Settings in FI
10: US dollars
31: US dollars
Settings in CO
10: US dollars
31: US dollars
Requirements
nMexican pesos
nUS dollars
Settings in FI
10: Mexican pesos
31: US dollars
40: US dollars
Settings in CO
10: Mexic anpesos
31: US dollars
Company in Mexico City
Material Ledger
2 data records
Material Ledger
3 data records
Price / Material
10: USD 10031: USD 90
Price / Material10: 800 MXN31: USD 9040: USD 110
Company in Detroit
Actual Costing Actual Costing
This slide shows a group of affiliated companies based in the United States. One company in the group
is in Detroit, while another is in Mexico City. As in the earlier example, the headquarters report in US
Dollar to comply with legal requirements of the United States.
To comply with the legal requirements of the United States, the company in Detroit reports in US
dollars. At the same time, the company reports to group headquarters which consolidates all its affiliated
companies. This consolidation currency is called group currency. All internal profits are illiminated
during consolidation. The resulting valuation approach is called group valuation.
The company in Mexico City must report in Mexican pesos to comply with legal requirements in
Mexico. Like the Detroit company, the Mexican company needs to prepare its financial statements both
to meet legal requirements and also to report to group headquarters. When it reports to group
headquarters, the company must use the group currency (USD). In addition, Mexican law requires to
report in a hard currency, due to inflation issues. In the SAP system, this means that both companies define their local currency as currency type 10
(Detroit: USD, Mexico: MXN). In addition to that, both companies define a Group currency at Group
Valuation (Currency Type 31), USD. The Mexican company defines a hard currency (currency type 40)
US Dollar).
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 285/304
(C) SAP AG AC530 9-4
© SAP AG 2001
Costing Run: Costing Sequence
...
...
...
...
Directed level
Cycle level
Directed level
Directed level
Cycle level
Directed level
When you determine the sequence, the system generates order in which the costing run will be
completed. This internal function is the first level of multilevel actual costing. The quantity structure is
determined from actual data collected from movements and operations in logistics (materials
management, production planning and so on).
The quantity structure is generated from actual data in order to fulfil the prerequisites of multilevel
actual costing. In contrast to the plan quantity structure the actual quantity structure contains objects
(materials, worklists, bills of materials,...) that were actually used during production. The quantity
structure tool uses the input data to create a process model, which contains materials, processes and
procurement and consumption alternatives. This process model is condensed to a predecessor/successor
model, which only contains relations (that is quantity flows) between materials. In a final step, the
predecessor/successor model is split up into a level model, which describes the sequence in which
materials have to be processed. The update of movements and operations for actual costing is controlled using the actual costing/material ledger controlling levels.
This results in a list of production levels (for example level 1 raw materials, level 2 semifinished goods
and so on) with hierarchical information about the respective materials. You can go to the material list
from the level overview, which allows you to display detailed information about the materials. From the
material list you can then directly access the material ledger data.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 286/304
(C) SAP AG AC530 9-5
© SAP AG 2001
Material Update Structure
PriceExchRt diff.Price diff.Prelim. valuationQntty
Beginning inventory
Receipts
Production
Purchase order
Processtypes
Categories
Procurement alternatives
Vendor A/6000
Vendor B/ 6000
....IR..
....GR...
(Rem.) Purchase order
Unspecified receipts for process type
Other receipts/consumpt ions
Other user-definablereceipts
P+: Other procurement
C+: Other consumption
Inventory
Consumption, labor
Naming rules
The material update structure determines which transactions are entered in which category of the
material ledger display. SAP recommends the use of the standard update structure.
Optionally, you can define your own material update structure. The data for the goods movements is
collected in different categories of the material ledger according to the material update structure.
Through your own naming rules, you can assign your controlling levels to a process category in order to
make further distinctions between specific transactions in the material ledger data than provided for in
the standard system.
If the process category represents a receipt, choose the category Receipts. The category Receipts has
an influence on the price. However, with process category B+ (procurement), you can also choose the
category Other receipts/consumptions in order to distinguish between such receipts in the material
update structure.
If the process category represents a consumption, you can decide whether the consumption should have an influence on the price. The category Other receipts/consumptions has an influence on the price;
the category Consumption doesn‘t. If you want to further distinguish between process categories that
represent a consumption, enter a movement type group for the material ledger. This only applies to
consumptions that are single-level.
