Upload
ibnuasad984
View
212
Download
0
Embed Size (px)
Citation preview
7/25/2019 3PHMSAPart192WeldingandSubpartE
1/57
Welding
Subpart E
Not applicable to welding during
manufacture of pipe and components
7/25/2019 3PHMSAPart192WeldingandSubpartE
2/57
192.225 WELDING - GENERAL
Performed by a QualifiedWelder
Using QualifiedWelding
Procedures
Procedures Qualifiedby
Destructive Testing
7/25/2019 3PHMSAPart192WeldingandSubpartE
3/57
192.225 WELDING - GENERAL
Qualified Procedure vs Qualified Welder
qualified procedure testverifies integrity/
metallurgy of that weld
qualified welder testverifies ability of thatwelder
7/25/2019 3PHMSAPart192WeldingandSubpartE
4/57
192.225 Welding procedures
Welding Performed byQualified Welder
Welding Procedures
Qualified Using API1104 Section 5 or ASMEB&PV Section IX
Recorded in Detail andQualified byDestructive Testing
Followed when the
Procedure is Used
7/25/2019 3PHMSAPart192WeldingandSubpartE
5/57
Procedure must be qualified by
estructive Testing
7/25/2019 3PHMSAPart192WeldingandSubpartE
6/57
API 1104
Procedure
Qualification
Section 5, Figure 3
Number, Type, andLocations of TestStraps Required forProcedure
Qualification Tests
7/25/2019 3PHMSAPart192WeldingandSubpartE
7/57
7/25/2019 3PHMSAPart192WeldingandSubpartE
8/57
7/25/2019 3PHMSAPart192WeldingandSubpartE
9/57
Change in Process orMethod of Application
Pipe Grades
42,000 SMYS
> 42,000 but < 65,000
65,000 - Separate Test for Each Grade
Essential Variables
API 1104 Procedure Qualification
7/25/2019 3PHMSAPart192WeldingandSubpartE
10/57
Joint Design (U or V groove)
Position ( fixed or rolled,horizontal or tilted)
Wall Thickness Group< 3/16 (.188)3/16 - 3/4 (.188 - .750)
> 3/4 (.750)
Essential Variables
API 1104 Procedure Qualification
7/25/2019 3PHMSAPart192WeldingandSubpartE
11/57
Time Between Passes
Max time betweenroot and second
Direction of weldingUphill or downhill
Essential Variables
API 1104 Procedure Qualification
7/25/2019 3PHMSAPart192WeldingandSubpartE
12/57
Essential Variables
API 1104 Procedure Qualification
Shielding Gas and Flow Rate
Shielding Flux
Speed of Travel
Filler Metal
Group
AWS
Specification
Electrode
1 A5.1
A5.5
E6010 E6011
E7010 E7011
2 A5.5 E8010 E8011E9010
3 A5.1 or A5.5
A5.5
E7015 E7016
E7018
E8015 E8016
E8018 E9018
Group
7/25/2019 3PHMSAPart192WeldingandSubpartE
13/57
192.227 Qualification of
Welders
Section 6 of API Standard 1104
Section IX of ASME Boiler and PressureVessel Code
Less than 20% SMYS -Appendix C
7/25/2019 3PHMSAPart192WeldingandSubpartE
14/57
192.227 Qualification of
Welders
Welder Qualified under Earlier Edition ofAPI 1104 or ASME Section IX---
May Continue to Weld
May Not Re-qualify under
that Edition
7/25/2019 3PHMSAPart192WeldingandSubpartE
15/57
Qualified Welders
I dont Think So
7/25/2019 3PHMSAPart192WeldingandSubpartE
16/57
API 1104 Welder Single
Qualification Butt or Fillet)
If Qualified on ButtWelds in Fixed Position@ 45 Angle, Qualifiedfor Butt Welds and Lap
Fillet Welds in allPositions
7/25/2019 3PHMSAPart192WeldingandSubpartE
17/57
Essential Variables - Welder
Single Qualification
Change in any oneof:
Process
Direction of Welding
Filler-metal Classification Outside Diameter Group < 2.375
