Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Disaster ManagementPlan for
Thermal Power Plants
7/31/2019 5. Disaster Management
2/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Natural disasters (earth quake, flood etc.,)
Technical disasters sabotage, collapse of buildings, release of gases, major fires, explosions.
7/31/2019 5. Disaster Management
3/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
A disaster occurring in the plant may affect/cause several sections within it serious injuries / loss of lives, Extensive damage to property Serious disruption out side the works area
It will require the best use of internal resources aswell as outside resources to handle it effectively.
Disaster (Major Emergency)
7/31/2019 5. Disaster Management
4/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
ON-SITE EMERGENCY : An accidentwhich takes place in an industry handlinghazardous materials and its effects areconfined to the factory premises involvingonly the people working in the factory.
OFF-SITE EMERGENCY: If an accident
takes place in an industry handlinghazardous materials and its effects are feltoutside the factory premises, the situationthus generated is called an Off-Site
Emergency
7/31/2019 5. Disaster Management
5/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Is Power Industry A Hazardous Industry?
Yes,
In accordance with the provision of Schedule 2 (C),(b) read with The Factories Act 1948, powergenerating industry is classified as hazardousprocess under item 5 thereof.
According to Section 41-b, para 4, of Factories Act1948, all factory engaged in hazardous processes
must have disaster plan .
7/31/2019 5. Disaster Management
6/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Every occupier shall, with the approval of chief inspector, draw up on site emergency plan anddetailed disaster control measures for his factoryand make known to the workers employed there inand to the general public living in the vicinity of factory the safety measure required to be taken inthe event of an accident taking place.
Provisions of Section 41-b, Para -4 of Factories Act 1948
7/31/2019 5. Disaster Management
7/63Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Provisions of Section 41-b, Para -5 of Factories Act 1948
Every occupier of a factory shall,-(A) If factory engaged in a hazardous process on the
commencement of the Factories (amendment) Act,1987 (20 of 1987), within a period of thirty days of such commencement; and
(B) If such factory proposes to engage in a hazardousprocess at any time after such commencement, within aperiod of thirty days before the commencement of suchprocess,
Inform the chief inspector of the nature & details of the process in such form and in such manner as maybe prescribed.
7/31/2019 5. Disaster Management
8/63Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Laws relevant to disaster management,emergency planning, preparedness & response
Factories Act, 1948 (major amendment in 1987)Environment (Protection) Act, 1986
Manufacture, Storage, Use & Import of hazardous chemicalsAct, 1989Chemical Accidents (Emergency Planning, Preparedness & Response) Rules, 1996Hazardous wastes (Management & Handling) Rules, 1989Public Liability Insurance Act, 1991Water (Prevention & Control of Pollution) Act, 1974
Air (Prevention & Control of Pollution) Act, 1981Public Nuisance ActExplosives Act, 1884/Rules, 1983 (includes Gas CylindersRules, 2004)Petroleum Act, 1934/Rules, 2002 etc.
7/31/2019 5. Disaster Management
9/63Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Aim of the Disaster Plan
The emergency planning is aimed to ensure
safety of life, protection of environment,installations and restoration of production
(generation of electricity).
7/31/2019 5. Disaster Management
10/63Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Objective of the PlanThe plan is developed to make best possible use of resources at its command and / or out side agenciesfor the following purposes.
