Section 4 I Page 1 UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing Stress Control and Insulation Materials 4.1.1 Single-Core Paper Insulated Cables in Transition Joints Prepare the cable as described in section 3.2. Use a chinagraph pencil to mark 20mm onto the lead sheath and 10mm onto the insulation papers. Remove the release paper from the medium length of yellow stress control tape. Stretch the tape to about half its original width and wrap it around the lead sheath for 20mm. Remove the twine binder from the screen edge and continue with the tape over the screen papers and onto the insulation for 10mm. Use a chinagraph pencil to mark the lead sheath 20mm beyond the yellow stress control tape. Position the clear barrier tubing over the core end and over the yellow stress control tape, overlapping onto the lead sheath by 20mm. UNCONTROLLED

33kV+Jointing+Manual+Section+4

Embed Size (px)

DESCRIPTION

cable jointing

Citation preview

  • Section 4 I Page 1UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS

    4.1 Installing Stress Control and Insulation Materials

    4.1.1 Single-Core Paper Insulated Cables in Transition Joints

    Preparethecableasdescribedinsection3.2.Useachinagraphpenciltomark20mmontotheleadsheathand10mmontotheinsulationpapers.

    Removethereleasepaperfromthemediumlengthofyellowstresscontroltape.Stretchthetapetoabouthalfitsoriginalwidthandwrapitaroundtheleadsheathfor20mm.Removethetwinebinderfromthescreenedgeandcontinuewiththetapeoverthescreenpapersandontotheinsulationfor10mm.

    Useachinagraphpenciltomarktheleadsheath20mmbeyondtheyellowstresscontroltape.Positiontheclearbarriertubingoverthecoreendandovertheyellowstresscontroltape,overlappingontotheleadsheathby20mm.UN

    CONT

    ROLL

    ED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 2

    Shrinkthetubingdown,startingontheleadsheathandcontinuingtowardsthecoreend.Oncecompletedthetubingshouldbefullyshrunkandhaveasmoothfinishwithoutwrinklesorcreases.

    Positiontheshortblackconductivesleeve220mmfromthecoreendandshrinkthetubingdownstartingattheopencableendbeforeworkingtowardstheleadsheath.

    4.1.2 Single-Core Polymeric Pot Ends

    Preparethecablesasdescribedinsection3.1uptoandincludingthescreenremovalpoint.Thedimensionforthescreenis80mm.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 3UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Removetheinsulationfor30mmfromtheendofthecable.

    Cleananddegreasetheinsulationwithanapprovedsolventwipetoremovealltracesofconductingmaterial.Alwayswipefromtheopencutendtowardsthescreenwirestoavoidcontaminatingtheinsulationwithcarbonfromthescreenlayer.

    Wraptheconductivetapesuppliedinthejointingkitaroundthe30mmofexposedconductorstretchingittoabouthalfitsoriginalwidth.

    Increasetheconductordiametersufficientlysothattheinsulatingrodisasnugfitovertheconductor.Pushtheinsulatingrodontotheconductorensuringthatitbuttsagainstthecableinsulation.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 4

    Useashortstripofyellowstresscontrolmasticandremovethereleasepapersfromashortstripofyellowstresscontrolmastictape.Wrapitaroundtheedgeoftheinsulationscreenstarting20mmfromthescreenedge,beforecontinuingfor10mmontothecoreinsulation.Stretchthetapetoapproximatelyhalfitsoriginalwidthtoobtainafineedgeontotheinsulation.

    Usingalongstripofyellowstresscontrolmasticandremovethereleasepapers.Wrapitaroundthecoreinsulationstarting10mmfromtheinsulationedge,beforecontinuingontotheinsulatingrodcoveringthe'paintedarea'and10mmbeyondontotherodinsulation.

    Useonlyasmuchoftheyellowstresscontrolmastisasnecessarytofillinthestepbetweentheinsulationandtherod.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 5UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Wraponelayerofredmasticaroundtheinsulatingrod60mmfromitsendandwithawidthof10mm.

    Positiontheblackstresscontroltubingovertheinsulatingrodandbuttitupagainstthecableoversheathcut.Shrinkthetubingdownstartingattheoversheathendbeforeworkingtowardstheinsulatingrodend.

    Useonelayerofredmasticaroundeachendoftheinstalledstresscontrolledtube60mminfromeachendandwithawidtehof10mm.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage6

    Slidetheredinsulatingtubingoverthestresscontroltubebuttingitagainstthecableover-sheathandcoincidingwiththestresscontroltubingedge.

    Shrinkthetubingdownstartingattheover-sheathendandworkingtowardstheinsulatingrodend.

    Placetheblackandredscreenedinsulatingtubingovertheassemblyandpositionittocoincidewiththepreviouslyinstalledtubes.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 7UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Shrinktheblackandredtubedownstartinginthecentre.Whenthissectionisfullyshrunkitshouldbesmoothwithoutridgesandshouldnotmovewhentwistingthetubeend.

    Continuetheshrinkingprocess,workingtowardsoneendandstopping50mmfromtheend.Thenshrinktowardstheoppositeendstopping50mmfromtheend.Finallyshrinkdownthefirstremaining50mmoftubingfollowedbythesecond50mmoftubing.Thisprocessensuresthatnoairistrappedinsidethetube.

    4.1.3 Resin Filled Three-Core Transition Straight Joints (Three-Core Paper to 3 x Single-Core Polymeric Cables)

    Preparethecablesuptothepointasdescribedinsection3.3.

    ProtecttheCopperWovenTape(CWT)withnylontape,startingfrom20mmontotheleadsheathextending30mmontothecores.Thenylontapeshouldbeappliedwithtension.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage8

    Atthescreenterminationpositionwraponelayerofvoidfillingyellowstresscontrolmasticaroundeachcore,overlappingthescreenpapersby20mmandtheinsulationby10mm.Removethemetalbinderfromthescreenedgeduringthetapingprocess.

