    Part A: Student Activities

    1. Association activities:

    S.No Date Description/ Activity/Topic SpeakerRemarks/Purpose

    Outcome

    1

    10.8.2012

    Inaugural Function of meCKro Sri Asok Giridhari, Chief Engineer,Wallem ShipManagement,Norway

    ---

    Students got exposure onEmployment opportunitiesIn Marine Engg and R& AC of ships, Operations of Locomotives andmaintenance of ships

    2Guest lecture onRefrigeration and Air -conditioning in Ships

    2. Practical Knowledge Training:

    S.No

    DateBranch/

    Year/Section

    Industryvisited

    No.of

    days

    No. of studen

    tsFaculty Accompanied

    Feedback fromstudents

    Relevant subjectknowledge gained

    103-08-2012

    Mech/II/A

    TNSTC,Villupuram 1 57

    1. Mr D. Ratchaga raja2. Mr G.Ganesan Obtained 14

    reports fromstudents

    Repairing andMaintainingAutomobiles (Bus)

    204-08-2012

    Mech/II/B

    TNSTC,Villupuram

    1 511. Mr R.Anandhan2. Mr G.Mohan3. Mr.T.Narayanan

    331-08-2012

    Mech/ IVNLC,

    Neyveli1 57

    1. Mr T.R.Sathish kumar2. Mr B.Raja Bharathi3. Mr S.Aramuthan

    Report Yet tobe collected

    Gained knowledgein working onThermal powerstation, industrialsafety, and millingwork

    3. Extra Curricular activities: (Sports/NSS/NCC & others)

    S.No. Date BatchNo.of students/ Name

    of the studentEvents Position Remarks

    1 11.08.2012

    II Year & IIIYear

    MechanicalEngineering

    16

    Campus cleaningProgram as a part of Implementation of

    Zero WasteManagement in

    CKCET

    --- ---

    2

    31.08.2012III Year

    Mechanical

    Engineering

    M.BALASUBRAMANIAN

    ANANCID DE ZAP PARTICIPATED ---3 LINE FOLLOWER PARTICIPATED ---4 ZARA SOCHLE THIRD ---5 AUTOMARACE PARTICIPATED ---

  • 7/28/2019 2.Monthly Activities Plan for (Aug-2012)

    2/6

    Page 2 of 6

    4. Co-curricular activities:a) Paper presented / Quiz:

    S.No. Date Name of Students / Class Organizer Program Position

    1 31.08.2012 M.BALASUBRAMANIANST.ANNES ENGG

    COLLEGE QUIZ PARTICIPATED

    5. Students Conferences / Seminars/Work shop/Symposium participated:

    S.No Name of StudentTitle of

    ProgrammeOrganized

    byDATE Period

    Knowledgegained/outcome

    1 U.ASHWIN

    NATIONAL

    CONFERENCE ONDESIGN,

    MATERIALS &CONSTRUCTION

    VEL TECHUNIVERSITY

    24.08.2012 2 DAYS

    EXPLOSURE TOOTHER

    MECHANICAL

    STREAM ANDHOW TO

    PRESENT PAPERIN NATIONAL

    LEVELCONFERENCE

    2 V.DEVANATHAN

    3 V.PARTHIBEAN

    4 C.SIVA KUMAR

    5 L.SIRANJEEVI6 R.ARUN KUMAR

    7 J.NAVIN KUNAR

    8 M.RAMANAN

    9 K.MANIMARAN

    10 C.ANNAMALAI

    11 M.BALASUBRAMANIAN

    12 R.PREMKUMAR

    STUDY OFFRICTION STIR

    WELDINGOF ALALLOY TO STEEL

    VEL TECHUNIVERSITY

    24.08.2012 2 DAYS

    FULL PROCUDREOF WELDINGMETALS AND

    GOT

    KNOWLEDGE INTENSILE

    STRENGTH

    13 22 students

    Seminar onEnvironmentalAwareness for

    SustainableDevelopment

    CKCET 14.8.2012 DayStudents got anawareness onEnvironmental

  • 7/28/2019 2.Monthly Activities Plan for (Aug-2012)

    3/6

    Page 3 of 6

    Part B: Faculty Activities

    1. Industrial training:

    S.No. Date Name of the FacultyIndustry in which

    Trained DurationReport/

    Reference/Outcome

    1 22/08/2012BALAMURUGAN A JANATICS INDIA

    PVT. LTD4 DAYS

    (22.8.12 25.8.12)USEFUL TO HANDLEMECHATRONICS LABGANESAN.G

    2. Faculty achievements:S.No. Name of the Faculty Achievements Remarks/Outcome

    1 Mr S.PANNERSELVAMProduced 100% Result in even

    semester2012BASIC CIVIL AND MECH ENGG

    II-ECE(A)

