40 40 Production and Operations Management

Embed Size (px)

Citation preview

  • 8/6/2019 40 40 Production and Operations Management

    1/37

    (Book ID: B1133)

    Set- 1 (60 Marks)

    1. Explainin briefthe origins ofJust in Time. Explain the different types ofwastes that can be

    eliminated using JIT.

    Ans. Just in time were developed to minimize wastage across the organization. If a firm is

    optimistic about the demand, then that firm increases their planned inventories. On the other hand

    if the demand is weak when compared to the expectations, then that firm s unplanned inventories

    are high. That means companies dont keep a lot of excess inventory, then manufacture a product

    as an order comes in. It is management philosophy of continuous and forced problem solving.

    Theseven types ofwastes to beeliminated according to JIT are :

    1 Over production

    Over production is to manufacture products before it is actually needed. If the demand for that

    product decreases, the extra parts or products produced may not be useful or needed. Also

    over production results in high storage costs and is also difficult to detect defects. So, over

    productions is considered a waste.

    2 Inventory.

    Excess procurement or production builds up stock of materials which are not immediately use,

    this locking space and fund carrying heavy cost.

    3 Waiting time.

    Waste of time happen when goods are not moving or being processed. The operator, the

    machine or the part will either be not working or be worked upon. The duration is can be said to

    be unproductive and may create more serious consequences.

    4. Movement

    Any unnecessary movement is a waste of energy; it causes blockages, disrupting movements

    and delaying the flow of other items creating delays.

  • 8/6/2019 40 40 Production and Operations Management

    2/37

    5. Effort:

    The people, who work, do not make a study as to how the products on which they are making

    are utilized and do not realize the purpose for which they are made. This lack of education will

    lead to waste of resources. Finally, they end up in shortage of resources whenneeded.

    6. Defectiveproducts.

    The defective products leads to a tremendous loss to the company. This is because they use up

    the same equipments, workmen and the time that would be used to make good products. Thus

    defective products use up resources and result in losses.

    7. Over Processing

    Some steps like unnecessary processing or production do not add value to the final output. As a

    results, it is waste of all the inputs that go into the process.

    Q.2 What isvalueengineering or valueanalysis ? Elucidatefive companies which have

    incorporate VE with briefexplanation.

    Ans. Value of engineering (VE) or value Analysis is a methodology by which we try to find

    substitutes for a product or an operation.

    The concept of value engineering originated during the second world war . It was developed by the

    General Electric corporations (GEC). Value Engineering has gained popularity due to its potential for

    gaining high Returns on investment (ROI). This methodology is widely used in business re-

    engineering, government projects, construction, assembling and machining processes, health care

    and environmental engineering, and many others. Value engineering process calls for a deep study

    of a product and the purpose for which it is used, such as the raw materials used; the processes of

    transformation; the equipment needed, and many others. It is also questions whether what is

    being used is the most appropriate and economical. This applies to all aspects of the products.

    1. GENERAL ELECTICALS CORPORATION (GEC)

  • 8/6/2019 40 40 Production and Operations Management

    3/37

    The concepts of value engineering originated in 1947 in General Electricals

    corporation (GEC) When a substitute for asbestos for flooring had to be found.

    Specialized dealers could provide an equally good material at a lesser price.

    Initially, the practioners were the people in charge of purchasing who tried to locate

    substitute material which would be equally good, ifnot better, at a lower price. This

    the first and basic approach to value engineering. A the concept percolated to the

    manufacturing departments, engineers applied the same principles and found that,

    they could use alternate materials, which were cheaper giving the same

    performance. It was also fund that dimensions and tolerance could be altered

    without affecting the performance of the part or the product. The investigations took

    them on the path of eliminating some operations. The focus was on the value of each

    bit materials, each operation. This approach led to the design stage.

    2. ASHOK LEYLAND.

    In implementation of VA, Ashok Leyland changed gear material from phosphor

    bronze to a less expensive cast iron and eliminated frequent field complaint of gear

    seizure in trucks.

    3. TVS.

    T.V. Sundaram Lyenger (TVS) Limited is one of the largest automobile distribution

    companies in India.

    During the mid 1940 to 1960s, TVS based in Madurai was ranked as the best bus

    transportation system in India. It could manage to run the fleets for about 96% of the

    time.

    TVS used the VE approach to restore the mobility of buses that had broken down.

    They stocked their garage with some critical assemblies of a bus. Wheneve r, a part or

    an assembly failed of a bus, they replaced it immediately with a new one, thus

    restoring mobility within a couple of hours.

  • 8/6/2019 40 40 Production and Operations Management

    4/37

    When compared to the traditional method, this approach has gained much more

    benefits to the company, it helped to save time, reduce cost, efficient, quicker, and

    competitive.

    4. MODI XEROX.

    Modi Xerox designed the VE-d low cost copier 1025 ST, which uses a single tray. The

    advantage ofnew design is that it is easy to operate and the cost is also very low.

    5. TITAN

    Titan

    watches in

    troducedn

    ew design

    s adoptin

    g a strategy of inn

    ovation

    .

    Q.3 Explain different types of quantitative models. Differentiate between work

    study and motion study.

    Ans. There are different quantitative models.

    1. LINEAR PROGRAMMING: Linear programming technique is often used for

    optimizing a given objective like; profit or revenue maximization, or cost outgo

    minimization. Distribution of the revenues is the critical issue, when there are

    limited resources and they have to meet competing demands.

    2. TRANSPORTATION MODEL: Transportation model is concerned with goods

    from manufacturing centres or warehouses which have to be supplied to

    depots or retails outlets. The demand and supply position of the places where

    they are required or produced and the cost of transportation are considered in

    the model. We use this model to economize.

    3. ASSISGNMENT MODEL: Allocating jobs or persons to machines, awarding

    different projects to contractors is done so that maximum returns occur or less

    expenses are incurred. Hence, calls for the use of this model.

    4. INVENTORY CONTROL MODEL: Inventory control model considers the:

  • 8/6/2019 40 40 Production and Operations Management

    5/37

    y Frequency of placing orders.

    y Quantities per order considering the cost of placing an order.

    y Number of pieces that are to be kept in reserve.

    y Rate of consumption.

    y Lead time required for the supplier.y Cost involved in storage.