    Slidetheclearbarriertubingovereachcoreandposition30mmfromtheendofthemetalsheath.Shrinkdownthetubingstartingatthecrutchpositionworkingtowardstheopencoreends.Checkthetubingisshrunkdownevenlyandfreefromcreasesorwrinkles.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 9UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Slidetheblackconductingtubingoverthecoreendsandpositionthem50mmfromtheendofthemetalsheath.Shrinkthetubesdownatthispositionstartingatthecrutchbeforeworkingtowardsthecoreends.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 10

    Slidethesmallyellowmasticwedgeintothecrutchusingtheinstallationtoolprovided.Takethelargerwedgeandinsertitintothecrutchbehindthesmallerwedgeusingthesametool.Removethenylontapeafterinsertionofbothwedges.

    Degreasethecoresusingapprovedsolventwipes.Makeachinagraphpencilmarkontheconductivetubes70mmfromtheleadsheathcutandfor20mmontotheleadsheath.

    Wrapstripsofyellowmasticaroundthecrutchbetweenthetwochinagraphpencilmarks.Applysufficienttensiontostretchthetapetohalfitsoriginalwidthuntila'cone'shapeisformed.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 11UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Passtheconductivebreakoutoverthecoresandpushitwelldownintothecrutch,usingtheyellowwedgeinstallationtool.Holdthebreakoutinplaceandshrinkitdownstartingatthecentre,beforefirstlyworkingtowardstheleadsheathandthentowardsthebreakoutfingers.

    4.1.4 Heatshrink Three-Core Transition Straight Joint (Three-Core Paper to 3 x Single-Core Polymeric Cables)

    Preparethecablesuptothepointasdescribedinsection3.3.

    ProtecttheCWTwithnylontape,starting20mmontotheleadsheathextending30mmontothecores.Thenylontapeshouldbeappliedwithtension.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 12

    Atthescreenterminationpositionwraponelayerofvoidfillingyellowstresscontrolmasticaroundeachcoreoverlappingthescreenpapersby20mmandtheinsulationby10mm.Removethemetalbinderfromthescreenedgeduringthetapingprocess.

    Slidetheclearbarriertubingovereachcoreandposition30mmfromtheendofthemetalsheath.Shrinkdownthetubingstartingatthecrutchpositionbeforeworkingtowardstheopencoreends.Checkthetubingisshrunkdownevenlyandisfreefromcreasesorwrinkles.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 13UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Slidetheblackconductingtubingoverthecoreendsandpositionthem50mmfromtheendofthemetalsheath.Shrinkthetubesdownatthispositionstartingatthecrutchworkingtowardsthecoreends.

    Slidethesmallersuppliedyellowmasticwedgeintothecrutchusingtheinstallationtoolprovided.Takethelargerwedgeandinsertitintothecrutchbehindthesmallerwedgeusingthesametool.Removethenylontapeafterinsertionofbothwedges.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 14

    Degreasethecoresusingapprovedsolventwipes.Makeachinagraphpencilmarkontheconductivetubes70mmfromtheleadsheathcutandfor20mmontotheleadsheath.

    Wrapthestripsofyellowstresscontrolmasticaroundthecrutchbetweenthetwochinagraphpencilmarks.Applysufficienttensiontostretchthetapetohalfitsoriginalwidthuntilaconeshapeisformed.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 15UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Passtheconductivebreakoutoverthecoresandpushitwelldownintothecrutch,usingtheyellowwedgeinstallationtool.Holdthebreakoutinplaceandshrinkitdown,startingatthecentrebeforeworkingtowardstheleadsheathandthentowardsthebreakoutfingers.

    Positiontheshortlengthofwrap-aroundheatshrinktubeoverthepapercablesothatitcoverstheleadsheathandthethreefingerbreakout.Leaveagapofatleast100mmbetweentheendofthewraparoundandthearmoursealingsleeve.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage16

    Shrinkthewrap-aroundinplacestartinginthemiddle,untilthesurfacepaintonthetubeturnsfromgreentoblack.Thengraduallymovetoeachendusingthesameprocess.Extraheatshouldbeappliedtothemetalchanneluntilthewhitemarkerlinecanbeclearlyseenunderit.

    Positiontheshortsealingheatshrinktubesovertheturretsoftheheatshrinkbreakout,ensuringtheyarepushedrightintothecrutchandshrinkinplace.

    4.1.5 HSL Breakout Module

    Preparethecablesuptothepointasdescribedinsection3.4.1to3.4.3.

    Useachinagraphpenciltomarkeachleadsheath100mmfromthearmourcutedge.Foldashortlengthoftinnedcoppermeshinhalflengthways.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 17UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Wrapthetinnedcoppermesharoundtheleadsheathscenteredonthe100mmmark.

    Positiononeofthelengthsofbraidoverthemeshsothatthelooseendpointsawayfromthecrutchofthecable.

    Securealengthofearthbraidtoeachleadoftheleadsheathsusingoneturnoftherollspringsdirectlyontothecoppermeshwrap.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage18

    Bendthebraidsbackovertherollspringandthensecureinplacewiththeremainingturns.

    CovereachoftherollspringswithtwolayersofPVCtape.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 19UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Securethebraidendstothearmoursandthesupportringwitharolloftinnedcoppermeshsandwichingthebraidsbetweenthemeshwraps.

    Finally,securethemeshandbraidstothesupportringandarmoursusingthewormdriveclipsprovided,withoneclipeithersideofthesupportringscentralridge.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 20

    CoverthewormdriveclipswithPVCtapetotidyuptheirlooseends.

    Slideasealingsleeveovereachleadsheathandrollspringconnectionuptowheretheearthbraidmeetsthesupportring.Shrinkthemdownstartingontheleadsheathsandcontinuingtowardsthearmourwiresarea.

    Wrapastripofblackmasticbehindthesupportringoverthearmourwires,fillingthespacebetweentheringandtheoutersheath.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 21UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Passthebreakoutovertheleadsealingsleevesandpulldownintothecrutch.Shrinkthebreakoutdownstartinginthecentrebeforemovingtowardstheover-sheathandthenshrinkthebreakoutfingers.

    Positionthecrutchsealingsleevewithoneendlevelwiththeendofthefingersonthebreakoutandshrinkintoplace.

    4.1.6 HSL Cable Core Preparation

    Preparethecablesasdetailedinsection4.1.5andremovetheleadsheathsasdescribed insection3.4.4.

