Section 4 I Page 1UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS
4.1 Installing Stress Control and Insulation Materials
4.1.1 Single-Core Paper Insulated Cables in Transition Joints
Preparethecableasdescribedinsection3.2.Useachinagraphpenciltomark20mmontotheleadsheathand10mmontotheinsulationpapers.
Removethereleasepaperfromthemediumlengthofyellowstresscontroltape.Stretchthetapetoabouthalfitsoriginalwidthandwrapitaroundtheleadsheathfor20mm.Removethetwinebinderfromthescreenedgeandcontinuewiththetapeoverthescreenpapersandontotheinsulationfor10mm.
Useachinagraphpenciltomarktheleadsheath20mmbeyondtheyellowstresscontroltape.Positiontheclearbarriertubingoverthecoreendandovertheyellowstresscontroltape,overlappingontotheleadsheathby20mm.UN
CONT
ROLL
ED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 2
Shrinkthetubingdown,startingontheleadsheathandcontinuingtowardsthecoreend.Oncecompletedthetubingshouldbefullyshrunkandhaveasmoothfinishwithoutwrinklesorcreases.
Positiontheshortblackconductivesleeve220mmfromthecoreendandshrinkthetubingdownstartingattheopencableendbeforeworkingtowardstheleadsheath.
4.1.2 Single-Core Polymeric Pot Ends
Preparethecablesasdescribedinsection3.1uptoandincludingthescreenremovalpoint.Thedimensionforthescreenis80mm.
UNCO
NTRO
LLED
Section 4 I Page 3UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Removetheinsulationfor30mmfromtheendofthecable.
Cleananddegreasetheinsulationwithanapprovedsolventwipetoremovealltracesofconductingmaterial.Alwayswipefromtheopencutendtowardsthescreenwirestoavoidcontaminatingtheinsulationwithcarbonfromthescreenlayer.
Wraptheconductivetapesuppliedinthejointingkitaroundthe30mmofexposedconductorstretchingittoabouthalfitsoriginalwidth.
Increasetheconductordiametersufficientlysothattheinsulatingrodisasnugfitovertheconductor.Pushtheinsulatingrodontotheconductorensuringthatitbuttsagainstthecableinsulation.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 4
Useashortstripofyellowstresscontrolmasticandremovethereleasepapersfromashortstripofyellowstresscontrolmastictape.Wrapitaroundtheedgeoftheinsulationscreenstarting20mmfromthescreenedge,beforecontinuingfor10mmontothecoreinsulation.Stretchthetapetoapproximatelyhalfitsoriginalwidthtoobtainafineedgeontotheinsulation.
Usingalongstripofyellowstresscontrolmasticandremovethereleasepapers.Wrapitaroundthecoreinsulationstarting10mmfromtheinsulationedge,beforecontinuingontotheinsulatingrodcoveringthe'paintedarea'and10mmbeyondontotherodinsulation.
Useonlyasmuchoftheyellowstresscontrolmastisasnecessarytofillinthestepbetweentheinsulationandtherod.
UNCO
NTRO
LLED
Section 4 I Page 5UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Wraponelayerofredmasticaroundtheinsulatingrod60mmfromitsendandwithawidthof10mm.
Positiontheblackstresscontroltubingovertheinsulatingrodandbuttitupagainstthecableoversheathcut.Shrinkthetubingdownstartingattheoversheathendbeforeworkingtowardstheinsulatingrodend.
Useonelayerofredmasticaroundeachendoftheinstalledstresscontrolledtube60mminfromeachendandwithawidtehof10mm.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage6
Slidetheredinsulatingtubingoverthestresscontroltubebuttingitagainstthecableover-sheathandcoincidingwiththestresscontroltubingedge.
Shrinkthetubingdownstartingattheover-sheathendandworkingtowardstheinsulatingrodend.
Placetheblackandredscreenedinsulatingtubingovertheassemblyandpositionittocoincidewiththepreviouslyinstalledtubes.
UNCO
NTRO
LLED
Section 4 I Page 7UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Shrinktheblackandredtubedownstartinginthecentre.Whenthissectionisfullyshrunkitshouldbesmoothwithoutridgesandshouldnotmovewhentwistingthetubeend.
Continuetheshrinkingprocess,workingtowardsoneendandstopping50mmfromtheend.Thenshrinktowardstheoppositeendstopping50mmfromtheend.Finallyshrinkdownthefirstremaining50mmoftubingfollowedbythesecond50mmoftubing.Thisprocessensuresthatnoairistrappedinsidethetube.
4.1.3 Resin Filled Three-Core Transition Straight Joints (Three-Core Paper to 3 x Single-Core Polymeric Cables)
Preparethecablesuptothepointasdescribedinsection3.3.
ProtecttheCopperWovenTape(CWT)withnylontape,startingfrom20mmontotheleadsheathextending30mmontothecores.Thenylontapeshouldbeappliedwithtension.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage8
Atthescreenterminationpositionwraponelayerofvoidfillingyellowstresscontrolmasticaroundeachcore,overlappingthescreenpapersby20mmandtheinsulationby10mm.Removethemetalbinderfromthescreenedgeduringthetapingprocess.
Slidetheclearbarriertubingovereachcoreandposition30mmfromtheendofthemetalsheath.Shrinkdownthetubingstartingatthecrutchpositionworkingtowardstheopencoreends.Checkthetubingisshrunkdownevenlyandfreefromcreasesorwrinkles.
UNCO
NTRO
LLED
Section 4 I Page 9UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Slidetheblackconductingtubingoverthecoreendsandpositionthem50mmfromtheendofthemetalsheath.Shrinkthetubesdownatthispositionstartingatthecrutchbeforeworkingtowardsthecoreends.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 10
Slidethesmallyellowmasticwedgeintothecrutchusingtheinstallationtoolprovided.Takethelargerwedgeandinsertitintothecrutchbehindthesmallerwedgeusingthesametool.Removethenylontapeafterinsertionofbothwedges.
Degreasethecoresusingapprovedsolventwipes.Makeachinagraphpencilmarkontheconductivetubes70mmfromtheleadsheathcutandfor20mmontotheleadsheath.
Wrapstripsofyellowmasticaroundthecrutchbetweenthetwochinagraphpencilmarks.Applysufficienttensiontostretchthetapetohalfitsoriginalwidthuntila'cone'shapeisformed.