    We have different models which give solutions to optimization depending

    upon the probabilities of consumption and supply.

    5. WAITING LINE MODELS: Queues are formed when the rate of services is at a

    variance with the rate of arrival. They are formed when the rate of production

    is less at particular points compared to the previous one. Sometimes we see

    multiple service points and a single queue are formed for feeding them.Number of items which includes the following is studied with some special

    techniques.

    y People to be serviced.

    y Rate of service

    y Type of queue discipline that is intended to be followed.

    y Policy of priority

    y Tolerable amounts of waitin

    y

    Others.6. SIMULATION MODELS: Simulation models are used when we will not be able

    to formulate mathematical model. So, we develop a model which resembles a

    real life situation. Based on this pattern, we predict and plan our procurement,

    production, delivery and other actions.

    7. PERT (PROJECT EVALUATION AND REVIEWTECHNIQUE) AND CPM (CRTICAL

    PATH METHOD) MODELS:When projects are undertaken with a number of

    activities, some happens in sequence, with gaps of weeks or months and some

    happens simultaneously. It is important to estimate the time required for

    completion of the project. A lot of coordination is needed while supplying the

    resources. It is also equally important to identify the bottlenecks and

    smoothen resources so that time schedules are maintained. Delayed

    completion may entail penalties. In this model, we adopt special methods to

    make the system.

  • 8/6/2019 40 40 Production and Operations Management

    6/37

    Q.4 What is rapid prototyping ? Explain the difference between Automated flow line and

    Automated assembly line with examples.

    Work study Motions study.

    We can say that work study is being

    conducted when analysis of work

    methods is conducted during the period

    when a job is done on a machine or

    equipment.

    Method study is on studying the method

    currently being used and developing a new

    method of performing the task in a better

    way.

    The study helps in designing the

    optimum work method and

    stan

    dardization

    of the work method.

    Operation flow charts, motion charts, flow

    process charts, which are the elements of the

    task are studied to fin

    d the purpose of eachactivity, the sequences in which they are

    done, and the effect of these on the work.

    The study enables the methods

    engineer to search for better methods

    for higher utilization of man and

    machine and accomplishment of higher

    productivity.

    The study may help in changing some of

    them and even eliminate some of them to

    effect improvements.

    The study gives an opportunity to the

    workmen to learn the process of study

    thus making them able to offer

    suggestions for improved methods.

    The new method should result in saving of

    time, reduced motions and simpler activities.

  • 8/6/2019 40 40 Production and Operations Management

    7/37

    Ans. Prototyping is a process by which a new prod uct is developed in small numbers.

    Prototyping is helpful to:

    y Determine the suitability of the materials

    y Study the various methods of manufacture

    y Determine type of machinery required

    y Develop techniques to overcome problems that may be encountered when full scale

    manufacturing is undertaken.

    Prototype do meet the specification of the components that enter a product and performance can

    be measured on those. It helps in confirming the design and any shortcomings can be rectified at

    low cost. If serious def ects or problems arise during manufacturing, a thorough change in design or

    even its replacement may be considered. Toa arrive at decisions and to make use of the

    advantageous stated above, it is important that the prototypes are made within the shortest

    possible time, Rapid prototyping facilities this.

    The advanced Rapid Prototype Modelling Processes are:

    ComputerAided Design (CAD)

    Selective Laser Sintering (SLS)

    Fused Deposition Modelling (FDM)

    Lamination Object Manufacturing (LOM)

    Electronic Beam Melting (EBM)

    Different between Automated Flow lines and Assembly Flow line.

    AUTOMATED FLOW LINES ASSEMBLY FLOW LINES

    Several Automated machines are linked by a All equipments are needed to in automated

  • 8/6/2019 40 40 Production and Operations Management

    8/37

    transfer system. Assesmbly line

    Handling machine have main role to move semi

    finished product to the next stage.

    All equipments make role of making sub-assemblies

    put together and fitted.

    Semi-finished products are the main core

    activities.

    Here Sub-assemblies product are the core activites.

    Here raw materials are achieving to get required

    shapes and acquire special properties.

    Here intermediated products are achieving to get

    finished product.

    The materials are needed to be moved, held,

    rotated, fitted and positioned for completing

    different operations.

    Here All parts or sub-assemblies are fitted to enables

    the product to be in readiness to perform the

    function it was designed to. This process is called

    assembly.

    Human intervention may be needed to verify

    that the operations are taking place according to

    standards.

    No human intervention is needed, methodologies

    are framed to achieve the final result, basic principle

    is to fit parts together and ensure linkages so that

    the functions are integrated and give out the desired

    output.

    Q.5 Explain Break even Analysis and centre of gravity methods. Explain product layout and

    processlayout with examples.

    Ans. Break even analysis

    Every manufacturing company will have three major contributors to cost;

    1. Investments made for land, plant and machinery r esulting in interest and depreciation.

    2. Recurring expenses, which are not proportional to the quantity of production.

    3. Variable costs, which are directly proportional to the quantity produced.

    For our calculations, we combine the first two costs together and call them fixed costs. We call

    those costs that depend on the quantity of production as variable costs.

    We compare the total costs for different locations on estimated amounts per annum and select

    whichever locations costs the least. However we will have to consider the possible variations in

    production levels during the foreseeable time spans and take decision.

  • 8/6/2019 40 40 Production and Operations Management

    9/37

    CENTRE OF GRAVITY METHOD.

    Centre of gravity method is used mainly when;

    y Transportation costs, either for distribution of products or collection of materials from

    different suppliers is the main criterion.

    y Production rates are high.

    y The volume and weights of materials that have to be moved are huge.

    y Time taken either to receive materials from suppliers or delivery to customers is critical.

    It is better to locate the facility at such a place, which caters to the different points most optimally.

    The vital factor is the load, that is, number of items, or the weights that need to be moved from the

    central location to the existing or demanding point. We use this method when, both distance and

    load have to be considered for optimality in terms of costs.

