s t e e l • c o n c r e t e • w o o d • m a s o n r y • m e t a l b u i l d i n g s y s t e m s
4th Dimension Design, Inc. 817 Venture Ct., Waukesha, WI 53189 • 262.896.6500 • www.4dd.com
4th Dimension Design, inc.Ph i l o s o P h yPh i l o s o P h y
Quality-driven
4th Dimension Design’s professional engineers are knowledgeable experts, developing quality, cost effective design solutions.
Innovative
Our team of experts will solve your most challenging structural issues, working directly with builders, material suppliers and architects.
Timely
Project timelines are critical. Your project, large or small, will receive personal attention and professional results.
Responsive
From preliminary design and bidding, right through to last minute changes on the construction site. Get the answers you need, when you need them!
Our Four Principles for Successful Projects
s t e e l • c o n c r e t e • w o o d • m a s o n r y • m e t a l b u i l d i n g s y s t e m s
4th Dimension Design, Inc. 817 Venture Ct., Waukesha, WI 53189 • 262.896.6500 • www.4dd.com
4th Dimension Design, inc.De s i g n Pr o f e s s i o n a l sDe s i g n Pr o f e s s i o n a l s
John Rave, P.E. - Vice President
Education •MarquetteUniversity-B.S.CivilEngineering
Instructor •EconomicdesignofLowRiseStructures
Registrations & Professional Affiliations •RegisteredEngineer-
Alabama,Arkansas,Colorado,Delaware,Georgia,Maryland,Massachusetts,Minnesota,Mississippi,Missouri,NewMexico, NorthCarolina,Oklahoma,Oregon,Pennsylvania,SouthCarolina,Tennessee, Texas, Virginia, Wisconsin
•TheNationalSocietyofProfessionalEngineers(NSPE-WSPE)
•MetalBuildingManufacturersAssociation(MBMA) Chairman-TechnicalCommittee
•AssociatedBuilders&Contractors,Inc.(ABC) BoardofDirectors MembershipCommittee ABCRepresentativeIndustryAdvisoryCommittee(IAC) forInternationalCodeCouncil(ICC)
Experience •50+years
GeneralManagerofEngineering(InrycoInc.,Milwaukee,WI) Owner/President-4thDimensionDesign,Inc.,foundedin1986
John Peterson, P.E., S.E. - Vice President
Education •UniversityofWisconsin,Platteville,WI-B.S.CivilEngineering
Registrations & Professional Affiliations •RegisteredEngineer-
Arizona(SE),Florida,Illinois(SE),Indiana,Michigan,Nevada, NewYork,Utah(SE),Washington,Wisconsin
Experience •45+years
VicePresident-4thDimensionDesign,Inc.since1986
s t e e l • c o n c r e t e • w o o d • m a s o n r y • m e t a l b u i l d i n g s y s t e m s
4th Dimension Design, Inc. 817 Venture Ct., Waukesha, WI 53189 • 262.896.6500 • www.4dd.com
4th Dimension Design, inc.De s i g n Pr o f e s s i o n a l sDe s i g n Pr o f e s s i o n a l s
John R. Groh, P. E., S.E. - Vice President
Education •MilwaukeeAreaTechnicalCollege,Milwaukee,WI-
AssociatesDegreeinAppliedScienceinCivilTechnology •MarquetteUniversity-B.S.CivilEngineering •MarquetteUniversity-M.S.CivilEngineering
Registrations & Professional Affiliations •RegisteredEngineer-
California,Conneticut,Idaho,Illinois(SE),Iowa,Kansas, Kentucky,NewJersey,NewYork,NorthDakota,Ohio, SouthDakota,WestVirginia,Wisconsin,Wyoming
•MemberAmericanSocietyofCivilEngineers(ASCE)
•MemberAmericanConcreteInstitute(ACI)
•MemberAmericanInstituteofSteelConstruction(AISC)
Experience •30+years
SeniorDesignEngineer,4thDimensionDesign,Inc.since1998
Joseph E. Moha, P.E.