UNCO
NTRO
LLED
Section 4 I Page 11UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Passtheconductivebreakoutoverthecoresandpushitwelldownintothecrutch,usingtheyellowwedgeinstallationtool.Holdthebreakoutinplaceandshrinkitdownstartingatthecentre,beforefirstlyworkingtowardstheleadsheathandthentowardsthebreakoutfingers.
4.1.4 Heatshrink Three-Core Transition Straight Joint (Three-Core Paper to 3 x Single-Core Polymeric Cables)
Preparethecablesuptothepointasdescribedinsection3.3.
ProtecttheCWTwithnylontape,starting20mmontotheleadsheathextending30mmontothecores.Thenylontapeshouldbeappliedwithtension.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 12
Atthescreenterminationpositionwraponelayerofvoidfillingyellowstresscontrolmasticaroundeachcoreoverlappingthescreenpapersby20mmandtheinsulationby10mm.Removethemetalbinderfromthescreenedgeduringthetapingprocess.
Slidetheclearbarriertubingovereachcoreandposition30mmfromtheendofthemetalsheath.Shrinkdownthetubingstartingatthecrutchpositionbeforeworkingtowardstheopencoreends.Checkthetubingisshrunkdownevenlyandisfreefromcreasesorwrinkles.
UNCO
NTRO
LLED
Section 4 I Page 13UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Slidetheblackconductingtubingoverthecoreendsandpositionthem50mmfromtheendofthemetalsheath.Shrinkthetubesdownatthispositionstartingatthecrutchworkingtowardsthecoreends.
Slidethesmallersuppliedyellowmasticwedgeintothecrutchusingtheinstallationtoolprovided.Takethelargerwedgeandinsertitintothecrutchbehindthesmallerwedgeusingthesametool.Removethenylontapeafterinsertionofbothwedges.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 14
Degreasethecoresusingapprovedsolventwipes.Makeachinagraphpencilmarkontheconductivetubes70mmfromtheleadsheathcutandfor20mmontotheleadsheath.
Wrapthestripsofyellowstresscontrolmasticaroundthecrutchbetweenthetwochinagraphpencilmarks.Applysufficienttensiontostretchthetapetohalfitsoriginalwidthuntilaconeshapeisformed.
UNCO
NTRO
LLED
Section 4 I Page 15UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Passtheconductivebreakoutoverthecoresandpushitwelldownintothecrutch,usingtheyellowwedgeinstallationtool.Holdthebreakoutinplaceandshrinkitdown,startingatthecentrebeforeworkingtowardstheleadsheathandthentowardsthebreakoutfingers.
Positiontheshortlengthofwrap-aroundheatshrinktubeoverthepapercablesothatitcoverstheleadsheathandthethreefingerbreakout.Leaveagapofatleast100mmbetweentheendofthewraparoundandthearmoursealingsleeve.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage16
Shrinkthewrap-aroundinplacestartinginthemiddle,untilthesurfacepaintonthetubeturnsfromgreentoblack.Thengraduallymovetoeachendusingthesameprocess.Extraheatshouldbeappliedtothemetalchanneluntilthewhitemarkerlinecanbeclearlyseenunderit.
Positiontheshortsealingheatshrinktubesovertheturretsoftheheatshrinkbreakout,ensuringtheyarepushedrightintothecrutchandshrinkinplace.
4.1.5 HSL Breakout Module
Preparethecablesuptothepointasdescribedinsection3.4.1to3.4.3.
Useachinagraphpenciltomarkeachleadsheath100mmfromthearmourcutedge.Foldashortlengthoftinnedcoppermeshinhalflengthways.
UNCO
NTRO
LLED
Section 4 I Page 17UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Wrapthetinnedcoppermesharoundtheleadsheathscenteredonthe100mmmark.
Positiononeofthelengthsofbraidoverthemeshsothatthelooseendpointsawayfromthecrutchofthecable.
Securealengthofearthbraidtoeachleadoftheleadsheathsusingoneturnoftherollspringsdirectlyontothecoppermeshwrap.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage18
Bendthebraidsbackovertherollspringandthensecureinplacewiththeremainingturns.
CovereachoftherollspringswithtwolayersofPVCtape.
UNCO
NTRO
LLED
Section 4 I Page 19UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Securethebraidendstothearmoursandthesupportringwitharolloftinnedcoppermeshsandwichingthebraidsbetweenthemeshwraps.
Finally,securethemeshandbraidstothesupportringandarmoursusingthewormdriveclipsprovided,withoneclipeithersideofthesupportringscentralridge.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 20
CoverthewormdriveclipswithPVCtapetotidyuptheirlooseends.
Slideasealingsleeveovereachleadsheathandrollspringconnectionuptowheretheearthbraidmeetsthesupportring.Shrinkthemdownstartingontheleadsheathsandcontinuingtowardsthearmourwiresarea.
Wrapastripofblackmasticbehindthesupportringoverthearmourwires,fillingthespacebetweentheringandtheoutersheath.
UNCO
NTRO
LLED
Section 4 I Page 21UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Passthebreakoutovertheleadsealingsleevesandpulldownintothecrutch.Shrinkthebreakoutdownstartinginthecentrebeforemovingtowardstheover-sheathandthenshrinkthebreakoutfingers.
Positionthecrutchsealingsleevewithoneendlevelwiththeendofthefingersonthebreakoutandshrinkintoplace.
4.1.6 HSL Cable Core Preparation
Preparethecablesasdetailedinsection4.1.5andremovetheleadsheathsasdescribed insection3.4.4.
Useachinagraphpenciltomark20mmontotheleadsheath,and10mmontothe insulationpapers.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 22
Removethereleasepaperfromoneofthemediumlengthsyellowstresscontroltape.Stretchthetapetoabouthalfitsoriginalwidthandwrapitaroundtheleadsheathfor20mm.Removethetwinebinderfromthescreenedgeandcontinuewiththetapeoverthescreenpapersandontotheinsulationfor10mm.
Makeamarkontheleadsheathusingachinagraphpencil20mmbeyondtheyellowstresscontroltape.Positiontheclearbarriertubingoverthecoreendandtheyellowstresscontroltapeoverlappingontotheleadsheathby20mm.