1. Safe guard others by evacuating them to saferplaces;
2. Rescue of victims and treating them suitably toeffect speedy recovery at hospital;
3. Identify the personnel affected / dead;4. Inform relative of those deceased / effected;
5. Providing relevant record / data needed asevidence for subsequent enquiry;
6. Rehabilitation of the affected;
7/31/2019 5. Disaster Management
11/63Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Cause of Major Disasters in Power Plants
Fast spreading fires
Explosions Bursting of pipe lines / vessels Uncontrolled release of toxic / corrosive /
flammable liquids
Slow isolated fires Uncontrolled release of toxic / flammable gases /dusts
Breach of dams, / ash dykes Floods
7/31/2019 5. Disaster Management
12/63Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Fire Hazards In Power Plants
Coal handling plant : Coal dust accumulation on
conveyor decks, cable trays, head & tail pulleys, Crusher house and vibrating screen floors, Bunker house ,
Belt sway, belt tension, Failure of belt joints, Snapping of belts, Partially damaged belt in operation, Smoldering fire in bunkers, Jamming of idlers and pulleys,
7/31/2019 5. Disaster Management
13/63Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Fire Hazards In Power Plants Cables in cable galleries and on trays in all plant
sections, Coal dust deposited on cable trays in mill area Fuel oil handling and oil tanks (HSD, HFO,
Naphtha, Petrol ) Transformer oil, turbine oil, control fluid, seal oil, Natural gas Electrical system Heat path damaged insulation Grass Accumulation of waste material etc.
7/31/2019 5. Disaster Management
14/63Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Explosion Hazard In Power Plant
Hydrogen plant Turbo generators where hydrogen is used for
cooling of TG.
Transformer (oil cooled).
Boiler (Coal/Oil fired).
Coal dust in Mills and Boilers.
7/31/2019 5. Disaster Management
15/63Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Bursting of Pipe Lines, Vessels
Water / Steam pipes due to high pressure/temperature
H2 Gas lines and Acid lines.
Acid/Alkali tanks
H2 Gas Cylinders
Compressed air header.
Compressed air receivers.
H2 Gas Holder.
7/31/2019 5. Disaster Management
16/63Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Release of Gases / Dust
Chlorine in water treatment plant Hydrogen in turbo generator area of main plant Pulverised coal dust from mills and associated
piping Fly ash from chimneys and ash ponds, ESP
hoppers and bottom ash system Coal dust in transfer points, CHP, Crusher & mill
area.
Flue gas from the ducts
7/31/2019 5. Disaster Management
17/63Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Release Of Liquid
Acid and alkali tanks in water treatment plants Chlorine toners in WTPs
Fuel oil tanks in fuel oil handling section Naphtha handling and storage Ash dyke Control fluid in 500 MW turbine system
Turbine oil and seal oil leakage
7/31/2019 5. Disaster Management
18/63Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Floods
Breach of balancing reservoir. Breach of ash dykes
7/31/2019 5. Disaster Management
19/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Potential Major Emergency
A major emergency is one that effect severaldepartments within the factory or may causeserious injuries, loss of life extensive damage toproperty or serious disruption of works whichrequire the involvement of several resources tohandle it effectively.
7/31/2019 5. Disaster Management
20/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Sections Which Are Prone to Such Emergencies
1.Coal handling plant2.Main plant3.Water treatment plant4.Hydrogen generation plant5.MGR transportation system
7/31/2019 5. Disaster Management
21/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Common elements of a modelOn/Off-site
Emergency Management Plan
7/31/2019 5. Disaster Management
22/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Components of On-site Emergency Plan
Plant emergency organization
Plant & Area risk evaluation Notification procedures & communication systems
Emergency equipment and facilities
Procedure for returning to normal operations Training and drills for specialized services
Regular tests of emergency organization andprocedures
Plan updates
Emergency response procedures
Detailed operating manual
7/31/2019 5. Disaster Management
23/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
General Risk Evaluation
Consists of the following components: Maximum quantitative and qualitative
assessment of of hazards at any given point of time
Location of hazardous systems Properties of hazardous systems (MSDS) Location of isolation systems Special fire-fighting procedures Special handling requirements.
7/31/2019 5. Disaster Management
24/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Notification procedures & communication systems
Alarm systems
Communication equipment (radio, hot lines) Plant management, Local Officials, Response
Agencies, Neighbouring industries, Neighbourhoodpopulation
Names and telephone #s of the designatedofficials and their alternates
Designated persons for media contacts Procedures for notifying families of injured
employees Central reporting office.
