21 Junio 2010 Estimación de Recursos y Reservas: Problemas Frecuentes Jean-Michel Rendu Executive Consultant [email protected]

3 estimacion de recursos jm rendu

Embed Size (px)

Citation preview

Page 1: 3 estimacion de recursos   jm rendu

21 Junio 2010

Estimación de Recursos y Reservas:Problemas Frecuentes

Jean-Michel Rendu

Executive Consultant

[email protected]

Page 2: 3 estimacion de recursos   jm rendu

General Outline

Estimation Process

Drilling, Sampling, and Sample Preparation

Mining, Metallurgical and Economic

Factors

The Human Factor and Quality Control

More Challenges for Competent Person

Page 3: 3 estimacion de recursos   jm rendu

Relationship between Exploration Results, Mineral Resources and Mineral Reserves

3

EXPLORATION

RESULTS

MINERAL RESOURCES

MINERAL RESERVES

INFERRED

INDICATED PROBABLE

Increasing level of

geoscientific knowledge

and confidence

MEASURED PROVEN

Consideration of mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors

(the "Modifying Factors")

Page 4: 3 estimacion de recursos   jm rendu

4

Estimation Process: Resources

Sampling and

Deposit

Characterization

Deposit

Modeling

Need for More

Geologic

Information

Preliminary

Technical and

Economic

Parameters

Resource Estimation

Reasonable Prospects for

Eventual Economic

Extraction?

Resource

Reporting

Abandon or

Sell Project

Page 5: 3 estimacion de recursos   jm rendu

5

Estimation Process: Reserves

Resource

Model

Need for more geologic,

metallurgical, geotechnical,

environmental information

Modifying Factors: Mining,

metallurgical, economic, marketing,

legal, environmental, social and

governmental factors

Mine Design

and

Production

Scheduling

Reserve

ReportingCashflow

and Risk

Analysis

Need for more economic,

marketing, legal, social,

governmental information

Abandon or

Sell Project

Page 6: 3 estimacion de recursos   jm rendu

6

SAMPLING METHODS

Page 7: 3 estimacion de recursos   jm rendu

7

Exploration and Data CollectionDrill Hole Sampling

•Core Holes

•Normal (Direct) Circulation

•Reverse Circulation

Page 8: 3 estimacion de recursos   jm rendu

8

CORE HOLES

Page 9: 3 estimacion de recursos   jm rendu

9

High Core Recovery = No Grade Bias?

Page 10: 3 estimacion de recursos   jm rendu

Problems with Core Sampling

•Poor Recovery

•Selective Recovery

•Loss of Fines during: Core Washing Core Cutting Core Splitting Crushing and Pulverizing

10

Page 11: 3 estimacion de recursos   jm rendu

11

Is a core sample representative of what is in the ground?

•What percentage recovery is acceptable?

•Is 98% acceptable?• Recovered: 98% at 0.30% Cu• Lost: 2% at 3% CuShould be: 100% at 0.35% Cu (+18%)

• Recovered: 98% at 0.30% Cu• Lost: 2% at 0% CuShould be: 100% at 0.29% Cu (-2%)

Page 12: 3 estimacion de recursos   jm rendu

Loss of Fines During Core SplittingWhere does it Happen? (Guillotine; Saw)

12

Page 13: 3 estimacion de recursos   jm rendu

Size Distribution in Porphyry Copper Deposit

Rock Type 1

0

10

20

30

40

3/4" 1/2" 1/4" 10# 32# 65# - 65#

Weig

ht

%

%C

u

Size fraction

%Cu Weight %

Rock Type 2

0

10

20

30

40

3/4" 1/2" 1/4" 10# 32# 65# - 65#

Weig

ht

%

%C

u

Size fraction

%Cu Weight %

13

Page 14: 3 estimacion de recursos   jm rendu

14

Core Splitting Problem

•Broken core in box

•Splitting method 1

•Splitting method 2

Page 15: 3 estimacion de recursos   jm rendu

Comparison of Blast Hole and Drill Hole Grades•Old Method:

Take broken material from top of core box

Fines are left inside box

Blast holes are much higher grade than core samples

•New Method: Split core evenly Blast holes are

slightly higher grade than core samples

15

Old Method

New Method

0,00

0,10

0,20

0,30

0,0 0,5 1,0 1,5 2,0

Bla

st

Ho

le

-D

rill

Ho

le G

rad

e

Drill Hole Grade

Page 16: 3 estimacion de recursos   jm rendu

Normal and Reverse

Circulation

Page 17: 3 estimacion de recursos   jm rendu

17

Problems with Normal Circulation Rotary Drilling

•Is Normal (Direct) Circulatrion Rotary Drilling as “Bad” as Claimed? YES!

•Water is the Enemy, whether Injected or from Underground

•Can it Ever be Used? Yes, to Determine Whether there is

Mineralization But Not to Characterize Mineralization

(Depth, Thickness, Grade)

Page 18: 3 estimacion de recursos   jm rendu

18

Problems with

Reverse Circulation Drilling

•Is Reverse Circulation Really Much Better than Normal Circulation?

Usually Yes Bypass Contamination Face Sampling Bits Water is the Enemy, whether Injected

or from the Ground

Page 19: 3 estimacion de recursos   jm rendu

19

Problems with Reverse Circulation Drilling

Face Sampling Bits

Water is the Enemy

Water inflow can

result in sample

contamination

Page 20: 3 estimacion de recursos   jm rendu

20

Problems with Reverse Circulation Drilling

•Sample Splitting

Too Much Water Bag Overflowing Loss of Fines Use of Micropores Speed or Quality?

