REQUEST FOR INSPECTION Saudi Aramco 6717-ENG (11/98) 726-200 (Inspection epartment) !e"# $I 10-00741 %& SO2636 ' ase it*e Clean o # 'ro+ect Inspection ,nit/ r. Sa%ee& i i* ec Inspection /monitorin is re uired on (date) 2-Fe'-1( at (time) )*00 +, prior to Pipin Pre-Installation Inspe.tion "or t e "o**o3in *ocation/e uipment Sa/sn a!"o n +rea 3 4or5 'ermit re uired# es No 'ro+ect ua*it '*an# S+P,T representati&e #as &eri$ie" t#at t#e or is rea"! $or CONTR+CTOR #as &er inspe.tion an" .on$or/s to t#e pro%e.t re ire/ents .o/plete an" in .o/plia SA' Name 5lis SAES/SA S/&t er Si nature ate ontractor/ ompan e*ep one :a; A/ Name A/ Si nature is "orm recei ed < t e undersi ned Inspection epartment emp*o ee# Name Sa%ee& Si nature ate istri<ution# Note * Inspector=s si nature is "or recei in t is t is re uest on* and not "or appro a* or d + &ri ina* - 'ro+ect ana ement 1st op - Inspection

3. RFI FORM

Embed Size (px)

DESCRIPTION

Sample RFI

Citation preview

RFI FORMREQUEST FOR INSPECTIONSaudi Aramco 6717-ENG (11/98) 726-200 (Inspection Department)Ref: RFI No.BI 10-00741 JOSO2636 PhaseTitleClean Trasportation Fuels at Riyadh RefineryTo : Project Inspection Unit/Mr. SajeevCivilMechPlumb. Comms.Elect.OtherInspection /monitoring is required on (date)2-Feb-15at (time)9:00 AMprior toErectionPiping Pre-Installation Inspectionfor the following location/equipmentSamsung Laydown Area 35Work Permit required:YesNoProject Quality Plan:Hold PointWitness Point

SAPMT representative has verified that the work is ready forCONTRACTOR has verified that the work to be inspected isinspection and conforms to the project requirements.complete and in compliance with the following specifications:

SAPMT NameJuliusSAES/SAMS/Other # SATIP-L-350-01 # 3.1SignatureDateContractor/CompanySAMSUNG EPC CO. LTD.Telephone FaxQA/QC NameRichardQA/QC SignatureDate

This form received by the undersigned Inspection Department employee:

NameSajeevSignatureDateTime

Note : Inspector's signature is for receiving this this request only and not for approval or disapproval of the work or facility inspected.Distribution:A. Original - Project ManagementB. 1st Copy - InspectionC. 2nd Copy - Contractor

QR Number #QMIS RFI #