7/31/2019 5. Disaster Management
25/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Emergency equipment, facilities & procedure forreturning to normal operations
Fire-fighting equipment Emergency medical supplies Toxic gas detectors Wind direction/speed indicators
Self-contained breathing apparatus Protective clothing Other on-site equipment to be specified according
to the local conditions
Containment facilities around tanks/vessels Interfaces & lines of communication with off-site
officials, neighbouring industries.
7/31/2019 5. Disaster Management
26/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Training & Drills
Knowledge of chemicals (properties, toxicity, etc.)and procedures for reporting emergencies
Alarm systems and communication network
Location of fire-fighting/first-aid equipment
Use of fire-fighting/first-aid equipment
Use of protective equipment(respirators, breathingapparatus, clothing, etc.)
Decontamination procedure for protective clothingand equipment; demolition and repair
Evaluation procedures and rescue services
Records of documented simulated emergencies whichshould be conducted frequently.
Transportation and public relations
T i i & D ill
7/31/2019 5. Disaster Management
27/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Training and drills for specialized servicesRegular tests of emergency organization andprocedures
Plan updates
Emergency response procedures
Detailed operating manual
Training & Drills
E P d
7/31/2019 5. Disaster Management
28/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Emergency Preparedness
Testing and evaluating are an integral part of
emergency preparedness Objectives:o Assessment of effectiveness of the plan and response
capability and identify whole elements in the plano Establish criteria for corrective actionso Test knowledge/skill of the participating personnelo Serve as continuing training tool for response personnel,
provide an opportunity to practice skills under realisticcondition
o Test communication network & co-operative response
skills, educate the personnel and all other concerned.
Off i E Pl
7/31/2019 5. Disaster Management
29/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Off-site Emergency PlanLegal requirement:The concerned authority shall be duty-bound toprepare and keep up-to-date an off-site emergencyplan containing the specified details as to
How to deal with an emergency relating to a possible majoraccidentWhile preparing the plan the Authority shall consult theOccupier
The Occupier shall assist the Authority in preparation of theplanThe Authority shall prepare the plan in associationwith the plant management actively participating inthe process, in case of a new industry before the activity commences, and in case of an existing one within six months of these Rules
coming into force
The Authority shall ensure that a rehearsal of the plan is conducted at least once in a year.
7/31/2019 5. Disaster Management
30/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Work IncidentController
Chief IncidentController
First Information
EmergencyControl Room
DIZASTER MAGMT.ORGN.
Emergency plan
Each section will be headed by Works incidentcontroller reporting to the chief incident
controller Details in next slide
AS AG O G
7/31/2019 5. Disaster Management
31/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Work IncidentController
Chief Incident
Controller
Task ForceTeam
HR Team
Matls Mgmt.Team
Rescue Team
Medical team
Autobase Team Security Team
Support Team
Communicationteam
MaintTeam
SupportTeam
DIZASTER MAGMT.ORGN.
Di t M g t O g i ti
7/31/2019 5. Disaster Management
32/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
OCCUPIER WHO HAS THE ULTIMATE CONTROL OVERTHE AFFAIRS OF FACTORY
Occupier in relation to NTPC plant is
Head of the plant i.e., Plant GeneralManager.
CHIEF INCIDENTCONTROLLER(CIC)
The GM of the plant will be CIC. In theabsence of GM whoever is in-charge GMwill be CIC
WORKS INCIDENT
CONTROLLER(WIC)
Head of O&M will be WIC. In the absence
of Head of O&M, in-charge O&M on thatday will be WIC.
INCIDENTCONTROLLER (IC)
Shift Charge Engineer will be the IncidentController
EMERGENCY
COMMUNICATIONOFFICER(ECO)
Public Relation Officer(PRO) will be theECO
KEY PERSONNEL The personnel who will have key role toplay in providing advice and inimplementing the decisions made by theCIC
Disaster Management Organisation
W k I id t C t ll (WIC )
7/31/2019 5. Disaster Management
33/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Works Incident Controller (WIC )
The main task to WIC is to visit the scene of theemergency, assessment of the situation anddecide whether a major emergency exists orlikely.
WIC is responsible for implementing the disasterplan to control the emergency.