Page 21: 3 estimacion de recursos   jm rendu

21

SAMPLING IN

UNDERGROUND

MINES

Page 22: 3 estimacion de recursos   jm rendu

22

Some Underground Sampling Methods

•Core Samples: Location, Orientation, Deflection

•Blast Hole Samples: Water, Sample Collection

•Chip Samples

•Channel Samples

•Muck Samples

Page 23: 3 estimacion de recursos   jm rendu

23

Channel Sampling

How do I Sample This?

Page 24: 3 estimacion de recursos   jm rendu

24

Chip Sampling

Page 25: 3 estimacion de recursos   jm rendu

25

Channel SamplingChannel Sampling

Page 26: 3 estimacion de recursos   jm rendu

26

Chip SamplingSampling of

Broken Muck

Page 27: 3 estimacion de recursos   jm rendu

27

Stockpile Sampling:

Is this a Good Sample?

Page 28: 3 estimacion de recursos   jm rendu

28

Compare Size of Scoop with Size of Material

Sampled

Page 29: 3 estimacion de recursos   jm rendu

Sampling of Individual Loads

Sample (10 kg) Loader (1 tonne)

29

Page 30: 3 estimacion de recursos   jm rendu

Comparison of Bucket and Drum Samples

30

0%

5%

10%

15%

20%

25%

30%

4 2 1 1/2 1/4 6 12 20 45 100

Weig

ht

%

Size Fraction (inch/mesh)

Size Distributions

DRUM SCOOP

4 2 1 1/2 1/4 6 12 20 45 100

Gold

Gra

de

Size Fraction (inch/mesh)

Grade Distributions

DRUM SCOOP

Material > 4

inches very

high grade

In Drum,

20% > 4 inches

Page 31: 3 estimacion de recursos   jm rendu

31

ESTIMATION OF MINERAL RESOURCES

Page 32: 3 estimacion de recursos   jm rendu

32

Deposit Modeling and Estimation of Mineral Resources

A Deposit Model is not a Resource

• A Resource must show Reasonable Prospects for Eventual Economic Extraction

• Technical, Economic and Other Assumptions must be Made, Albeit at a Preliminary Level.

Page 33: 3 estimacion de recursos   jm rendu

33

DEPOSIT MODEL AND MINING METHOD

Page 34: 3 estimacion de recursos   jm rendu

34

- Deposit Model and Mining Method -

•Different Models for Different Mining Methods

Open Pit or Underground

Bulk Mining or Selective Mining

High or Low Cutoff Grades

Page 35: 3 estimacion de recursos   jm rendu

35

DEPOSIT MODEL AND METALLURGICAL PROCESS

Page 36: 3 estimacion de recursos   jm rendu

36

- Deposit Model and Processing Method -

•Different Models for Different Processing Methods

Copper Oxide, Sulfide, Transition

Gold Cyanide Amenability

Mill Throughput, Power Consumption, Acid Consumption

Recovery

Page 37: 3 estimacion de recursos   jm rendu

37

What is a Representative

Geometallurgical Sample

•From Laboratory Test to Semi-Industrial Test to Full Scale Operation

Many Small Samples Few Large Samples According to Geology High Grade, Low Grade, Near Surface, At Depth

Page 38: 3 estimacion de recursos   jm rendu

38

Resource and Reserve Estimation

Economic Considerations

Page 39: 3 estimacion de recursos   jm rendu

39

Estimation of Mineral ReservesEconomic Analysis

•Which Commodity Price Should be Used?

Who Decides and Who Signs the Competent Person’s Report?

Beware of External Pressures• Use a High Price to Report Higher Reserves• Use a Low Price for Tax or Other Reasons

Page 40: 3 estimacion de recursos   jm rendu

40

THE HUMAN FACTOR

ESTIMATION IS BY PEOPLE FOR PEOPLE

Page 41: 3 estimacion de recursos   jm rendu

41

Resource Estimation Quality Control

•Maintain Effective Communications with:

Those Generating the Data (Geologist, Driller, Laboratory, Surveyor, etc.)

Those who will Use the Model (Mining Engineer, Metallurgist, Project Engineer, Environmentalist, Management)

Page 42: 3 estimacion de recursos   jm rendu

42

Resource Estimation Quality Control

•Have Regular Meetings throughout the Entire Modeling Process with Detailed Review at Beginning and End

•Ask for and Compare Geologic Interpretations from Different Geologists

•Use More than One Modeling Method. Compare Results. Explain Differences

•Consider Outside Reviews.

Page 43: 3 estimacion de recursos   jm rendu

43

Crocodiles Lurking in the Murky Waters

- Warnings to Competent Person -

Page 44: 3 estimacion de recursos   jm rendu

44

Challenges for the Competent Person

•Corporate Objectives:

Raise Funds for Continuous Project Development

Grow the Company by Bringing a New Mine to Production

Sell the Deposit

Page 45: 3 estimacion de recursos   jm rendu

45

Challenges for the Competent Person

•Competent Person Objectives: To Do the Best Technical and Ethical Job he/she

Knows How to Do To Answer Management’s Questions The Answer May Differ from Management’s

Expectations

•Maximizing Personal Bonus (or the Boss’s Bonus) must NOT be a Competent Person’s Objective.

Page 46: 3 estimacion de recursos   jm rendu

46

Blast Hole Sampling Methods

1 - Rocket Sampler

•Where to take the sample? Too close: underestimation Too far: Overestimation

•How deep should the sampler go?

•What should be the diameter of the sampler? Too large: hard to push through Too small: not representative

•Now many samples per blast hole?

Rocket Sampler

FINAL OBJECTIVE:

A TECHNICALLY AND

ECONOMICALLY SUCCESSFUL

MINING OPERATION