    Useachinagraphpenciltomark20mmontotheleadsheath,and10mmontothe insulationpapers.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 22

    Removethereleasepaperfromoneofthemediumlengthsyellowstresscontroltape.Stretchthetapetoabouthalfitsoriginalwidthandwrapitaroundtheleadsheathfor20mm.Removethetwinebinderfromthescreenedgeandcontinuewiththetapeoverthescreenpapersandontotheinsulationfor10mm.

    Makeamarkontheleadsheathusingachinagraphpencil20mmbeyondtheyellowstresscontroltape.Positiontheclearbarriertubingoverthecoreendandtheyellowstresscontroltapeoverlappingontotheleadsheathby20mm.

    Shrinkthetubingdown,startingontheleadsheathandcontinuingtowardsthecoreend.Oncecompletedthetubingshouldbefullyshrunkandhaveasmoothfinishwithoutwrinklesorcreases.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 23UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Positiontheshortblackconductivesleeve220mmfromthecoreendandshrinkthetubingdown,startingattheopencableendbeforeworkingtowardstheleadsheath.

    4.1.7 Paper Insulation 'Shim Kit' for Cable Cross Sections 70mm & 95mm

    Forcablesbelowtheminimumsizerangespecifiedonthekitlabela'shimkit'mustbeused.

    Thecableswillbeatthestageofpreparationdescribedinsections4.1.1,4.1.3,4.1.4or 4.1.6.

    Applyapieceoftheyellowstresscontroltape20mmovertheendoftheconductivetubeandontothecleartubingby10mm.Usesomeoftheyellowtapeprovidedinthemainjointkit.

    Positionashortlengthofthesmallerdiameterstresscontroltubing(42/16)overthecoreend,overlappingtheconductivetubesandtheyellowstresscontrolmasticby40mm.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 24

    Shrinkthestresscontroltubingdown,startingfromtheyellowmastictapeandworkingtowardstheopencoreend.

    Wraponeoftheredmasticstripsprovidedaroundtheendofthestresscontroltube30mmontothetubingand10mmontothecore.

    Positionashortlengthofthelargerdiameterstresscontroltubing(54/24)directlyoverthepreviouslyappliedstresscontroltubeandshrinkdownfollowingthesameprocedureasbefore.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 25UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Applyoneoftheredmasticstripsprovidedaroundtheendofthestresscontroltube30mmontothetubingand10mmontothepreviouslyappliedredmastic.

    4.1.8 Paper Insulation 'Shim Kit' for Cable Cross Sections 120mm & 150mm

    Forcablesbelowtheminimumsizerangespecifiedonthekitlabel,a'shimkit'mustbeused.

    Thecableswillbeatthestageofpreparationdescribedinsections4.1.1,4.1.3,4.1.4or 4.1.6.

    Applyashortlengthoftheyellowstresscontroltape20mmovertheendoftheconductivetubeandontothecleartubingby10mm.Usesomeoftheyellowtapesuppliedinthemainjointkit.

    Positionashortlengthofthestresscontroltubing(54/24)overthecoreend,overlappingtheconductivetubesandtheyellowstresscontrolmasticby40mm.UN

    CONT

    ROLL

    ED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage26

    Shrinkthestresscontroltubingdown,startingfromtheyellowmastictapeandworkingtowardstheopencoreend.

    Wraponeoftheredmasticstripsprovidedaroundeachendofthestresscontroltube30mmontothetubingand10mmontothecore.

    4.1.9 Single-Core Polymeric Terminations (Indoor and Outdoor)

    Followthecablepreparationproceduresforpolymericcablesasdescribedinsection3.1.

    Useachinagraphpenciltomarktheoutersheath60mmbelowthesheathcutposition.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 27UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Wraponelayerofredsealanttapeoverthecablesheathdowntothechinagraphpencilmark.

    Bendbackthecopperscreenwirescarefullyandlaythemontothemastictapetakingcarenottocrossoveranyofthewires.Securethewireswithawirebinderatthe60mmmark.

    Makeachinagraphpencilmarkontothecorescreen40mmfromthesheathcut.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage28

    Removethecorescreendowntothe40mmmarkusingtheapprovedscreenstrippingtool.

    Makeamarkwithachinagraphpencil20mmontothecorescreenand10mmontotheinsulation.

    Removethereleasepaperandwraptheyellowstresscontrolmasticaroundthescreencutbetweenthetwopencilmarks.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontotheinsulation.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 29UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Positiontheblackstresscontroltubingoverthecoresothatitislevelwiththeoutersheathcut.Shrinkthetubingdown,startingatthesheathcutendandworkingupwards.Whenfullyshrunkthetubingshouldbesmoothandwrinklefree.

    Removetheinsulationfromthecoreendaccordingtotheinnerdimensionofthecablelugbarrel.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 30

    Fitthecablelugensuringthatthelugbuttsagainsttheinsulationedgeandhandtightenthesecuringbolts.

    Shearofftheboltheadsusingtheapprovedtoolsandfillintheindentswiththegreyclayprovided.

    Wraptheredsealanttapearoundthelugbarrel,overlappingontotheinsulation.Buildupthediameterdifferencewiththeredtapesothatasmoothandevenprofileisachieved.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 31UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Removethereleasepaperfromtheredtubing.Placethetubingoverthecableend(withthesealantcoatedenddownwards),levelwiththewirebinder.

    Shrinkthetubingdownstartingattheoutersheathend,beforeworkingtowardsthecable lug.

    Cutthetubingbackontothecablelug,levelwiththetopofthemainbody,ifnecessary.

    Post-heatthepalmofthecableluguntilabeadofthesealantappearsaroundthetopof thetubing.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 32

    Useachinagraphpenciltomarkthepositionfortheshedsonthetubingatthedimensiongivenintheterminationinstruction.

    Placetwoskirtsoverthecableendandpositiononthepreviouslymademarks.Shrinkeachshedinplace.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 33UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Foroutdoorterminationstherearefourskirtstobefittedtoeachtermination.Theseshouldbeplacedandshrunkintopositionatthemeasurementsindicatedintherelevantjointinginstruction.

    4.2 Installing Mechanical Connectors and Lugs

    4.2.1 Single-Core Polymeric Straight Joints

    Thecableswillhavebeenprepareduptothepointasdescribedinsection3.1.

    Positionthecombinedstresscontrol,screenedinsulatingtubingandoutersealingsleeveoveroneofthecableends.