Shrinkthetubingdown,startingontheleadsheathandcontinuingtowardsthecoreend.Oncecompletedthetubingshouldbefullyshrunkandhaveasmoothfinishwithoutwrinklesorcreases.
UNCO
NTRO
LLED
Section 4 I Page 23UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Positiontheshortblackconductivesleeve220mmfromthecoreendandshrinkthetubingdown,startingattheopencableendbeforeworkingtowardstheleadsheath.
4.1.7 Paper Insulation 'Shim Kit' for Cable Cross Sections 70mm & 95mm
Forcablesbelowtheminimumsizerangespecifiedonthekitlabela'shimkit'mustbeused.
Thecableswillbeatthestageofpreparationdescribedinsections4.1.1,4.1.3,4.1.4or 4.1.6.
Applyapieceoftheyellowstresscontroltape20mmovertheendoftheconductivetubeandontothecleartubingby10mm.Usesomeoftheyellowtapeprovidedinthemainjointkit.
Positionashortlengthofthesmallerdiameterstresscontroltubing(42/16)overthecoreend,overlappingtheconductivetubesandtheyellowstresscontrolmasticby40mm.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 24
Shrinkthestresscontroltubingdown,startingfromtheyellowmastictapeandworkingtowardstheopencoreend.
Wraponeoftheredmasticstripsprovidedaroundtheendofthestresscontroltube30mmontothetubingand10mmontothecore.
Positionashortlengthofthelargerdiameterstresscontroltubing(54/24)directlyoverthepreviouslyappliedstresscontroltubeandshrinkdownfollowingthesameprocedureasbefore.
UNCO
NTRO
LLED
Section 4 I Page 25UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Applyoneoftheredmasticstripsprovidedaroundtheendofthestresscontroltube30mmontothetubingand10mmontothepreviouslyappliedredmastic.
4.1.8 Paper Insulation 'Shim Kit' for Cable Cross Sections 120mm & 150mm
Forcablesbelowtheminimumsizerangespecifiedonthekitlabel,a'shimkit'mustbeused.
Thecableswillbeatthestageofpreparationdescribedinsections4.1.1,4.1.3,4.1.4or 4.1.6.
Applyashortlengthoftheyellowstresscontroltape20mmovertheendoftheconductivetubeandontothecleartubingby10mm.Usesomeoftheyellowtapesuppliedinthemainjointkit.
Positionashortlengthofthestresscontroltubing(54/24)overthecoreend,overlappingtheconductivetubesandtheyellowstresscontrolmasticby40mm.UN
CONT
ROLL
ED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage26
Shrinkthestresscontroltubingdown,startingfromtheyellowmastictapeandworkingtowardstheopencoreend.
Wraponeoftheredmasticstripsprovidedaroundeachendofthestresscontroltube30mmontothetubingand10mmontothecore.
4.1.9 Single-Core Polymeric Terminations (Indoor and Outdoor)
Followthecablepreparationproceduresforpolymericcablesasdescribedinsection3.1.
Useachinagraphpenciltomarktheoutersheath60mmbelowthesheathcutposition.
UNCO
NTRO
LLED
Section 4 I Page 27UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Wraponelayerofredsealanttapeoverthecablesheathdowntothechinagraphpencilmark.
Bendbackthecopperscreenwirescarefullyandlaythemontothemastictapetakingcarenottocrossoveranyofthewires.Securethewireswithawirebinderatthe60mmmark.
Makeachinagraphpencilmarkontothecorescreen40mmfromthesheathcut.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage28
Removethecorescreendowntothe40mmmarkusingtheapprovedscreenstrippingtool.
Makeamarkwithachinagraphpencil20mmontothecorescreenand10mmontotheinsulation.
Removethereleasepaperandwraptheyellowstresscontrolmasticaroundthescreencutbetweenthetwopencilmarks.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontotheinsulation.
UNCO
NTRO
LLED
Section 4 I Page 29UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Positiontheblackstresscontroltubingoverthecoresothatitislevelwiththeoutersheathcut.Shrinkthetubingdown,startingatthesheathcutendandworkingupwards.Whenfullyshrunkthetubingshouldbesmoothandwrinklefree.
Removetheinsulationfromthecoreendaccordingtotheinnerdimensionofthecablelugbarrel.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 30
Fitthecablelugensuringthatthelugbuttsagainsttheinsulationedgeandhandtightenthesecuringbolts.
Shearofftheboltheadsusingtheapprovedtoolsandfillintheindentswiththegreyclayprovided.
Wraptheredsealanttapearoundthelugbarrel,overlappingontotheinsulation.Buildupthediameterdifferencewiththeredtapesothatasmoothandevenprofileisachieved.
UNCO
NTRO
LLED
Section 4 I Page 31UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Removethereleasepaperfromtheredtubing.Placethetubingoverthecableend(withthesealantcoatedenddownwards),levelwiththewirebinder.
Shrinkthetubingdownstartingattheoutersheathend,beforeworkingtowardsthecable lug.
Cutthetubingbackontothecablelug,levelwiththetopofthemainbody,ifnecessary.
Post-heatthepalmofthecableluguntilabeadofthesealantappearsaroundthetopof thetubing.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 32
Useachinagraphpenciltomarkthepositionfortheshedsonthetubingatthedimensiongivenintheterminationinstruction.
Placetwoskirtsoverthecableendandpositiononthepreviouslymademarks.Shrinkeachshedinplace.
UNCO
NTRO
LLED
Section 4 I Page 33UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Foroutdoorterminationstherearefourskirtstobefittedtoeachtermination.Theseshouldbeplacedandshrunkintopositionatthemeasurementsindicatedintherelevantjointinginstruction.
4.2 Installing Mechanical Connectors and Lugs
4.2.1 Single-Core Polymeric Straight Joints
Thecableswillhavebeenprepareduptothepointasdescribedinsection3.1.
Positionthecombinedstresscontrol,screenedinsulatingtubingandoutersealingsleeveoveroneofthecableends.
Removetheinsulationasdescribedinsection3.1.3.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 34
Theconnectorcomeswithmetalinsertstofitsmallconductors.Iftheconductorwillnotfittheconnector,discardtheinsertandusetheconnectorwithoutit.