A material update structure must contain at least the process categories B+ and V+.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 287/304
(C) SAP AG AC530 9-6
© SAP AG 2001
Define Material Update Structure
B+: Other Procurement
Other Receipts/Consumption
V+: Other Consumption
Inventory
Check Cost Center
Production
Purchase order
Vendor A/ 6000
Vendor B/ 6000
....IR..
....GR...
Purchase Order:
Beginning inventory
Receipts
PricePrice diff.Preliminary ValuationQuantity
Receipts only in categories- Receipts- Other R/C
Consumption only incategories- Consumption- Other R/C
Only:B+ ProcurementV+ ConsumptionVA AssetsVK Cost center VKA Customer order VNAW Consumption (plant not active)VP Project
VUBM Material Transfer Posting
i.e.: single level consumption /B+
CreateOwn CO Level
(Name):e.g Check Cos t Center
AssignProcess category
(e.g VK)to Own CO Level
DefineUpdate Structure
& AssignValuation Area
3
4
ReceiptsConsumption
Specific MovementType Group?
2
You can assign your own Controlling levels to a process category using your own name formation
rules. This allows you to differentiate between specific activities in the material ledger data, further than
you could in the standard system.
First you have to create your own controlling level. Then you create your self-defined name. You may
have also created your own movement type groups to allow you to differentiate your name.
Choose new entry and enter the process category. Enter B+ for process categories for procurement
(receipts). For consumption process categories enter a process category that begins with V.
Enter the controlling level and your own movement type group, as required.
Save.
To view the list of assignments, go to Customizing and choose "Assign Self-defined Names for
Receipts/Consumption". From here you can display the assignment of name formation rules to process
categories. Recommendation: Use the standard naming structure. The definition of alternative structures
enables you to manipulate the calculation of the periodic unit price, as you can differentiate between the
way you include single-level consumption (for example cost center withdrawals).
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 288/304
(C) SAP AG AC530 9-7
© SAP AG 2003
Manual Change of Actual Cost Component Split
You can use this function to change actual cost component splits for each procurement alternative. This
may be necessary for the following reasons. for example:
Individual values in a split are incorrect.
No cost component split information was available for a transaction at the time the actual entry was
made. This is now to be added retrospectively.
The same selection criteria are available as for material price analysis. In addition, once you have
selected the material, you can switch from main to auxiliary cost component split (and vice versa). This
is also possible for nodes that cannot be changed. To simplify changing cost component split values, you
can rescale the base quantity from the actual quantity to any quantity (user input). Double-click on a procurement alternative. The existing cost component split is displayed on the right. Now you can edit
the fields that have a white background color.
You should only make changes that do not change the column total. The difference form the existing
column total created by your changes is displayed on the Difference line.
In order to transfer changes to values in local currency (column Variable 1) to other currencies, select
column Variable 2 (or Variable 3) and choose Translate from local currency. The new values are
translated to the other currency and displayed in the column selected. To replace the cost component
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 289/304
(C) SAP AG AC530 9-8
split values with values from a cost component split template, choose Transfer . Save your entries. The
changed lines are highlighted in color.
If the total for all elements changes, a debit/credit document is posted (similar to transaction MR22,
Material debit/credit). In account determination, posting keys UMB and PRD must be maintained with
modification MAN.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 290/304
(C) SAP AG AC530 9-9
© SAP AG 2003
Allocation of Activity Quantity Dif ferences
Cost Center
Actual quantitythrough entry of activitye.g. 6000 h
Retrogradeconfirmation:5000 h
Al location rules
1000 h
Order
Order
If for example you have used indirectly determined activity quantities to allocate the costs of your
activities (retrograde confirmations), variances from the quantities actually determined may arise. On
the basis of the quantity measured, the system is enabled to determine a more accurate operating
rate. This gives you more detailed information on target costs and the cause of variances.
Allocation of activity differences
• Enter the activity for the actual quantities.
• Produce an allocation of activity differences.
You can display and edit a default allocation.
Allocate activity differences
Post the allocation of activity differences
Option for correction
You can edit the allocation before posting it. In this process you can adjust the quantities to beallocated and decide whether to debit the adjustment for this quantity to the associated order, material
or finished product.
