33 Phillips Street Time line February 2014- Rental Permit issued April22, 2014- Order to Correct issued for "unsafe porches, no handrails inside, broken windows, extremely poor condition overall" April29, 2014- Notice of Violation issued for smoke and carbon monoxide detectors, fire escape maintenance, repairs to the second and third floor units, and exterior clean up of trash and furniture. · May 20, 2014- After an inspection of the entire building, the Town's Code Enforcement Officer issued a Cease and Desist letter requiring that an unauthorized basement fourth unit be demolished or a Special Permit sought to legalize the fourth unit. That order identified June 24, 2014 as a deadline to act. May 21, 2014- Planning Department email identifying and outlining Special Permit process to formalize the fourth unit (email attached). May 29, 2014- Planning Department email to applicant identifying submission requirements, including floor plans, survey, etc. (email attached). June 18,2014- The Building Commissioner granted a 14 day extension on the order to allow the owner's architect and surveyor to complete their work. June 18, 2014- Planning Department emaltt<i'applicant regarding-extension and need for floor plans by architect, existing and proposed survey including parking, management plan, etc. (email attached) July 8, 2014- The application was received by Planning Department. July 25, 2014- The applicant was notified via email requesting the following (email attached): Updated floor plans showing the proposed egress, room dimensions and labels, fire escape and stamp from an architect An elevation prepared by an architect showing any exterior changes on the west fas;ade Relocation of trash receptacles, how the parking area can be separated from the adjacent property, and plan for delineation ofthe parking area Clarification on the number of tenants as it relates to parking and whether tenants from the adjacent property will park there. More detailed information about the parking permit system August I, 2014- Order to repair fire escape. 45 day deadline established for completion. August 7, 2014 (approx) -A revised/updated survey is submitted. August 26, 2014- Nuisance Violation issued for mattress on side porch; Revised/updated floor plans prepared by the architect were submitted. August 26, 2014- The applicant was notified via email that (email attached): The floor plans for the basement did not show enough detail with regard to room dimensions and labeling of existing versus proposed conditions. An elevation prepared by an architect showing the exterior change for the new egress door is required. The survey will need to show existing topography and proposed changes to grade, including information about whether a retaining wall is required and the location of a walkway to the new egress door. August 28, 2014- Notice to Abate issued for "couch in front yard, trash cans blocking sidewalk, trash on the ground"

33 Phillips Street Timeline

Embed Size (px)

DESCRIPTION

Stephan Gharabegian dawdled and the Amherst Zoning Board of Appeals denied his Special Permit to expand operations at 33 Phillips Street from three to four units (which would have allowed 16 unrelated tenants).

Citation preview

  • 33 Phillips Street

    Time line

    February 2014- Rental Permit issued

    April22, 2014- Order to Correct issued for "unsafe porches, no handrails inside, broken windows, extremely poor condition overall"

    April29, 2014- Notice of Violation issued for smoke and carbon monoxide detectors, fire escape maintenance, repairs to the second and third floor units, and exterior clean up of trash and furniture.

    May 20, 2014- After an inspection of the entire building, the Town's Code Enforcement Officer issued a Cease and Desist letter requiring that an unauthorized basement fourth unit be demolished or a Special Permit sought to legalize the fourth unit. That order identified June 24, 2014 as a deadline to act.

    May 21, 2014- Planning Department email identifying and outlining Special Permit process to formalize the fourth unit (email attached). May 29, 2014- Planning Department email to applicant identifying submission requirements, including floor plans, survey, etc. (email attached). June 18,2014- The Building Commissioner granted a 14 day extension on the order to allow the owner's architect and surveyor to complete their work.

    June 18, 2014- Planning Department emaltt

  • 3 3 Phillips Street

    Timeline

    September 8, 2014- The applicant was provided, via email, with a copy of the Fire Department Review letter (email attached). September 24, 2014- ZBA conducts site visit

    September 25, 2014- Original date offrrst hearing. Continued/rescheduled to October 2, 2014 to observe religious holiday

    October 2, 2014- Initial ZBA hearing

    October 31, 2014 - Plarrning Department email to applicant containing detailed list/review of site plan dated October 29, 2014 with wetland flagging (email attached). November 5, 2014- Conference call (Plarrning Department, applicant, attorney) to discuss need for Conservation Commission

    November 6, 2014- Plarrning Department email containing Conservation Commission time line, notation Of the need for an engineer, and responses to request for continuation (email attached) November 6, 2014- Second ZBA hearing. Board does not take testimony votes'to continue to January 29, 2015 as per applicant's request for more time.

    -~ ...

    December 19, 2014 - Plarrning Department email to applicant and attorney containing Conservation Commission application and timeline review (email attached). January 13, 2015- Planning Department email to applicant noting no contact since November 6, 2014. Request for both to attend January 29, 2015 hearing (email attached). January 29, 2015- Third ZBA hearing. Board votes to continue to June 11, 2015 to allow time for applicant to prepare more detailed plans, submit application and obtain approval from Conservation Commission by June 11, 2015. The Board clearly stated potential denial if everything is not prepared

    February 25, 2015 - Plarrning Department email to applicant asking for progress, recommended meeting with surveyor and attorney (email attached). March 31, 2015- Plarrning Department email noting 30 days since last email. IdentifY importance oftimeline for wetland consultant, surveyor and engineer. Recommended meeting with surveyor and attorney to review (email attached) April15, 2015- attorney emails Plarrning Department. Proposes potential solution and/or possible request to withdraw without prejudice April 17, 2015 - Plarrning Department email proposing meeting to discuss. Email notes importance of project and potential loss of units (email attached). April24, 2015- Conference call scheduled but cancelled due to Planning staff illness

    May 1, 2015- Conference calf with applicant, attorney, Building Commissioner, Plarrning staff, and Wetland Administrator. Reviewed need for civil engineer io prepare grading and drainage plan for the parking area for both Conservation Commission and ZBA application. Discussed timeline for submitting information and Conservation Commission schedule

    May 4, 2015- Plarrning Department email to applicant and attorney containing detailed summary of conference call (email attached). May 8, 2015- Plarrning Department to applicant email hoting no response.