Fittheconductorsintotheconnector.Theinsulationshouldbuttagainsttheendoftheconnector.
Usingtheapprovedinsulatedtooltoholdtheconnector,takeupthetensiononalltheboltsequallywithoutshearingthemoff.
UNCO
NTRO
LLED
Section 4 I Page 35UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Continuetotightenandsheeroffalltheboltsstartingwiththeboltsateachendfollowedbythecentralbolts.
Filltheboltholesintheconnectorwiththegreyclaysuppliedinthejointkit.
4.2.2 Single-Core Transitional Straight Joints
Thecableswillhavebeenprepareduptothepointasdescribedinsections3.1and3.2.
Slidethefivepiecetubingsetoverthepolymericcableside.Nestingthetubesetontheplasticbagwrappingwillkeeptheinsideofthetubesclean.Thetubesetshouldbeplacedintheordershown.
Note :Itisimportantthatthefourthtube(thesecondlargest)isplacedwithinthetubeset sothattheuncoatedinneredgepointstowardsthejointcentre.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage36
Removetheinsulationfrombothcablesusingthemethodsdescribedinsections3.1.3and3.2.5.
Theconnectorisa'TwoPiece'designwiththetwohalvessecuredtogetherwithacentralshearbolt.Eachconnectorhalfhastwoconductorsecuringboltswhicharealsooftheshearofftype.
Fittheconductorsintotheconnector.Theinsulationshouldbuttagainsteachendoftheconnector.
UNCO
NTRO
LLED
Section 4 I Page 37UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Usingtheapprovedinsulatedtooltoholdtheconnector,takeupthetensiononalltheboltsequallywithoutshearingthemoff.
Continuetotightenandsheeroffalltheboltsstartingwiththoseateachendfollowedbythecentralbolt.
Filltheboltholesintheconnectorwiththegreyclaysuppliedinthejointkit.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage38
4.2.3 Resin Filled Three-Core Trifurcating Joints (Three-Core Paper to 3 x Single-Core Polymeric Cables)
Thecableswillhavebeenprepareduptothepointasdescribedinsection3.1and4.1.3.
Slidetheplastictrifurcatingendoftheplasticjointboxoverthesingle-corecablesandpositionitawayfromthejointingarea.
Slidethethreepiecetubingsetsoverthepolymericcableside.Nestingthetubesetsontheplasticbagwrappingtokeeptheinsideofthetubesclean.Thetubesetsshouldbeplacedintheordershown.
Setthecoresintheirfinaljointingposition.Checkthattheconductorshavebeencuttoallowforanyconnectorcentralmoistureblock.Removetheinsulationfrombothconductors,sections3.1.3and3.3.7,totheconnectorinsertiondepth.
UNCO
NTRO
LLED
Section 4 I Page 39UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Inserteachendofthecoreintoitsrespective'connectorhalf'andfinger-tightenthebolts.
Alignandpositionthetwoconnectorhalvessothatthecentralfixingboltcanbeinsertedintothecentralfixinghole.Theuseofforceforthisoperationshouldnotbenecessary.
Holdtheconnectorwiththeapprovedholdingtoolandtightenthetwoboltsononesideuntiltheysheeroff.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 40
Repeattheoperationontheothersideoftheconnector.Checkthatthecombinedtubesetislocatedoverthesingle-corecablesandsheeroffthecentralfixingbolt.
Cleananddegreasetheconnector.Filltheboltholeswiththesuppliedgreyclaytoobtainasmoothfinish.
4.2.4 Heatshrink Three-Core Transition Straight Joint (Three-Core Paper to 3 x Single-Core Polymeric Cables)
Thecableswillhavebeenprepareduptothepointasdescribedinsections3.1and4.1.4.
Slidetheouterjointheatshrinksealingbreakoutoverthesingle-corecablesandpositionitawayfromthejointingarea.
UNCO
NTRO
LLED
Section 4 I Page 41UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Slidethefourpiecetubingsetoverthepolymericcableside.Nestingthetubesetontheplasticbagwrappingwillkeeptheinsideofthetubesclean.Thetubesetshouldbeplacedintheordershown.
Removetheinsulationfrombothcablesusingthemethodsdescribedinsections3.1.3and3.3.7.
Slidethemechanicalconnectorontotheconductoronthepapersideofthejoint.Theconnectorisfittedwithaninserttoaccommodatesmallersectioncables;ifthecableconductorfitsintotheconnectorwiththeinsertinplace,useit-ifnot,removetheinsertanduseitwithout.
Checkthattheconnectorbuttsupagainsttheinsulationandfinger-tightenthebolts.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 42
Insertthesingle-corepolymericcablesintotheconnectorensuringthattheconnector buttsupagainsttheinsulationandfinger-tightenthebolts.
Holdtheconnectorwiththeapprovedholdingtoolandtighteneachbolthalfaturnatatimewithasocketuntilitshearsoff.Startwiththeboltnearesttheinsulationateachendbeforemovingontotheothertwobolts,workingtowardsthemiddle.
Smoothoffanysharpedgesfromtheboltsandthencleananddegreasetheconnector.Filltheboltholeswiththesuppliedgreyclaytoobtainasmoothfinish.
UNCO
NTRO
LLED
Section 4 I Page 43UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
4.2.5 HSL Trifurcating Joints (Three-Core HSL to 3 x Single-Core Polymeric Cables)
ThecableswillhavebeenprepareduptothepointasdescribedinSection3.1and4.1.6.
Slidetheplastictrifurcatingendoftheplasticjointboxoverthesingle-corecablesandpositionitawayfromthejointingarea.
Positionacombinedtubeset(stresscontrol,insulatingtubeandscreenedinsulating)overeachofthesingle-corepolymericcables.
Setthecoresintheirfinaljointingposition.Checkthattheconductorshavebeencuttoallowforanyconnectorcentralmoistureblock.Removetheinsulationfrombothconductors(3.1.3and3.3.7)totheconnectorinsertiondepth.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 44
Inserteachendofthecoreintoitsrespective'connectorhalf'andfinger-tightenthebolts.
Alignandpositionthetwoconnectorhalvessothatthecentralfixingboltcanbeinsertedintothecentralfixinghole.Theuseofforceforthisoperationshouldnotbenecessary.