    PRODUCT LAYOUT

    Product layout is also called as production lines or assembly lines. They are designed and laid out in

    such a way that only few products are capable of being manufactured or assembled. Materials flow

    through the various facilities. These use special machines to perform specific operations to produce

    only one product at one time. So, companies should set different set of machines for different

    products. Workers perform a narrow range of activities to complete the operations on the product

    as it moves in a flow line. The operation times, the sequence of movements and routing procedures

    are highly standardized to meet production requirements which are synchronized with many such

    TO THECOST

    CONTRIBUTING

    COMPANIESMAJOR

    CONTRIBUTORSTOCOST

    FIXED COSTS

    LAND,PLANTAND

    MACHINERY

    RECURRINGEXPENSES

    VARIABLECOSTS

    PRODUCTIONCOST

  • 8/6/2019 40 40 Production and Operations Management

    10/37

    products to complete finished goods to meets demands. Using special machines and implementing

    standardization in operations have many advantages which are listed below:

    y The skill required of the workers is low

    y Supervision is minimal

    y Training needs are small

    Precautions to be taken are:

    y Constant check on the processes needs to be performed so that quality is assured.

    y Corrective measures have to be implemented to avoid rejections, since, the quantities that

    get manufactured will be continuous.

    y Check for the behavioral of the worker. As jobs are repetitive, workers tend to be bored and

    lose concentration. This may affect productivity and quality.

    Example:

    Let us consider an examples of a stainless steel manufacturing industry, in which the operations

    turning, milling and drilling happen in a sequence. Testing is performed in each process to assure

    the quality. The items are then sent to the assembly block. The items that arrive for assembly are

    either bought out items or made item components from elsewhere in the plant. The final product

    inspection is made and send to the packing dispatch.

    TURNINGOPERATION

    MILLINGMACHINES

    DRILLINGMACHINES

    PACKING

    DISPATCH

    INSPECTION ASSSEMBLY

    PROCESS LAYOUT

    DESIGN OF PROCESS LAYOUT

    The analysis involved in the design of production lines and assembly lines relates primarily to

    timing, coordination, and balance among individual stages in the process.

    For process layouts, the relative arrangement of departments and machines is the critical

    factor because of the large amount of transportation and handling involved.

  • 8/6/2019 40 40 Production and Operations Management

    11/37

    PROCEDURE FOR DESIGNING PROCESS LAYOUTS

    Process layout design determines the best relative locations of functional work centres.Work

    centres that interact frequently, with movement of material or people, should be located close

    together, whereas those that have little interaction can be spatially separated. One approach of

    designing an efficient functional layout is described below.

    1. List and describe each functional work centre.

    2. Obtain a drawing and description of the facility being designed.

    3. Identify and estimate the amount of material and personnel flow among work centres

    4. Use structured analytical methods to obtain a good general layout.

    5. Evaluate and modify the layout, incorporating details such as machine orientation, storage

    area location, and equipment access.

    The first step in the layout process is to identify and describe each work centre. The

    description should incl ude the primary function of the work centre; drilling, new accounts, or

    cashier; its major components, including equipment and number of personnel; and the space

    required. The description should also include any special access needs (such as access to runn ing

    water or an

    elevator) or restriction

    s (it must be in

    a clean

    area or away from heat).

    For a new facility, the spatial configuration of the work centres and the size and shape of

    the facility are determined simultaneously. Determining the locations of special structures and

    fixtures such as elevators, loading docks, and bathrooms becomes part of the layout process.

    However, in many cases the facility and its characteristics are a given. In these situations, it is

    necessary to obtain a drawing of the faci lity being designed, including shape and dimensions,

    location

    s of fixed structures, an

    d restriction

    s on

    activities, such as weight limits on

    certain

    parts

    of a floor or foundation.

  • 8/6/2019 40 40 Production and Operations Management

    12/37

    Fig 2.11Relationship flow diagram

    To minimize transport times and material-handling costs, we would like to place close

    together those work centres that have the greatest flow of materials and people between them.

    To estimate the flows between work centres, it is helpful to begin by drawing relationship diagram

    as shown in Fig. 2.11.

    For manufacturing systems, material flows and transporting costs can be estimated reasonably

    well using historical routings for products or through work sampling techniques applied to workers

    or jobs. The flow of people, especially in a service system such as a business office or a

    university administration building, may be difficult to estimate precisely, although work sampling

    can be used to obtain rough estimates.

    The amounts and/or costs of flows among work centres are usually presented using a flow

    matrix, a flow-cost matrix, or a proximity chart.

    Q.6 Explain Jurans Quality Trilogy and Crosbysabsolutes ofquality. List out thepillars of total

    productivemaintenance.

    Ans.JURANS QUALITYTRIOLOGY

    Juran uses his famous universal Breakthrough Sequence to implement quality programmes. The

    universal break through sequences are ;

    y Proofofneed: there should be a compelling need to make changes.

    y Project identification: here what is to be changed is identified. Specific projects with time

    frames and the resource allocation are decided.

    y Topmanagement commitment:Commitment of the top management is to assign people

    and fix responsibilities to complete the project.

  • 8/6/2019 40 40 Production and Operations Management

    13/37

    y Diagnostic journey:Each team will determine whether the problems result from systemic

    causes or are random or are deliberately caused. Root causes are ascertained with utmost

    certainty.

    y Remedial Action: This is the stage when changes are introduced. Inspection, testing, and

    validation are also included at this point.

    y Holding on to thegains: the above steps results in beneficiary results. Having records or all

    actions and consequences will help in further improvements. The actions that results in the

    benefits derived should be the norm f or establishing standards.

    JURAN HAS CATEGORISED COSTOF QUALITY INTO FOUR CATEGORIES:

    1. Failure costs internal: These are cost of rejections, repairs in terms of materials, labour,

    machine time and loss of morale.

    2. Failure costs-External: These are cost of replacement, on-site rework including spare parts

    and expenses of the personnel, warranty costs and loss of goodwill.

    3. Appraisal costs: These are cost inspection, including maintenance of records, certification,

    segregation costs, and others.