  • 33 Phillips Street

    Timeline

    May 15, 2015- Applicant email to Planning Department referencing contact with a civil engineer

    May 18, 2015 -ln person meeting with applicant, realtor, Building Commissioner, Planning staff, Building Commissioner, and Wetland Administrator. Discussed importance for engineered plans and extremely short timeline for completion. Applicant states commitment to move forward with preparation of plans, wetland consultant, and civil engineer.

    May 28, 2015 -Email from surveyor stating request for more time to complete Environmental Studies.

    June 3, 2015 -Planning Department email to surveyor and applicant to clarify status, pr()gress, and potential for denial (email attached) June 1 I, 2015- Email fr9m applicant stating s9me work being completed by surveyor (email attached) .June 11, 2015- Fourth ZBA hearing.

  • CJ'ownof 'f!J!."'~ST, M~ _r~7 ___ A_M_H_E_R_S_T __ 9Vt_as_sa_c_fiu_s_et_ts_ ~~ TOWN HALL INSPECTION SERVICES DEPARTMENT ~ 4 Boltwood Avenue Phone (413) 259-3030. Fax (413)259-2402

    Amherst, MA 01002-2351 Email: [email protected]

    Certified Mail and Email

    Stephan Gharabegian Knight Properties, LLC. 405 Waltham St. #396 Lexington, MA 02421

    Dear Mr. Gharabegian,

    CEASE AND DESIST

    May 20,2014

    ..

    During my inspection of your property at 33 Phillips Street on May 15, 2014 you showed ine through the entire house, including first, second, and third floor apartments, and a four bedroom apartment in the basement which I had not previously seen.

    My review of the Town of Amherst assessor's records indicate that this is a three family building. Creation of the fourth unit required a special permit from the Zoning Board of Appeals, as there is no record of a special permit or even a building permit to create the additional apartment I hereby order you to cease use of the unit and remove the basement apartment.

    Your attention is directed to Town of Amherst Zoning Bylaw (ZBL), Section 11.45 which provides that any violation may be enforced, by the Building Commissioner, by non-criminal complaint pursuant to the provisions of General Laws, Chapter 40, Section 21D. The fine for any violation disposed of through this procedure shall be one hundred dollars ($100.00) for each offense. Each day such violation continues shall be deemed a separate offense.

    If you feel aggrieved by said decision or, any officer or Board of the Town, may within 30 days appeal to the Board of Appeals.

    A demolition permit must be obtained before work can begin, and all demolition must be complete and inspected by Inspection Services by June 24,2014.

    Sincerely,

    5~ Jon Thompson

    Town of Amherst Building Inspector Code Enforcement Officer 413-259-3117 [email protected]

  • Bagg, Jeffrey

    From: Sent: To: Subject:

    Dear Mr. Gharabegian,

    Bagg, Jeffrey Wednesday, May 21, 2014 12:58 PM [email protected] 33 Phillips Street- Amherst ZBA

    Please consider this email as an initial response to your phone call from yesterday. I understand that you may be inquiring about the process to formalize/legalize an additional unit at 33 Phillips Street (to increase from three units to four units).

    The process would be a Special Permit fi:om the Zoning Board of Appeals (ZBA) to alter and extend a non-conforming use and building. The Special Permit process, in general, requires:

    A complete application and fee (approximately $3 7 5) Notification to abutters within 300 feet A public hearing, and . A uri~linous vote of the three person Zoiiing Board of Appeais: .

    In terms of application materials, it would need to consist of a set of floor plans for the entire dwelling prepared by a licensed architect. Additionally, an existing conditions survey/site plan prepared by a licensed engineer, surveyor, or landscape architect would be required. Finally, a Management Plan (which outlines the management and use of the building) would be required. These documents would be the basis for an application.

    A copy of the application form is here: http://www.amherstrna.gov/DocumentCenterNiew/25343 A copy of the ZBA rules and regulations are here:

    http://www.amherstma.gov/DocumentCenterNiew/25561

    The process can take 2-3 months (or more in some cases) to complete and is considered a "discretionary" approval process meaning that a permit can be issued with conditions, or in some cases denied.

    There are some other items that would need to be addressed, but this is an overview. I recommend to all applicants that a meeting with Town staff occur should you choose to move forward with an application.

    Please let me know if you'd like to arrange a meeting.

    Sincerely,

    JeffBagg Senior Planner Amherst Planning Department 413-259-3187 [email protected]

  • Bagg, Jeffrey

    Subject: FW: 33 Phillips Street -Amherst ZBA

    from: Bagg, Jeffrey Sent: Thursday, May 29, 2014 3:14 PM To: Stephan Subject: RE: 33 Phillips Street- Amherst ZBA

    Dear Mr. Gharabegian,

    As I mentioned, this is a summary email of some of the important points from our meeting today with Jon Thompson and Terry Avery.

    We identified thatthere appear to be two options: 1. Take the necessary steps to make an application to the Zoning Boa.rd of Appeals for approval of the addition of

    the fourth basement unit; or 2. To applyfora demolition permit to remove the unit and building permit to complete the work.

    You asked iftherewas a third optioninvolving the removal ofthe unit by making It finished space: You suggested two final uses of finished space could be either 1) for the tenants, such as a living room, or 2) for your storage purposes. We explained that use of the space by tenants would need to be connected to one of the units via some type of internal connection such that tenants of a unit would not be required to walk out of the building, down the driveway in order to enter an extra room associated with a unit In terms of storage for your use, it seemed plausible following the steps of #2 above but would require detailed information about how it would be used. There was an outstanding question whether this would change the use in terms of zoning. You stated that you pain to move forward with trying for 4 units and considering this if the request was denied.

