44-21!39!3602 HVAC Calculation-OSBL Rev.2

Embed Size (px)

Citation preview

  • 8/16/2019 44-21!39!3602 HVAC Calculation-OSBL Rev.2

    1/14

    EPC for Rumaitha/Shanayel Facilities-Phase IIIADCO PROJECT No. P44010

    ADCO CONTRACT No. 15678.01/EC 10884

    DOCUMENT / DRAWING COMMENTS RESOLUTION SHEET 

    1 / 1 

    GS Transmittal Reference  Date  Honeywell Transmittal Reference  Date 

    T-GS-HW-P44010-0110 12-OCT-2015 T-HW-GS-P44010-0078 03-MAR-2016

    Document / Drawing Document / Drawing Number  

    HVAC Calculation-OSBL 44-21-39-3602_Rev.2

    COMMENTS RESOLUTION SHEET

    Serial No. Page No./ 

    Sheet No. DS COMMENTS 

    Honeywell / HISCO RESPONSE /JUSTIFICATION 

    REMARKS/STATUS  

    Dodsal Comments 

    1  5

    as per HVAC design basis thesefactors and noise level all arerequired and need to maintainedwithin specified value

    Refer to Attachment #1.

    2 6 Substaion or ITR? Complied.

    3 6U factor calculation to be demonstrated forwall,roofsections and material of construction

    Refer to Attachment #2.

  • 8/16/2019 44-21!39!3602 HVAC Calculation-OSBL Rev.2

    2/14

    EPC for Rumaitha/Shanayel Facilities-Phase IIIADCO PROJECT No. P44010

    ADCO CONTRACT No. 15678.01/EC 10884

    DOCUMENT / DRAWING COMMENTS RESOLUTION SHEET 

    1 / 1 

     Attachment #1. (Refer to 44-21-40-3601 HVAC System Data Sheet and Catalog  – OSBL) 

  • 8/16/2019 44-21!39!3602 HVAC Calculation-OSBL Rev.2

    3/14

    EPC for Rumaitha/Shanayel Facilities-Phase IIIADCO PROJECT No. P44010

    ADCO CONTRACT No. 15678.01/EC 10884

    DOCUMENT / DRAWING COMMENTS RESOLUTION SHEET 

    1 / 1 

     Attachment #2. 

  • 8/16/2019 44-21!39!3602 HVAC Calculation-OSBL Rev.2

    4/14

     

    RUMAITHA/SHANAYEL FACILITIES - PHASE IIIADCO Contract No. : 15678.01 / EC 10884

    ADCO Project No. : P44010

    HVAC CALCULATION - OSBL

    2 03.MAR.2016 JS Lee SS Moon MS Kim Issued for Final

    1 09.SEP.2015 JS Lee SS Moon MS Kim Issued for Final

    A 05.JUN.2015 JS Lee SS Moon MS Kim Issued for Approval

    REV. DATE ORIGINATOR REVIEWED APPROVED DESCRIPTION

    THIS DOCUMENT IS INTENDED FOR USE BY ADCO AND ITS NOMINATED CONSULTANTS, CONTRACTORS, MANUFACTURERS ANDSUPPLIERS. 

    EQUIPMENT / ITEM NO.: Integrated Control and Safety System(ICSS) 

    CONTRACTOR: THE CONSORTIUM OF

    VENDOR / SUB-CONTRACTOR:

     ADCO DOC. No. 44-21-39-3602  PAGE 1 of 11 

    ORIGINATOR No.