Holdtheconnectorwiththeapprovedholdingtoolandtightenthetwoboltsononesideuntiltheysheeroff.
UNCO
NTRO
LLED
Section 4 I Page 45UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Repeattheoperationontheothersideoftheconnector.Checkthatthecombinedtubesetislocatedoverthesingle-corecablesandsheeroffthecentralfixingbolt.
Cleananddegreasetheconnector.Filltheboltholeswiththesuppliedgreyclaytoobtainasmoothfinish.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage46
4.2.6 Mechanical Lugs for Indoor and Outdoor Terminations
Followthecablepreparationproceduresforpolymericcablesinsections3.1.1to3.1.3beforeinstallinganymechanicallugs.
Eachkitcomeswiththecorrectsizeandtypeoflugforeachtermination.Removetheconductorinsulationtotheinsertiondepthofthelug.
Placethelugovertheconductorsothatthebottomofthebarrelbuttsupagainstthecoreinsulation.
UNCO
NTRO
LLED
Section 4 I Page 47UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Tightentheboltsbyhandandcheckthatthepalmholeslineupwiththeirrespectiveconnectionpoint.
Tightentheboltsuntiltheboltheadsshearoff.
4.3 Installing Connector Stress Control and Heatshrink Insulation
4.3.1 Single-Core Polymeric Straight Joints
Fittheconnectoruptothepointasdescribedinsection4.2.1.
Useachinagraphpenciltomarktheblackinsulationscreenofbothcables20mmfromthescreencut.
Makeasecondchinagraphpencilmarkontheinsulation10mmfromthescreencut.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage48
Stretchoneoftheshortyellowstresscontrolmasticsuppliedinthekittohalfitsoriginalwidth.Wrapitaroundthecorescreenandinsulationbetweenthetwochinagraphpencilmarks.Repeatfortheothercableside.
Usethelongstripofyellowstresscontrolmastictowrapthemasticaroundtheconnectorwitha50%overlap,stretchingthemastictoabouthalfitsoriginalwidth.Coveralltheconnectorareaandoverlaptotheinsulationoneachsideoftheconnectorby5mm.Makesurethereisasmoothtransitionfromtheconnectorontotheinsulation.
Positiontheblackstresscontroltubecentrallyovertheconnectorarea.Eachendofthetubeshouldextendbeyondthescreenterminationpointsofeachcable.Shrinkthestresscontroltubingdown,startinginthecentreandworkingtowardseachendinturn.
UNCO
NTRO
LLED
Section 4 I Page 49UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Positionthescreenedinsulatingredandblacktubecentrallyoverthestresscontroltubeandstartshrinkingthesleeveatthecentrepositionusingequalheatoverthewholesurface.
Whenthetubingisproperlyshrunk,theridgesontheouterblacklayerofthetubeshouldnolongerbevisible.
Continuetoshrinkthetubefromthecentretowithin50mmofoneend.
Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubing.Stopagain50mmfromtheend.Thisensuresthatairinsidethetubeisexpelledasthetubeshrinks.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 50
Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.
4.3.2 Single-Core Transition Straight Joints
Fittheconnectoruptothepointasdescribedinsection4.2.2.
Wrapashortpieceoftheyellowstresscontrolmasticaroundthepapercablecoreattheedgeoftheshortblackconductingsleeve.Start20mmontheconductingtube,continuingfor10mmontotheclearbarriertube.
Wrapashorterpieceoftheyellowstresscontrolmasticaroundthepolymericscreen,starting20mmfromthescreenedgeandcontinuingfor10mmontotheinsulation.Stretchthetapetohalfitsoriginalwidthduringthetapingprocess.
UNCO
NTRO
LLED
Section 4 I Page 51UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Usethelongstripsofyellowstresscontrolmastictowrapthemasticaroundtheconnectorwitha50%overlap,stretchingittoabouthalfitsoriginalwidth.Covertheconnectorareaandoverlapontotheinsulationeachsideoftheconnectorby5mm.Makesureaminimumcoverageof2mmisachievedovertheconnectorarea.
Pulltheblackstresscontroltubingfrominsidethenestedtubesetandpositionitcentrallyovertheconnectorarea,leavinga20mmgapbetweentheoversheathandthetubingend.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 52
Shrinkthestresscontroltubingdownstartinginthecentre,beforeworkingtowardseachendinturn.Whenfinishedthetubingshouldbefullyshrunkandwrinklefree.
Wrapapieceofredsealantmasticaroundeachendofthestresscontroltubing.Startfrom10mmonthestresscontroltubingandextendfor10mmontothecorescreenatbothends.
Pulltheredinsulatingtubingfrominsidethenestedtubesetandpositionitcentrallyoverthestresscontroltube.Startshrinkinginthecentrebeforeworkingtowardseachendinturn.
Note:Continueontothenextstepwhiletheredinsulatingtubingisstillhot.
UNCO
NTRO
LLED
Section 4 I Page 53UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Pulltheblackandredscreenedinsulatingtubingcentrallyovertheredinsulatingtubeandstartshrinkingthesleeveatthecentrepositionusingequalheatoverthewholesurface.Whenthetubingisproperlyshrunk,theridgesontheouterblacklayerofthetubeshouldnolongerbevisibleandthetubecannolongerbemoved.
Continuetoshrinkthetubefromthecentretowithin50mmofoneend.
Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubing.Stopagain50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.
Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 54
Pulltheblackcompressionsealingsleeveacrossthejointtothepapercablesideandplaceitsothatatleast50mmofleadsheathisstillvisible.
Shrinkthetubingdown,startingonthetubesetendandworkingtowardstheleadsheath.Oncecompletedthereshouldbeapproximately50mmofleadsheathstillexposed.
4.3.3 Resin Filled Three-Core Transition Straight Joints (Three-Core Paper to Single-Core Polymeric Cables)
Fittheconnectoruptothepointasdescribedinsection4.2.3.
Removethereleasepaperfromoneoftheshortyellowstresscontrolmasticstripsandwrapitaroundthepolymericcorescreen,starting20mmfromthescreenedgeandcontinueontotheinsulationfor10mm.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontheinsulation.
UNCO
NTRO
LLED
Section 4 I Page 55UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Repeattheexerciseonthepapercablecore,wrappingtheyellowstresscontrolmasticaroundtheedgeoftheconductivetubing.Cover20mmoftheconductivetubingandcontinueontothecleartubingfor10mm.
