2 nd Quarter June 7, 2016

2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

2nd Quarter June 7, 2016

Page 2: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

Financials • Financial Report • Approval of Claims • Budget Revision • Banking Resolution

2

Page 3: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

Old Business

• Basin Updates

3

Page 4: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

Old Business

•• St. Joseph River Basin Filter Strip Initiative

4

Page 5: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

Old Business

••• IWLA Scholarship ▫ Randy Sexton, Noble County Surveyor ▫ 2017 Scholarship

5

Page 6: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

Old Business

•••• Cobus Creek Watershed Diagnostic Study

6

Page 7: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

7

• Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed

• Aquatic organisms surveys started

• Chemical testing beginning soon

• Scheduling sites visits to public properties, Elkhart Conservation Club, & Edwardsburg

• Fish Passage Survey in September

• Draft Document early 2017

• Approval March 2017

Cobus Creek WDS

Page 8: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

Old Business

••••• Water Monitoring Program Update

8

Page 9: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

9

Page 10: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

10

Page 11: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

11

Page 12: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

12

Page 13: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

13

Page 14: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

14

Page 15: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

15

The number of sampling events exceeding water quality targets tells an even darker story…

Page 16: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

16

Page 17: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

17

Page 18: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

Old Business

•••••• Elkhart River Conservation Initiative ▫ A collaborative effort to implement sustainable

projects in Elkhart River Watershed

18

Page 19: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

Elkhart River Conservation Initiative • Workshop Held: March 29, 2016 ▫ What projects would you like to see implemented?

19

Page 20: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

New Business

• 2016 – 2017 Budget & Workplan

20

Page 21: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

New Business

•• IN-MI St. Joseph River Basin Symposium Recap

21

Page 22: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

New Business

••• 2016-2017 Water Monitoring Sites (Phase 3)

22

Page 23: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

23

2016-2017 Water Monitoring Sites (Phase 3)

Turkey Creek

Baugo Creek

Brandywine Creek- St. Joseph River

Page 24: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

24

2016-2017 Water Monitoring Sites (Phase 3)

Page 25: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

25

Page 26: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

LTCP Overview & Update

City of South Bend Department of Public Works

St. Joseph River Basin Commission, June 2016

Page 27: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

6/7/2016 2

Page 28: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

6/7/2016 3

LTCP

CSO Control Phase 1

WWTP upgrades

Collection system controls

Bendix

Eastbank

Diamond Avenue

Oliver Plow

Southwood

Kensington

CSO Control Phase 2

Storage Tanks

Memorial Park

Old Fire Station

Ice Rink Parking Lot

Randolph & Sampson

Nuner

Leeper Park

Brownsfield Park

Storage Conduit

Parallel Interceptor

5th (& final stage) happening now

Page 29: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

6/7/2016 DIVISION OF ENGINEERING: MISSION STATEMENT 4

Visualization of Phase 2

Page 30: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

6/7/2016 5

LTCP

CSO Control Phase 1

WWTP upgrades

Collection system controls

Bendix

Eastbank

Diamond Avenue

Oliver Plow

Southwood

Kensington

CSO Control Phase 2

Storage Tanks

Memorial Park

Old Fire Station

Ice Rink Parking Lot

Randolph & Sampson

Nuner

Leeper Park

Brownsfield Park

Storage Conduit

Parallel Interceptor

Page 31: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

The Relook at Phase 2 City is examining alternatives to/variations of the current plan, due to:

•New EPA Policies on e.g. Integrated Planning, Green Stormwater Infrastructure. Meaning less focus on just grey solutions. Holistic solutions = Green Stormwater Infrastructure, Real time sewer flow control, downspout disconnection etc. •Flaws in current plan re tank sizing (+/-) and locating. Better understanding of St. Joseph River flow dynamics in SB.

•& Obviously cost.

6/7/2016 6

Page 32: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

State of the City Speech “…when it comes to our federally mandated plan to separate City sewers to comply with the clean water act. With hundreds of millions of dollars of spending required, we will be using every tool available to us—technical, legal, and political—to minimize the impact this work will have on ratepayers.” - Mayor Pete Buttigieg, January 2016.

6/7/2016 7

Page 33: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

Therefore: New Team, New Vision, New multi-fronted Approach

Driven by: An initiative to improve water quality and alleviate many waste-water concerns by focusing on these Four areas:

1. GSI- Getting the Rain Out 2. Repairing and Maintaining 3. Smarter Sewers 4. Building New Infrastructure

6/7/2016 8

Page 34: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

1. GSI (or GRO)- Getting the Rain Out (Green Stormwater Infrastructure)

Reclaim stormwater naturally, reduce sewer overflows, and minimize basement backups. Improve St. Joseph River.

Reduce the volume of stormwater in our combined sewer -installing landscaping that helps capture rain (near) where it falls, increase aesthetic appeal, improve property values, and attract biota.

6/7/2016 9

https://www.epa.gov/soakuptherain

Page 35: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

2. Repairing and Maintaining City to spend >2M$/year on evaluating, repairing and improving our existing system.

Removing Inflow And Infiltration. Ensure integrity of current system. Get the most out of what we have before we spend.

6/7/2016 10

Improving what we have.

Continue to aim for improvements while maintaining progress

made.

Page 36: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

3. Smarter Sewers Not just with what we have now but with new phases.

We’ve been water quantity focused, lets get smart about water quality too.

A mechanism to clarify our impact (e.g. E. Coli) on the St. Joseph River. E. Coli source knowledge (human, non-human). CSO auto sampler campaign.

6/7/2016 11

Page 37: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

4. Building new Infrastructure Build to bridge the gap after exhausting 1, 2 & 3. Always spending wisely. Locally where possible. Less Gray Infrastructure. Different Gray infrastructure, better located, better sized. Less invasive on the City?

6/7/2016 12

Page 38: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

Where are we now: honing alternatives

With existing Consent Decree- full compliance, and finalizing Phase 1.

With our considerations for Phase 2: Multi consultancy team (MWH, American Structurepoint, EmNet, LimnoTech, Morgan & Lewis), finalizing alternatives currently.

•GSI with less tanks

•GSI with a large tunnel

•GSI with a short tunnel and consolidation sewer network.

6/7/2016 13

Currently we are detailing these alternatives with regards to locations, sizes, costs, impacts, funding options etc.

Complex Matrix. Ingredients. Quantities. Methods.

Page 39: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

Where next If best alternative requires renegotiation with

-EPA

-DOJ

-IDEM

It’ll be a major issue/task.

In the meantime we must ensure continued compliance with our Consent Decree.

6/7/2016 14

? Questions

Page 40: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

2nd Quarter June 7, 2016

Page 41: 2nd Quarter · 2016-06-07 · 7 • Wind-shield survey complete*** • ~8,720 acres ag bmps needed • ~0.9 miles bank stabilization needed • ~3.2 miles riparian buffer needed •

Next Meeting September 6th, 2016