Objectives
� Upon completion of this course, you will be able to:
� Describe the procedure of NodeB commissioning
� Perform NodeB commissioning
Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved.
References
� 《NodeB LMT User Guide》
� 《NodeB Commissioning Guide》
� 《DBS3900 Hardware Description》
� 《BTS3900 Hardware Description》
Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved.
Contents
1. Preparation for NodeB Commissioning
2. Procedure for NodeB Commissioning
Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved.
Contents
1. Preparation for NodeB Commissioning
2. Procedure for NodeB Commissioning
Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved.
Preparation for NodeB Commissioning� Prerequisites at NodeB side
� The NodeB hardware passes the installation check
� Checking the DIP switch setting of WMPT, WTRP
� The NodeB is powered on
� The data configuration file is ready
� Prerequisites at RNC side
� The RNC connected to the NodeB works well
� The data of the NodeB to be commissioned has been
configured in RNC
Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved.
Preparation for NodeB Commissioning� Selecting commissioning modes
� Local commissioning
� The transmission is unavailable
� Perform NodeB commissioning on site with LMT
� Remote commissioning
� The transmission is available
� The O&M channel between RNC and NodeB works properly
� Perform NodeB commissioning remotely through M2000
Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved.
Contents
1. Preparation for NodeB Commissioning
2. Procedure for NodeB Commissioning
Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved.
Procedure for NodeB Commissioning
� Step 1: Logging in to NodeB through the LMT
� Set the IP address of the LMT PC
� The default NodeB local maintenance IP address is 17.21.2.15
� Connect the LMT PC to the Ethernet Port on WMPT board
Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved.
Procedure for NodeB Commissioning
� Step 2: Checking the current NodeB BootRom and software
version
� A, if NodeB BootRom and software in active directory are the
right version to be used, then keep the software
� B, If the right BootRom version is stored in the standby
directory, activate it. Otherwise download the right BootRom
version and activate it
� C, if the right software version is stored in the standby directory,
activate it. Otherwise download the right software version and
activate it
Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved.
Procedure for NodeB Commissioning
� Step 3: Downloading the NodeB data configuration file
� The file name of the NodeB data configuration file must be
NodeBCfg.xml
� After the download is finished, reset the NodeB to make the
configuration file work
Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved.
Procedure for NodeB Commissioning
� Step 4: Handling alarms during NodeB commissioning
� Step 5: Checking the running state of the NodeB
� Checking SNTP (Simple Network Time Protocol)
� Checking the status of a cell
� Measuring RTWP
� Monitoring the output power of the NodeB
� Step 6: Initially activating the NodeB license
� Step 7: Recording NodeB information in data sheet
Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved.
Procedure for NodeB Commissioning
� Step 8: Commissioning the NodeB RET antenna (If RET is
used)
� Preparation for the RET antenna commissioning
� Data configuration file of the RET antenna
� Vendor code and type of the NodeB RET antenna
� Tilt of the RET antenna to be commissioned
� Step 9: Commissioning the TMA (If TMA is used)