    Special Permit process and application materials {I gave you a copy of the application and ZBA rules and regulations): Floor plan for each unit -I explained that they would need to be prepared by an architect. The plans should encompass the entire building as the ZBA would be required to consider the whole use of the building. The plans for the basement should include existing and proposed plans showing any changes or upgrades necessary. The question of whether the unit has two means of egress was noted. You mentioned that there is a door and a sliding glass door next to one another. The architect would need to review this and determine if it meets the building code.

    Existing conditions survey- It was noted that the surveyor should be asked to prepare an existing conditions survey based on the requirements in the Special Permit application. The surveyor would also likely also need to draw a proposed parking configuration include number and size of parking spaces.

    Wetland consultant. Albeit towards the end of our discussion, it was identified that there may be wetlands at the rear of the property. Even in the "do nothing" approach to the parking area, the location of any wetlands should be identified. I noted that it would be unlikely that the existing conditions of the parking area would be sufficient and that an upgrade or change to the parking would require the wetland information to determine the distances of any wetland to any change.

    You asked what the likelihood of approval was and whether members of the public would come. I explained that the neighborhood has owners that pay attention to these types of applications and communicate and would likely come to express any issues or concerns. Those issues and concerns would have to be heard by the ZBA members and considered as they may relate to the application. You mentioned that the basement unit had been used for years and that nothing

    1

  • was really changing. I stated that if the proposal can be seen as an improvement (in terms of parking or management of the property) those may be seen as positive aspects of the application.

    We discussed the time line and the Special Permit application. We stated that if a complete application to the ZBA was not submitted prior to June 25'", you'd be susceptible to daily fines under the current enforcement action. You stated that you intended to proceed and that you had contacted surveyors but they had not called you back and that you had an architect in Boston that you were trying to have come out. We expressed the importance of taking the timeline seriously.

    We discussed parking. I noted that there was a high likelihood that the parking surface would need to be upgraded. You noted that you had thought about paving it anyway. I explained that for any parking with 5 or more spaces, there is a process, so it's recommended that no activity occur without talking to the town. I mentioned the possibility of there being a requirement for lighting, given the distance of some of the parking from the building. We talked about numbers of parking spaces. You noted that units 1, 2, and 3 are all four bedrooms and that the basement might be two bedrooms with a total of four tenants. I explained that the Zoning Bylaw requires a minimum of 2 per unit but that the ZBA would likely discuss parking for each tenant. You noted that the property to the west doesn't have parking and you own it with those tenants parking behind this building. You mentioned that the property to the east is owned by Eaglecrest and that you believe they park back there. I noted that the requirements for parking are found in the Zoning Bylaw and should be considered when working with the surveyor. Here is a link to Article 7 which deals with parking: http://www.amherstma.gov/DocumentCenter/View/26082

    You mentioned wanted to implement-a-parking permit system due to the number of people who park there that are not tenants. I noted that. this would be information that would be included in the Management Plan.

    We discussed the Management Plan requirements including trash storage and maintenance of the landscaping and should contain a description of whatever your property management company is responsible for.

    Please contact me if you feel any of this is inac.curate- or if you have any questions.

    Sincerely,

    Jeff Bagg Senior Planner Amherst Planning Department 413-259-3187 [email protected]

    i I

    ?

  • Bagg, Jeffrey

    Subject: FW: 33 Phillips Street -Amherst ZBA

    From: Bagg, Jeffrey Sent: Wednesday, June 18, 2014 3:14PM To: Bagg, Jeffrey Subject: RE: 33 Phillips Street- AmherstZBA'

    Dear Mr. Gharabegian,

    I got your email. Before you travel here to submit the application, please note that without architectural plans and a survey the application will not be deemed complete. The submission of an application form and fee alone will not be sufficient. I discussed your email with the Building Commissioner and he agreed to consider giving you a 14 day extension on the deadline to act (which was June 24, 2014 pursuant to Mr. Thompson's enforcement letter).

    Please acknowledge the receipt of this email and that you understand that a two week extension to comply may be available. However, -failure to comply with this through the submission of a complete application will .result in enforcement action. For clarification, it will not be sufficient to indicate in two weeks that local professionals are

    'booked and a Boston architect will be more expensive, ther~fore you require more time. 'This is an important deadline' -where f.ailure to comply will result in daily fines.

    Here is summary ofthe minimum required to constitute a complete application (which was listed in the summary email below and described in our meeting):

    Floor Plans, prepared by a Massachusetts Licensed Architect showing the existing and proposed configuration of all units

    Existing and proposed conditions survey, prepared by a Massachusetts Licensed Surveyor, Engineer, or Landscape Architect showing existing and proposed conditions, including parking

    Management Plan, with all necessary information as listed in the ZBA Rules and Regulations including lease agreement, complaint response plan, landscape maintenance, etc.

    In t

  • I have a question, why is this matter going to the ZBA and not the planning board. The house is a multi-family house and is in a multi family zoned area. Does a 4 family need a different zoning than a 3 family?

    I am going to file the application tomorrow. Still having a hell of a tiine with survivors and architects. My Boston one wants an extra $1000 because he has to drive to Amherst. My surveyor wont even consider going out to Anilierst. Everyone in Western Mass is booked solid for 2 months. But I am still working on it. I am hopeful that Bean D L out of Westfield can expedite the process.

    Thank you,

    Stephan 617-821-4476 sqharabe@qmail. com

    ...