    4. Prevention costs: Prevention cost is the sequence of three sets of activities, Quality

    planning, Quality control, and Quality improvement, forming t he triology to achieve TOTAL

    QUALITY MANAGEMENT.

    JURANS ARGUMENTSAYS THAT;

    y Quality is the result of good planning consideration the needs of both internal and external

    customers and develops processes to meet them. The processes are also planned to meetthem.

    y Quality is built into the system of manufacture, inputs and processes that are on stream like

    raw material, spare parts, labour, machine maintenance, training, warehousing, inspection

    procedures, packaging, and other. All these have to follow standards and control exercises

    to make sure that mistake do not occur often and that if mistakes do occur then they are

    corrected at the source.

    y Quality improvement measures are essential to keep the quality culture alive. Newer

    methods will be found, some operations can be eliminated, improved technology available.

    In short, as experience is gained things can always be done better. IT is for the management

    to take the initiative an encourage the employees to be on lookout for opportunities for

    improvement.

    CROSBYS ABSOLUTES OF QUALITY

  • 8/6/2019 40 40 Production and Operations Management

    14/37

    Like Deming, Crosby also lays emphasis on top management commitment and responsibility for

    designing the system so that defects are not inevitable. He urged that there be no restriction on

    spending for achieving quality. In the long run, maintaining quality is more economical than

    compromising on its achievement. His absolutes can be listed as under:

    y

    Quality is con

    forman

    ce to requiremen

    ts,n

    ot goodn

    essy Prevention, not appraisal, is the path to quality.

    y Quality is measured as the price Paid for non-conformance and as indices

    y Quality originates in all factors. There are no quality problems. It is the people designs and

    processes that create problems.

    Crosby also has given 14 points similar to those of Deming. His approach emphasizes on

    measurement of quality, increasing awareness, corrective action, error cause removal and

    continuously reinforcing the system, so that advantages derived are not lost over time. He opined

    that the quality management regimen should improve that overall health of the organization and

    prescribed a vaccine. The ingredients are.

    1. Integrity: Honesty and commitment help in producing everything right first time, every

    time.

    2. Communication: Flow of information between departments, suppliers, customers helps inindentifying opportunities.

    3. Systems and operations: These should bring in a quality environment so that nobody iscomfortable with anything less than the best.

    TOTAL PRODUCTION MAINTENANCE (TPM)

    Maintenance is a function in any operations system. Maintenance keeps the equipments in good condition.

    Generally equipments deteriorate because usage wear to the parts introducing inaccuracies on the products

    made on them. When the deterioration produces components which exceeds the permitted deviations

    rendering them unacceptable, maintenance is undertaken to bring back the machine to produce acceptable

    components. Sometimes the failure is sudden and serious and the equipment stops working. Disruption of

    production and emergency repairs works are costly and schedules are missed causing delays in supplies and

    consequent losses. These breakdowns occur because the equipment was carrying hidden defects which

    were not apparent. All theses are attended to by the maintenances department. Historical records indicate

    the probability of failures over different periods thus enabling us to plan to attend to them. With progress in

    automation, we have costly equipments. We have flow lines and any one machine breaking down causes a

    series of machine to be idle. So, we have to move towards zero breakdowns like we want to move towards

    zero defects by implementing TQM Tools.

    TPM puts the responsibility of maintenance where it belongs to and the operator who uses the equipment. It

    is a companywide activity which involves all the people. The main thrust is eliminating all break downs. The

    focus is on the operating personnel because they would know about malfunctioning earlier and more than

  • 8/6/2019 40 40 Production and Operations Management

    15/37

    anybody else. They work on the machine and are aware of the slightest variations that occur and thus should

    be able to plan to remove the cause before it becomes serious. So every planned maintenance activity

    reduces the probability of a breakdown, Ownership of the operation and machine increases the

    commitment of the workmen. Autonomy is the starting point for learning and excellence. The worker can

    suggest better ways of improving quality, productivity, and design. This help in continuous improvement,

    Team work an

    d participation

    improves the quality culture. The prin

    ciples of 5S- the housekeepin

    g activitieswhich improve efficiency at workplace is considered a measurable standard to aid the implementation at

    TPM even in the office rooms.

  • 8/6/2019 40 40 Production and Operations Management

    16/37

  • 8/6/2019 40 40 Production and Operations Management

    17/37

    (Book ID: B1133)

    Set- 2 (60 Marks)

    Q1. EXPLAIN LOGICAL PROCESS MODELLING AND PHYSICAL PROCESS MODELLING.

    WHAT ARE THE INGREDIENTS OF BUSINESS PROCESS?

    ANS.LOGICAL PROCESS MODELLING

    Logical process modeling is the representation of putting together all the activities of

    business process in details and making a representation of them.

    The initial data collected need to be arrange in a logical manner so that, links are

    made betweennodes for making for the workflow smooth. The steps to be followedto make the work smoother are given below:

    1. Capture relevant data in detail to be acted upon.

    2. Establish controls and limit access to the data during processes execution

    3. Determine which task in the process is to be done and also the subsequent

    task in that process.

    4. Make sure that all the relevant data is available for all the tasks.

    5. Make the relevant and appropriate data available for that task.

    6. Establish a mechanism to indicate acceptance of the results after every task orprocess. This is to have an assurance that flow is going ahead with

    accomplishments in the desired path.

    Some of these activities may occur in a sequential order whereas, some of them run

    parallel. There may even be circular paths, like re -work loops. Complexities arise

    when the processes activities are not connected together.

    Logical processes model consists of only the business activities and shows the

    connectivity among them. The process model is a representation of the businessactivities different from the technology dependent ones. Thus, we have a model that

    is singularly structured only for business activities. Computer programmes are also

    present in the total system. This allows the business oriented executives to be in

    control of the inputs, processes and outputs. The logical process model improves,

  • 8/6/2019 40 40 Production and Operations Management

    18/37

    control on the access to data. It also indentifies, who is in possession of data at

    different nodes in the dataflow network that has been structured.

    A few of the logical modeling formats are given below.