    Removetheinsulationasdescribedinsection3.1.3.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 34

    Theconnectorcomeswithmetalinsertstofitsmallconductors.Iftheconductorwillnotfittheconnector,discardtheinsertandusetheconnectorwithoutit.

    Fittheconductorsintotheconnector.Theinsulationshouldbuttagainsttheendoftheconnector.

    Usingtheapprovedinsulatedtooltoholdtheconnector,takeupthetensiononalltheboltsequallywithoutshearingthemoff.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 35UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Continuetotightenandsheeroffalltheboltsstartingwiththeboltsateachendfollowedbythecentralbolts.

    Filltheboltholesintheconnectorwiththegreyclaysuppliedinthejointkit.

    4.2.2 Single-Core Transitional Straight Joints

    Thecableswillhavebeenprepareduptothepointasdescribedinsections3.1and3.2.

    Slidethefivepiecetubingsetoverthepolymericcableside.Nestingthetubesetontheplasticbagwrappingwillkeeptheinsideofthetubesclean.Thetubesetshouldbeplacedintheordershown.

    Note :Itisimportantthatthefourthtube(thesecondlargest)isplacedwithinthetubeset sothattheuncoatedinneredgepointstowardsthejointcentre.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage36

    Removetheinsulationfrombothcablesusingthemethodsdescribedinsections3.1.3and3.2.5.

    Theconnectorisa'TwoPiece'designwiththetwohalvessecuredtogetherwithacentralshearbolt.Eachconnectorhalfhastwoconductorsecuringboltswhicharealsooftheshearofftype.

    Fittheconductorsintotheconnector.Theinsulationshouldbuttagainsteachendoftheconnector.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 37UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Usingtheapprovedinsulatedtooltoholdtheconnector,takeupthetensiononalltheboltsequallywithoutshearingthemoff.

    Continuetotightenandsheeroffalltheboltsstartingwiththoseateachendfollowedbythecentralbolt.

    Filltheboltholesintheconnectorwiththegreyclaysuppliedinthejointkit.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage38

    4.2.3 Resin Filled Three-Core Trifurcating Joints (Three-Core Paper to 3 x Single-Core Polymeric Cables)

    Thecableswillhavebeenprepareduptothepointasdescribedinsection3.1and4.1.3.

    Slidetheplastictrifurcatingendoftheplasticjointboxoverthesingle-corecablesandpositionitawayfromthejointingarea.

    Slidethethreepiecetubingsetsoverthepolymericcableside.Nestingthetubesetsontheplasticbagwrappingtokeeptheinsideofthetubesclean.Thetubesetsshouldbeplacedintheordershown.

    Setthecoresintheirfinaljointingposition.Checkthattheconductorshavebeencuttoallowforanyconnectorcentralmoistureblock.Removetheinsulationfrombothconductors,sections3.1.3and3.3.7,totheconnectorinsertiondepth.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 39UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Inserteachendofthecoreintoitsrespective'connectorhalf'andfinger-tightenthebolts.

    Alignandpositionthetwoconnectorhalvessothatthecentralfixingboltcanbeinsertedintothecentralfixinghole.Theuseofforceforthisoperationshouldnotbenecessary.

    Holdtheconnectorwiththeapprovedholdingtoolandtightenthetwoboltsononesideuntiltheysheeroff.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 40

    Repeattheoperationontheothersideoftheconnector.Checkthatthecombinedtubesetislocatedoverthesingle-corecablesandsheeroffthecentralfixingbolt.

    Cleananddegreasetheconnector.Filltheboltholeswiththesuppliedgreyclaytoobtainasmoothfinish.

    4.2.4 Heatshrink Three-Core Transition Straight Joint (Three-Core Paper to 3 x Single-Core Polymeric Cables)

    Thecableswillhavebeenprepareduptothepointasdescribedinsections3.1and4.1.4.

    Slidetheouterjointheatshrinksealingbreakoutoverthesingle-corecablesandpositionitawayfromthejointingarea.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 41UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Slidethefourpiecetubingsetoverthepolymericcableside.Nestingthetubesetontheplasticbagwrappingwillkeeptheinsideofthetubesclean.Thetubesetshouldbeplacedintheordershown.

    Removetheinsulationfrombothcablesusingthemethodsdescribedinsections3.1.3and3.3.7.

    Slidethemechanicalconnectorontotheconductoronthepapersideofthejoint.Theconnectorisfittedwithaninserttoaccommodatesmallersectioncables;ifthecableconductorfitsintotheconnectorwiththeinsertinplace,useit-ifnot,removetheinsertanduseitwithout.

    Checkthattheconnectorbuttsupagainsttheinsulationandfinger-tightenthebolts.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 42

    Insertthesingle-corepolymericcablesintotheconnectorensuringthattheconnector buttsupagainsttheinsulationandfinger-tightenthebolts.

    Holdtheconnectorwiththeapprovedholdingtoolandtighteneachbolthalfaturnatatimewithasocketuntilitshearsoff.Startwiththeboltnearesttheinsulationateachendbeforemovingontotheothertwobolts,workingtowardsthemiddle.

    Smoothoffanysharpedgesfromtheboltsandthencleananddegreasetheconnector.Filltheboltholeswiththesuppliedgreyclaytoobtainasmoothfinish.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 43UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    4.2.5 HSL Trifurcating Joints (Three-Core HSL to 3 x Single-Core Polymeric Cables)

    ThecableswillhavebeenprepareduptothepointasdescribedinSection3.1and4.1.6.

    Slidetheplastictrifurcatingendoftheplasticjointboxoverthesingle-corecablesandpositionitawayfromthejointingarea.

    Positionacombinedtubeset(stresscontrol,insulatingtubeandscreenedinsulating)overeachofthesingle-corepolymericcables.

    Setthecoresintheirfinaljointingposition.Checkthattheconductorshavebeencuttoallowforanyconnectorcentralmoistureblock.Removetheinsulationfrombothconductors(3.1.3and3.3.7)totheconnectorinsertiondepth.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 44

    Inserteachendofthecoreintoitsrespective'connectorhalf'andfinger-tightenthebolts.

    Alignandpositionthetwoconnectorhalvessothatthecentralfixingboltcanbeinsertedintothecentralfixinghole.Theuseofforceforthisoperationshouldnotbenecessary.