Ensurethattheboltholesarefilledwiththesuppliedgreyclaytoleaveasmoothprofile.Usealongpieceoftheyellowstresscontrolmastictofilltheendsoftheconnectorandtheinsulationcutbackcontinuing10mmontotheinsulation,and20mmontotheconnector.Ifthereisastepbetweenthebodyoftheconnectorandthecableinsulationapplyyellowstresscontrolmastictoformasmooththeprofile.
Removethereleasepaperfromtheyellowstresscontrolmasticpatchandwrapitcentrallyaroundtheconnector,takingcaretoexcludeanytrappedairasitisapplied.Whenfinishedthepatchshouldbesmoothandwrinklefree.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage56
Slidethestresscontroltubingfrominsidethenestedtubesetandpositionitcentrallyovertheconnectorarea.Makesurethattheoverlapovereachtapedscreenedgeisequal.Shrinkthetubingstartinginthecentreandworkingtowardseachendinturn.
Removethereleasepaperfromonelengthoftheredsealanttapeandwrapitaroundtheendofthestresscontroltube.Overlapthetapeontothetubeby20mmandby10mmontothecore.
Pulltheredinsulatingtubesfromthetubesetsandcentrallypositionthemoverthestresscontroltubes.Shrinkthetubingstartinginthecentrebeforeworkingtowardseachendinturn.Whencompletethetubeshouldbesmoothandwrinklefree.
Note:Continuewiththenextstepwhiletheredinsulatingtubingisstillhot.
UNCO
NTRO
LLED
Section 4 I Page 57UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Positionthescreenedredandblackinsulatingtubescentrallyovertheredinsulatingtubes.Startshrinkingthesleevesatthecentrepositionusingequalheatoverthewholesurface.Whenthetubingisproperlyshrunk,theridgesontheouterblacklayerofeachtubeshouldnolongerbevisibleandthetubescannolongerbemoved.
Continuetoshrinkthetubefromthecentretowithin50mmofoneend.
Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubing.Stopagain50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage58
Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.
4.3.4 Heatshrink Three-Core Transition Straight Joints (Three-Core PILC to Single-Core Polymeric)
Fittheconnectoruptothepointasdescribedinsection4.2.4.
Removethereleasepaperfromoneoftheshortyellowstresscontrolmasticstripsandwrapitaroundthepolymericcorescreen,starting20mmfromthescreenedgeandcontinueontotheinsulationfor10mm.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontheinsulation.
Repeattheexerciseonthepapercablecore,wrappingtheyellowmasticaroundtheedgeoftheconductivetubing.Cover20mmoftheconductivetubingandcontinueontothecleartubingfor10mm.
UNCO
NTRO
LLED
Section 4 I Page 59UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Checkthattheboltholesarefilledwiththesuppliedclaytoleaveasmoothprofile.Using alongpieceoftheyellowstresscontrolmastic,filltheendsoftheconnectorsandthe insulationcutbacks,continuing10mmontotheinsulationand20mmontotheconnector. Ifthereisastepbetweenthebodyoftheconnectorandthecableinsulationapply yellowstresscontrolmastictoformaprofile.
Removethereleasepaperfromoneoftheyellowstresscontrolmasticpatchandwrapitcentrallyaroundtheconnector,takingcaretoexcludetheairasitiswrapped.Whenfinishedthepatchshouldbesmoothandwrinklefree.Repeattheprocesswithallthreeconnectors.
Slidethestresscontroltubesfrominsidethenestedtubesetsandpositionthemcentrallyovereachconnectorensuringthattheoverlapovereachtapedscreenedgeisequal.Shrinkthetubingstartinginthecentrebeforeworkingtowardseachendinturn.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage60
Removethereleasepaperfromonelengthoftheredsealantmastictapeandwrapitaroundtheendofthestresscontroltube.Overlapthetapeontothetubeby20mmandby10mmontothecore.
Pulltheredinsulatingtubesfromthetubesetsandcentrallypositionthemoverthestresscontroltubes.Shrinkthetubingstartinginthecentrebeforeworkingtowardseachendinturn.Whencompletethetubeshouldbesmoothandwrinklefree.
Note:Continuewiththenextstepwhiletheredinsulatingtubesarestillhot.
Pullthescreenedredandblackinsulatingtubescentrallyovertheredinsulatingtubesandstartshrinkingthesleevesatthecentrepositionusingequalheatoverthewholesurface.Whenthetubesareproperlyshrunk,theridgesontheouterblacklayerofthetubesshouldnolongerbevisibleandthetubescannolongerbemoved.
UNCO
NTRO
LLED
Section4IPage61UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Continuetoshrinkthetubesfromthecentretowithin50mmofoneend.
Removetheheatfromthatendandstartshrinkingfromthemiddletowardstheotherendofthetubes.Stop50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.
Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage62
Positionthethreecompressionsleevesoverthepaperendofthejoint,sothattheyequallyoverlaptheredandblackinsulationtubesandthecoretubes.Theuncoatedendofthecompressionsleeveshouldbepositionedtowardsthecentreofthejoint.Shrinkinplacestartingfromthecentreofthetubestowardsthecentreofthejointbeforefinallyshrinkingfromthecentretowardsthecrutch.
4.3.5 HSL Trifurcating Joints (Three-Core HSL to 3 x Single-Core Polymeric Cables)
Fittheconnectoruptothepointasdescribedin4.2.5.
Removethereleasepaperfromoneoftheshortyellowstresscontrolmasticstripsandwrapitaroundthepolymericcorescreen,starting20mmfromthescreenedgeandcontinueontotheinsulationfor10mm.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontheinsulation.
Repeatthisonthepapercablecore,wrappingtheyellowmasticaroundtheedgeoftheconductivetubing.Cover20mmoftheconductivetubingandcontinueontothecleartubingfor10mm.UN
CONT
ROLL
ED
Section4IPage63UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Checkthattheboltholesarefilledwiththesuppliedgreyclaytoleaveasmoothprofile. Usealongpieceoftheyellowstresscontrolmastictocoverbothendsoftheconnector, 20mmontheconnectorand10mmontotheinsulation.
