132KV GIS-PD
Citation preview
EPIC FOR POWER SUPPLY PROJECT THROUGH SUBMARINE CABLES FROM RAS LAFFAN TO HALUL
SITE ACCEPTANCE TEST FOR 132kV GIS
Client
Qatar Petroleum
Document No.
3433-HW08-2-05-0003-F01
Contractor
LSC / L&T
Date / Rev.
05/03/2015 / Rev. - 1
Location
Page No
1 of 1
Equipment Tag
Test Date
Make
Name / Type of Equipment
Serial Number
Rating
Power
Voltage
Current
DESIGN AND VISUAL CHECKS
1. Check List
Sr. No.
Particulars
Status / Remarks
1
Check each name plate according to drawing
2
Check space heater for wire continuity
3
Check setting of thermostat for space heater
4
Check door closing properly
5
Check earthing state door and frame
6
Check all signal / indication lamps
7
Check all limit switches of door, DS / ES etc.
8
Check Phase marking as per approved drawing
9
Check interlock lever for operation
10
Check number mark on cables
11
Check CT lugs / wires are connected as per approved drawing
12
Check for conformity of control cable connection and identification label.
13
Check all components labels are placed
14
Check for pad locks are placed where as required
15
Check earthing is connected as per approved drawing
16
Check for paint condition wherever applicable
2. Test Equipments used
Sr. No.
Equipment / Instrument
Make
Equip. Sr. No.
Calibration due date
Remarks:
L&T
Vendor
LSC
QP
Signature
Name
Designation
Date