    3. Project proposals submitted

    S.No.Name of the

    ProjectName(s) of

    Investigators

    Agencyto which

    it wassent

    ProposedBudget

    Estimate(Rs. Inlakhs)

    Date of Submissio

    n /Presentati

    on

    Project outcome/significance/Remarks

    1

    SDP onComputational

    Intelligence forOptimization of

    Product Designand

    Manufacturing

    Dr.G.SASIKUMAR AICTE 7,00,000.00 30.8.2012

    This FDP is designed toacquire knowledge aboutcurrent technologicaldevelopments in the fieldof ComputationalIntelligence forOptimization of ProductDesign and Manufacturing.

    2

    SecondNationalConference onComputational

    Intelligence forModeling andOptimization

    (CIMO-2013)

    Dr.G.SASIKUMAR AICTE 1,50,000.00 31.8.2012

    This conference acts as aforum for exchange of ideas and knowledge onlatest trends in Modelingand Optimization relatedto all fields of Engineeringand Technology.Participants are expected

    to gain more knowledgeand ideas for pursuingfurther research in theirrespective field after thisconference.

  • 7/28/2019 2.Monthly Activities Plan for (Aug-2012)

    4/6

    Page 4 of 6

    Part C: Department Activities1. Class test /IAT performance

    Class TEST/IATSubjectName

    Subject Name Subject NameSubjectName

    SubjectName

    SubjectName

    Remarks

    II - A

    CLASS

    TEST-III

    EDC MFT-I ETD FMM KOM TPDE

    Coachingclass for

    failedstudentsarranged.

    PKT 88 90 PKT 100 100

    IAT-IEDC MFT-I ETD FMM KOM TPDE82 76 75 80 83 80

    CLASSTEST-IV

    EDC MFT-I ETD FMM KOM TPDE60 96.2 INDEPEN DAYS 92.8 100 96.2

    CLASSTEST-V

    EDC MFT-I ETD FMM KOM TPDE77 90 46 100 100 RAMZAN

    II-B

    CLASSTEST-III

    EDC MFT-I ETD FMM KOM TPDE

    82-4 46 63.5 83.3 86.7 64.7

    IAT-IEDC MFT-I ETD FMM KOM TPDE

    57 48 66 82 82 82CLASS

    TEST-IVEDC MFT-I ETD FMM KOM TPDE

    58.4 92.6 INDEPEN DAYS 64.9 97.7 57.6

    CLASSTEST-V

    EDC MFT-I ETD FMM KOM TPDE

    68.9 86.9 87.9 63.1 100 58.4

    III

    CLASSTEST-III

    EVS DOM DME GDJP EMM AHP71.9 93.3 88.8 96.8 96.7 100

    IAT-IEVS DOM DME GDJP EMM AHP60.9 85.9 95.5 97.5 95.5 98.5

    CLASSTEST-IV

    EVS DOM DME GDJP EMM AHP67.2 100 INDEPEN DAYS 100 88.5 96.7

    CLASSTEST-V

    EVS DOM DME GDJP EMM AHP

    RAMZAN 92.9 84.3 100 80.7 88.6

    IV

    CLASSTEST-III

    TQM FEA MECHATRONICS CIM PPC ROBOTICS

    25.8 84.7 100 81.0 91.1 82.1

    IAT-ITQM FEA MECHATRONICS CIM PPC ROBOTICS

    72 91 98 83 92 86

    CLASSTEST-IV

    TQM FEA MECHATRONICS CIM PPC ROBOTICS

    NA 77.1 NA 84.3 92 87.7

    CLASSTEST-V

    TQM FEA MECHATRONICS CIM PPC ROBOTICSRAMZAN 98 91 92 97 87

    2. Attendance

    Class No of working daysTotal Student

    StrengthNo. Less than

    75%No. 80 to

    90%No. Greater than

    90%No. 100%

    II (A)21 (AUG) 66 0 18 24 24

    44 (As on 31.8.2012) 66 4 11 42 9

    II (B)21 (AUG) 68 3 2 29 33

    44 (As on 31.8.2012) 68 2 12 34 19

    III21 (AUG) 67 0 24 31 12

    44 (As on 31.8.2012) 67 0 10 52 5

    IV21 (AUG) 65 11 22 20 1244 (As on 31.8.2012) 65 4 7 31 -

  • 7/28/2019 2.Monthly Activities Plan for (Aug-2012)

    5/6

    Page 5 of 6

    3. Class Committee Meetings:

    ClassDate of meeting

    Academic issues General issues Action taken

    II (A) 22.8.2012

    1. KOM-Students want step by

    step explanation2. Low pass % in MFT-1 and EDC3. Lateral entry special coaching

    1. Books not issuedto Lateral Entrystudents2. Bench and deskshortage

    1.Informed to Librarian2.More writing practice for

    MFT-1 and EDC3.Informed EO and desks areto be taken from Conferencehall

    II (B) 23.8.2012

    1) STUDENTS NEED QUESTIONBANK.2) LATERAL ENTRY STUDENTSNEEDS SPECIAL COACHINGCLASSES FOR FIRST TWO UNITS INMATHS.3.MFT-1-More explanation

    1) ONE OF THEWINDOWS WASBROKEN.2) THEY NEEDSCREEN CLOTH FORWINDOWS.

