1. Works to be Accepted (C«ng viÖc nghiÖm thu):
- Work Item No (H¹ng môc sè): 06950-15
- Work Description (Tªn c«ng viÖc) : Checking level after excavation
- Location (VÞ trÝ) : Km32+880
- Scale of Acceptance (Ph¹m vi nghiÖm thu) :
2. Participants of Acceptance (Thµnh phÇn tham gia nghiÖm thu) :
- Highway Engineer (Kü s ®êng);
- Inpector ( Gi¸m s¸t hiÖn trêng):
- Main Contractor ( Ban ®iÒu hµnh):
- QC Manager ( Gi¸m ®èc chÊt lîng):
c) The Sub-Contractor (ThÇu phô): - Team Leader (§éi trëng):
3. Time of Acceptance (Thêi gian nghiÖm thu):
- Begin (B¾t ®Çu): 8h40' 15/10/2011
- End (KÕt thóc): 9h30' 15/10/2011
-Place (§Þa ®iÓm):
4. Evaluation on the construction Results (§¸nh gi¸ kÕt qu¶ x©y dùng):
a) Reference Documents for acceptance (C¨n cø nghiÖm thu):
OK OK
OK OK
OK OK
OK OK
OKb) Construction Quality (ChÊt lîng c«ng viÖc) : §¹t yªu cÇu.
c) Other Opinion (ý kiÕn kh¸c)
d) Commonts by the Engineer on the Acceptance of the Construction parts/ctates (ý kiÕn cña kü s) :
5. Comments (KÕt luËn) :
§ång ý nghiÖm thu. ChÊp thuËn cho ®¬n vÞ thi c«ng líp tiÕp theo
TrÇn §¨ng Thëng TrÇn V¨n TiÖp §ç V¨n Lîng Ph¹m Quèc Phong
8. Inspection Sheets (Biªn b¶n kiÓm tra hiÖn trêng) :
4. Method Statement ( BiÖn ph¸p thi c«ng): 9. Internal Acceptance Minute (BBNT néi bé):
NguyÔn H÷u H¹nh
Contractor
Sub - Contractor main - Contractor quanlity control inspector
5. Matertial Certificates (Chøng chØ vËt liÖu):
highway engineer
T¹i hiÖn trêng gãi 2 - §o¹n Sãc S¬n - Th¸i Nguyªn - Dù ¸n X©y dùng Quèc lé 3 míi
1. Request No (PhiÕu yªu cÇu nghiÖm thu) : 6. Equipment Quality check & Test Result ( KQKT T.bÞ ) :
2. Work Drawing ( B¶n vÏ thi c«ng): 7. Daily Record (NhËt ký thi c«ng) :
consultant
PROJECT MANAGEMENT UNIT 2
New national highway no.3 and regional road network construction project
PACKAGE 2 : Section of Soc Son – Thai Nguyen
Consultant: Nippon Koei - JBSI - TEDI Contractor: Cienco8 - TLG - TSC - Vinaconex
3. Specification( Tiªu chuÈn kü thuËt):
a) The Consultant (Kü s t vÊn):NguyÔn H÷u H¹nh
Ph¹m Quèc Phong
b) The Contractor (Nhµ thÇu):TrÇn V¨n TiÖp
Team leader D. Project Manager QC Manager
minutes of acceptance(Biªn b¶n nghiÖm thu)
§ç V¨n Lîng
TrÇn §¨ng Thëng
At side - Packup 2 - Section of Soc Son - Thai Nguyen - NH3 Construction Project
d) Commonts by the Engineer on the Acceptance of the Construction parts/ctates (ý kiÕn cña kü s) :
1. Works to be Accepted (C«ng viÖc nghiÖm thu) :
- Work Item No. (H¹ng môc sè): 06950-15
- Work Description (Tªn c«ng viÖc): Cao ®é hè mãng cèng chui d©n sinh
- Location (VÞ trÝ): Km32+880
2. Participants of Checking and Acceptance (Thµnh phÇn tham gia nghiÖm thu) :
a) Site Management Board's Representative (§¹i diÖn Ban ®iÒu hµnh): VINACONEX
_Mr. Ph¹m Hång TiÕn Construction Manager - Gi¸m ®èc thi c«ng
_Mr. Hoµng §×nh ThuËn Site Engineer - Kü s c«ng trêng
b) Construction team's Representative (§¹i diÖn ®éi thi c«ng) : VINACONEX
_Mr. TrÇn §¨ng Thëng Team leader - ChØ huy trëng ®éi thi c«ng
_Mr.
3. Acceptance Period (Thêi gian nghiÖm thu) :
Begin (B¾t ®Çu) : 14h00' 14-10-2011 End (KÕt thóc): 15h00' 14-10-2011
Place (§Þa ®iÓm):At side - Package 2 - Section of Soc Son - Thai Nguyen - NH3 Construction Project
T¹i hiÖn trêng gãi 2 - ®o¹n Sãc S¬n - Th¸I Nguyªn - Dù ¸n X©y dùng Quèc lé 3 míi
4. Comments and Evaluation on the Completed works (§¸nh gi¸ c«ng viÖc hoµn thµnh):
a) Reference Documents for acceptance (OK or N/A) (KiÓm tra tµi liÖu nghiÖm thu):
OK 6- Equipment Checking Results (KQ KT T.bÞ): OK
OK 7- Records & Inspection Sheets for all piles OK
OK (B¸o c¸o & Biªn b¶n kiÓm tra hiÖn trêng):
4- Other's Tech Instructions (ChØ dÉn KT kh¸c): OK 8- Test Result (KÕt qu¶ kiÓm tra): OK
5- Material Certificate (Chøng chØ vËt liÖu): OK 9- Daily Record (NhËt ký thi c«ng): OK
b) Construction Quality (KiÓm tra chÊt lîng x©y dùng):
5. Conclusion (KÕt luËn):
SOCIALIST REPUBLIC OF VIETNAM CéNG HßA X· HéI CHñ NGHIA VIÖT NAM
Independence - Freedom - Happiness §éc lËp - Tù do - h¹nh phóc
Date (Ngµy): 14-10-2011
3- Working Drawing (B¶n vÏ thi c«ng):
1- Request (PhiÕu yªu cÇu nghiÖm thu):
2- Method Statement (BPTC):
Position (Chøc vô):
Position (Chøc vô):
Position (Chøc vô):
Position (Chøc vô):
internal acceptance minute no.
of construction work
(biªn b¶n nghiÖm thu néi bé c«ng viÖc x©y dùng)
project: new national highway no.3 construction project
package 2 - section of socson - thai nguyen
TrÇn §¨ng Thëng Hoµng §×nh ThuËn
Construction team leader Site engineer
§¹t yªu cÇu kü thuËt!
§ång ý nghiÖm thu!