    1. Process Descriptions with task sequences and data addresses.2. Flow chart with various activities and relationships

    3. Flow diagrams

    4. Function hierarchies

    5. Function dependency diagram

    Every business activity, when considered as a logical process model, can be

    represented by a diagram, it can be decomposed and meaningful names can be given

    to the details. Verb and noun form combinations can be used to describe at each

    level. Nouns give the name of the activity uniquely and are used for the entire model

    meaning the same activity.

    PHYSICAL PROCESS MODELLING

    Physical process modeling is concerned with the actual design of data base meeting

    the requirement of the business.

    Physical modeling deals with the conversion of the logical model into a relation

    model. Object gets defined at the schema level. The objects here are tables created

    on the basis of entities and attributes. A database is defined for the business. All the

    information is put together to make the database software specific. This means that

    the objects during physical modeling vary on the database software being used. The

    outcomes are server model diagrams showing tables and relationships with a

    database.

    BELOWARE THE INGREDIENTS OF BUSINESS PROCESS.

    The ingredients that might be used in a business process can be briefly outlined as

    shown below.

    y The data which accomplishes the desired bus iness objective.

  • 8/6/2019 40 40 Production and Operations Management

    19/37

  • 8/6/2019 40 40 Production and Operations Management

    20/37

    WORK BREAK DOWN STRUCTURE.

    Theen

    e process of a projec

    may becons

    ere to be made up onnumber ofsubprocess placed

    in different stagecalled the work breakdownstructure (WBS

    WBS is the technique to analysis the content of work and cost by breaking it down into its

    component parts rojects keystages from the highest level of the WBS which is then used to show

    the details at the lower levels of the project. Each keystagecomprises many task identified at the

    start of planning and later this list will have to bevalidated.

    WBS is produced by indentifying the keyelements breaking each elements down into component

    parts and continuing to breakdown until manageable work packages have indentified. These can

    ROJECTMA AGEME T

    ROJECTI TERGRATIO

    MA AGEME T

    ROJECT COSTMA AGEME T

    ROJECTCOMMU ICATIO

    ROJECT SCO EMA AGEME T

    ROJECT QUALITY

    MA AGEME T

    ROJECT RISKMA AGEME T

    ROJECT TIMEMA AGEME T

    ROJECT HR

    MA AGEME T

    EXECUTI G ROCESSES

  • 8/6/2019 40 40 Production and Operations Management

    21/37

    then be allocated to the appropriate person. The WBS does not shown dependencies other than a

    grouping under the key stages. It isnot time based - there isno timescale on the drawing.

    Chart showing the example of work break down structure.

    A Work Breakdown Structure is a results-oriented family tree that captures all the work of a project

    in an organized way. It is often portrayed graphically as a hierarchical tree, however, it can also be a

    tabular list of "element" categories and tasks or the indented task list that appears in your Gantt chart

    schedule. As a very simple example, Figure 1 shows a WBS for a hypothetical banquet.

    EXAMPLE 1.

  • 8/6/2019 40 40 Production and Operations Management

    22/37

    EXAMPLE -2

  • 8/6/2019 40 40 Production and Operations Management

    23/37

    Q.3 T AKE AND EXAMPLE OF ANY PRODUCT OR PROJECT AND EXPLAIN PROJECT MANAGEMENT

    LIFE CYCLE.

    ANS. A life cycle of a project consists of the following steps.

    y Understanding the scope of the project.

    y Establishing objectives of the projects

    y Formulating and planning various activities.

    y Executing the project

    y Monitoring and controlling the project resources.

    y Closing and post completion analysis

    PHASES OF PROJECT MANAGEMENT LIFECYLCE.

    Project man

    agemen

    t life cycle has six phases:

    1. Analysis and evaluation phase.

    2. Marketing phase

    3. Design phase

    4. Execution phase

    5. Control-inspecting, testing, and delivery phase

    6. Closure and post completion analysis phase.

    1. ANALYSIS AND EVALUATION PHASE: Analysis and evaluation phase is the initial phase ofany project. In this phase, information is collected from the customer pertaining to the

    project. From the collected information, the requirements of the project are analyzed.

    According to the customer requirement, the entire project is planned in a strategic manner.

    The project manager conducts the analysis of the problem and submits a detailed report to

    the top management.

    2. MARKETING PHASE: A project proposal is prepared by a group of people including the

    project manager. This proposal has to contain the strategic adopted to market the product

    to the customer.

    3. DESIGN PHASE: Design phase involves the study of inputs and outputs of the various project

    stages.

    a. Inputs received consist of project feasibility study, preliminary project evaluation

    details, project proposal, and c ustomer interviews.

    b. Outputsproduced consist of system design specifications, functional specifications

    of the project, design specifications of the project and project plan.

  • 8/6/2019 40 40 Production and Operations Management

    24/37

    4. EXECUTION PHASEIn execution phase, the project manager and the term members work on

    the project objectives as per the plan. At every stage during the execution, reports are

    prepared.

    5. Control- inspecting testingand delivery phase: During this phase, the project teams works

    under the guidance of the project manager. The project manager has to ensure that the

    team working under him is implementing the project designs accurately. The project has to

    be tracked or monitored through its cost, manpower, and schedule. The project manager

    has to ensure ways of managing the customer and marketing the future work, as well as

    ways to perform quality control work

    6. Closureand post completionanalysisphase: Upon satisfactory completion and delivery of

    the intended product or service the staff performance has to be evaluated. The project

    manager has to document the lessons from the project. Reports on project feedback are to

    be prepared and analyzed. A project execution report is to be prepared.

    Let us havea quick recap ofwhat isinvolved in theabovephases

    a. Analysisand evaluationphase: The preparation stage involves the preparation and

    approval of project outline, project plan, and project budget.

    b. Assigning task to the teammembers: The next stage involves selecting and briefing

    the project team about the proposals, followed by discussions on the roles and

    responsibilities of the project member and the organization.

    c. Feasibility study: The feasibility or research stage establishes whether the project is

    feasible or not and establishes the risk factors likely to be faced during the course of

    the project execution and the related key factors to overcome the problem

    d. Executionphase:A detailed definition and plan for the project and its execution is

    prepared by the team and coordinated by the project manager.e. Implementation stage: The implementation stage involves the execution of the

    project as per the plan, this also involves careful monitoring of the project progress

    and managing the changes, if any, within the scope of the project framework.

