29
5. “Topographic Survey Remarks”. OBO-Zhang, 2017.

5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

5. “Topographic Survey Remarks”. OBO-Zhang, 2017.

ZhangX3
Oval
ZhangX3
Line
ZhangX3
Polygon
Page 2: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

6. Field Report: Structural Observations: J.E. Dumsick, P.E. (OBO/OPS/CH), October 23, 2018.

Page 3: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates
Page 4: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates
Page 5: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates
Page 6: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

Historic Ermida de Santo Antonio (Chapel) & Gymnasium: Existing Conditions

Department of State, Overseas Buildings Operations

Office of Cultural Heritage

November 28, 2018

7. “Historic Ermida de Santo Antonio (Chapel) & Gymnasium: Existing Conditions”. J.E. Dumsick, P.E. (OBO/OPS/CH), November 28, 2018.

Page 7: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

Chapel/Site History

1. Embassy is located on the site of former Quinta do Pinheiro2. Historic Manor House, Chapel and site structures originate from 17th century.3. Historic tilework was installed in many structures (buildings, fountains, site

walls, etc.)4. Tile work of Chapel dates from 17th and 18th centuries. 5. Acquired by U.S. Government in 19796. Storage structure to east of Chapel was reconstructed by DOS c.1980 as a

Garage. Now used as Gymnasium7. Consular constructed in 19848. Landscape and retaining walls contructed in 1985-1986

Page 8: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

Cultural and Architectural Significance (Interior)

Page 9: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

Existing Site Plan

Page 10: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates
Page 11: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

Photographs (prior to Chancery Construction)

Page 12: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

Photographs (during Chancery Construction)

Page 13: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

Photographs (during Chancery Construction)

Page 14: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

1980 Partial Reconstruction

Page 15: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

June 2014 Photographs (Donnie Seale)

Page 16: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

June 2014 Photographs (Donnie Seale)

Page 17: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

June 2014 Photographs (Donnie Seale)

Page 18: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

November 2018 Photographs (OBO/OPS/CH)

Page 19: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

November 2018 Photographs (OBO/OPS/CH)

Page 20: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

November 2018 Photographs (OBO/OPS/CH)

Page 21: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

November 2018 Photographs (OBO/OPS/CH)

Page 22: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

November 2018 Photographs (OBO/OPS/CH)

Page 23: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

November 2018 Photographs (OBO/OPS/CH)

Page 24: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

November 2018 Photographs (OBO/OPS/CH)

Page 25: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

November 2018 Measurements (OBO/OPS/CH)

Page 26: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

November 2018 Measurements (OBO/OPS/CH)

Page 27: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

April 2014 Structural Investigation Findings (Estiplano)

1. Observations1. Various cracking throughout Chapel (vertical and diagonal)2. Water leakage in Gym’s roof (south)

2. Findings1. Chapel shear walls are constructed of soft stone rubble masonry set in lime mortar2. Geotechnical investigation revealed foundations bearing on low-capacity soils of suspect fill material (to

depth of 1.0-1.5m) 3. Conditions and movements are indicative of poor soils and of slope stability

3. Recommendations1. Strengthening foundations with underpinning which incorporates a continuous strap footing. Foundations

down to 1.5m below grade (south and west) and 1.0m (north).2. Alternative underpinning method is to install piles 3. Investigation of slope stability and monitor retaining walls.

Page 28: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

Discussion: Recommendations/ Next Steps

1. Structural Monitoring of Retaining Walls and Chapel/Gym Structure a) 7901 Funds Availableb) Total Station Quarterly Measurements for one yearc) Instrumentation: Crack Meters and Tiltmeters-Need to review costs associated with active digital monitoring versus analog

2. Structural Investigation/Analysis of Retaining Walls and Subsurface Soilsa) Borings b) Test Pits to confirm gravity wall and cantilevered retaining wall construction c) Analyses to confirm behavior of retaining walls and stabilityd) Review surcharge loadings of terraced retaining walls e) Slope stability analysis

3. Design Repairs to Chapel/Gym and Retaining Walls (pending findings of above investigation)

Other Work Proposed• Roof Repairs (Gym and Chapel) with FAC Roof• Exterior Stucco Repairs with FAC Roof• Possibly join these repairs with structural stabilization

Page 29: 5. “Topographic Survey Remarks”. OBO-Zhang, 2017. · 3. Historic tilework was installed in many structures (buildings, fountains, site walls, etc.) 4. Tile work of Chapel dates

8. 8.Proposed Monitoring Layout – OBO/OPS/CH