Education •UniversityofWisconsin,Madison-B.S.CivilEngineering •CornellUniversity,Ithaca,NY-M.E.StructuralEngineering
Registrations •RegisteredEngineer-
Florida,Louisiana,Maryland,Montana,Nebraska,NewHampshire, NorthCarolina,SouthCarolina,Vermont,Virginia,Wisconsin
Experience •38+years
SeniorDesignEngineer,4thDimensionDesign,Inc.since2002
s t e e l • c o n c r e t e • w o o d • m a s o n r y • m e t a l b u i l d i n g s y s t e m s
4th Dimension Design, Inc. 817 Venture Ct., Waukesha, WI 53189 • 262.896.6500 • www.4dd.com
4th Dimension Design, inc.De s i g n Pr o f e s s i o n a l sDe s i g n Pr o f e s s i o n a l s
Joel Nelson, P.E.
Education •MilwaukeeSchoolofEngineering-B.S.StructuralEngineering
Registrations •RegisteredEngineer-
Wisconsin,Indiana,Michigan
Experience •10years
DesignEngineer,4thDimensionDesign,Inc.since2003
s t e e l • c o n c r e t e • w o o d • m a s o n r y • m e t a l b u i l d i n g s y s t e m s
4th Dimension Design, Inc. 817 Venture Ct., Waukesha, WI 53189 • 262.896.6500 • www.4dd.com
4th Dimension Design, inc.li c e n s e D st a t e sli c e n s e D st a t e s
Alabama,Arizona,Arkansas,Colorado,Delaware,Florida,Georgia,Idaho,Illinois,
Indiana,Iowa,Kansas,Kentucky,Louisiana,Maryland,Massachusetts,Michigan,
Minnesota,Mississippi,Missouri,Montana,Nebraska,Nevada,NewHampshire,
NewJersey,NewMexico,NewYork,NorthCarolina,NorthDakota,Ohio,
Oklahoma,Oregon,Pennsylvania,SouthCarolina,Tennessee,Texas,
Utah,Vermont,Virginia,Washington,WisconsinandWyoming.
New Jersey
R.I.
Maine
VirginiaWest
Delaware
Alaska
Hawaii
Washington
Oregon
Arizona
New Mexico
Texas
Oklahoma
Kansas
Colorado
Utah
Nevada
California
Idaho
Montana North Dakota
South Dakota
Nebraska
Minnesota
Iowa
Missouri
Arkansas
MississippiAlabama
Louisiana
Florida
Georgia
Tennessee
Wisconsin
IllinoisIndiana
Ohio
Michigan
Kentucky
New YorkConn.
Mass.
N.H.
Wyoming
Pennsylvania
Virginia
Md.
Vt.
Carolina
North Carolina
South
Our engineers are REGISTERED in the fol lowing STATES :
s t e e l • c o n c r e t e • w o o d • m a s o n r y • m e t a l b u i l d i n g s y s t e m s
4th Dimension Design, Inc. 817 Venture Ct., Waukesha, WI 53189 • 262.896.6500 • www.4dd.com
4th Dimension Design, inc.Po r t f o l i oPo r t f o l i o
P r o j e c t s o f D i s t i n c t i o n
Ethanol Plant- GreenPlains,WI-70,000sq.ft.complex-
9buildings
4DD Design:Metalbuildingfoundations,tankand equipmentfoundations.
Riverwalk- FortAtkinson,WI
•Riverwalk,sidewalks,retainingwalls, overhangs and monument.
4DD Design:Retainingwalls,riverwall, monument foundation.
Design Type:Structuralsteel,castin place concrete.
s t e e l • c o n c r e t e • w o o d • m a s o n r y • m e t a l b u i l d i n g s y s t e m s
4th Dimension Design, Inc. 817 Venture Ct., Waukesha, WI 53189 • 262.896.6500 • www.4dd.com
4th Dimension Design, inc.Po r t f o l i oPo r t f o l i o
P r o j e c t s o f D i s t i n c t i o n
U.S. Foodservice- Ogden,UT-280,000sq.ft.