    7. Closureand post completionanalysisphase: The final stage involves satisfactory delivery of

    the product/service to the customers. Upon completion, a project review is to be conducted

    by the project manager along with team member, sponsors, and customer. A project review

    process involves discussions about the progress, performance, hurdles that were overcome

    and problems faced , so that, such instances could be avoided in future projects.

    ExampleNo.1

  • 8/6/2019 40 40 Production and Operations Management

    25/37

    ExampleNo.2

  • 8/6/2019 40 40 Production and Operations Management

    26/37

    ExampleNo.3

    Q.4 EXPLAIN PMIS. WHATIS DIFFERENCEBETWEEN KEY SUCCESS FACTOR (KSF) AND KNOWLEDGE

    (K) FACTOR ? EXPLAINWITH EXAMPLES.

    ANS. PMIS (PROJECTMANAGEMENT INFORMATION SYSTEM)

    An information system is mainly aimed at providing the management at different levels with

    information related to the system of the organization. It helps in maintaining discipline in the

    system.

    An information system dealing with project management tasks is the project management

    information system. It helps in decision making in arriving at opti mum allocation of resources. The

    information system is based on a database of the organization. A project management information

    system also hold schedule, scope changes, risk assessment and actual results.

    The information is communicated to managers at different levels of the organization depending

    upon the need. Let us find how a project management information system is used by different

    stakeholders.

  • 8/6/2019 40 40 Production and Operations Management

    27/37

    WHONEEDS INFORMATION AND WHY?

    Upper managers To know information on all project regarding progress,

    problem, resource usage, costs and project goals. Thisinformation helps them take decisions on the projects. They

    should review the projects at each milestone and arrive at

    appropriate decision.

    Project manager and department

    managers

    To see each project schedule, priority and use of resources to

    determine the most efficient use across the organization.

    Project team members To see schedule, task lists and specification so that they know

    what needs to be done next.

    Thefoursmajorsaspects ofa PMIS are:

    1. Providing information to the major stakeholder.

    2. Assisting the team members, stakeholders, managers with necessary information and

    summary of the information shared to the higher level managers.

    3. Assisting the manager in doing what if analysis about project staffing, proposed staffing

    changes and total allocation of resources.

    4. Helping organizational learning by helping the members of the organizations lean about

    project management.

    Usually, the team members, and not the systems administrators of the company, develop a good

    PMIS. Organisations tend to allocate such responsibility by rotation among members with a well

    designed and structured data entry and analytical format.

    DIFFERENT BETWEENKEY SUCCESS FACTORS (KSF) AND KNOWLEDGE (K) FACTOR

  • 8/6/2019 40 40 Production and Operations Management

    28/37

    Key successfactors (KSF) Knowledge (k) factor

    The KSF should be evolved based on a basic

    consensus document (BCD)

    Knowledge is the most powerful mover of the

    wheels of progress

    KSF will also provide an input to effective exit

    strategy (EES)

    Knowledge (k) factor is an index of the extent to

    which one can manager today with yesterdays

    knowledge content and also the extent to which

    todays knowledge will be used tomorrow.

    Broad level of KSF should be available at the

    conceptual stage and should be firmed up and

    detailed out during the planning stage. The

    easiest way would be for the team to evaluate

    each step for chances of success on a scale of

    ten.

    K factor would render the development process

    more productive. The k factor of course,

    undergoes correction through obsolescence, since

    changes are now phenomenal.

    KSF should be available to the management,

    duly approved by the project manager before

    execution and control stages.

    Leaders should recognize the knowledge potential

    of the younger managers. Seniority is no more an

    automate scale for knowledge. It is equally

    important for younger member not suppress their

    knowledge potential from its application.

    KSF rides normal consideration of time and

    cost- at the levels encompassing client

    expectation and management perception-time

    and cost come into play as subservient to thesemajor goal.

    Here time and cost does not matter, knowledge is

    to be updated time to time to get better results.

    In order to provide complete stability to

    fulfillment of goals, a project manager needs to

    constantly evaluate the key success factor from

    time to time.

    As age and experience advance wisdom gains, but

    knowledge should always be updated and utilized.

    It is the task of every team members to maximize

    the k factor in all directions.

    Example ofKey successfactor

    According to TeachMeFinance.com, a turnkey project is "a project in which a builder/developer

    contracts to construct a completed facility that includes all items necessary for use and

    occupancy." Unfortunately, many turnkey businesses never capture the interest of the buyers.

    Whether you're building in brick and mortar or building in computer code, there are several

    factors critical to the success of your turnkey project.

  • 8/6/2019 40 40 Production and Operations Management

    29/37

    Know the Business

    Several businesses can be set up as turnkey businesses, from food service to copy

    management to telemarketing and sales. Whichever you decide, it is important to have an

    intimate knowledge of the business you are building. One key factor in a successful turnkey

    business is being able to anticipate the needs and desires of the potential owners before theyare brought on board. A salesman, for example, looking to purchase a turnkey sales business

    will need an office as a base of operations; but since so much of the sales process is done

    through phones, computers and other electronic devices, the turnkey developer may want to

    include additional power outlets in the construction of the building, or desks with o nboard power

    strips and surge protectors. These small additions can make a turnkey project a success.

    Know the Area

    Internet businesses often have nationwide access to clientele, but brick -and-mortar turnkey

    operations sometimes run into trouble in areas poorly suited to the service they offer. For

    example, an outdoor food service stand opening in Wilkes -Barre, Pennsylvania, will not do asmuch business (at least during the winter months) as one opening in an Orlando, Florida,

    theme park. Knowing the area where you are constructing your turnkey business includes

    knowing the weather conditions, the dominant demographic, the current popularity and number

    of businesses like the one you are creating and the average income of the public. Planning a

    turnkey business that uses these factors to its advantage will make the business more readily

    sellable.

    Make Connections

    Turnkey businesses are designed to be ready to operate as soon as the buyer takes ownership.