    Holdtheconnectorwiththeapprovedholdingtoolandtightenthetwoboltsononesideuntiltheysheeroff.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 45UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Repeattheoperationontheothersideoftheconnector.Checkthatthecombinedtubesetislocatedoverthesingle-corecablesandsheeroffthecentralfixingbolt.

    Cleananddegreasetheconnector.Filltheboltholeswiththesuppliedgreyclaytoobtainasmoothfinish.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage46

    4.2.6 Mechanical Lugs for Indoor and Outdoor Terminations

    Followthecablepreparationproceduresforpolymericcablesinsections3.1.1to3.1.3beforeinstallinganymechanicallugs.

    Eachkitcomeswiththecorrectsizeandtypeoflugforeachtermination.Removetheconductorinsulationtotheinsertiondepthofthelug.

    Placethelugovertheconductorsothatthebottomofthebarrelbuttsupagainstthecoreinsulation.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 47UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Tightentheboltsbyhandandcheckthatthepalmholeslineupwiththeirrespectiveconnectionpoint.

    Tightentheboltsuntiltheboltheadsshearoff.

    4.3 Installing Connector Stress Control and Heatshrink Insulation

    4.3.1 Single-Core Polymeric Straight Joints

    Fittheconnectoruptothepointasdescribedinsection4.2.1.

    Useachinagraphpenciltomarktheblackinsulationscreenofbothcables20mmfromthescreencut.

    Makeasecondchinagraphpencilmarkontheinsulation10mmfromthescreencut.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage48

    Stretchoneoftheshortyellowstresscontrolmasticsuppliedinthekittohalfitsoriginalwidth.Wrapitaroundthecorescreenandinsulationbetweenthetwochinagraphpencilmarks.Repeatfortheothercableside.

    Usethelongstripofyellowstresscontrolmastictowrapthemasticaroundtheconnectorwitha50%overlap,stretchingthemastictoabouthalfitsoriginalwidth.Coveralltheconnectorareaandoverlaptotheinsulationoneachsideoftheconnectorby5mm.Makesurethereisasmoothtransitionfromtheconnectorontotheinsulation.

    Positiontheblackstresscontroltubecentrallyovertheconnectorarea.Eachendofthetubeshouldextendbeyondthescreenterminationpointsofeachcable.Shrinkthestresscontroltubingdown,startinginthecentreandworkingtowardseachendinturn.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 49UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Positionthescreenedinsulatingredandblacktubecentrallyoverthestresscontroltubeandstartshrinkingthesleeveatthecentrepositionusingequalheatoverthewholesurface.

    Whenthetubingisproperlyshrunk,theridgesontheouterblacklayerofthetubeshouldnolongerbevisible.

    Continuetoshrinkthetubefromthecentretowithin50mmofoneend.

    Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubing.Stopagain50mmfromtheend.Thisensuresthatairinsidethetubeisexpelledasthetubeshrinks.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 50

    Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.

    4.3.2 Single-Core Transition Straight Joints

    Fittheconnectoruptothepointasdescribedinsection4.2.2.

    Wrapashortpieceoftheyellowstresscontrolmasticaroundthepapercablecoreattheedgeoftheshortblackconductingsleeve.Start20mmontheconductingtube,continuingfor10mmontotheclearbarriertube.

    Wrapashorterpieceoftheyellowstresscontrolmasticaroundthepolymericscreen,starting20mmfromthescreenedgeandcontinuingfor10mmontotheinsulation.Stretchthetapetohalfitsoriginalwidthduringthetapingprocess.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 51UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Usethelongstripsofyellowstresscontrolmastictowrapthemasticaroundtheconnectorwitha50%overlap,stretchingittoabouthalfitsoriginalwidth.Covertheconnectorareaandoverlapontotheinsulationeachsideoftheconnectorby5mm.Makesureaminimumcoverageof2mmisachievedovertheconnectorarea.

    Pulltheblackstresscontroltubingfrominsidethenestedtubesetandpositionitcentrallyovertheconnectorarea,leavinga20mmgapbetweentheoversheathandthetubingend.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 52

    Shrinkthestresscontroltubingdownstartinginthecentre,beforeworkingtowardseachendinturn.Whenfinishedthetubingshouldbefullyshrunkandwrinklefree.

    Wrapapieceofredsealantmasticaroundeachendofthestresscontroltubing.Startfrom10mmonthestresscontroltubingandextendfor10mmontothecorescreenatbothends.

    Pulltheredinsulatingtubingfrominsidethenestedtubesetandpositionitcentrallyoverthestresscontroltube.Startshrinkinginthecentrebeforeworkingtowardseachendinturn.

    Note:Continueontothenextstepwhiletheredinsulatingtubingisstillhot.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 53UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Pulltheblackandredscreenedinsulatingtubingcentrallyovertheredinsulatingtubeandstartshrinkingthesleeveatthecentrepositionusingequalheatoverthewholesurface.Whenthetubingisproperlyshrunk,theridgesontheouterblacklayerofthetubeshouldnolongerbevisibleandthetubecannolongerbemoved.

    Continuetoshrinkthetubefromthecentretowithin50mmofoneend.

    Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubing.Stopagain50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.

    Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 54

    Pulltheblackcompressionsealingsleeveacrossthejointtothepapercablesideandplaceitsothatatleast50mmofleadsheathisstillvisible.

    Shrinkthetubingdown,startingonthetubesetendandworkingtowardstheleadsheath.Oncecompletedthereshouldbeapproximately50mmofleadsheathstillexposed.

    4.3.3 Resin Filled Three-Core Transition Straight Joints (Three-Core Paper to Single-Core Polymeric Cables)

    Fittheconnectoruptothepointasdescribedinsection4.2.3.

    Removethereleasepaperfromoneoftheshortyellowstresscontrolmasticstripsandwrapitaroundthepolymericcorescreen,starting20mmfromthescreenedgeandcontinueontotheinsulationfor10mm.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontheinsulation.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 55UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Repeattheexerciseonthepapercablecore,wrappingtheyellowstresscontrolmasticaroundtheedgeoftheconductivetubing.Cover20mmoftheconductivetubingandcontinueontothecleartubingfor10mm.