•Highseismicarea,foodstoragefacilitywithDry,CoolerandFreezerwarehouse.
•Officeandtruckmaintenancebuildings. •Refrigerationequipmentsupportframing.
4DD Design:Foundation, roof and wall framing, mezzaninesandequipmentplatforms.
Design Type:Structuralsteelandconcrete.
Concession Building- NewJerseyMotorsportsPark-8,800sq.ft.
4DD Design:Metalbuildingdesignanddetailing.
Design Type:Structuralsteel,lt.gaugeframing,metalwallpanel, “arched” standing seam roof, segmented rafters and variable length purlins and clips.
s t e e l • c o n c r e t e • w o o d • m a s o n r y • m e t a l b u i l d i n g s y s t e m s
4th Dimension Design, Inc. 817 Venture Ct., Waukesha, WI 53189 • 262.896.6500 • www.4dd.com
4th Dimension Design, inc.Po r t f o l i oPo r t f o l i o
P r o j e c t s o f D i s t i n c t i o n
Systems Control - Electrical Building-
Customdesignelectricalenclosure, factory built and outfitted for “Plug and Play”onsiteinstallation.Eachenclosureisindividuallydesignedtomeettherequire-ments of the local building code.
4DD Design:Structuralsteel
Stayer House- ElkhartLake,WI-13,200sq.ft.
•Tileroof,concretefloorsystem with integral floor heating system, custom design steel balconies.
4DD Design:Foundation, retaining walls, floor framing, roof and wall framing.
Design Type:Wood, structural steel, concrete, precast concrete plank and masonry.
s t e e l • c o n c r e t e • w o o d • m a s o n r y • m e t a l b u i l d i n g s y s t e m s
4th Dimension Design, Inc. 817 Venture Ct., Waukesha, WI 53189 • 262.896.6500 • www.4dd.com
4th Dimension Design, inc.Po r t f o l i oPo r t f o l i o
P r o j e c t s o f D i s t i n c t i o n
St. Mary Church- HalesCorners,WI-25,000sq.ft.
•Engineeredwoodframing •Glassandbrickveneer •Remodelofexistingchurchintomulti-
level office and classroom space.
4DD Design:Foundation, retaining walls, exterior walls, modify existing building.
Design Type:Structuralsteel,wood,masonry and precast concrete.
Quad Graphics- Sussex,WI-50,000sq.ft. Lomira,WI-70,000sq.ft.
•Automatedrackstoragebuildings, over100feettall.
4DD Design:ConcreteMatFoundation
s t e e l • c o n c r e t e • w o o d • m a s o n r y • m e t a l b u i l d i n g s y s t e m s
4th Dimension Design, Inc. 817 Venture Ct., Waukesha, WI 53189 • 262.896.6500 • www.4dd.com
4th Dimension Design, inc.Po r t f o l i oPo r t f o l i o
N e w B u i l d i n g s
The following is a sampling of new buildings 4DD has designed.
M&I Bank -Pewaukee,WI-2,700sq.ft. •Brickandblockbearingwalls •Woodtrussroofsystem •Concreteplankfloor •Vaultsupport
Pinahs Bakery-Pewaukee,WI-40,175sq.ft. •Precastconcretebearingwalls •Trussgirderandjoistroofsystem •Tanksupport
Knight Manufacturing-Brodhead,WI-50,476sq.ft. •3Separatebuildingextensions •Metalbuildingsystem •Cranes:15TON-55ft.span 5TON-37ft.span 5TON-25ft.span 3TON-25ft.span 3TON-17ft.span •Existingbuildingmodificationfor
crane and snow drift.