    Still, once they are sold, many businesses of this type run into problems when it comes toresupplying, logistics and advertising. Because of this, many buyers are wary of turnkey

    operations. One way to quell any "down the road" fears is to have this part of the infrastructure

    accounted for. Make contact with businesses which help advertise businesses, ship products,

    supply copy paper and any other stock the owner might require. Obtain discounts from as many

    as possible

    Example ofKnowledge (k) factor

    ABSTRACT

    Most organisations are aware that in todays highly competitive environment managing effectively

    their knowledge is the only way to achieve a sustainable competitive advantage. One of the primary

    areas to which knowledge management can be applied is the field of project management. An

    increasing number of business sectors are adopting a project approach to carry out a range of

    essential activities where valuable knowledge is gained. Knowledge from projects is an important

    resource for further projects, because projects solve innovative and interdisciplinary tasks. However,

    the majority of organisations do not manage the information gained through past projects. Failure to

    transfer knowledge from past to future projects leads to wasted activity and unnecessary expenses by

  • 8/6/2019 40 40 Production and Operations Management

    30/37

    reinventing the wheel. Therefore, knowledge management is a critical success factor for manyprojects.

    The purpose of this Management Report is to approach knowledge management from the perspective

    of project management. The main objective is to define how knowledge management can be

    enhanced within a project by analysing suitable tools and relevant theories. The research is based on

    the high-speed train project XY of the company XXX. This project is an important milestone forXXX to improve its market position in Spain. The knowledge gained through the XY project will be

    the key factor for the success of the further high-speed train projects.

    The main finding of the case study highlights that there is a lack of formal knowledge management

    activities at the project. The project team focuses mainly on personal interaction for transferring

    knowledge and information technology is not used to its full potential. A hybrid approach to

    knowledge management for project environments is suggested, taking into account technical as well

    as human-specific aspects. The main recommendation is to determine a knowledge management

    strategy, which preferably focuses on transferring tacit knowledge and gives information technology

    a support function. Other areas of improvement are creating an open and constructive project culture,

    including knowledge initiatives in reward systems and fostering documented project review sessions.

    Finally, general conclusions are provided to answer the main research question of this managementreport.

    Q.5 EXPLAINTHE SEVEN PRINCIPAL OF SUPPLY CHAIN MANAGEMENT.TAKE AND EXAMPLE OF

    ANY PRODUCTINTHE MARKETAND EXPAINTHE SECENRIO OFBULLEHIP EFFECT.

    Ans: Seven principles of SCM are:

    1. Group customer by needs: Effective SCM groups customers by distinct service needs,

    regardless of industry and then tailors services to those particular segments.

    2. Customize the logisticsnetworks: In designing their logistic network, companies need to

    focus on the service requirement and profit potential of the customer segments identified.

    3. Listen to signals ofmarket demand and planaccordingly: sales and operations planners

    must monitor the entire supply chain to detect early warning signals of changing customers

    demand and needs. This demand driven approach leads to more consistent forecast and

    optimal resource allocation.

    4. Differentiate theproduct closer to the customer: companies today no longer can afford to

    stockpile inventory to compensate for possible forecasting errors. Instead, they need to

    postpone product differentiation in the manufacturing process closer to actual consumer

    demand. This strategy allows the supply chain to respond quickly and cost effectively to

    changes in customer needs.

    5. Strategically manage thesources ofsupply: By working closely with their key suppliers to

    reduce the overall costs of owning materials and services, SCM maximizes profit margins

    both for themselves and their suppliers.

    6. Developasupply chain wide technology strategy: As one of the cornerstones of successful

    SCM, information technology must be able to support multiple levels of decisions making. It

    also should afford a clear view and ability to measure the flow of products, services and

    information.

  • 8/6/2019 40 40 Production and Operations Management

    31/37

    7. Adopt channel spanning performance measures: Excellent supply chain performance

    measurement systems do more than just monitor internal functions. They apply

    performance criteria to every link in the supply chain -criteria that both service and financial

    metrics.

    BULLWHIP EFFECT IN SCM

    An organization will always have up and downs. It is necessary that the managers of the

    organization keep track of the market conditions and analyze the changes. They must take

    decisions on the resources and make necessary changes within the organization to meet the

    market demands. Failing to do so may results in wild swings in the orders. This may adversely

    affect the functioning of the organization resulting in lack of coordination and trust among

    supply chain members. The changes may affect the information and may led to demand

    amplification in the supply chain. The Bullwhip effect is the uncertainty caused from distorted

    information flowing up and down the supply chain. This has its affect on almost all the

    industries, poses a risk to firms that experience large variations in demand, and also those firm

    which are dependent on suppliers, distributors and retailers. A bullwhip effect may arise

    because of:

    y Increase in the lead time of the project due to increase in variability of demand

    y Increase in the stocks to accommodate the increase demand arising out of complicated

    demand models and forecasting techniques.

    y Reduced service levels in the organization.

    y Inefficient allocation of resources.

    y Increased transportation cost.

    How to prevent it ?

    Bullwhip effect may be avoided by one or more of the following measures:

    y Avoid multiple demand forecasting.

    y Breaking the single order into number of batches of orders.

    y Stabilize the prices, avoid the risk involved in overstocking by maintaining a proper stock

    y Reduce the variability and uncertainty in point of sale (POS) and sharing information

    y

    Reduce the lead time in

    the stages of the projecty Always keep analyzing the past figures and track current and future levels of requirement.

    y Enhance the operational efficiency and outsourcing logistics to a capable and efficient

    agency

    Example ofoneproduct theeffect Bullwhip theory.

  • 8/6/2019 40 40 Production and Operations Management

    32/37

    The Beer Game

    The beer game was developed at MIT by the Systems Dynamic Group in the 1960s. The game

    involves a simple production/distribution system for a single brand of beer. There are three

    players in the game including a retailer, a wholesaler, and a marketing director at the brewery.

    Each player's goal is to maximize profit.

    A truck driver delivers beer once each week to the retailer. Then the r etailer places an order with

    the trucker who returns the order to the wholesaler. There's a four week lag between ordering and

    receiving the beer.