    44-21-39-3602

     ADCO ProjectNo. P44010 

    Rev. 2  Date : 03.MAR.2016 

    CODE DESCRIPTION & INSTRUCTIONS SIGN DATE

    1 APPROVED WITHOUT COMMENTS

    VENDOR TO SUBMIT FOR FINAL

    2 APPROVED WITH COMMENTS

    VENDOR TO AMEND AND SUBMIT FOR FINAL

    3

     APPROVED WITH COMMENTS

    VENDOR TO AMEND AND

    RE-SUBMIT FOR APPROVAL

    4

    NOT REVIEWED/CONSIDERED

    UNACCEPTABLE QUALITY

    VENDOR TO RE-SUBMIT FOR APPROVAL

  • 8/16/2019 44-21!39!3602 HVAC Calculation-OSBL Rev.2

    5/14

    RUMAITHA/SHANAYEL FACILITIES - PHASE III

    HVAC CALCULATIONS -OSBL Rev. 2

     

    Doc. No. : 44-21-39-3602 Page 2 of 11 

    “WARNING: Unauthorized use and misappropriation of this material is strictly prohibited. This material /document contain Honeywell confidential information. You are hereby notified that any dissemination,distribution of copying which amounts to misappropriation of this material, is strictly prohibited. If you havereceived this material/document in error, please notify us immediately, and return the original

    material/document without making any copies to us at:Honeywell Co., Ltd.HPS Project Operation,4F, Sangam IT Tower B4-4Block 1590, DMC Sangam-Dong, Mapo-gu, Seoul, 121-835, KoreaTel: +82-2-2129-7150.”

    Revision Status

    Rev. Description of Change Date Status Prepared By

     A Issue for Approval 05 JUN 2015 J.S Lee

    1 Issue for Final 09 SEP 2015 Lee. JunSeok 

    2 Issue for Final 03 MAR 2016 Lee. JunSeok 

    Honeywell Checked By :SoonSic, Moon

    Signed : Date :03 MAR 2015

    Honeywell Approved By :Kim, MyoungSoo

    Signed : Date :03 MAR 2015

  • 8/16/2019 44-21!39!3602 HVAC Calculation-OSBL Rev.2

    6/14

    RUMAITHA/SHANAYEL FACILITIES - PHASE III

    HVAC CALCULATIONS -OSBL Rev. 2

     

    Doc. No. : 44-21-39-3602 Page 3 of 11 

    TABLE OF CONTENT

    1 General

    1.1 Purpose

    1.2 Reference Document

    2 Description and System Operation of Air Conditioning System

    3 Design Criteria

    3.1 External Conditions

    3.2 Indoor Conditions

    3.3 Heat Dissipation & Safety factor

    4 Air Conditioning System : Dimensioning

    5 Selection of Air Conditioning Equipment

  • 8/16/2019 44-21!39!3602 HVAC Calculation-OSBL Rev.2

    7/14

    RUMAITHA/SHANAYEL FACILITIES - PHASE III

    HVAC CALCULATIONS -OSBL Rev. 2

     

    Doc. No. : 44-21-39-3602 Page 4 of 11 

    1 General

    1.1 Purpose

    This specification is to define the basic engineering design data for use in the HVAC

    system of the ITR of the Phase lll Development Project in Shanayel, comprising the general

    requirements to be complied with in the project and a descriptive system.

    The air conditioning systems are intended to ensure appropriate conditions for occupants

    and equipment, through the cooling indoor air.

    1.2 Reference Document

    JOB Specification

    30.99.53.2601_SPECIFICATION FOR ETR / ITR SKID_Rev.1

    30.99.91.1685_HVAC DESIGN BASIS_RevE

    Vendor Document

    44-21-40-3601_HVAC SYSTEM DATA SHEET AND CATALOG – OSBL

    65-21-50-3603_HVAC LAYOUT DRAWINGS – OSBL

    65-21-50-3604_HVAC DETAIL DRAWINGS – OSBL

    2 Description and System Operation of Air Conditioning System

    It is about an installation designed to cool the air with operation 24 hours per day, in an ITR.

    The system will consist of single packaged air ACCU with high-capacity, mini split type, two

    effective and two redundant. They will attend the entire area of the ITR.

    It will be used as refrigerant R-410A and equipment operation will be cooling only. The ACCU

    will be air-cooled, with direct expansion and will have a redundancy level (2x50%). The ACCU

    will be installed internally on an appropriate basis. The air conditioning system will have a local

    control panel.

    The temperature control will be performed by a remote controller, with signals from temperature

    sensors installed in the environment.