    ,

  • Bagg, Jeffrey

    From: Sent: To: Cc: Subject:

    Dear Stephan,

    Bagg, Jeffrey Friday, July 25, 2014 12:14 PM [email protected] Morra, Robert 33 Phillips ZBA

    Monday will mark three weeks since you submitted the Special Permit application, survey and floor plans. At that time we discussed with you a variety additions needed, including but not limited to:

    1- revised floor plans showing proposed egress. 2 -floor plans drawn to scale with room dimensions and room labels 3- plans must be stamped by the architect 4- for any side of the building with an exterior change, such as if a new door was installed on the west side, an elevation is needed. 5 -the plan was to show the fire escapes.

    '-

    Survey: 1 -Confirmation of parking. The plan showed additional spaces proposed which you indicated you do not want to do. 2 -clarification of the patio/fence area around space 1 3 -relocation of the trash receptacles 4- consideration as to how the parking area can be separated from the adjacent Eaglecrest property and some proposal to delineate the gravel from other landscaped areas. 5- clarification on the number of tenants as it relates to parking; and clarification as to whether tenants in your adjacent property will park there.

    Management: key issue was related to how you would monitor parking, including more information about your parking permit system.

    This was all discussed and I believe we all left with these expectations. I will be filing the permit with the Town Clerk on Tuesday and it will become public. It's critical that this updated information is submitted as soon as possible.

    Fiinally, I believe we talked about needing PDFs of the plans.

    I'd like to establish a deadline for this information as Friday, August 1st since we discussed the need for this information three weeks ago.

    I have the hearing scheduled for September 25th.

    Please contact me with any questions.

    Jeff Bagg Senior Planner

    Sent from my iPhone, please excuse typos.

  • Bagg, Jeffrey

    From: Sent: To: Subject: Attachments:

    Dear Stephan,

    Bagg, Jeffrey Tuesday, August 26, 2014 2:16 PM Stephan RE: 33 Phillips Street, Amherst, MA. 01002 33 PHILUPS STREET EXISTING PLANS complete.pdf

    Thank you for the updated floor plans. I quickly reviewed them with the Building Commissioner. We have determined that plans for the "fourth" unit in the basement do not show enough detail by the architect. This unit is to be considered under today's building code so there will be some additional information required from the architect. In addition to that information, you have not provided an elevation of the west side where the new egress door is proposed. You will need to provide the elevation from the architect. As previously noted, a single clear photograph showing all the other sides of the building may be sufficient since there are no changes.

    Finally, related to the new egress door, the survey does not show any change. From my understanding of the property, some type of change to the site (such as a retaining wall) and walkway appear to be required in order to get from the parking area to the new door. That information willultimately be needed in order for the Board to make a final decision.

    Sincerely,

    Jeff Bagg Senior Planner [email protected]

    From: Stephan [mailto:[email protected]] Sent: Tuesday, August 26, 2014 7:29AM To: Bagg, Jeffrey Subject: :33 Phillips Street, Amherst, MA. 01002

    Hello Jeff,

    Here is the stamped final plans for 33. Phillips Street. I'll bring you hard copies tomorrow.

    Thank you,

    Stephan 617-821-4476 sqharabe@qmail. com

    1

  • Bagg, Jeffrey

    From:. Sent: To: Subject: Attachments:

    Dear Stephan,

    Bagg, Jeffrey . Monday, September 08, 2014 11:23 AM Stephan FW: 33 Phillips Street 33 Phillips.docx; A TTOOOOl.htm; RE: 33 Phillips Street, Amherst, MA. 01002

    Attached please find the review by the Amherst Fire Department of the ZBA application for 33 Phillips Street. As you will see, they are requiring that the building be upgraded with a sprinkler system. It will be very important that you (with

    your architect) determine what will be involved in making this upgrade both internally and externally on the property.

    The ZBA process is such that they will receive this letter and will likely make this a requirement of the Special Permit-and this upgrade would be required to be completed before occupancy of the fourth unit.

    I should also note that I've previously identified the need for the architect to provide a proposed elevation for the west side; photographs of each other side for existing condition elevat(ons; and the need for the surveyor to show the

    proposed new door location and access including walkway and confirmation of whether a retaining wall is required next to the door.

    Sincerely,

    Jeff Bagg Senior Planner [email protected] 413-259-3187

    Begin forwarded message:

    From: "McKay, Donald" Date: September 5, 2014 at 5:20:16 PM EDT To: "Bagg, Jeffrey" , "Britt, Lindsey'' Cc: "Nelson, Tim" , "Roy, Michael" Subject: 33 Phillips Street

    Jeff,

    Attached you should find the Fire Department comments on the application for a special permit for 33 Phillip~ Street.

    Don

    Assistant Chief Don.ald R. McKay, EMT-P, MPH Amherst Fire Department Amherst, MA 01002 (413) 259-3130

    1

  • Bagg, Jeffrey

    From: Bagg, Jeffrey Sent: Friday, October 31, 2014 4:32 PM

    Mehdi Rahmani; Stephan To: Cc: Morra, Robert Subject: RE: 33 Phillips Street Attachments: ART7.pdf; Ting - 164 Sunset -Site Plans.pdf; Plot Plan Checklist. pdf; 33 phillips, October

    29.PDF; RENDERED SITE PLAN 2014-10-29.jpg; ELEVATION new basement entry 2014-10-29Jpg

    Hi Mehdi and Stephan,

    Unfortunately, the Jist is pretty long and complex. I ran out of time today, so please consider this is a preliminary list. I understand that effort was made on the wetland delineation- which is good. However, that was only one component of the requested items. In my professional opinion, I believe that you will need to work with a civil engineer to better analyze and design the parking area .. Even if the surveyor updates the plans with more information, both the Conservation Commission and the ZBA will require il more detailed plan of how the parking area will get constructed and how topography and drainage will be handled. This is typically work done by an engineer.