    Ensurethattheboltholesarefilledwiththesuppliedgreyclaytoleaveasmoothprofile.Usealongpieceoftheyellowstresscontrolmastictofilltheendsoftheconnectorandtheinsulationcutbackcontinuing10mmontotheinsulation,and20mmontotheconnector.Ifthereisastepbetweenthebodyoftheconnectorandthecableinsulationapplyyellowstresscontrolmastictoformasmooththeprofile.

    Removethereleasepaperfromtheyellowstresscontrolmasticpatchandwrapitcentrallyaroundtheconnector,takingcaretoexcludeanytrappedairasitisapplied.Whenfinishedthepatchshouldbesmoothandwrinklefree.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage56

    Slidethestresscontroltubingfrominsidethenestedtubesetandpositionitcentrallyovertheconnectorarea.Makesurethattheoverlapovereachtapedscreenedgeisequal.Shrinkthetubingstartinginthecentreandworkingtowardseachendinturn.

    Removethereleasepaperfromonelengthoftheredsealanttapeandwrapitaroundtheendofthestresscontroltube.Overlapthetapeontothetubeby20mmandby10mmontothecore.

    Pulltheredinsulatingtubesfromthetubesetsandcentrallypositionthemoverthestresscontroltubes.Shrinkthetubingstartinginthecentrebeforeworkingtowardseachendinturn.Whencompletethetubeshouldbesmoothandwrinklefree.

    Note:Continuewiththenextstepwhiletheredinsulatingtubingisstillhot.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 57UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Positionthescreenedredandblackinsulatingtubescentrallyovertheredinsulatingtubes.Startshrinkingthesleevesatthecentrepositionusingequalheatoverthewholesurface.Whenthetubingisproperlyshrunk,theridgesontheouterblacklayerofeachtubeshouldnolongerbevisibleandthetubescannolongerbemoved.

    Continuetoshrinkthetubefromthecentretowithin50mmofoneend.

    Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubing.Stopagain50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage58

    Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.

    4.3.4 Heatshrink Three-Core Transition Straight Joints (Three-Core PILC to Single-Core Polymeric)

    Fittheconnectoruptothepointasdescribedinsection4.2.4.

    Removethereleasepaperfromoneoftheshortyellowstresscontrolmasticstripsandwrapitaroundthepolymericcorescreen,starting20mmfromthescreenedgeandcontinueontotheinsulationfor10mm.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontheinsulation.

    Repeattheexerciseonthepapercablecore,wrappingtheyellowmasticaroundtheedgeoftheconductivetubing.Cover20mmoftheconductivetubingandcontinueontothecleartubingfor10mm.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 59UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Checkthattheboltholesarefilledwiththesuppliedclaytoleaveasmoothprofile.Using alongpieceoftheyellowstresscontrolmastic,filltheendsoftheconnectorsandthe insulationcutbacks,continuing10mmontotheinsulationand20mmontotheconnector. Ifthereisastepbetweenthebodyoftheconnectorandthecableinsulationapply yellowstresscontrolmastictoformaprofile.

    Removethereleasepaperfromoneoftheyellowstresscontrolmasticpatchandwrapitcentrallyaroundtheconnector,takingcaretoexcludetheairasitiswrapped.Whenfinishedthepatchshouldbesmoothandwrinklefree.Repeattheprocesswithallthreeconnectors.

    Slidethestresscontroltubesfrominsidethenestedtubesetsandpositionthemcentrallyovereachconnectorensuringthattheoverlapovereachtapedscreenedgeisequal.Shrinkthetubingstartinginthecentrebeforeworkingtowardseachendinturn.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage60

    Removethereleasepaperfromonelengthoftheredsealantmastictapeandwrapitaroundtheendofthestresscontroltube.Overlapthetapeontothetubeby20mmandby10mmontothecore.

    Pulltheredinsulatingtubesfromthetubesetsandcentrallypositionthemoverthestresscontroltubes.Shrinkthetubingstartinginthecentrebeforeworkingtowardseachendinturn.Whencompletethetubeshouldbesmoothandwrinklefree.

    Note:Continuewiththenextstepwhiletheredinsulatingtubesarestillhot.

    Pullthescreenedredandblackinsulatingtubescentrallyovertheredinsulatingtubesandstartshrinkingthesleevesatthecentrepositionusingequalheatoverthewholesurface.Whenthetubesareproperlyshrunk,theridgesontheouterblacklayerofthetubesshouldnolongerbevisibleandthetubescannolongerbemoved.

    UNCO

    NTRO

    LLED

  • Section4IPage61UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Continuetoshrinkthetubesfromthecentretowithin50mmofoneend.

    Removetheheatfromthatendandstartshrinkingfromthemiddletowardstheotherendofthetubes.Stop50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.

    Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage62

    Positionthethreecompressionsleevesoverthepaperendofthejoint,sothattheyequallyoverlaptheredandblackinsulationtubesandthecoretubes.Theuncoatedendofthecompressionsleeveshouldbepositionedtowardsthecentreofthejoint.Shrinkinplacestartingfromthecentreofthetubestowardsthecentreofthejointbeforefinallyshrinkingfromthecentretowardsthecrutch.

    4.3.5 HSL Trifurcating Joints (Three-Core HSL to 3 x Single-Core Polymeric Cables)

    Fittheconnectoruptothepointasdescribedin4.2.5.

    Removethereleasepaperfromoneoftheshortyellowstresscontrolmasticstripsandwrapitaroundthepolymericcorescreen,starting20mmfromthescreenedgeandcontinueontotheinsulationfor10mm.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontheinsulation.

    Repeatthisonthepapercablecore,wrappingtheyellowmasticaroundtheedgeoftheconductivetubing.Cover20mmoftheconductivetubingandcontinueontothecleartubingfor10mm.UN

    CONT

    ROLL

    ED

  • Section4IPage63UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Checkthattheboltholesarefilledwiththesuppliedgreyclaytoleaveasmoothprofile. Usealongpieceoftheyellowstresscontrolmastictocoverbothendsoftheconnector, 20mmontheconnectorand10mmontotheinsulation.

    Removethereleasepaperfromtheyellowstresscontrolmasticpatchandwrapitcentrallyaroundtheconnector,takingcaretoexcludeanytrappedairasitisapplied.Whenfinishedthepatchshouldbesmoothandwrinklefree.