You can use this function to allocate activity differences from the recording of actual activityquantities
to orders, or to product cost collectors or make a subsequent debit to the finished product. You should perform the allocation of activity differences at least once a month before period-
end close.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 291/304
(C) SAP AG AC530 9-10
When you post activ ity di fferences, the relevant cost centers are debited or credited.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 292/304
(C) SAP AG AC530 9-11
© SAP AG 2003
Allocation of Material Quantity Differences
Beginning Inventory:1100 PC
Goods Issues: 1000 PC
Automatic
allocation
100 PC
Inventory
Physical inventory documentInventory:0 PC
Order Order
You can use this function to allocate consumption differences from a physical inventory to orders, or make a subsequent debit to the material or finished product. You should performthe allocation of consumption differences at least once a month before period-end close. Inthe material ledger you can use the material price analysis to check the inventory values and to monitor postings. The material price analysis tells you the movement types of thepostings under Other receipts and consumption. You can obtain the movement types of theconsumption line in the original document.
The function is composed of Generate allocation Edit and post allocation Display allocation of consumption differences
Enter the required selection criteria. You will get a list of inventory documents. Select one ormore lines, and choose Allocate. The system provides a default quantity allocation. You canchoose whether to create a subsequent debit for the quantities and values to the followingobjects:
Orders Material Finished product Product cost collector To edit this allocation, choose Details. The individual items are displayed. Now you can
change the quantity, the allocation indicator and the recipient object for each item. When you
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 293/304
(C) SAP AG AC530 9-12
have made your changes, choose Post in the Item overview. To display the result, chooseDetails.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 294/304
(C) SAP AG AC530 9-13
© SAP AG 2003
AVR: Detailed View of Cockpit
Determining the firstand last period of an
alternative costing run
Transfer of endinginventory values from
a previous run
While creating an AVR, the first and last period of the cumulation period are defined. The beginning
inventory of the AVR is set to equal the quantity and valuation of the beginning inventory of the first
period of the cumulation period. If a different beginning inventory valuation is required, this can be
accommodated by referring to a previous run. If that is the case, the valuation of the AVR beginning
inventory is made in line with the ending inventory valuation of the previous run.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 295/304
(C) SAP AG AC530 9-14
© SAP AG 2003
AVR: Detailed View of Cockpit
While creating an AVR, the first and last period of the cumulation period are defined. The beginning
inventory of the AVR is set to equal the quantity and valuation of the beginning inventory of the first
period of the cumulation period. If a different beginning inventory valuation is required, this can be
accommodated by referring to a previous run. If that is the case, the valuation of the AVR beginning
inventory is made in line with the ending inventory valuation of the previous run.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 296/304
(C) SAP AG AC530 9-15
© SAP AG 2003
AVR: Detailed View of Cockpit
Revaluation of inventories
Revaluation of single-level consumption
Marking of futurestandard price
Specifying the pricesincluded in costing for
each valuation view
Under the Settings tab, the prices can be set for valuating the activity consumption. If parallel value
records are maintained in the material ledger, a price has to be entered for each of the parallel value
records. In the above example, the material ledger in the participating plants has two parallel value records,
legal and profit center valuation.
The valuation alternative controls the allocation of the cumulative differences to consumption and ending
inventory. If no entry is made here, cost allocation is made in the same way as for the single-level material
price determination of the periodic actual costing, on the basis of consumption and ending inventory
quantities.
There is an option to revaluate the material inventories on the basis of the calculated prices of an AVR.
The revaluation is posted to the last period of the cumulation period. The posting is not made on theinventory accounts themselves, but on inventory delta accounts. Using the account modification constant or
an accounting policy rule, the postings of different alternative valuation runs can be recorded on separate
accounts.
In addition the prices calculated by an AVR can be marked as future standard prices.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 297/304
(C) SAP AG AC530 9-16
© SAP AG 2003
AVR: Detailed View of Cockpit
Under the Settings tab, the prices can be set for valuating the activity consumption. If parallel value
records are maintained in the material ledger, a price has to be entered for each of the parallel value
records. In the above example, the material ledger in the participating plants has two parallel value records,
legal and profit center valuation.
The valuation alternative controls the allocation of the cumulative differences to consumption and ending
inventory. If no entry is made here, cost allocation is made in the same way as for the single-level material
price determination of the periodic actual costing, on the basis of consumption and ending inventory
quantities.
There is an option to revaluate the material inventories on the basis of the calculated prices of an AVR.