    -- ---~-- , .... .-'--- -~ .- -- - -' . - -- - . _.,

    Please note that while the new site plan shows the wetland flags and a 50 foot buffer, the Wetland Regulations are such that any significant changes to the site (which there would be) within 100 feet of the wetland are subject to review by the Conservation Commission. The Conservation Commission would require information on topography, drainage, and removal of vegetation as part oft hat process.

    Here is a preliminary Jist. We should discuss these:

    The site plan needs to show the topography and proposed changes in the vicinity of the new egress door.

    The site plan needs to show the topography at tlie rear of the property, especially in the proximity of space #13. The space #12 and #13 are essentially in overgrown shrub areas and based on the measurements taken at the site visit would require removal of a tree or trees larger than 8 inches in diameter. At the site visit there was a question about the feasibility of parking space #12 as it was close to the embankment.

    The site plan does not appear to accurately show the location of "tree and brush line" on the west property line. That area was extensively cleared and is no longer accurate.

    The site plan stiH does not distinguish between existing and proposed conditions. Based on the site visit and discussion by the Board the existing parking area will not meet the design requirements of Section 7.101. The expanded areas are not labeled as proposed.

    The existing and proposed Jot coverage's are not calculated. The new survey contains the same lot coverage numbers as the previous plan despite the addition of spaces.

    The site plan no longer shows the proposed fence.

    The site plan does not identify any proposal to delineate the overall parking area and does not address how each space will be delineated.

    The site plan does not contain any information about lighting in the parking area.

  • The site plan does not accurately show the fence area at the rear of the building or wood landing.

    The site plan does not provide any information about re-paving the blacktop portion of the driveway.

    Trash storage is not shown

    Other issues: The architects plan of the building, while visually pleasing, is not a true elevation. It doesn't contain any scale,

    dimensions, or measurable information about the location of the door. The plan shows a retaining wall, landing, and changes to grade all of which will require more detailed information and measurements.

    I didn't have time to go over the information in detail. Attached is Article 7 of the Zoning Bylaw which relates to parking. I've highlighted many ofthe issues that need to be addressed. However, I'm not sure that the surveyor (unless they can provide engineering information) will be able to provide enough of the required information. I've also attached an example of a similar project going before the ZBA and the type of plan and detail submitted.

    Also, attached is a standard "plot plan" checklist for reference. Finally, the ZBA application form (page 2 and 3) contains the typical requirements of "site plans" and "elevations": http://www.amherstma.gov/DocumentCenter/View/25343

    Let's schedule a time' to conference call on Monday if possible.

    Thanks,

    Jeff Bagg Senior Planner [email protected]

    -----------------

    From: Mehdi Rahmani [mailto:[email protected]] Sent: Friday, October 31, 2014 12:21 PM To: Bagg, Jeffrey Cc: Stephan Subject: 33 Phillips Street

    Hi Jeff,

    Good to see you last night. Let me know if you will be able to provide a list of the discrepancies or missing pieces you touched on last night concerning 33 Phillips. Thank you again for your attention on this matter.

    All the best, Mehdi

    Mehdi Rahmani I Principal Vazir Law and Sports Management 800 Boylston Street. 16'h Floor I Boston T: +1 617 207 4088 /M: +1 617 320 1606 DL: +1857 453 6542 /F: +1857 453 6501 [email protected] I www.vazirlaw.com

    ~ CONFIDENTIALITY NOTIC ~ The information (including any attachments) contained in this electronic communication is privileged and confidential and intended only for' the use of the named addressee and is or may be protected by the attorney-client privilege, the work product doctrine, joint defense privileges, trade secret protections and/or other applicable protections from

    2

  • Bagg, Jeffrey

    From: Sent: To: Cc: Subject:

    Mehdi,

    Bagg, Jeffrey Thursday, November 06, 2014 11:59 AM Mehdi Rahmani Stephan; Morra, Robert RE: Request for Additional Continuation - 33 Phillips Street

    Thanks for the email. Did you get a sense of how long it would take to get a plan from the engineer? It relates to how long the continuation should be. Tonight the ZBA will have to pick a "date certain" to continue to. The continuation date should include an opportunity for you to apply and have a hearing with the Conservation Commission- and must include the fact that the schedule for these volunteer boards will diminish between mid-December and early January.

    Depending on how long it will take the engineer, I would be recommending that the.ZBA continue to January 15'h. Here's why:

    The Conservation Commission will have their next meeting on December 10'h. In order to be on that agenda, an application for a Notice of lnterit(along with the submission of an engineer plan) must be submitted by November 26'h at noon. I would recommend that you do whatever you can to have the engineer's plan done by then and have the meeting with the Conservation Commission on December 10'h. This would allow time in the event that the Conservation Commission requested more information or needed more time.

    The Conservation Commission will then have their next meeting on January i4'h. The ideal scenario would be. that you begin on December 10'h and are approved by the Conservation Commission on January 14'h. This would allow the ZBA to fully utilize the Conservation Commission decision in rendering their decision. The worst case scenario is if the engineer plans are not ready and January 14'h is the first hearing with the Conservation Commission.

    What do you think?

    Jeff Bagg Senior Planner [email protected]

    From: Mehdi Rahmani [mailto:[email protected]] Sent: Thursday, November 06, 2014 10:44 AM To: Bagg, Jeffrey Cc: Stephan; Morra, Robert Subject: Request for Additional Continuation - 33 Phillips Street

    Good morning Jeff,

    Pursuant to our conversation yesterday, we will need to request an additional continuance for the 33 Phillips Street hearing. Stephan has reached out to Lewis & Cook; they have recommended engineers to visit the site and complete a detailed draw up. As the requested plans and additional information cannot be completed in time for our scheduled hearing this evening, we will need some additional time, subject to you and the board's approval.