    Slidethestresscontroltubesfrominsidethenestedtubesetsandpositionthemcentrallyovertheconnectorsensuringthattheoverlapovereachtapedscreenedgeisequal.Shrinkthetubesstartinginthecentrebeforeworkingtowardseachendinturn.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage64

    Removethereleasepaperfromonelengthoftheredsealantmastictapeandwrapitaroundbothendsofthestresscontroltube.Overlapthetapeontothetubeby20mmandby10mmontothecore.

    Pulltheredinsulatingtubesfromthetubesetsandcentrallypositionthemoverthestresscontroltubes.Shrinkthetubesstartinginthecentrebeforeworkingtowardseachendinturn.Whencompletethetubesshouldbesmoothandwrinklefree.

    Note:Continuewiththenextstepwhiletheredinsulatingtubesarestillhot.

    Pullthescreenedblackandredinsulatingtubescentrallyovertheredinsulatingtubesandstartshrinkingatthecentrepositionusingequalheatoverthewholesurface.Whenthetubesareproperlyshrunk,theridgesontheouterblacklayerofthetubesshouldnolongerbevisibleandthetubescannolongerbemoved.

    UNCO

    NTRO

    LLED

  • Section4IPage65UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Continuetoshrinkthetubesfromthecentretowithin50mmofoneend.

    Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubes.Stopagain50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.

    Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage66

    4.4 Installing Mechanical Earth Bonds and Associated Components

    4.4.1 Single-Core Polymeric Straight Joints

    Completetheproceduresforinsulatingtheconnectorasdescribedin4.3.1.

    Wrapthejointwithonelayerofthetinnedcoppermeshensuringthereisa50mmoverlapontotheoversheathofthecablesidewiththeshortshieldwires.

    Continueacrossthewholejointwiththetinnedcoppermeshata50%overlapandsecureontotheoppositejointside.

    Onthecablesidewiththelongscreenwires,bendthescreenwiresbackacrossthejointandformthemintotwoseparateconductors.Onthecablesidewiththeshortscreenwires,repeatthesameexerciseandfoldthegatheredwiresbacktowardsthejointcentre.

    UNCO

    NTRO

    LLED

  • Section4IPage67UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Gatherthewirestogetherandcutthemcentrallyabovethetinnedcoppermeshoverlappingthecablesheath.Installthecopperscreenwireconductorsintotheirrespectiveconnectorandtightentheboltsuntiltheheadsshearoff.

    Wrapasecondlayerofthecoppermesharoundthejoint,asbefore,sothatthewholeareaiscompletelycoveredincludingthemechanicalscreenconnectors.

    Cleananddegreasetheoutersheathsofbothcablesfor150mmfromthesheathcut.Slidethelargeoutersealingsleevecentrallyoverthejointarea.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage68

    Startshrinkingthetubeatthecentrebeforeworkingtowardseachendinturn.Allowtocoolbeforemovingorbackfillingthejoint.

    4.4.2 Single-Core Transition Joints

    Completetheproceduresforinsulatingtheconnectorasdescribedin4.3.2.

    Wraptwolayersoftinnedcoppermeshat50%overlapoverthejointfromtheleadsheathonthepapercabletotheover-sheathcutonthepolymericcable.

    Foldbackthecopperscreenwiresoverthejointandformthemintoanearthleadexceptfortheareaovertheleadsheath.Atthispointopenupthewiresandplacethemdirectlyontothetinnedcoppermesh.Wraptherollspringoverthescreenwiresandtwistuptight.

    UNCO

    NTRO

    LLED

  • Section4IPage69UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    CompletelycovertherollspringwithtwolayersofPVCtape.

    Clean,degreaseandabradetheoutersheathsfor150mmfromthesheathcuts.Slidethelargeoutersealingsleeveoverthejointareaandstartshrinkingthetubeatthecentrebeforeworkingtowardseachendinturn.

    Allowthejointtocoolbeforemovingorbackfilling.UN

    CONT

    ROLL

    ED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 70

    4.4.3 Polymeric Pot Ends

    Completethestepsinsection4.1.2.

    Laythecopperscreenwiresbackoverontothescreenedblackandredinsulatingsleeveanddistributethemaroundthecircumferenceevenly.

    Wrapthetinnedtinnedcoppermeshwitha50%overlaparoundthepotend,startingattheoutersheathandcontinuingupontothecopperscreenwires,beforecoveringtheinsulatingrod.

    Note:Thestresscontroltubingandtherodendmustbeincontactwiththetinnedcoppermesh.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 71UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Covertheendsofthecopperscreenwiresunderthetinnedcoppermeshwithtwolayers offabrictape.

    Placetheheatshrinkendcapoverthepotendandshrinkitintoplace.Startattheclosedendbeforeworkingtowardsthecablesheath.Duringtheshrinkingprocesscarefullypushtheclosedendofthecapagainsttheinsulatingendwithanappropriatetool.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 72

    Checkthattheover-sheathiscleananddegreased.Positiontheoutersealingsleeveover thepotendassemblysothatitlinesupwiththeendoftheendcap.

    Shrinkthetubingdown,startingatthecentreworkingtowardseachendinturn.Donotmoveorbackfilluntilthepotendhascooled.

    4.4.4 Resin Filled Three-Core Transition Straight Joints (Three-Core Paper to 3 x Single-Core Polymeric Cables)

    Completetheproceduresforinstallingtheconnectorinsulationinsection4.3.3.

    Pullthecorestogetherascloselyaspossibleandwraponelayeroftinnedcoppermesharoundthejointwitha50%overlap.Continueontotheleadsheathfor30mmanduptothescreenwiresontheoppositejointside.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 73UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Laythecopperwirescreensbackacrossthejointandformthemintothreeseparateearthconductors.Connectthecopperscreenwirestoeachofthethreeearthbraidsusingthemechanicalconnectorsprovided.

    Positionthethreeearthbraidsevenlyaroundtheleadsheathareaontopofthetinnedcoppermesh.Connectthethreeearthbraidstotheleadsheathusingalargerollspring.

    Wraptherollspringoverthebraidsandtwistthespringuptightly.CovertherollspringwithtwolayersofPVCtape.