The Sr. Manager of the section concerned shallbe WIC and name of all WIC shall be identified.
The unit controller / shift in charge engineersshall assume the responsibility of WIC, when heis not available at station.
R ibili i f WIC
7/31/2019 5. Disaster Management
34/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Responsibilities of WIC
The WIC shall identify ;
All probable emergency causing situations andtake proper precautionary measures to prevent /control such situations;
Ensure that all emergency team under him areinformed about their functions before and duringemergency;
Direct all operations with in the affected areawith the following priority;
1. Secure the safety of personnel2. Minimise damage to plant & environment3. Minimise loss of material
R ibiliti WIC
7/31/2019 5. Disaster Management
35/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Responsibilities WIC
Ensure that all non-essential workers in the affectedareas are evacuated to appropriate assembly point .
Set up communication contact through telephone /messenger etc. With emergency control centre.
Report significant developments to the chief incidentcontroller.
Assume duties of chief incident controller pendinghis arrival and in particular;
1.Direct the shut down and evacuation of plant and affectedareas likely to be threatened by the emergency.2.Ensure key personnel are informed and they are called in
Chief Incident Controller(CIC)
7/31/2019 5. Disaster Management
36/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Chief Incident Controller(CIC)
The General Manager /Head of Project shall bethe Chief Incident Controller (CIC).
The O&M in-charge on duty shall assumeresponsibility of CIC in the absence of GM/HoP.
Functions of CIC
7/31/2019 5. Disaster Management
37/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Functions of CIC
1. Relieve the works incidence controller from theresponsibility of over all main control.
2. Declare major emergency, if considered necessaryand ensure out side emergency services are called
in and near by industries are informed.3. Ensure key personnel are called in to exercise,
direct operation control.4. Directing shutting down and evacuation of plant,
establish liaison with head of fire, safety, medical,HR, security and local police.
Functions Of CIC
7/31/2019 5. Disaster Management
38/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Functions Of CIC
5. Arrange for relief of personnel and cateringfacilities for affected in emergency.
6. Issue authorised statements to news media.
7. Ensure information / reporting to CorporateOffice and Statutory authorities as perprovisions of state Factory rules and Factory Act1948.
Emergency Control Centre (ECC)
7/31/2019 5. Disaster Management
39/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Emergency Control Centre (ECC)
Emergency control centre will be established andequipped with adequate means of communicationto areas inside and outside.
The emergency control room will be manned bythe Chief Incident Controller and key personneland Sr.Officers of out side services called forassistance.
No other personnel shall have access to the ECC.
E g C t l C t (ECC)
7/31/2019 5. Disaster Management
40/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Emergency Control Centre (ECC)
ECC must contain the following information:
1. Safety data pertaining to all hazardous materialslikely to cause emergency.
2. Procedure of major and special fire fighting, rescueoperations, first aid etc.
3. Emergency call out list of persons drafted foremergency control eg key personnel from fire,
safety, medical, HR, security, local police andDistrict admn. Authorities.
E ti A d A bl P i t
7/31/2019 5. Disaster Management
41/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Evacuation And Assembly Points
In an emergency, it will almost certainly benecessary to evacuate personnel from affectedareas.
On evacuation, employees shall assemble atassembly point .
Assembly point must be given in disaster plan.
Assembly points
1. Main gate ( security gate no.1)2. Industrial canteen3. Administrative building
Ke Personnel
7/31/2019 5. Disaster Management
42/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Key Personnel
Apart from WIC and CIC, other works personnelwill have key role to play in providing advice andin implementing the decisions made by CIC.
Key personnel includes
1. Incharge of generation, electrical & mechanicalmaintenance, C&I, Chemistry (& WTP)
2. Head of HR, safety, autobase, PR, Medical,Security & fire.
Mutual Aid
7/31/2019 5. Disaster Management
43/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Mutual Aid
An understanding for mutual aid between nearbyindustries to send assistance to each other incase of an emergency;
Details of facilities offered by the mutual aid
partners should be mention in the plan; Details of contact phone nos. of officers
responsible for emergency action of mutual aidpartners should be mention in the plan
First Information
7/31/2019 5. Disaster Management
44/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
First Information
The first person who observes / identifies theemergencies shall inform by shouting and bytelephone to the shift engineer / emergencycontrol room and fire station about the hazard.