White Pine Lumber-Romeoville,IL-32,100sq.ft. •Metalbuildingsystem •Precastconcretedryingkiln •Heavywarehousestorageload
Cross Roads Shopping Center - MenomoneeFalls,WI-8,900sq.ft. •Beamandjoistroofconstruction •Fitbetween2existingbuildings •2Wallsexisting •1WallbearingCMU •1Wallsteelandglass
J.W. Speakers-Germantown,WI-45,000sq.ft. •Trussgirderandjoistroofsystem •Reinforcedmasonrywalls
Michael’s Cooperage-Chicago,IL-60,000sq.ft. •Metalbuildingsystem •Enclosedshippingdock •Offices-CMU&precastconcreteplank
Ayres Chevrolet-Brodhead,WI-13,790sq.ft. •Metalbuildingsystem •Woodandsteelmezzanine •Servicearea,officesandshowroom
Northeast Corporate Center- Glendale,WI-28,000sq.ft.(2buildings) •Trussgirderandjoistroofsystem •Steelstudandbrickfascia •Bankwithvault-tenantmodification •Glasswalls
Sunrise Point -GreenLake,WI-12,700sq.ft.ParkingGarage •Precastconcreteplank •Precastinteriorbeamsandcolumns •Sitecastexteriorwalls
Metal Craft of Mayville-Mayville,WI-32,000sq.ft. •Metalbuildingsystem •10Toncrane-40’span •Steeljoist&standingseamroof •Deepconcretepit •Recessedtruckdock
Patrick Cudahy-Cudahy,WI-65,000sq.ft. •Precastconcrete–doubleTroofsystem •Precastcolumnsandbeams •2storybuilding •Coldstorage–foaminsulatedwalls
Beaulieu of America-Aiken,SC-240,000sq.ft. •Trussgirdersandjoistroofsystem •Precastconcrete–loadbearing
double T walls
Mayville Engineering Corp.- Mayville,WI-70,000sq.ft. •Trussgirderandjoistroofsystem •Precastconcreteloadbearingwalls •Suspendedmono-railcrane •Highbaybridgecranes
s t e e l • c o n c r e t e • w o o d • m a s o n r y • m e t a l b u i l d i n g s y s t e m s
4th Dimension Design, Inc. 817 Venture Ct., Waukesha, WI 53189 • 262.896.6500 • www.4dd.com
4th Dimension Design, inc.Po r t f o l i oPo r t f o l i o
R e p a i r a n d R e t r o f i t
The following is a sampling of repaired/retrofitted buildings 4DD has designed.
Gilman Engineering-Janesville,WI 50,940sq.ft.retrofitroofsystems •Subframingsystemandametalbuilding’s
beam and purlin system, both with standingseampanel.Bothoverdifferenttypes and ages of existing buildings.
Alloway-Westgo,Fargo,ND •Analysisofexistingstructurefor
added monorail system. •Analysisoftwistedcolumn. •Changebuildingwindbracing
for additional door.
Bonnie Castle Resort-Alexandria,NY •Determinedloadcapacityof
existing structure. •Modificationsnecessarytomeet
current building code.
Plastronics Plus Inc.-EastTroy,WI •Metalroofwithsub-framinginstalled
overexistingbuilt-uproof.
Future Foam Inc.-Middleton,WI •Modifiedexistingstructuretosupport
snow drift caused by new structure being erected.
Mid-Way Supply-Zion,IL •Modifiedexistingbeamand15’O.C.
columnwalltoa60’clearspanwall.
Stelrema Corp.-Knox,IN •Checkedbuildingandcranesupports
for increase in crane capacity and recommended modifications.
Knaak Manufacturing-CrystalLake,IL •Beefedupexistingstructureforsnow
drifting caused by new adjacent building.
Delta Airlines, Inc.-Atlanta,GA 13,600sq.ft.retrofitroofsystem •Curaframingsystem. •Standingseamroofpanel.
Dover Air Force Base-Dover,Delaware11,700sq.ft.retrofitroofsystem •Curaframingsystem. •Standingseamroofpanel,
hip and valley roof.
