3GPP CWTS Workshop 02 Project Management

Embed Size (px)

Citation preview

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    1/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    1

    3GPP CWTS workshop3GPP CWTS workshop

    Beijing, 28 January 2003Beijing, 28 January 2003

    Presentation 2:Presentation 2:

    Active project managementActive project management

    John M MeredithJohn M Meredith

    3GPP Specifications Manager3GPP Specifications Manager

    ETSI Mobile Competence CentreETSI Mobile Competence Centre

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    2/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    2

    3GPP Releases3GPP Releases

    Release '99Release '99 functionally frozen December1999. Thefunctionally frozen December1999. Thebasis for early 3G deployment in Japan, Islebasis for early 3G deployment in Japan, Isle

    of Man, Monaco, and many more inof Man, Monaco, and many more inpreparation.preparation.

    Release 4Release 4 functionally frozen March 2001.functionally frozen March 2001. Defines theDefines the

    low chip rate TDD mode of particular interestlow chip rate TDD mode of particular interest

    to China, but with high potential in otherto China, but with high potential in other

    markets.markets.

    Release 5Release 5 functionally frozen March/June 2002functionally frozen March/June 2002

    Release 6Release 6 expected to be functionally frozen in lateexpected to be functionally frozen in late20032003

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    3/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    3

    Feature 1 spec Feature 2 spec Feature 3 spec

    Functional decomposition of requirements leads to the definition of aFunctional decomposition of requirements leads to the definition of a

    number of Features.number of Features.

    Each feature enhances overall system capability byEach feature enhances overall system capability by

    Providing end users with new or improved functionality (e.g.Providing end users with new or improved functionality (e.g.

    migration of SMS to EMS and to MMS); ormigration of SMS to EMS and to MMS); or

    Providing equipment suppliers with improved possibilities forProviding equipment suppliers with improved possibilities for

    product differentiation; orproduct differentiation; or

    Providing network operators with enhanced revenueProviding network operators with enhanced revenue--generatinggenerating

    possibilities.possibilities.

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    4/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    4

    Active project managementActive project management

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    5/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    5

    The 3GPP work plan can be consulted at:The 3GPP work plan can be consulted at:

    http://www.3gpp.org/ftp/Information/WORK_PLAN/http://www.3gpp.org/ftp/Information/WORK_PLAN/

    Active project managementActive project management

    3G Release 99 contained more or less the same functionality as GSM3G Release 99 contained more or less the same functionality as GSMR99, but of course using the new UTRA radio access network technologyR99, but of course using the new UTRA radio access network technology

    (W(W--CDMA).CDMA).

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    6/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    6

    Release 4Release 4

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    7/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    7

    Release 5Release 5

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    8/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    8

    Release 6Release 6

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    9/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    9

    Take a closer look at the project management techniques Take a closer look at the project management techniques

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    10/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    10

    Take a closer look at the project management techniques Take a closer look at the project management techniques

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    11/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    11

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    12/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    12

    The work plan is reviewed at every TSG SA meeting The work plan is reviewed at every TSG SA meeting

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    13/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    13

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    14/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    14

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    15/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    15

    Every Feature (top level functional enhancement) is examinedEvery Feature (top level functional enhancement) is examined

    in sufficient detail to ensure thatin sufficient detail to ensure that

    Its definition is (still) correct, and thatIts definition is (still) correct, and that

    It is making adequate progress according to plan.It is making adequate progress according to plan.

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    16/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    16

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    17/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    17

    Its Work Item Definition sheet isIts Work Item Definition sheet is

    updated if necessary and reupdated if necessary and re--issuedissued

    as a TSG meeting document. Thisas a TSG meeting document. This

    is the document which will beis the document which will be

    referred to in the next issue of thereferred to in the next issue of theWork Plan.Work Plan.

    The Work Item Definition sheetsThe Work Item Definition sheets

    are reare re--issued after each TSG SAissued after each TSG SA

    meeting.meeting.

    You can find them atYou can find them at

    http://www.3gpp.org/ftp/Information/WI_Sheethttp://www.3gpp.org/ftp/Information/WI_Sheet ..

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    18/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    18

    Its Work Plan isIts Work Plan is rere--issued afterissued after

    each TSG SA meeting.each TSG SA meeting.

    You can find it atYou can find it at

    http://www.3gpp.org/ftp/Information/WORK_PLANhttp://www.3gpp.org/ftp/Information/WORK_PLAN ..

  • 8/8/2019 3GPP CWTS Workshop 02 Project Management

    19/19

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    19

    For more information please visitFor more information please visit

    http://www.3gpp.orghttp://www.3gpp.org

    Or contactOr contact

    [email protected]@etsi.org