  • Thank you for your attention.

    All the best, Mehdi

    Mehdi Rahmani I Principal Vazir Law and Sports Management 800 Boylston Street. 16'h Floor I Boston T: +1 617 207 4088 /M: +1617 320 1606 DL: +1 857 453 6542 /F: +1 857 453 6501 [email protected] I www.vazirlaw.com

    ~ CONFIDENTIALITY NOTICE ..,. The information (including any attachments) contained in this electronic communication is privileged and confidential and intended only for the use of the named addressee and is or may be protected by the attorney-client privilege, the work product doctrine, joint defense privileges, trade secret protections and/or other applicable protections from disclosure. The sender of this communication specifically intends to preserve the confidentiality of the enclosed information and does not waive any applicable privilege or protection from disclosure.

    If you have received this communication in error, please delete it without further distribution and reply to the sender that you have received the message in error. Thank you.

    ~ .... ~ ...

    ?

  • Bagg, Jeffrey

    From: Sent: To: Cc:

    Bagg, Jeffrey Friday, December 19, 2014 4:28 PM 'Stephan'; Mehdi Rahmani Morra, Robert; Willson, Elizabeth

    Subject: 33 Phillips Street (ZBA FY2015-00007) Attachments: RE: 33 Phillips Street; RE: Request for Additional Continuation - 33 Phillips Street

    Stephan and Mehdi,

    Now that 186 College Street is underway, I'd like to turn your attention to 33 Phillips Street. I haven't heard anything from you on this since November 5th. Here's a quick re-cap:

    During the initial hearing on October 2, 2014, the Zoning Board of Appeals requested a range of additional information needed for them to review the application. They continued the hearing to November 6, 2014. On October 29, 2014, while doing the site visit for 186 College Street, you provided me an updated survey showing the wetland boundary information. On October 30, 2014, you em ailed me a rendering of the site plan and a rendering of the west side of the building. . On October 31, 2014, I sent you a comprehensive email summarizing numerous issues that were unresolved (email is attached). On November 6, 2014 you requested and the ZBA granted a continuation to January 29, 2015 to allow additional time to have an engineer review the parking area, architect update the plans, and for an application to be made to the Conservation Commission. That same day I sent an email outlining the timelines associated with making an application to the Conservation Commission, which including the potential to appear before ttiem twice before returning to the ZBA at the end of January (email is attached).

    It's critical that you work with your team to submit an application to the Conservation Commission. Here is information about how to make an application. You may wish to speak with the wetland consultant who did the work for assistance:

    Notice of Intent (NO I) The Town accepts the Massachusetts DEP WPA Form 3- Notice of Intent form for both state and local filings. In cases where work falls under the jurisdiction of The Town of Amherst Wetlands Protection Bylaw, only the town's portion of the state fee shall be submitted. Applications may be downloaded here or obtained from the Conservation Department office, located on the second floor of Town Hall.

    WPA Form 3- Notice of Intent Application (PDF) WPA Form 3- Instructions (PDF) NOI Checklist (PDF) Abutter's List Request Form (PDF) Abutter Notification Template Form (PDF) Wetland Fee Transmittal Form (PDF)

    Given the pattern of either miscommunication, or a lack of communication, I'd like to request from you a detailed list of actions you've taken since November 5th in preparation for January 29th and a time line for preparing the requested information.

    Sincerely,

    Jeff Bagg

  • Bagg, Jeffrey

    Subject: FW: 33 Phillips Street (ZBA FY2015-00007) Attachments: RE: 33 Phillips Street; RE: Request for Additional Continuation - 33 Phillips Street

    From: Bagg, Jeffrey Sent: Tuesday, January 13, 2015 2:12PM To: 'Stephan'; Mehdi Rahmani Cc: Morra, Robert Subject: FW: 33 Phillips Street (ZBA FY2015-00007)

    Stephan and Medhi,

    I haven't heard anything from you on this in response to my email below, or since November 61h.

    The both of you should plan to attend the continued public hearing set for 6:30p.m. on January 29,2015 to give the ZBA an update. Any new information is required to be submitted a week prior to the hearing, so that deadline would be Friday, January 23, 2015 at noon.

    Sincerely,

    Jeff Bagg Senior Planner Amherst Planning Department [email protected] 413-259-3187

    ~c. '

    1

  • Bagg, Jeffrey

    From: Sent: To: Cc: Subject:

    Dear Stephan,

    Bagg, Jeffrey Wednesday, February 25, 2015 9:38AM 'Stephan' Morra, Robert 33 Phillips Street & 186 College Street

    At the conclusion of the ZBA hearing on January 29, 2015, the ZBA chair sent a pretty stern message that a complete application be provided at the continued hearing on June 11, 2015 or you'd be faced with a potential denial of the request.

    While June sounds distant, the track record.has been one of long delays in between preparation of plans and then the prepared plans being only partially complete. .

    My recommendation woul.d be that we plan a meeting either late next week or the w!'!.ek after with you, your attorney and Richard Cook. We need to all sit and be clear as to what is necessary to complete the process.

    It would be helpful if you give me an update on what you've done since the last hearing.

    Thanks,

    Jeff Bagg Senior Planner Amherst Planning Department [email protected] 413-259-3187

    1

  • Bagg, Jeffrey

    From: Bagg, Jeffrey Sent: To:

    Tuesday, March 31, 2015 1:50 PM Stephan

    Subject: RE: 33 Phillips Street & 186 College Street

    Dear Stephan,

    It has been over 30 days since you replied to my email below. In order to have all the necessary information for the May 14th ZBA meeting {186 College St) and June 11th ZBA meeting (33 Phillips Street), you really need to be coordinating with your wetland consultant and the Town's Wetland Administrator. It's my understanding applications received by April 8th would be scheduled for a hearing with the Conservation Commission on April 22nd. Additionally, you really need to be working with your surveyor, a civil engineer, and your architect, to ensure that all the plans and information are complete. As we have discussed, involving a civil engineer is critical for the new parking area.