    1) ALL THE STAFFS ARE

    INSTRUCTED TO GIVEQUESTION BANKS 2) SPECIAL COACHING CLASSARE ARRANGED FOR WEAKSTUDENTS

    III 21.8.2012

    1) STUDENTS NEED QUESTIONBANK.2) STUDENTS NEEDED 2 MQUESTIONS FOR ALL UNITS.3) STUDENTS NEED SPECIAL CAREIN DME.

    1. A.C. Problem inclass room2. Value addedcourse on Pro-E

    1) ALL THE STAFFS ARE

    INSTRUCTED TO GIVEQUESTION BANKS 2) SPECIAL COACHING CLASSARE ARRANGED FOR WEAKSTUDENTS3) DATA BOOK IS NEEDED FORDME.

    IV 17.8.2012QB to be given and a Work shop on

    FEA to be conducted

    Placement issuesDiscussed with SACL, Leo

    Fasteners

    4. Important Decisions:

    S.No Description Existing SystemChanges

    RecommendedReason/Purpose

    1

    To transfer HEATTRANSFER LAB from D 01to Ground Floor of MechBlock

    The lab is functioning inD-06

    To transfer the lab toGround Floor

    To utilize the classroom D01 forregular classes

    2Students Attendance entry

    Attendance is entered inthe Personal log, Classlog, Master attendanceand ERP.

    Attendance entry is tobe made simple. Entry

    in Personal log andERP is enough. ISOprocedure needs tobe changedaccordingly.

    To avoidduplication of data

    5. Knowledge Sharing:

    Date and Venue Faculty Name Topic of Discussion Expected outcome30.8.2012

    Cad labBALAMURUGAN A Various Pneumatic and

    hydraulic circuitsTo undertake

    Mechatronics LabGANESAN.G

  • 7/28/2019 2.Monthly Activities Plan for (Aug-2012)

    6/6

    Page 6 of 6

    6. ISO (Internal auditing) activities:S.No. Date Type Suggestions/Comments/NC Remarks

    1 30-8-2012 Department auditing1) Auditing done for all the staff members,2) Some suggestion are given for updating the ISO files

    ---

    7. New equipments/Failures /Service in the laboratory:S.No. Item Description Quantity Cost Purpose Remarks

    MECHATRONICS LAB

    1

    Design and testing of fluid powercircuits to control (i) Velocity (ii)direction (iii) force of single anddouble acting actuators usingHydraulic Trainer Kit

    1 115875TO CONDUCT LAB

    EXPERIMENT---

    2 Speed Control of AC & DC drives 1 33469TO CONDUCT LAB

    EXPERIMENT---

    3Electro Pneumatic Trainer Kit withSwitch Mode Power supplyElectroPneumatic Trainer Kit with PLCwith Switch Mode Power supply

    1 239362TO CONDUCT LAB

    EXPERIMENT---

    4Automation Studio Version 5.7 (10Users License)

    1 318750TO CONDUCT LAB

    EXPERIMENT---

    58031/51 Microcontroller TrainerKit with Power Supply(5V,1.5A,+/-12V,100mA)

    1 7463TO CONDUCT LAB

    EXPERIMENT---

    6 Stepper Motor Interface (InterfaceCard & One Motor)

    1 3712TO CONDUCT LAB

    EXPERIMENT---

    7 Servo Controller Interfacing for DCmotor

    1 84375 TO CONDUCT LABEXPERIMENT

    ---

    8 PID Controller interfacing 1 22125TO CONDUCT LAB

    EXPERIMENT---

    9

    Computerized data loggingsystem with control for processvariables like pressure flow andtemperature

    1 111563TO CONDUCT LAB

    EXPERIMENT---

    10

    ELGI make VAYU 1.0HPReciprocating Air CompressorSingle Phase With 25 Liters Air

    Receiver

    1 30000TO CONDUCT LAB

    EXPERIMENT---

    TOTAL COST 966694

    Date: 07.09.2012 PREPARED BY:B.RAJA BHARATHI, AP/MECH