2.37512.750
> 12.750
Wall Thickness Group
Position
Joint Design
7/25/2019 3PHMSAPart192WeldingandSubpartE
18/57
API 1104 Welder Multiple
Qualification
Must Make ButtWeld First
Layout, Cut & FitBranch Connection
Cut Hole in Run for
BranchMake Fillet Weld on
Branch/Run Joint
7/25/2019 3PHMSAPart192WeldingandSubpartE
19/57
API 1104 Welder Multiple
Qualification
Butt & Branch WeldsMust Be Made on Pipe at
Least 6.625
12.75 Qualifies for allPipe Diameters
Butt Weld Made in FixedHorizontal or 45 AnglePosition
7/25/2019 3PHMSAPart192WeldingandSubpartE
20/57
API 1104 Welder Multiple
Qualification
Cut Full-Size Holein Run Pipe
Run Pipe Shall BeHorizontal
Branch Shall ExtendVertically Downward
From Run Pipe
7/25/2019 3PHMSAPart192WeldingandSubpartE
21/57
Essential Variables Welder
Multiple Qualification
Change in weldingprocesses
Change in direction
of welding
Change in filler metalclassifications
7/25/2019 3PHMSAPart192WeldingandSubpartE
22/57
192.229 Limitations on Welders
Welder whose qualification is based onnondestructive testing may not weld oncompressor station pipe and
components
Must have welded with particularprocess within the preceding 6 calendar
months
7/25/2019 3PHMSAPart192WeldingandSubpartE
23/57
192.229 Additional Limitations
Welder qualified under Section 6 of API1104 or Section IX of ASME
To weld on pipe operating at 20%
SMYS or more, must have weld tested:
Every 6 months per API 1104 Section 6 or 9, orTwice each CY at intervals Not exceeding 7-1/2
months
7/25/2019 3PHMSAPart192WeldingandSubpartE
24/57
192.229 Additional Limitations
Welder qualified under Section 6 of API1104 or Section IX of ASME
To weld on pipe operating > 20 % SMYS, must:
Have weld tested every 6 months per API 1104Section 6 or 9, or
Re-qualify under Appendix C every calendaryear not to exceed 15 months, or
Cut out and test a production weld
twice each calendar year
7/25/2019 3PHMSAPart192WeldingandSubpartE
25/57
192.229 Additional Limitations
Welder qualified under Appendix C Must re-qualify under Appendix C every
calendaryear not to exceed 15 months, or Must cut out and test a production weld
twice each calendar year(interval
cannot exceed 7 1/2 months), or For service lines 2 inches and smaller
only, 2 welds tested per App. C, Sec. III
7/25/2019 3PHMSAPart192WeldingandSubpartE
26/57
192.231 Protection from
Weather
The welding operation must be protectedfrom weather conditions that would impair
the quality of the completed weld.
7/25/2019 3PHMSAPart192WeldingandSubpartE
27/57
192.233 Miter Joints
30% or more SMYS,Maximum of 3
>10% SMYS
7/25/2019 3PHMSAPart192WeldingandSubpartE
28/57
192.235 Preparation for Welding
Before beginning any welding, the weldingsurfaces must be clean and free of any materialthat may be detrimental to the weld, and
Must be aligned to provide the most favorablecondition for depositing the root bead. Thisalignment must be preserved while root is
deposited.
7/25/2019 3PHMSAPart192WeldingandSubpartE
29/57
192.241 Inspection and Test of
Welds
Visual inspection (by individual qualifiedby training & experience) of the
WELDING must be doneto insure --Welding is done according
to procedure, and
Weld is acceptable
per API 1104 Section 9.
