23
31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

Embed Size (px)

Citation preview

Page 1: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

31-04: Respond Offline to Planning Schedules

Supply Chain Platform

Training Presentation

Updated April 2011

Page 2: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 2Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Course Objectives

• After completing this course, you should be able to:

> Download a planning schedule

> Create an offline response

> Upload a planning schedule

> Send a PS response to a buyer

Page 3: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 3Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Planning Schedule Download/Upload

• Data for planning schedules can be taken “offline” from SCP by downloading selected collaborations.

• The downloaded information can be used for reference outside of SCP, or modified and then uploaded back into the SCP application.

• Data that is downloaded and uploaded back into SCP must be in a Microsoft Excel (.xls) file format.

• Only Excel columns that are highlighted in yellow can be edited.

• If the uploaded file contains invalid records, an error file is generated with an explanation of the problem.> The rules around editable Supplier Responses for Past Due Items are validated.> The system validates the data type, data size and date formats for all editable

data values.> The system ensures a Reason Code was provided, and if the Reason Code of

‘X – Other’ is used, then the ‘Item Notes’ field must have a value.– The Item Notes fields has a maximum character limit of 500.

Page 4: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 4Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Upload/Download User Interface per Role

• Buyers and Suppliers can download Planning Schedules, but only a Supplier can upload files.

Buyer Supplier

Page 5: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 5Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

SCP Process: Download and Upload a PS

Run search for PS Items

(to documentsearch criteria)

DownloadPS items

Save &open

Excel file

Make changesto Excel PS

(Continued below)

Upload ExcelFile

Success

Fail

Finish

Fix errors on Excel sheet

PS is automatically sent to buyer

Upload file& fix untilsuccessful

FinishPS is automatically sent to buyer

Page 6: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 6Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Downloading Planning Schedule Data

Page 7: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 7Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Search Before You Download

The search process for downloading does not show a list of the searched items before it downloads them. Therefore, you will not see what will be downloaded.

A good workaround for this issue is to first run a PS search:

1. From the Navigation Tree, click Demand Plan & Forecast Planning Schedules Search to access the Search page

2. Enter your search criteria

3. Click Search

4. Once you have found the items to be downloaded, write down your search criteria

12

3

Page 8: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 8Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Downloading Data

1. From the Navigation Tree, click Upload/Download Download Plan Schedule

2. Enter search criteria (from the PS search process in the previous step)

3. Click Search to create the file to be downloaded

1

3

2

Page 9: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 9Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Downloading Data - Status

A. The Status column indicates the progress of the file to be downloaded.> Queued means the system is working on other files and your file is pending.

> In Progress means the system is still writing the file to be downloaded.

– If “Queued” or “In Progress” status is displayed, periodically click the Refresh icon (R) to display the most current status. It will not automatically refresh.

> Completed means the system is done writing the file to be downloaded, and the download file was successfully written on the server.

– If the Status column displays an exclamation point icon, an error occurred in writing the file. Click the icon to view an explanation of the error.

R

A

Page 10: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 10Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Downloading Data

4. Click File Name to begin the download to your computer.

5. Click Save to copy the file to your computer’s hard drive, or click Open to immediately view the file.

4

5

Page 11: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 11Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Inbox Status

All User Roles

Page 12: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 12Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Inbox StatusThe Inbox Status section shows the status of all documents being manually uploaded and

downloaded into SCP by a user. Clicking on any file name in the Inbox Status allows you to Open or Save that file.

From the Navigation Tree, click Inbox Status If there is an Error File icon , click on it to see why the file did not download

or upload successfully.

Note: If there are a lot of jobs listed, click on + Job Filter to expand a searching section that will filter the job list.

31

2

Page 13: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 13Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Working Offline with Downloaded Data

Supplier Role Only

Page 14: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 14Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Working Offline with Downloaded Data1. In the spreadsheet, only columns in yellow are editable:

F. In the Supplier Response Date column, you can enter a new dateG. In the Supplier Response Qty column, you can enter a new quantityH. If your Response Date and/or Quantity do not match the Schedule Date and/or

Quantity (V), enter a Reason Code in column H by typing the first letter of any reason code listed at the top of the page (it should populate with the entire code)

I. If your reason code is X-Other, enter a note in the Item Notes column

2. Save your spreadsheet

G H IF V

Page 15: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 15Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Uploading Planning Schedule Data

Supplier Role Only

Page 16: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 16Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Uploading Planning Schedule Data

1. From the Navigation Tree, click Upload/Download Upload Plan Schedule Response

2. On the File Upload page, click Browse… to access the Choose File window.

3. Navigate to and select the file to be uploaded. Then click Open.

1

2

3

Page 17: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 17Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Uploading Planning Schedule Data

5. Optional: Enter a note in the Comments field to reference your download.

6. Click Proceed to access the Acknowledgement page.

6

5

Page 18: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 18Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Uploading Data - Status

A. The Status column indicates the progress of the file to be downloaded.> Queued means the system is working on other files and your file is pending.

> In Progress means the system is still writing the file to be downloaded.

– If “Queued” or “In Progress” status is displayed, periodically click the Refresh icon (R) to display the most current status. It will not automatically refresh.

> Completed means the system is done writing the file to be downloaded, and the download file was successfully written on the server.

– If the Status column displays an exclamation point icon, an error occurred in writing the file. Click the icon to view an explanation of the error.

R

A

Page 19: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 19Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Uploading Planning Schedule Error File

• If you see a red exclamation [!] icon in the Status column, it means that an error occurred during the upload.

1. In the Status column click the red exclamation [!] icon to view the Error File that will explain what failed.

1

Page 20: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 20Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Troubleshooting Upload Errors

• Some of the most common errors when uploading a file:

> Uploaded Excel document’s format must exactly match the downloaded format (placement of columns etc.)

> Items must correlate to original list of items

> Delivery date must be prior to the upload’s run date (or Response Limit Date if one was provided by the buyer)

> Dates must be in correct date format

> Quantities must be positive numbers

> Reason codes must exactly match reason code standard choices (not just the letter but the entire code as listed at the top of the page)

> Using reason code of ‘X – Other’ must include Notes

> Notes field must be less than 500 characters

Page 21: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 21Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Send PS Responses from an Upload

Supplier Users Only

Page 22: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 22Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

Sending Planning Schedule Response

If the PS Upload has a status of Completed and there is no Error File shown, then the PS Response has automatically been sent back to the buyer for all of the items that were in the uploaded file.

To confirm that the PS items were sent, you can run a PS search and:

1. View the Status column on the PS List page

2. Or, open the MCV page and view the Status row. If it is green for today’s date then that item was sent.

Page 23: 31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011

3104 - 23Copyright 2011 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential

End – Respond Offline to Planning Schedules