1
Source: Thomas Guide, 2006 N 8800 0 4400 2200 Scale in Feet Pardee Substation 25 24 23 22 21 20 4 5 6 7 8 9 10 4. Veluzat Motion Picture Ranch 5. Single Family Residences (20) 6. Single Family Residences (8) and Mountainview Elementary School 7. Single Family Residences (53) 8. Mountain View Park 9. Single Family Residences (25) 10. Single Family Residences (44) 11. Multi-Family Residences (8), Chesebrough County Park, North Park Elementary School, and Church 12. Single Family Residences (28) 13. Single Family Residences (25) 14. Rio Notre Junior High School 15. Single Family Residences (40) See Table C.10-1 for more information. Aspen Environmental Group PREPARED BY Noise Sensitive Receptor Locations for the Proposed Project (Southern Portion) Figure C.10-3b C.10-7 Draft EIR/EIS Antelope-Pardee 500-kV Transmission Project C.10 NOISE July 2006 11 12 13 14 15 Proposed Project Sierra-Pelona Re-Route (Alt. 5)

4460 4550 Thomas SIL DECORO b REYBURN s I JNCE BLUESTCA … · 2006-07-17 · Single Family Residences (25) 14. Rio Notre Junior High School 15. Single Family Residences (40) See

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 4460 4550 Thomas SIL DECORO b REYBURN s I JNCE BLUESTCA … · 2006-07-17 · Single Family Residences (25) 14. Rio Notre Junior High School 15. Single Family Residences (40) See

Source: Thomas Guide, 2006

N 88000 44002200

Scale in Feet

Pardee Substation

25

24

23

22 21

20 4

5

6

7

8

9

10

4. Veluzat Motion Picture Ranch5. Single Family Residences (20)6. Single Family Residences (8) and Mountainview Elementary School7. Single Family Residences (53)8. Mountain View Park9. Single Family Residences (25)10. Single Family Residences (44)

11. Multi-Family Residences (8), Chesebrough County Park, North Park Elementary School, and Church12. Single Family Residences (28)13. Single Family Residences (25)14. Rio Notre Junior High School15. Single Family Residences (40)

See Table C.10-1 for more information.

AspenEnvironmental Group

PR

EPA

RED

BY

Noise Sensitive Receptor Locationsfor the Proposed Project (Southern Portion)

Figure C.10-3b

C.10-7Draft EIR/EIS

Antelope-Pardee 500-kV Transmission ProjectC.10 NOISE

July 2006

11

12

13

14

15

Proposed Project

Sierra-Pelona Re-Route (Alt. 5)