    Wraptheremainingexposedleadsheathwiththestripsofredsealanttape.This is an important moisture seal. Do not leave out.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 74

    4.4.5 Heatshrink Three-Core Transition Straight Joints (Three-Core Paper to Single-Core Polymeric)

    Completetheproceduresforinstallingtheconnectorinsulationinsection4.3.4.

    Pullthecorestogetherascloselyaspossibleandwraponelayeroftinnedcoppermesharoundthejointwitha50%overlap.Continueontotheleadsheathfor30mmanduptothescreenwiresontheoppositejointside.

    Laythescreenwiresbackacrossthejointandformthemintothreeseparateearthconductors.Connectthecopperwirescreenstothethreeearthbraidsusingthemechanicalconnectorsprovided.

    Laythethreeearthleadsevenlyaroundtheleadsheathontopofthetinnedcoppermesh.Connectthethreeearthbraidstotheleadsheathusingalargerollspring.Wraptherollspringoverthebraidsandtwistthespringuptightly.CoverthespringwithtwolayersofPVCtape.UN

    CONT

    ROLL

    ED

  • Section 4 I Page 75UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Applyonehalflaplayerofwhitefabrictapeoverthesingle-corepolymericendofthejointforadistanceof150mmfromthecableoversheathtoprotectthetinnedcoppermeshtapefromtheheatgeneratedbyshrinkingtheThree-Corebreakout.

    Pulltheheatshrinkbreakoutbackoverthejointasfarasitwillgoandshrinkinplace,startingwiththeturretsbeforemovingontothemainbody.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage76

    Wraptheremainingexposedleadsheathwiththestripofblackmasticsealanttape.Thisisanimportantmoistureseal.Donotleaveout.

    Positionthewraparoundheatshrinkjointsleevearoundthejointandconnectthetwoendstogetherusingthemaetalchannelandthemetaljoiningclip.

    Shrinkthewraparoundsleeveinplace,startingatthemiddlebeforemovingtowardseachendinturn.Thegreenpaintonthesurfaceofthesleeveshoulddisappearwhenthetubeiscorrectlyshrunk.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 77UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Extraheatshouldbeappliedtothemetalchanneluntilthewhitemarkerlinecanbe clearlyseenunderit.

    Donotmoveorbackfilluntilthejointhascompletelycooled.

    4.4.6 HSL Trifurcating Joints (Three-Core HSL to 3 x Single-Core Polymeric Cables)

    Completetheproceduresforinstallingtheconnectorinsulationinsection4.3.5.

    Wraponelayeroftinnedcoppermeshwitha50%overlapovereachinsulatedcorecontinuingacrossthejointedcoresfromthesheathcutonthepolymericcables.Finish50mmontotheleadsheaths.

    Laythecopperscreenwiresbackacrossthejointandformthemintothreeseparateearthconductors.Connectthecopperscreenwirestoeachofthreeearthbraidsusingmechanicalconnectorsprovidedinthekit.UN

    CONT

    ROLL

    ED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage78

    Connecttheeachearthbraidstoeachoftheindividulleadsheathsusingatwoturnsoftherollsprings.

    Turntheendoftheearthbraidsbackoverthetwoturnsoftherollspringensuringthattheyareflatandeven.Wraptheremainderofthespringlengthoverthebraidsandtwistthespringuptightly.

    CovertherollspringswithtwolayersofPVCtape.

    UNCO

    NTRO

    LLED

  • Section 4 I Page 79UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Wraptheremainingexposedleadsheathswiththestripsofredsealanttape.This is an important moisture seal. Do not leave out.

    4.4.7 Connection of Screen Wires on Indoor and Outdoor Terminations

    Completetheproceduresforinstallingtheterminationsdescribedinsection4.1.8.

    ConnectthescreenwirestotheEarthingstudorpositionprovided(outdoorterminations)asapplicableforthegeometryoftheapparatus.

    4.4.8 Fitting Plastic Joint Boxes (Trifurcating Joints Only)

    Trimofftheendsofthejointboxsuppliedwiththekit,sothatitwillfitoverthecablesenteringthebox.

    Usingtheboxasaguide,offerituptothecableandmarkthestandoffpositionsofthemouldingswithachinagraphpencil.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage80

    Removethebackingfromtherubberpatchessuppliedinthekitandapplycentrally(overthepreviouslymademarks)withthestickysideout.

    Placethetwohalvesofthejointshelloverthejointandclipthetwohalvestogetherwiththeclipsprovided.Checkenoughclipsareusedtostoptheresinleakingoutwhenitispouredin.

    UNCO

    NTRO

    LLED

  • Section4IPage81UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    TapethejointboxtotheincomingcablewithPVCoranothersuitabletape.Iflargegapsareleftwhentheshellisfitteditmaybenecessarytopacktheendsofthejointshelloutwiththeclaypacksuppliedinsomekits.

    Forextrasecurity,runalengthofPVCtapedowntheseamsofthejointshellandfittheplasticlid.

    4.4.9 Mixing and Installation of Polyurethane Resin

    All33kVjointsshouldbefilledwith3-partpolyurethaneresin.CheckthatthecorrectPersonalProtectiveEquipmentiswornatalltimesandtheresinisnotmixedinaconfinedspace.

    Checkthelabelonthebuckettoensurethattheresinhasnotpassedtheusebydate.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage82

    Emptythecontentsofthebucketandcheckforanydamagetothepackaging.

    Pickupthefoilbagcontainingtheresinandhardenerandapplypressuretothelargeresinpouchsothattheresinbreaksthesealbetweenthetwosectionsandmixeswiththehardener.

    Mixthecontentsofbagbykneadingthefoilbagforaminimumoftwominutes.

    UNCO

    NTRO

    LLED

  • Section4IPage83UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

    Carefullycutoneofthecornersoffthefoilbagandpourallthecontentsintothesuppliedplasticbucket.

    Pourapproximatelyhalfofthesandsuppliedintheplasticbagintothebucketandstiruntilitisthoroughlymixedintotheresin.

    Pourtherestofthesandintothebucketandmixuntilnorawsandisvisibleandtheresinhasnolumpsinit.

    UNCO

    NTRO

    LLED

  • UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage84

    Pourthemixedresinintothejointshell.

    UNCO

    NTRO

    LLED