Brandon Meats-Brandon,WI 2,400sq.ft.freezer •Removeoldandbuiltnew. •Reinforceandreplaceexisting
wood trusses.
Silgan Container-Waupun,WI •Removeandrelocatebuildingcolumns. •Minimumplantinterruption,noshoring.
Kerry Ingredients-Owen,WI •Addlargeprecastconcrete
equipmentmezzanine. •Removemainbuildingcolumns. •Coverexistingcourtyardwith
precast concrete roof. •Equipmentpits.
Speed Queen-Ripon,WI •Addequipmentfoundations
with access pits below. •250,500and1,000Tonpresses. •Electricalpanelmezzanine.
s t e e l • c o n c r e t e • w o o d • m a s o n r y • m e t a l b u i l d i n g s y s t e m s
4th Dimension Design, Inc. 817 Venture Ct., Waukesha, WI 53189 • 262.896.6500 • www.4dd.com
4th Dimension Design, inc.Po r t f o l i oPo r t f o l i o
I n v e s t i g a t i o n
The following is a sampling of 4DD investigative work.
Issue: AbuildingcollapsednearRichmond,Virginiaundersnowload.
As the expert for the manufacturer we determined that the design was correct. The field investigation showed that the foundation was not properly installed. All parties agreed to the convening of a technical expert conference on the matter. The case was settled as a result of the conference report which set the blame on the foundation problem.
Issue: AbuildinginRichmond,Virginia,approximately10yearsold,hadsomeroof leaks and the owner wanted a new roof.
As the expert for the contractor we showed that the roof was only in need of a minor amount of repair. The judgment against our client was less than his last offer to settle.
Issue: AportionofabuildinginDutchHarbor,Alaskacollapsedundersnowload. The portion of the structure that collapsed was designed to carry a heavier load than the balance of the building that did not collapse.
Our field investigation of the site showed that the end of the building that collapsed was in the shadow of a high cliff that had been blasted into the side of a mountain. The drifting of the snow on the building caused by this condition had not been considered in the design. The weather reports for the island of Dutch Harbor showed that the wind direction would have caused drifting for about the week before the collapse. As a result of our report all parties agreed and there was no litigation.
Issue: TheendwallofabuildinglocatedinWillmar,Minnesotacollapsed from grain load.
Our field investigation uncovered that the grain had been stored to a height 4ft. higher than was specified. We prepared calculation that showed stress levels in the endwall columns were at 53% to 70% over allowable. Our report assisted in avoiding any litigation.
s t e e l • c o n c r e t e • w o o d • m a s o n r y • m e t a l b u i l d i n g s y s t e m s
4th Dimension Design, Inc. 817 Venture Ct., Waukesha, WI 53189 • 262.896.6500 • www.4dd.com
4th Dimension Design, inc.Po r t f o l i oPo r t f o l i o
I n v e s t i g a t i o n
The following is a sampling of 4DD investigative work.
Issue: TheentireroofofagrandstandinasmalltownnearChicago,Illinois blew off the main frames of the stands. The roof system, nearly intact, wascarried200yardsandwrappedaroundanotherbuilding.
Site investigation did not reveal any other damage to other building’s at the fair grounds. The evaluation of the site condition and testing done at the University of Wisconsin, Milwaukee lead to the conclusion that an isolated tornado would be the only way such a incident could have happened. What makes this such an unusual conclusion is that it was in the middle of December, it was snowing, but there were reports of lightning and thunder in the area at the time the roof blew off. Suit by uninsured owner was settled.
Issue:AnexplosioninasteelfabricatingplantinLincoln,Nebraskasentplates ofsteelthrutheroof,openinglargeholes.Astheplatesre-enteredthebuilding, back thru the roof, smaller holes were also made.
We were hired to determine the extent of damage and what parts of the building needed to be replaced or repaired. Our report developed two methods of repair, patching the holes or replacing the roof. Because of the business interruption cost, the replacement of the roof option was selected. Roof was replaced without significant interruption to work.