The revaluation is posted to the last period of the cumulation period. The posting is not made on theinventory accounts themselves, but on inventory delta accounts. Using the account modification constant or
an accounting policy rule, the postings of different alternative valuation runs can be recorded on separate
accounts.
In addition the prices calculated by an AVR can be marked as future standard prices.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 298/304
(C) SAP AG AC530 9-17
© SAP AG 2003
AVR: Detailed View of Cockpit
Determining thedifferences between
the AVR and the actualcosting of the last
period
Determining thecumulative actual
values
Call-up of BADI
CMLAVR_SIM tomodify data
Cumulation of periods
zUsing the process step Cumulate data, the periodic data is copied and summarized, providing the
cumulation period covers more than one period.
zIf BADI CKMLAVR_SIM is activated, it can be called up in process step Modification of value added .
This BADI can be used to set any number of material prices and to modify the quantity structure. If the
BADI is not activated, this process step is hidden.
zIf in line with its settings, the AVR uses cumulative actual prices to valuate activity consumption, they are
determined with process step Determine actual prices. This process step remains hidden, unless valuation
of activity consumption is made with cumulative actual prices.
zIf the given AVR is a posting run, the postings that result can be simulated and analyzed in the processstep Determine delta postings.
zThe process step Post closing is used to make the delta postings that previously existed as statistical
entries. During posting, material inventories and single-level consumption can be revaluated and cost
centers can be credited. In the same way as for periodic revaluation, postings for the subsequent period are
reversed.
zSAP recommends revaluation of the periodic actual costing. From a preventive maintenance point of
view, SAP only supports AVR revaluation for material inventories. If this recommendation is disregarded
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 299/304
(C) SAP AG AC530 9-18
and cost centers are credited via an AVR, the following must be observed: Either credit only the periodic
actual costing with periodic actual prices, or exactly one AVR with cumulative actual prices.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 300/304
(C) SAP AG AC530 9-19
© SAP AG 2003
AVR: Detailed View of Cockpit
zUsing the process step Cumulate data, the periodic data is copied and summarized, providing the
cumulation period covers more than one period.
zIf BADI CKMLAVR_SIM is activated, it can be called up in process step Modification of value added .
This BADI can be used to set any number of material prices and to modify the quantity structure. If the
BADI is not activated, this process step is hidden.
zIf in line with its settings, the AVR uses cumulative actual prices to valuate activity consumption, they are
determined with process step Determine actual prices. This process step remains hidden, unless valuation
of activity consumption is made with cumulative actual prices.
zIf the given AVR is a posting run, the postings that result can be simulated and analyzed in the processstep Determine delta postings.
zThe process step Post closing is used to make the delta postings that previously existed as statistical
entries. During posting, material inventories and single-level consumption can be revaluated and cost
centers can be credited. In the same way as for periodic revaluation, postings for the subsequent period are
reversed.
zSAP recommends revaluation of the periodic actual costing. From a preventive maintenance point of
view, SAP only supports AVR revaluation for material inventories. If this recommendation is disregarded
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 301/304
(C) SAP AG AC530 9-20
and cost centers are credited via an AVR, the following must be observed: Either credit only the periodic
actual costing with periodic actual prices, or exactly one AVR with cumulative actual prices.
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 302/304
(C) SAP AG AC530 9-21
© SAP AG 2003
AVR: Results and Integration
z Actual cost component sp lit is calculated
z Inventory can be revaluated
z Analysis v ia material price analysis (CKM3)
z Analysis by d isplaying the valuated quantity structure
z Transaction CKMLAVRPERD compares the cumulative tothe periodic data
z Result can be reconciled to Business Information
Warehousez Results can be analyzed in the Value Flow Monitor
z Revaluation possib le in prof itabili ty analysis
7/16/2019 55907058 AC530 Costing Material Ledger (1)
http://slidepdf.com/reader/full/55907058-ac530-costing-material-ledger-1 303/304
(C) SAP AG AC530 9-22
© SAP AG 2003
Follow-up to profitability analysis
Definition of a costing
selection
Assignment to
an AVR
z Definit ion of a costing selection
z IMG:z - Controlling- Profitability Analysisz Master Data- Valuation- Create valuation with material- costing- Define access to actual costing/material ledger
z Assigning a costing select ion to alternative valuation runs z IMG:z - Controllingz Product Cost Controlling -- Actual Costing/Material Ledger – Actual
Costing – Enter Cost Component Split in CO-PA