StructuresSuper-Tall
CSSE.kr
7/22/2019 3.SuperTallStructures
2/6
SEOUL DMC LITE TOWER
- Occupancy : Residences, Hotel,
Office,
Business Center
- Story : B9/133F (Highest: 640m)
- Gross Area : 724,675
- Architects : SOM +
Samoo Architects
- Structure : Outrigger + Core
Seoul, Korea, 2009
The Digital Media City Tower is a slender tower with residenal occupancies in the upper poron of the building. Acceleraons due to
the moon of the building structure in the wind must be controlled to acceptable levels.
To control the acceleraon due to vortex shedding, the tower is designed with a varying profile which disturbs the formaon of
uniform vorces.
The structure for the 640m tall Digital M edia City Tower is
conceived as a highly efficient, easily constructed, repeve, and
robust combinaon of a rigid central coreand perimeter megacolumns.
The lateral wind load resisng system is comprised of interior
reinforced concrete core walls coupled with reinforced concrete
outrigger walls spanning between the coreand four megacolumns
on each of the broad faces of the towerand two megacolumns
on the narrow faces.
The outrigger walls are strategically located at each of the twostory
mechanical floors and link the core to th eexterior megacolumnsin order to bring addional gravity loadsto the perimeter
while resisng upli wind forces
Structural Diagram
Reinforced concretecore wall system
Structural Diagram
Reinforced concretemega columns
Reinforced concreteoutrigger walls atmechanical Floors
Mode 1 - Translaon
T = 8s
Wind Load Deflecon
H / 500
Varying profile disrupts the
formaon of uniform vorces
Mode 2 - Translaon
T = 7s
Mode 3 - Translaon
T = 2s
STRUCTURAL STIFFNESS & OCCUPANCY COMFORT
STRUCTURAL SYSTEMJamsil, Seoul, Korea, 2001
- Occupancy : Residenal complex
- Story : B5/46 F
- Gross Area : 280,000
- Architects : HEERIM Architects +
GROUP-3
- Contractors : HANWHA +
SAMSUNG E&C Co., Ltd.
- Structure : RC Core Wall(600mm) +
Outrigger Girder(Depth. 1600mm) +Fin Wall(300mm)
- Overseas Partner : Ove Arup
GALLERIA PALACE IN CHAMSIL
Eccentricity Connecon of Outrigger and Core wall
Secon Shape Gravity + Lateral Load () Gravity + Lateral Load ()
Stress of Outrigger and Core wall
7/22/2019 3.SuperTallStructures
3/6
Dogok, Seoul, Korea, 1998
- Occupancy : Residences
- Story : 4/66
- Gross Area : 460,000
- Architects : Samoo Architects & Engineering
- Contractors : SAMSUNG E&C Co., Ltd.
- Structure : RC Core(650mm) +
Steel outrigger truss
TOWER PALACE I
CORE WALL
OUTRIGGER & BELT TRUSS
STEEL FRAME
Base plate
Ulsan, Kyoungnam, Korea, 2005
- Story : 4/53
- Gross Area : 126,903
- Architects : Kiahn
- Structure : RC Core wall + Finwall
53 story apartment, and 4 story
basement parking story. Thickness 700mm
RC core wall and FinWall.
30m thick transfer plates of 5th floor are
supporng the above story's bearing walls
and acng as outrigger truss fot
the horizontal forces.
IAAN EXORDIUM
7/22/2019 3.SuperTallStructures
4/6
BUCHEN KUMHO RICHENSIA
- Occupancy : Residenal complex
- Story : 7/66
- Gross Area : 178,500
- Architects : Haeahn
- Contractors : Kumho E&C Co., Ltd.
- Structure : RC Core wall + Fin Wall +
Outrigger/Belt Wall
Buchen, Korea, 2007
Beltwall opening concept View
: RC Core Wall + Fin Wall + Outrigger/Belt Wall
Link Beam
(depth.700)
Core Wall
(thk.1000)
Finwall
Fin wall
(thk.600)
Outrigger Wall
(thk.600)
Belt Wall
(thk.500)
41F-65F
Core Wall
Thk.600
21F-40F
Core Wall
Thk.800
B6F-20F
Core Wall
Thk.1000
Changwon, Korea, 2004
- Occupancy : Residences
- Story : 4/43 Gross Area : 427,548
- Architects : A Group
- Structure : RC Core wall + Flat Plate
43 story officetel and 5 story basement parking story. Thickness 700mm
RC core wall and Flat Plate (THK. 250mm) resist lateral force. (Dual system)
THE CITY 7
PC + T.S.G + Column
Concept of Transfer System
7/22/2019 3.SuperTallStructures
5/6
ASAN CYCLONE TOWER
- Occupancy : Office
- Story : B7/51F
- Gross Area : 522,456
- Architects : Kunwon Architects
- Contractors : SK E&C Co.Ltd.
- Structure :RC Core wall + Steel Diagrid System(Spiral Brace)
Asan, Korea, 2006
Lateral Resisng Behavior
Node Design (considering Construcon Sequence)
Alt 1.
Outrigger &
Belt Truss System
Alt 2.
Diagrid System
Inner View of Each S tability System
Core
thk.900
Corner
Column
Diagrid
Column
RC Core
Steel
Girder
Core
thk.1100
Step1.Highstrengthbolt at Diagrid Segment joint : KBC2005(LSD)
Step2.Forceflow betweendiagrid segmentandperimeter girder : designedby beam-columnelement to
resist tensile force from upper inclined column.
Step3.Diagrid columnjoint : analyzedprecisely using FEM in DesignDevelopment step.
[Construcon procedure of diagrid segments] [Design Process]
1. in-place steel shop welding
2. liing up by 1 piece
3. trial shop assembly of some of high strength bolts in-place welding
4. high strength bolts assembly
5. seng up perimeter girders
Member Plan
BUSAN TREPLE SQUARE
Haeundae, Busan, Korea, 2007
- Occupancy : Resort, Spa Facilies
- Story : 117F(Highest:511m),
85F(396m) Two Tower, 58F Middle Tower
- Gross Area : 584,911
- Architects : Beyond Space Group + BSD Architects
- Structure : Triangle Core + Mega Flange
Interacon of Iateral-force
H-type bending members using web wall
System
7/22/2019 3.SuperTallStructures
6/6
GALLERIA FORET
- Occupancy : Residenal complex
- Story : B7/45F
- Gross Area : 170,841
- Architects : Haeahn + Songhyun Architects
- Contractors : Hanhaw E&C Co., Ltd.
Seoul, Korea, 2008
Link Beam
depth.700skib thk.200
Link Beamdepth.650
RC Core Wall
thk. 1000~1300
Perimeter Girder
1600X400
>
>
>
>
>
PRD(1000)
Atrium designslower levels conduit design
1 block3 block
Plan
TOP - DOWN Method Wind Tunnel Test
BUSAN METROPOLITAN CITY HALL
Busan, Korea, 1992
- Occupancy : City Hall
- Story : 4/28
- Gross Area : 120,000
- Architects : ILSHIN Architects
- Contractors : SAMSUNG E&C J.V
- Structure : Steel frame
Frames
TUBE Sys. Concept