The shift engineer will inform to Work IncidentController, Chief Incident Controller and alsotelephone operator, who shall communicate it toall key offices about the emergency.
Key personnel
7/31/2019 5. Disaster Management
45/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Apart from WIC and CIC, other works personnel will have keyrole to play in providing advice and in implementing thedecisions made by the chief incident controller.
The key personnel include: Engineer-in-charge responsible for
Operation Electrical, Mechanical, C&I maintenance each
Chemical IT
Head of HR and officers connected with IR and labourwelfare.
Head of Tech. Services
Head of Safety Chief medical officer. Commandant/ Dy.Commandant (CISF) Asst. Commandant (fire) Transport (auto base) engineer-in-charge
Key personnel
Responsibilities of Task Force Team
7/31/2019 5. Disaster Management
46/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Responsibilities of Task Force Team
To identify source of hazard and try to neutralize / contain it.
To isolate remaining plant and keep that in safecondition.
To organise safe shutdown of plant, if necessary. To organise all support services ie operation of
fire pumps, sprinkler system etc.
Responsibilities of Maintenance Team
7/31/2019 5. Disaster Management
47/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Responsibilities of Maintenance Team
Attend all emergency maintenance jobs on toppriority.
To take steps to contain or reduce the level of hazard created due to disaster.
To organise additional facilities as desired.
Responsibilities of Fire Fighting Team
7/31/2019 5. Disaster Management
48/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Responsibilities of Fire Fighting Team
In case of fire emergencies, fire team is responsible,
To rush to fire spot and extinguish fire.
To seek help from out side fire fighting agencies.
To evacuate persons affected due to what everreasons
Responsibilities of Communication Team
7/31/2019 5. Disaster Management
49/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Responsibilities of Communication Team
To maintain the communication network inworking condition
To attend urgent repairs in the communication
system if required. To arrange messengers for conveying urgent
messages when needed so.
Responsibilities of Security Team
7/31/2019 5. Disaster Management
50/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Responsibilities of Security Team
To man all gates.
To bar entry of unauthorised persons.
To permit with minimum delay the entry of authorised personnel and out side agencies, vehiclesetc, who have come for help
To allow the ambulance / evacuation vehicles etc.,
to go through the gates without normal checks.
Responsibilities of HR team
7/31/2019 5. Disaster Management
51/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Responsibilities of HR team
To rescue the causalities on priority basis. To transport casualties to first aid post, safe
places, or medical centres. To account the personnel. To pass information to the kith and kin of fatal or
serious injured persons.
Responsibilities of Safety team
7/31/2019 5. Disaster Management
52/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Responsibilities of Safety team
To arrange required safety equipment. To measure gas concentrations, in case of gas
leakage, at various places. To record accidents. To collect and preserve evidences in connection
with accident inquiries. To guide authorities on all safety related issues.
Responsibilities of medical team
7/31/2019 5. Disaster Management
53/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Responsibilities of medical team
To arrange first aid material / stretchersimmediately and reach to site of incident.
To arrange for immediate medical attention. To arrange for sending the casualties to various
hospitals and nursing homes.
Support team to CIC & WIC
7/31/2019 5. Disaster Management
54/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Support team to CIC & WIC
In addition to the teams already mentioned there
will be one additional team known as support team .
This team will assist CIC & WIC during anemergency. The responsibilities of the team
given below; Contacting statutory authorities. Arranging for relievers and catering facilities. Giving information to media.
Responsibilities Of Support Team
7/31/2019 5. Disaster Management
55/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Responsibilities Of Support Team
Arranging shelters for affected persons.
Contacting medical centres and nursing homes.
Providing all other support, as necessary. Arranging for urgently required materials through
cash purchase or whatever means.
Arranging funds for various relief measures asemergency purchase of materials.
