4MOST – 4m Multi-Object Spectroscopic Telescope www.4MOST.eu Science Operations C. Jakob Walcher (AIP) 09.07.2020

4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

4MOST – 4m Multi-Object Spectroscopic Telescope

www.4MOST.eu

Science OperationsC. Jakob Walcher (AIP)

09.07.2020

Page 2: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

Principles of operations for participating surveys

• All participating surveys collaborate in the Science Team, also on science infrastructure

• Consortium Operations Group takes over tasks normally carried out by scientists

• Progress reporting and survey strategy parameterization allow ESO to exercise oversight role

4MOST Operations | 09.07.2020 | CJ Walcher 2

Page 3: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

“Science Operations”

• “Joint Operations Group“ (JOG): A group of people from the consortium who will run 4MOST operations in Europe.

• Separate from, but closely linked to ESO, who will run the instrument, VISTA, a public archive, select proposals, etc.

• The precursor to the JOG is called the “Operations Development Group” (ODG): talking to you now.

4MOST Operations | 09.07.2020 | CJ Walcher 3

Page 4: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

Organisational view

4MOST Operations | 06.05.2019 | CJ Walcher 4

Science Team

ESO

4MOST Executive Board

4MOST Principal Investigator

Infrastructure Working Groups

Community Surveys

Consortium Surveys

ESO

Consortium

Community

Operations

Operations System

Science

Operations Manager

Data Management System

Consortium Helpdesk

ESO Archive (SAF)

Non-participating Surveys

Project Scientists

Joint Operations Group

On-mountain Operations

Technical support

Quality Control 1

ESO Instrument Scientist

Exposure Time Calculator Technical support

Policies Board(s)

Science Coordination BoardWe

You

Page 5: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

Distinction between GTO and other surveys

• ESO requirement: No such distinction shall be made at any operations level.

• We are committed to this requirement.

4MOST Operations | 09.07.2020 | CJ Walcher 5

Page 6: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

How it would be if it was normal ESO operations

4MOST Operations | 09.07.2020 | CJ Walcher 6

Phase 3 process:!creation and publication !

of higher level data products!PI

Phase 1 process:!definition of 4MOST survey program!

ESO, community

Phase 2 process:!creation of OBs!

PI

Observing at Paranal!ESO

Target catalogues

Survey strategy OBs

Raw data

VISTA

4MOST

Page 7: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

Services for participating surveys

4MOST Operations | 06.05.2019 | CJ Walcher 7

Definition of community surveys (ESO, proposals)

IWG work Writing papers

Definition of consortium

surveys

Phase 3 process:!creation of level 1 data products!

Consortium: Data Management System

Phase 1 process:!definition of 4MOST survey program!

ESO, consortium, community

Phase 2 process:!creation of OBs!

Consortium: Operations System

Progress tracking

Observing at Paranal!ESO

Phase 3 process B:!creation of level 2 data products!

Surveys, science team

Target catalogues

Survey strategy OBs

Raw data

1D spectra

Calibration strategy

Optimization processes

VISTA

4MOST

Submission to ESO

L2 products

Survey simulations

Creation of level 1 data products

Page 8: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

Services for participating surveys

4MOST Operations | 06.05.2019 | CJ Walcher 8

Definition of community surveys (ESO, proposals)

IWG work Writing papers

Definition of consortium

surveys

Phase 3 process:!creation of level 1 data products!

Consortium: Data Management System

Phase 1 process:!definition of 4MOST survey program!

ESO, consortium, community

Phase 2 process:!creation of OBs!

Consortium: Operations System

Progress tracking

Observing at Paranal!ESO

Phase 3 process B:!creation of level 2 data products!

Surveys, science team

Target catalogues

Survey strategy OBs

Raw data

1D spectra

Calibration strategy

Optimization processes

VISTA

4MOST

Submission to ESO

L2 products

Survey simulations

Creation of level 1 data products

Front-end:OpSys, IWG2

Back-end: DMS, IWG4,7,8,9, QCS

Page 9: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

Front-end: Preparing observations

• Operations System with components– Target catalogue submission interface – 4MOST Facility Simulator (4FS)

• Heavy duty ETC (4FS-ETC)• Operations Simulation (OpSim)

– Observer Support Software (makes OBs)– Target and survey progress database

• IWG2 Survey Strategy– Development of requirements to survey strategy– Survey plan optimization