    I recommend that we have a meeting with you, your surveyor, and architect to ensure that all this is coming together. In terms of 33 Phillips St.c~et, the ZBA Chair was explicit in stating that if you have not P.ulled everything together to the satisfaction of the Town by June 11th that the application would be denied. .

    Sincerely,

    Jeff Bagg Senior Planner Amherst Planning Department [email protected] 413-259-3187

    From: Stephan [mailto:[email protected]] Sent: Wednesday, February 25, 2015 10:51 AM To: Bagg, Jeffrey Subject: Re: 33 Phillips Street & 186 College Street

    Good morning Jeff,

    I am actually headed to the airport. Be back end of next week. Have a nice couple of weeks, speak with you after.

    On Feb 25, 2015 9:38AM, "Bagg, Jeffrey" wrote:

    Dear Stephan,

    At the conclusion of the ZBA hearing on January 29, 2015, the ZBA chair sent a pretty stern message that a complete application be provided at the continued hearing on June 11, 2015 or you'd be faced with a potential denial of the request.

    1

  • While June sounds distant, the track record has been one of long delays in between preparation of plans and then the prepared plans being only partially complete.

    My recommendation would be that we plan a meeting either late next week or the week after with you, your attorney and Richard Cook. We need to all sit and be clear as to what is necessary to complete the process.

    It would be helpful if you give me an update on what you've done since the last hearing.

    Thanks,

    JeffBagg

    Senior Planner

    Amherst Planning Department

    baggj @amherstma.gov

    413-259-3187

    2

  • Bagg, Jeffrey

    From: Sent: To: Cc: Subject: Attachments:

    Dear Medhi and Stephan,

    Bagg, Jeffrey Friday, April17, 2015 1:22PM Mehdi Rahmani; Stephan Morra, Robert; Willson, Elizabeth RE: Parking Lots - 33 Phillips & 186 College RE: 33 Phillips Street & 186 College Street; Re: 33 Phillips Street (ZBA FY2015-00007); RE: Request for Additional Continuation - 33 Phillips Street; RE: 33 Phillips Street; RE: 33 phillips Street, Amherst, MA. 01002

    I think we should meet to discuss. the idea and the status of the projects in general. I propose that we aim for next Friday, April 24, 2015 (anytime between 8 a.m. and 3 p.m.).

    What's at stake is the loss ofthe fourth unit at Phillips Street and the third unit at College Street. So whatever the perceived burden is should be compared to the impact of the loss of the ability to use and rent those units.

    It's troubling that nothing has been done since January for Phillips Street andsince December for College Street -I've given as much guidance and information as I can to aim these projects in the right direction.

    Let's give it one more. shot by meeting to review.

    Jeff Bagg Senior Planner Amherst Planning Depa.rtment [email protected] 413-259-3187'

    From: Mehdi Rahmani [mailto:[email protected]] Sent: Wednesday, April15, 2015 4:09 PM To: Bagg, Jeffrey Cc: Stephan Subject: Parking Lots- 33 Phillips & 186 College

    Hi Jeff,

    .I hope things are going well. Stephan and I wanted to propose an amended solution in regard to the lot build out for the captioned properties.

    Rather than further expanding the lots and going through the approval process with the conservation commission, we would like to propose reducing the number of parking spaces by one spot in each property. This would reduce the ov.erall burden on Stephan and allow us to get the properties up to code in swifter fashion.

    If you don't think this could be a viable solution, we may need to withdraw the application without prejudice. Please let me know your thoughts.

    1

  • All the best, Mehdi

    Mehdi Rahmani I Principal Vazir Law and Sports Management 800 Boylston Street. 16'h Floor I Boston T: +1617 207 4088 /M: +1 617 320 1606 DL: + 1 857 453 6542 /F: + 1 857 453 6501 [email protected] I www.vazirlaw.com

    ~ CONFIDENTIALITY NOTICE _. The information (including any attachments) contained in this el.ectronic communication is privileged and confidential and intended only for the use of the named addressee and is or may be protected by the attorney-client privilege, the work product doctrine, joint defense privileges, trade secret protections and/or other applicable protections from

    disclosure~ The sender of this communication specifically intends to preserve the confidentiality of the enclosed information and does not waive any applicable privilege or protection from disclosure.

    If you have received this communication in error, please delete it without further distribution and reply to the sender that you have received the message in error. Thank you.

    "''

    2

  • Bagg, Jeffrey

    Subject: FW: Parking Lots- 33 Phillips & 186 College Attachments: RE: 33 phillips Street, Amherst, MA. 01002; RE: 33 Phillips Street & 186 College Street;

    Re: 33 Phillips Street (ZBA FY2015-00007); RE: 33 Phillips Street

    From: Bagg, Jeffrey Sent: Monday, May 04, 2015 3:42 PM To: Mehdi Rahmani; 'Stephan' Cc: Morra, Robert; Willson, Elizabeth Subject: RE: Parking Lots- 33 Phillips & 186 College

    Dear Medhi and Stephan,

    In the email from April151h you asked whether reducing the number of spaces by one would eliminate the need for involvement of the Conservation Commission. I had requested a meeting to discuss this and the status of the projects as a whole, but you had a;,ked for a conference call instead. The following is a quick summary of our conference call on Friday, May 1, 2015; .