    The retailer and wholesaler do not communicate directly. The retailer sells hundreds of products

    and the wholesaler distributes many products to a large number of customers.

    The following represents the results of a typical beer game:-

    3.1 The Retailer

    Week 1: Lover's Beer is not very popular but the retailer sells four cases per week on average.

    Because the lead time is four weeks, the retailer attempts to keep twelve cases in the store by

    ordering four cases each Monday when the trucker makes a delivery.

    Week 2: The retailer's sales of Lover's beer doubles to eight cases, so on Monday, he orders 8

    cases.

    Week 3: The retailer sells 8 cases. The trucker delivers four cases. To be safe, the retailer decides

    to order 12 cases of Lover's beer.

    Week 4: The retailer learns from some of his younger customers that a music video appearing on

    TV shows a group singing "I'll take on last sip of Lover's beer and run into the sun." The retailer

    assumes that this explains the increased demand for the product. The trucker delivers 5 cases.

    The retailer is nearly sold out, so he orders 16 cases.

    Week 5: The retailer sells the last case, but receives 7 cases.All 7 cases are sold by the end of

    the week. So again on Monday the retailer orders 16 cases.

    Week 6: Customers are looking for Lover's beer. Some put their names on a list to be called

  • 8/6/2019 40 40 Production and Operations Management

    33/37

    when the beer comes in. The trucker delivers only 6 cases and all are sold by the weekend. The

    retailer orders another 16 cases.

    Week 7: The trucker delivers 7 cases. The retailer is frustrated, but orders another 16 cases.

    Week 8: The trucker delivers 5 cases and tells the retailer the beer is ba cklogged. The retailer is

    really getting irritated with the wholesaler, but orders 24 cases.

    3.2 The Wholesaler

    The wholesaler distributes many brands of beer to a large number of retailers, but he is the only

    distributor of Lover's beer. The wholesaler or ders 4 truckloads from the brewery truck driver

    each week and receives the beer after a 4 week lag. The wholesaler's policy is to keep 12

    truckloads in inventory on a continuous basis.

    Week 6: By week 6 the wholesaler is out of Lover's beer and responds by ordering 30 truckloads

    from the brewery.

    Week 8: By the 8th week most stores are ordering 3 or 4 times more Lovers' beer than their

    regular amounts.

    ______________________________________________________________________________

    ___________________________ _____________________________________________________

    Week 9: The wholesaler orders more Lover's beer, but gets only 6 truckloads.

    Week 10: Only 8 truckloads are delivered, so the wholesaler orders 40.

    Week 11: Only 12 truckloads are received, and there are 77 truckloads in backlog, so the

    wholesaler orders 40 more truckloads.

    Week 12: The wholesaler orders 60 more truckloads of Lover's beer. It appears that the beer is

    becomin

    g more popular from week to week.

    Week 13: There is still a huge backlog.

    Weeks 14-15: The wholesaler receives larger shipments from the brewery, but orders from

    retailers begin to drop off.

    Week 16: The trucker delivers 55 truckloads from the brewery, but the wholesaler gets zero

  • 8/6/2019 40 40 Production and Operations Management

    34/37

    orders from retailers. So he stops ordering from the brewery.

    Week 17: The wholesaler receives another 60 truckloads. Retailers order zero. The wholesaler

    orders zero.

    The brewery keeps sending beer.

    3.3 The Brewery

    The brewery is small but has a reputation for producing high quality beer. Lover's beer is on ly

    one of several products produced at the brewery.

    Week 6: New orders come in for 40 gross. It takes two weeks to brew the beer.

    Week 14: Orders continue to come in and the brewery has not been able to catch up on the

    backlogged orders. The marketing manager begins to wonder how much bonus he will get for

    increasing sales so dramatically.

    Week 16: The brewery catches up on the backlog, but orders begin to drop off.

    Week 18: By week 18 there are no new orders for Lover's beer.

    Week 19: The brewery has 100 gross of Lover's beer in stock, but no orders. So the brewery

    stops producing Lover's beer.

    Weeks 20-23. No orders.

    At this point all the players blame each other for the excess inventory. Conversations with

    wholesale and retailer reveal an inventory of 93 cases at the retailer and 220 truckloads at the

    wholesaler. The marketing manager figures it will take the wholesaler a year to sell the Lover's

    beer he has in stock. The retailers must be the problem. The retailer explains that demand

    increased from 4 cases per week to 8 cases. The wholesaler and marketing manager think

    deman

    d mushroomed after that, an

    d then

    fell off, but the retailer explain

    s that didn

    't happen

    .

    Demand stayed at 8 cases per week. Since he didn't get the beer he ordered, he kept ordering

    more in an attempt to keep up with the demand. The marketing manager plans his resignation.

    3.4 Lessonsfrom the Beer Game

    1. The structure of a system influences behavior. Systems cause their own problems, not external

  • 8/6/2019 40 40 Production and Operations Management

    35/37

    forces or individual errors.

    2. Human systems include the way in which people make decisions.

    ______________________________________________________________________________

    ________________________________________________________________________________

    3. People tend to focus on their own decisions and ignore how these decisions affect others.

    3.5 LessonsRelated to the Learning Disabilities

    1. People do not understand how their actions affect others.

    2. So they tend to blame each other for problems.

    3. Becoming proactive causes more problems.

    4. The problems build gradually, so people don't realize there is a problem until its too late.

    5. People don't learn from their experience because the effects of their actions occur somewhere

    else in the system.

  • 8/6/2019 40 40 Production and Operations Management

    36/37

    Stockvariability amplification in a supplychain due toBullwhip Effect

    Q.6 TIME TAKEN BY THREE MACHINES ON FIVE JOBS IN A FACTORY IS

    TABULATED BELOW IN TABLE BELOW. FIND OUTTHE OPTIMALSEQUENCE TO

    BE FOLLOWED TO MINIMIZE THE IDLE TIME TAKEN BY THE JOBS ON THE

    MACHINES.

  • 8/6/2019 40 40 Production and Operations Management

    37/37

    ANS.