4MOST Operations | 09.07.2020 | CJ Walcher 9

Talk by P. Norberg

Talk by Thi, Comparat, Merloni

Talk by Thi, MichevaTalk by E. Tempel

Page 10: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

Calibration data

• Covered by regular calibration plan and L1 pipeline:– Day-time calibrations– Twilight flats– Night-time wavecal and fiber flat– Sky fibers and telluric standards– Use of Gaia targets for flux calibration

• Quality monitoring fields • Any other calibration (e.g. standard stars) have to be

submitted as (part of) OBs– Twilight calibrations (ca. half hour) are not counted – Night time calibration comes out of science time

(includes attached wavecal and fiber flat)

4MOST Operations | 09.07.2020 | CJ Walcher 10

Talk by Micheva / Irwin

Page 11: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

L0: Running observations

• VISTA+4MOST run by ESO. • Participating surveys do not choose

conditions (e.g. seeing) per target. Exposure time adaptation to conditions, sky coverage according to survey plan.

• Optimal way of picking next OB still being discussed (area, depth, cadence).

4MOST Operations | 09.07.2020 | CJ Walcher 11

Page 12: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

L1: Spectra

• Data Management System with major components– L1 pipeline– Progress measurement – Operational Repository– Public Archive

• Instrument Scientist / Quality Control Scientist / Survey teams provide QC

4MOST Operations | 09.07.2020 | CJ Walcher 12

Page 13: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

L2: physical properties

• Advanced pipelines– 4MOST Selection Functions pipeline (4SP)– 4MOST Galactic Pipeline (4GP)– 4MOST eXtragalactic Pipeline (4XP)– 4MOST Classification Pipeline (4CP)

• L2 products that are to be delivered to ESO in Phase 3 are deliverable L2 (DL2) products– Any survey may additionally generate additional L2

(AL2) products. • Instrument Scientist / Quality Control Scientist /

Survey teams provide QC

4MOST Operations | 09.07.2020 | CJ Walcher 13

Talk by L. DaviesTalk by R. Church

Talk by E. Tempel

Page 14: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

L2: Processing data (IWGs)

• IWGs are organizationally under operations– close coordination with L1 pipeline– make sure data flow work throughout– apply best practices for heavy duty software

systems• The work is about science analysis and

requires surveys to take interest • The human resources for IWGs – come from the surveys (e.g. postdocs)– are delegated to operations

4MOST Operations | 09.07.2020 | CJ Walcher 14

Infrastructure Working Groups

Talk by S. Feltzing

Page 15: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

How to get help

• ESO USD– Usual level of support as for any other instrument– May use consortium Helpdesk as back-office

• Consortium Helpdesk– Reachable through mail ([email protected]) and

through the website www.4most.eu click on help. – Open to anyone: proposers, accepted surveys and

scientists, archive users, general public.– FAQ page and glossary.– This is the preferred way to address questions from

any science user: monitored, minimizes overheads.

4MOST Operations | 09.07.2020 | CJ Walcher 15

Page 16: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

4MOST Operations | 06.05.2019 | CJ Walcher 16

Page 17: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

Non-participating (NP) surveys

• Some surveys may be able to fill all fibers of 4MOST within their sky area– No need for parallel observing– No common observation preparations– No common selection function computation– No cross-talk on CCD, sharing of 1D spectra– No participation in Science Team activities– Some consortium services not applicable

4MOST Operations | 09.07.2020 | CJ Walcher 17

Page 18: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

Services for non-participating surveys

• Provide Observer Support Software (OpSys)– Can be used to create Observation Blocks

(alternative to P2 web interface)– Training by consortium – NP-surveys have to run themselves

• Provide reduced L1 data (DMS)– Exact same data reduction procedures as ST– Assumes calibration strategy is same as ST– L1 data contain all calibration and provenance info– QCS for feedback in case of problems

4MOST Operations | 09.07.2020 | CJ Walcher 18

Page 19: 4MOST Operations Walcher - ESO · Principles of operations for participating surveys •All participating surveys collaborate in the Science Team, also on science infrastructure •Consortium

Service NOT offered to NP-surveys

• Front-end– No operations simulations beyond online 4FS, no

support in survey strategy development – No target and progress database / completion

tracking• Back-end– No processing beyond calibrated spectra per arm,

all additional processing science-specific – No measurement of success per OB or per target

– visitor mode! – No submission of Phase 3 on behalf of NP-survey – No access to Science Team L2 pipelines

4MOST Operations | 09.07.2020 | CJ Walcher 19