Responsibilities of key personnel:
7/31/2019 5. Disaster Management
56/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Departmental heads: The departmental heads will provide assistance as
required by the works incident controller. They willdecide which members of their departments arerequired at the incident site.
Head of Tech. Services On knowing the major emergency, he will proceed
to the site and report to CIC. He will provide technical information as required to
CIC/WIC.Head of Safety :
On knowing the emergency, he will immediatelyreport to site and keep in touch with CIC He will make sure the all safety equipments are
made available to the emergency teams. Participate in rescue operations.
Maintain inventory of items in ECC.
p y p
Responsibilities of key personnel: Commandant (CISF):
7/31/2019 5. Disaster Management
57/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
On knowing the emergency, he will Proceed to main entrance/main gate
Arrange to control the traffic at the gate and theincident area. Direct the security staff to the incident site to take part
in the emergency operations under his guidance andsupervision.
Arrange for rescue and evacuation of the people in theplant or in the nearby areas as advised by workincident controller after arranging the transportthrough transport in-charge.
Allow only those people who are associated withhandling emergency.
Maintain law and order in the area, if necessary seekthe help of police. Maintain communication with chief incident controller,
works incident controller.
Responsibilities of key personnel: Asst. Commandant (Fire)
7/31/2019 5. Disaster Management
58/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
On knowing the emergency, he will
Reach the fire station and arrange to sound thealarm as per the type of emergency. Guide the fire fighting crew ie. Firemen and trained
plant personnel and shift the fire fighting facilitiesto the emergency site. Adequate facilities will be
made available. Take guidance of the Works Incident Controller forfire fighting as well as assessing the requirement of outside help.
Maintain communication with Works Incident
Controller, Chief Incident Controller and EmergencyCommunication Officer. Seek outside help from other near by Fire Stations.
Responsibilities of key personnel:
7/31/2019 5. Disaster Management
59/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
On knowing the emergency he will immediately report
to Works Incident Controller. During emergencysituations, all company vehicles and hired vehiclesshould be surrendered automatically and shall beunder the control of auto base in-charge to facilitateavailability of all vehicles with administration team.
The responsibilities of Auto Base In-charge are : Make all the auto base vehicles ready to proceed
for evacuation or other duties, when asked for. Make all arrangements regarding transportation.
TRANSPORT (AUTOBASE) ENGINEER-I/c
Responsibilities of key personnel:
7/31/2019 5. Disaster Management
60/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
The responsibilities of Auto Base In-charge are: [contd.]
To send at least one mechanic at the site of incidentwhere he may help in attending minor defects inambulance, fire tenders or other vehicles
To arrange Petrol /diesel supply List of all NTPC vehicles and hired vehicles with contact
telephone numbers to be made available in Auto Base. Addresses of NTPC drivers and hired vehicles to be
made available in Auto Base. Liaison to be developed by the Auto Base in-charge
with neighbouring travelling agencies, transportagencies etc.
Contact telephone numbers of private ambulanceagencies. The above arrangements helps the auto base in-charge
to contact immediately for requesting the servicesduring major emergencies without any time delay.
TRANSPORT (AUTOBASE) ENGINEER-I/c
Mock Drill
7/31/2019 5. Disaster Management
61/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Mock-drills are conducted to test theeffectiveness of action plan/ emergencypreparedness.
Periodicity of mock drill is at least once in everysix months.
Deficiencies found are to be recorded andcorrective actions are to be taken foreffectiveness of the plan.
Action Plan
7/31/2019 5. Disaster Management
62/63
Safety Module: Disaster Management Plan, Rev 0.0, Mar 2007
Action PlanEmergency siren ---------------------------------------------------------------
T y p e Duration--------------------------------------------------------------- In case of fire 5 seconds on
2 seconds off,3 times
Emergency siren for 20 seconds on,Heavy chlorine leak 10 seconds off,
5 times.
All clear signal Continuoussiren for 3 min,only once.
--------------------------------------------------------
7/31/2019 5. Disaster Management