7/25/2019 3PHMSAPart192WeldingandSubpartE
30/57
192.241 Inspection and Test of
Welds
7/25/2019 3PHMSAPart192WeldingandSubpartE
31/57
192.241 Inspection and Test of
Welds
7/25/2019 3PHMSAPart192WeldingandSubpartE
32/57
192.241 Inspection and Test of
Welds
Welds on pipelines operating 20% SMYS must beNDTd, except:
Welds visually inspectedand approved by a weldinginspector qualified by training& experience if:
Pipe is < 6 nom. dia.; orLine operates below 40%
SMYS and welds are limited innumber.
7/25/2019 3PHMSAPart192WeldingandSubpartE
33/57
Alternative Acceptance Criteria
API 1104Appendix A (20thEditionErrata/Addendum July 2007)
Appendix A IsIncorporated by Reference inPart 192.241 (c) as an alternative acceptancecriteria if API 1104 Section 9 requirementscannot be met for any reason other than acrack.
Removed Appendix A 20thEdition (2005)and added new Appendix A (2007) -
Alternate Acceptance Standards for GirthWelds.
7/25/2019 3PHMSAPart192WeldingandSubpartE
34/57
Alternative Acceptance Criteria
API 1104Appendix A (20thEditionErrata/Addendum July 2007)
Uses Fracture Mechanics Analysis andFitness-for-Purpose Criteria to DetermineWeld Alternate Acceptance Criteria.
Additional Qualification Tests, Stress Analysis,and Inspection are required to use the
Fitness-for-Purpose criteria.Restricted use, not applicable in all conditions.
7/25/2019 3PHMSAPart192WeldingandSubpartE
35/57
192.243 Nondestructive Testing
NDT must be performedby any process, other thantrepanning, which willclearly indicate defectsthat may affect the
integrity of the weld.
7/25/2019 3PHMSAPart192WeldingandSubpartE
36/57
192.243 What is Trepanning?
7/25/2019 3PHMSAPart192WeldingandSubpartE
37/57
192.243 Nondestructive Testing
NDTmust be performed:
In accordance with
written procedures;and
By persons trainedand qualified in theprocedures andwith the equipment
being utilized
7/25/2019 3PHMSAPart192WeldingandSubpartE
38/57
192.243 Nondestructive Testing
Procedures must be established forinterpretation of each test to
ensure acceptabilityof the weld per
API 1104 Section 9.
7/25/2019 3PHMSAPart192WeldingandSubpartE
39/57
192.243 Nondestructive Testing
When required, (20% or more SMYS)random testing of each days weldsmust be tested at the following rates:
Class 1 areas - 10%
Class 2 areas - 15%
Class 3 & 4, offshore, rights-of-way, road &RR crossings 100%, unless impracticable,then 90%
Tie-Ins (including replacement sections)
100 %
7/25/2019 3PHMSAPart192WeldingandSubpartE
40/57
192.243 Nondestructive Testing
Must test some of each welders workeach day
Must retain for life:Record by milepost, engineering station,
etc.;
Number of welds Number tested
Number rejected
Disposition of rejects
7/25/2019 3PHMSAPart192WeldingandSubpartE
41/57
192.245 Repair or Removal of
Defects
Each unacceptable weld under192.241 (c);
Must be removed or repaired.Removed if crack is > 8% of weld length
For repairs, must removedefect down to sound metal,pre-heat if necessary, and
re-inspect
7/25/2019 3PHMSAPart192WeldingandSubpartE
42/57
192.245 Repair or Removal of
Defects
Repair of a crack or defectin a previously repairedarea
must be done in accordancewith written repair proceduresthat have been qualified under
192.225
7/25/2019 3PHMSAPart192WeldingandSubpartE
43/57
192.309 Repair of Steel Pipe
(c) Each arc burn on steelpipe to be operated 40%SMYS must be repaired orremoved If repaired bygrinding, must checkremaining wall thickness
Use dilute solution ofammonium persulfate tocheck for cracking
rc Burn
7/25/2019 3PHMSAPart192WeldingandSubpartE
44/57
Part 192
ppendix C Basic Test
Test on pipe 12 or
smallerWeld in horizontal,
fixed position
Weld according to aqualified, writtenprocedure
7/25/2019 3PHMSAPart192WeldingandSubpartE
45/57
Part 192
ppendix C Basic Test
Cut weld into
four coupons
Subject to aroot bend test
If two or more
have a crack
>1/8, weld is unacceptable
Successful test qualifies welder to weld
on i e diameters 12 inches
7/25/2019 3PHMSAPart192WeldingandSubpartE
46/57
Part 192 - ppendix C
Service Connections To Mains
Weld service
connection to pipe oftypical main size insame position as infield
Test destructively
7/25/2019 3PHMSAPart192WeldingandSubpartE
47/57
Part 192 - ppendix C
Small Service Lines
Two samples 8 long are cut with weldin center
Subject one to guided bend test
Subject second to tensile test
If tensile machine not available, bend test
7/25/2019 3PHMSAPart192WeldingandSubpartE
48/57
What About Maintenance/Hot
Welding?