Removethereleasepaperfromtheyellowstresscontrolmasticpatchandwrapitcentrallyaroundtheconnector,takingcaretoexcludeanytrappedairasitisapplied.Whenfinishedthepatchshouldbesmoothandwrinklefree.
Slidethestresscontroltubesfrominsidethenestedtubesetsandpositionthemcentrallyovertheconnectorsensuringthattheoverlapovereachtapedscreenedgeisequal.Shrinkthetubesstartinginthecentrebeforeworkingtowardseachendinturn.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage64
Removethereleasepaperfromonelengthoftheredsealantmastictapeandwrapitaroundbothendsofthestresscontroltube.Overlapthetapeontothetubeby20mmandby10mmontothecore.
Pulltheredinsulatingtubesfromthetubesetsandcentrallypositionthemoverthestresscontroltubes.Shrinkthetubesstartinginthecentrebeforeworkingtowardseachendinturn.Whencompletethetubesshouldbesmoothandwrinklefree.
Note:Continuewiththenextstepwhiletheredinsulatingtubesarestillhot.
Pullthescreenedblackandredinsulatingtubescentrallyovertheredinsulatingtubesandstartshrinkingatthecentrepositionusingequalheatoverthewholesurface.Whenthetubesareproperlyshrunk,theridgesontheouterblacklayerofthetubesshouldnolongerbevisibleandthetubescannolongerbemoved.
UNCO
NTRO
LLED
Section4IPage65UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Continuetoshrinkthetubesfromthecentretowithin50mmofoneend.
Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubes.Stopagain50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.
Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage66
4.4 Installing Mechanical Earth Bonds and Associated Components
4.4.1 Single-Core Polymeric Straight Joints
Completetheproceduresforinsulatingtheconnectorasdescribedin4.3.1.
Wrapthejointwithonelayerofthetinnedcoppermeshensuringthereisa50mmoverlapontotheoversheathofthecablesidewiththeshortshieldwires.
Continueacrossthewholejointwiththetinnedcoppermeshata50%overlapandsecureontotheoppositejointside.
Onthecablesidewiththelongscreenwires,bendthescreenwiresbackacrossthejointandformthemintotwoseparateconductors.Onthecablesidewiththeshortscreenwires,repeatthesameexerciseandfoldthegatheredwiresbacktowardsthejointcentre.
UNCO
NTRO
LLED
Section4IPage67UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Gatherthewirestogetherandcutthemcentrallyabovethetinnedcoppermeshoverlappingthecablesheath.Installthecopperscreenwireconductorsintotheirrespectiveconnectorandtightentheboltsuntiltheheadsshearoff.
Wrapasecondlayerofthecoppermesharoundthejoint,asbefore,sothatthewholeareaiscompletelycoveredincludingthemechanicalscreenconnectors.
Cleananddegreasetheoutersheathsofbothcablesfor150mmfromthesheathcut.Slidethelargeoutersealingsleevecentrallyoverthejointarea.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage68
Startshrinkingthetubeatthecentrebeforeworkingtowardseachendinturn.Allowtocoolbeforemovingorbackfillingthejoint.
4.4.2 Single-Core Transition Joints
Completetheproceduresforinsulatingtheconnectorasdescribedin4.3.2.
Wraptwolayersoftinnedcoppermeshat50%overlapoverthejointfromtheleadsheathonthepapercabletotheover-sheathcutonthepolymericcable.
Foldbackthecopperscreenwiresoverthejointandformthemintoanearthleadexceptfortheareaovertheleadsheath.Atthispointopenupthewiresandplacethemdirectlyontothetinnedcoppermesh.Wraptherollspringoverthescreenwiresandtwistuptight.
UNCO
NTRO
LLED
Section4IPage69UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
CompletelycovertherollspringwithtwolayersofPVCtape.
Clean,degreaseandabradetheoutersheathsfor150mmfromthesheathcuts.Slidethelargeoutersealingsleeveoverthejointareaandstartshrinkingthetubeatthecentrebeforeworkingtowardseachendinturn.
Allowthejointtocoolbeforemovingorbackfilling.UN
CONT
ROLL
ED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 70
4.4.3 Polymeric Pot Ends
Completethestepsinsection4.1.2.
Laythecopperscreenwiresbackoverontothescreenedblackandredinsulatingsleeveanddistributethemaroundthecircumferenceevenly.
Wrapthetinnedtinnedcoppermeshwitha50%overlaparoundthepotend,startingattheoutersheathandcontinuingupontothecopperscreenwires,beforecoveringtheinsulatingrod.
Note:Thestresscontroltubingandtherodendmustbeincontactwiththetinnedcoppermesh.
UNCO
NTRO
LLED
Section 4 I Page 71UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Covertheendsofthecopperscreenwiresunderthetinnedcoppermeshwithtwolayers offabrictape.
Placetheheatshrinkendcapoverthepotendandshrinkitintoplace.Startattheclosedendbeforeworkingtowardsthecablesheath.Duringtheshrinkingprocesscarefullypushtheclosedendofthecapagainsttheinsulatingendwithanappropriatetool.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 72
Checkthattheover-sheathiscleananddegreased.Positiontheoutersealingsleeveover thepotendassemblysothatitlinesupwiththeendoftheendcap.
Shrinkthetubingdown,startingatthecentreworkingtowardseachendinturn.Donotmoveorbackfilluntilthepotendhascooled.
4.4.4 Resin Filled Three-Core Transition Straight Joints (Three-Core Paper to 3 x Single-Core Polymeric Cables)
Completetheproceduresforinstallingtheconnectorinsulationinsection4.3.3.
Pullthecorestogetherascloselyaspossibleandwraponelayeroftinnedcoppermesharoundthejointwitha50%overlap.Continueontotheleadsheathfor30mmanduptothescreenwiresontheoppositejointside.
UNCO
NTRO
LLED
Section 4 I Page 73UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Laythecopperwirescreensbackacrossthejointandformthemintothreeseparateearthconductors.Connectthecopperscreenwirestoeachofthethreeearthbraidsusingthemechanicalconnectorsprovided.
Positionthethreeearthbraidsevenlyaroundtheleadsheathareaontopofthetinnedcoppermesh.Connectthethreeearthbraidstotheleadsheathusingalargerollspring.