    The hearing for 186 College Street is set to resume on May 14th, 2015. The hearing for 33 Phillips Street is set to resume on June 111h, 2015. You seemed surprised that the physical changes to the parking at each property would need to be upgraded. In

    order to get the approval for the 4th unit at Phillips Street and 3rd unit at College Street you will need to physically upgrade the condition of the parking areas (for 33 Phillips it has been previously identified that the building will need to be sprinklered). This will involve preparing a plan by an engineer and then commitment to actually have contractors and equipment make .changes to the site.

    We discussed the risks of a denial or a request to withdraw the applications. I reminded you that you are in the Special Permit process to remedy violations of the Zoning Bylaw (and Building Code) and that in either of those cases (denial or withdrawal) you'd be required to o~tain a building permit and would be required to physically remove the kitchen and it's major components. You need to compare the cost of the improvements to the loss in income from the unit.

    I'm re-attaching the em ails going back to October 31, 2014 when we started the discussion about parking, wetlands, and process.

    For Phillips Street: o There would be work occurring within 100 feet of the wetlands and this still requires filing a "Request

    for Determination" with the Conservation Commission. o The survey is like a "map" of the parking -it's only the first step. An engineer needs to show how the

    parking area would be actually be upgraded on the site. The Zoning Bylaw requires that a parking area consist of 12 inches of compacted gravel with a top coat of material. The parking area edges have to be delineated with something (6x6 wood timbers, wood guard rail fence, etc.). We have not gotten into those discussions much yet because the plans have been delayed.

    o The engineer would need to draw up the plans for the parking area and identify how drainage will be handled. This plan would be the basis for both the Conservation Commission and ZBA.

    o It was reiterated that the ZBA had strongly indicated' the potential for denial ifthe information was not pulled together for the June 111h continuation (that ZBA meeting was on January 291h, 2015)

    o So you are aware- our conference call only discussed parking. The ZBA had several other requests in terms of information about management, maintenance, and responding to complaints.

  • o As indicated in the email from March 31, 2015, an actual in person meeting with you and the . surveyor/engineer may help- but now time is running very short.

    For 186 College Street:

    Sincerely,

    o You noted that you had someone from Richard Cook's office go out and indicate that there are no wetlands. However, we have not seen that and should be provided with something in writing from whoever is making that determination.

    o The options for parking improvements cannot be figured out until the issue related to whether there are wetlands, or where are wetlands, is figured out.

    o I quickly noted that the existing parking may not meet the Zoning Bylaw requirements for size and maneuverability.

    Jeff Bagg Senior Planner Amherst Planning Department [email protected] 413-259-3187

    ?

    . .\ ..

  • Bagg, Jeffrey

    From: Sent: To: Cc: Subject: Attachments:

    Hi Richard,

    Bagg, Jeffrey Wednesday, June 03, 2015 10:48 AM [email protected] [email protected]; Morra, Robert RE: 186 College Street Site Plan Agenda 6-i1-15.doc

    The short answer to your question is that it is a decision of the Zoning Board of Appeals. There is a long back story that I will spare you for the moment, but unless you and Stephan both attend the ZBA hearing next week to explain exactly what is happening, I do not think the Board will grant a continuation and would likely deny both requests all together. 1 do not believe that simply stating that you waiting for Environmental Studies will be sufficient. Again, there is a long back story that I am not providing, but the applications for College Street began in October 2014 and 33 Phillips Street began in September 2014 and last time the ZBA informed Stephan that coming back on June 11'h without all the necessary plans would res.ult in denial.

    For example, the wetlands for 33Phillips Street have alreadybeen flagged and plotted onthe-survey. We've asked for an engineered plan for the improved parking lot to review storm water runoff/retention, grading, and more details as to the scope of construction to improve the parking. It's unclear if you'd lump that in with Environmental Studies?

    Jeff Bagg Senior Planner Amherst Planning Department [email protected] 413-259-3187

    From: [email protected] [mailto:[email protected]] Sent: Thursday, May 28, 2015 10:31 AM To: Bagg, Jeffrey Cc: [email protected] Subject: 186 College Street Site Plan

    Good Morning Jeff

    I am working with Stephan Gharabegian (College Street Properties, LLC) preparing a SITE PLAN for acquiring the special permits for 33 Phillips & 186 College St in town and would request additional time to complete the submittals as we are waiting for the Environmental Studies to be completed.

    Richard L. Cook, Principal Lewis & Cook Surveyors 69 Nipmuck Street Palmer, MA 01069 413-283-7238 Voice 413-289-1808 Fax 413-523-2684Cell [email protected]

  • Bagg, Jeffrey

    From: Sent: To: Subject:

    Hello again,

    Stephan Thursday, June 11, 2015 9:44AM Bagg, Jeffrey

    . RE:ZBA

    I guess Richard has been busy without telling me. Now I understand why you like to be tn the loop!

    His preparing the RDA for both properties. He has everything and will have it for me today. Maybe that would convince the ZBA to continue the application.

    You have everything else. I sent you the updates architect plans two weeks ago for 186 college st.

    On Jun 11,2015 9:14AM, "Stephan" wrote:

    I have called and emaiH!d Richard on a daily basis. I have ex;plained the importance of this and I still have nothing. So I am assuming that I will have to either get a continuance or file a iJ.ew application. Either case I think I need to contact a different surveyor.

    On Jun 11,2015 9:11AM, "Bagg, Jeffrey" wrote:

    i Stephan,

    I'm attaching the agenda. 33 Phillips is at 6:45p.m. and 186 College Street is at 8:40p.m. Are you planning to bring anyone with you? Also, what is the status?

    Jeff Bagg

    Senior Planner

    Amherst Planning Department

    [email protected]

    413-259-3187

    1

  • From: Stephan [mailto:[email protected]] . Sent: Thursday, June 11, 2015 8:55AM

    To: Bagg, Jeffrey Subject: ZBA

    Good morning,

    What time is my meeting tonight? Thank you.

    2