    The HCP will provide the power control and the automation control of the ACCU. In case of fire

    accident, the HVAC systems will automatically turn off. The actuation of the smoke detectors

    shall result the HVAC operation in recirculation mode.

    3 Design Criteria

    Humidity, Over Pressure and Fresh air flow are not requirement for the ITR.

    3.1 External Conditions

     Design temperature

  • 8/16/2019 44-21!39!3602 HVAC Calculation-OSBL Rev.2

    8/14

    RUMAITHA/SHANAYEL FACILITIES - PHASE III

    HVAC CALCULATIONS -OSBL Rev. 2

     

    Doc. No. : 44-21-39-3602 Page 5 of 11 

    - Summer : 48℃  db / 30℃ wb

    - Winter : 6℃  db – HR 90%

    - Outdoor daily range : 15℃ 

    - Summer ambient temperature for selection of external units : 52℃ 

    The HVAC equipment will be selected to provide a down grated cooling capacity at maximum

    outdoor dry bulb temperature (DBT) of 46 ℃ on condenser side.

    3.2 Indoor Conditions

     Design temperature

    - Summer required temperature : 25℃ 

    - Winter required temperature : 20℃ 

    3.3 Heat Dissipation & Safety Factor

    The calculation of the heat dissipation and the overall balance for the ITR will be done

    taking into account :

      44-21-40-3610_POWER CONSUMPTION & HEAT DISSIPATION – OSBL_RevD ;

      Latent and sensible heat gains due to people (0 people per ITR) ;

      External heat losses due to Solar radiations, walls, ceiling and floor transmissions ;

     Additionally, the cooling load calculation includes a 15% safety factor.

  • 8/16/2019 44-21!39!3602 HVAC Calculation-OSBL Rev.2

    9/14

    RUMAITHA/SHANAYEL FACILITIES - PHASE III

    HVAC CALCULATIONS -OSBL Rev. 2

     

    Doc. No. : 44-21-39-3602 Page 6 of 11 

    4 Air Conditioning System : Dimensioning

    To the air conditioning Dimensioning it was used the program “ Hourly Analysis Program v4.51”

    from Carrier. 

  • 8/16/2019 44-21!39!3602 HVAC Calculation-OSBL Rev.2

    10/14

    RUMAITHA/SHANAYEL FACILITIES - PHASE III

    HVAC CALCULATIONS -OSBL Rev. 2

     

    Doc. No. : 44-21-39-3602 Page 7 of 11 

      Zone Sizing Summary for Cluster for Shanayel

  • 8/16/2019 44-21!39!3602 HVAC Calculation-OSBL Rev.2

    11/14

  • 8/16/2019 44-21!39!3602 HVAC Calculation-OSBL Rev.2

    12/14

    RUMAITHA/SHANAYEL FACILITIES - PHASE III

    HVAC CALCULATIONS -OSBL Rev. 2

     

    Doc. No. : 44-21-39-3602 Page 9 of 11 

      Input Data for Cluster for Rumaitha

  • 8/16/2019 44-21!39!3602 HVAC Calculation-OSBL Rev.2

    13/14

    RUMAITHA/SHANAYEL FACILITIES - PHASE III

    HVAC CALCULATIONS -OSBL Rev. 2

     

    Doc. No. : 44-21-39-3602 Page 10 of 11 

      Space Input Data for Cluster for Rumaitha

  • 8/16/2019 44-21!39!3602 HVAC Calculation-OSBL Rev.2

    14/14

    RUMAITHA/SHANAYEL FACILITIES - PHASE III

    HVAC CALCULATIONS -OSBL Rev. 2

     

    5 Selection of Air Conditioning Equipment

    The air conditioning units were selected based on heat dissipation calculation above.

    More information about the equipment can be find in the data sheet.

    (44-21-40-3601_HVAC SYSTEM DATA SHEET AND CATALOG – OSBL_Rev.1)

    Equipment Features

    Supplier YORK by Johnson Control

    Model Refer to Doc. No. 44-21-40-3601

    Type PACU – Direct Expansion – Cooling only

    Heat Exchanger Cross Fin Coil

    Compressor Type Inverter Rotary

    Refrigerant R410-A