Wraptherollspringoverthebraidsandtwistthespringuptightly.CovertherollspringwithtwolayersofPVCtape.
Wraptheremainingexposedleadsheathwiththestripsofredsealanttape.This is an important moisture seal. Do not leave out.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 74
4.4.5 Heatshrink Three-Core Transition Straight Joints (Three-Core Paper to Single-Core Polymeric)
Completetheproceduresforinstallingtheconnectorinsulationinsection4.3.4.
Pullthecorestogetherascloselyaspossibleandwraponelayeroftinnedcoppermesharoundthejointwitha50%overlap.Continueontotheleadsheathfor30mmanduptothescreenwiresontheoppositejointside.
Laythescreenwiresbackacrossthejointandformthemintothreeseparateearthconductors.Connectthecopperwirescreenstothethreeearthbraidsusingthemechanicalconnectorsprovided.
Laythethreeearthleadsevenlyaroundtheleadsheathontopofthetinnedcoppermesh.Connectthethreeearthbraidstotheleadsheathusingalargerollspring.Wraptherollspringoverthebraidsandtwistthespringuptightly.CoverthespringwithtwolayersofPVCtape.UN
CONT
ROLL
ED
Section 4 I Page 75UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Applyonehalflaplayerofwhitefabrictapeoverthesingle-corepolymericendofthejointforadistanceof150mmfromthecableoversheathtoprotectthetinnedcoppermeshtapefromtheheatgeneratedbyshrinkingtheThree-Corebreakout.
Pulltheheatshrinkbreakoutbackoverthejointasfarasitwillgoandshrinkinplace,startingwiththeturretsbeforemovingontothemainbody.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage76
Wraptheremainingexposedleadsheathwiththestripofblackmasticsealanttape.Thisisanimportantmoistureseal.Donotleaveout.
Positionthewraparoundheatshrinkjointsleevearoundthejointandconnectthetwoendstogetherusingthemaetalchannelandthemetaljoiningclip.
Shrinkthewraparoundsleeveinplace,startingatthemiddlebeforemovingtowardseachendinturn.Thegreenpaintonthesurfaceofthesleeveshoulddisappearwhenthetubeiscorrectlyshrunk.
UNCO
NTRO
LLED
Section 4 I Page 77UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Extraheatshouldbeappliedtothemetalchanneluntilthewhitemarkerlinecanbe clearlyseenunderit.
Donotmoveorbackfilluntilthejointhascompletelycooled.
4.4.6 HSL Trifurcating Joints (Three-Core HSL to 3 x Single-Core Polymeric Cables)
Completetheproceduresforinstallingtheconnectorinsulationinsection4.3.5.
Wraponelayeroftinnedcoppermeshwitha50%overlapovereachinsulatedcorecontinuingacrossthejointedcoresfromthesheathcutonthepolymericcables.Finish50mmontotheleadsheaths.
Laythecopperscreenwiresbackacrossthejointandformthemintothreeseparateearthconductors.Connectthecopperscreenwirestoeachofthreeearthbraidsusingmechanicalconnectorsprovidedinthekit.UN
CONT
ROLL
ED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage78
Connecttheeachearthbraidstoeachoftheindividulleadsheathsusingatwoturnsoftherollsprings.
Turntheendoftheearthbraidsbackoverthetwoturnsoftherollspringensuringthattheyareflatandeven.Wraptheremainderofthespringlengthoverthebraidsandtwistthespringuptightly.
CovertherollspringswithtwolayersofPVCtape.
UNCO
NTRO
LLED
Section 4 I Page 79UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Wraptheremainingexposedleadsheathswiththestripsofredsealanttape.This is an important moisture seal. Do not leave out.
4.4.7 Connection of Screen Wires on Indoor and Outdoor Terminations
Completetheproceduresforinstallingtheterminationsdescribedinsection4.1.8.
ConnectthescreenwirestotheEarthingstudorpositionprovided(outdoorterminations)asapplicableforthegeometryoftheapparatus.
4.4.8 Fitting Plastic Joint Boxes (Trifurcating Joints Only)
Trimofftheendsofthejointboxsuppliedwiththekit,sothatitwillfitoverthecablesenteringthebox.
Usingtheboxasaguide,offerituptothecableandmarkthestandoffpositionsofthemouldingswithachinagraphpencil.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage80
Removethebackingfromtherubberpatchessuppliedinthekitandapplycentrally(overthepreviouslymademarks)withthestickysideout.
Placethetwohalvesofthejointshelloverthejointandclipthetwohalvestogetherwiththeclipsprovided.Checkenoughclipsareusedtostoptheresinleakingoutwhenitispouredin.
UNCO
NTRO
LLED
Section4IPage81UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
TapethejointboxtotheincomingcablewithPVCoranothersuitabletape.Iflargegapsareleftwhentheshellisfitteditmaybenecessarytopacktheendsofthejointshelloutwiththeclaypacksuppliedinsomekits.
Forextrasecurity,runalengthofPVCtapedowntheseamsofthejointshellandfittheplasticlid.
4.4.9 Mixing and Installation of Polyurethane Resin
All33kVjointsshouldbefilledwith3-partpolyurethaneresin.CheckthatthecorrectPersonalProtectiveEquipmentiswornatalltimesandtheresinisnotmixedinaconfinedspace.
Checkthelabelonthebuckettoensurethattheresinhasnotpassedtheusebydate.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage82
Emptythecontentsofthebucketandcheckforanydamagetothepackaging.
Pickupthefoilbagcontainingtheresinandhardenerandapplypressuretothelargeresinpouchsothattheresinbreaksthesealbetweenthetwosectionsandmixeswiththehardener.
Mixthecontentsofbagbykneadingthefoilbagforaminimumoftwominutes.
UNCO
NTRO
LLED
Section4IPage83UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
Carefullycutoneofthecornersoffthefoilbagandpourallthecontentsintothesuppliedplasticbucket.
Pourapproximatelyhalfofthesandsuppliedintheplasticbagintothebucketandstiruntilitisthoroughlymixedintotheresin.
Pourtherestofthesandintothebucketandmixuntilnorawsandisvisibleandtheresinhasnolumpsinit.
UNCO
NTRO
LLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage84
Pourthemixedresinintothejointshell.
UNCO
NTRO
LLED