Covered inAPI 1104 (20thed.) Appendix B(prev. API RP 1107)
Appendix B NOT incorporated by referencein Part 192
Maintenance Welding includes OQ Covered
Tasks
Operators must qualify Welders forMaintenance Tasks
7/25/2019 3PHMSAPart192WeldingandSubpartE
49/57
What About Maintenance/Hot
Welding?
Two Primary Concerns Welding
on In-Service Pipelines
Burn-Through
Hydrogen Cracking
7/25/2019 3PHMSAPart192WeldingandSubpartE
50/57
Burn-Through
Unlikely on Wall Thicknesses 0.250 in.
Low-Hydrogen Electrodes (EXX18) andNormal Welding Practices Followed
Thinner Wall Pipelines Require SpecialPrecautions (e.g., Limits on Heat Input)
7/25/2019 3PHMSAPart192WeldingandSubpartE
51/57
Low Hydrogen Electrodes
Dont dig like Cellulose electrodes
Require Uphill Direction in Procedure
Must Be Properly Stored (Heater Box)and Maintained
7/25/2019 3PHMSAPart192WeldingandSubpartE
52/57
Hydrogen Cracking
To Occur, 3 Conditions Must Occur:
1. Hydrogen Gas in the Weld
2. Development of Crack-Susceptible Weld
Microstructure3. Tensile Stress Acting on the Weld
7/25/2019 3PHMSAPart192WeldingandSubpartE
53/57
Hydrogen Cracking
Prevention
Must Eliminate One or More ofthe 3 Conditions
7/25/2019 3PHMSAPart192WeldingandSubpartE
54/57
Hydrogen Cracking Prevention
Use Low-Hydrogen Electrodes, Process and/orProcedures
High Heat Input Levels to Overcome CoolingEffect of Product Flow
Procedure Qualified for In-Service Welding
Preheating (where Practicable and Effective) Use of Temper-Bead Deposition Sequence
Attention to Proper Fit-Up to Minimize Stress
7/25/2019 3PHMSAPart192WeldingandSubpartE
55/57
Written welding procedures with qualifyingtest results available
How welders are qualified (API, ASME,Appendix C)
Verification of use of qualified welders
How welders maintain qualification/re-qualify
Qualifications of welding inspectors
What should State/Federal inspectors
or operators check for compliance
regarding Subpart E?
7/25/2019 3PHMSAPart192WeldingandSubpartE
56/57
What should State/Federal inspectors
or operators check for compliance
regarding Subpart E?
Adherence to welding procedures/coderequirements/housekeeping during field
weldingUse of N.D.T./N.D.T. procedures/
qualifications of N.D.T. technicians
Special procedures for hot or repairwelding
Repair criteria for defective welds
Maintenance of required records
7/25/2019 3PHMSAPart192WeldingandSubpartE
57/57
192 Subpart E
The End