    BHEL Focus on R&M

    Extended life.

    Restore lost capacity and /or enhance rated capacity.

    Im roved availabilit & reliabilit .

    Improved heat rate & cycle efficiency.

    State of art systems for better O & M practices.

    .

  • 8/13/2019 2a - Life Assesment of Boilers

    2/9

    Advantages with BHEL

    Single source Total solutions.

    Wide experience in conducting Destructive and NDT

    tests and its interpretations.

    Experience of conducting >250 RLA studies

    e eve ope a s or es ng o coa , as ,materials etc.

  • 8/13/2019 2a - Life Assesment of Boilers

    3/9

    Advantages with BHEL

    Unparalleled experience with Indian coal.

    based on wide experience.

    ,

    knowledge of O&M practices and problems.

    .

    Smart Wall Blower System.

    Gravimetric feeders with Micro processor controls

    Steam Tube Leakage Detection (STLD) system

    By-pass Over Fire Air System NOx Control

  • 8/13/2019 2a - Life Assesment of Boilers

    4/9

    Approach towards R &M

    Conductance of RLA/PET/CA studies to assessplants condition and identify areas of improvements.

    .

    Execution.

  • 8/13/2019 2a - Life Assesment of Boilers

    5/9

    When assessment is required?

    Assessment becomes necessary in either of thefollowing conditions:

    1. After 100000 hrs of o eration /Statutor

    2. Decreasing trend in availability & PLF

    . ncreas ng tren n cost

    4. Before R&M

  • 8/13/2019 2a - Life Assesment of Boilers

    6/9

    overseas projects boilers of various capacities and types

    , ,

    Life assessment and Extension

    Rehabilitation of boiler

    Up-gradation of C&I

    Overhauling and servicing

  • 8/13/2019 2a - Life Assesment of Boilers

    7/9

    R&M Executed

    Korba East Thermal Power Station - CSEB (2x120 MW)

    Unit 5: ABL boiler & Unit 6: BHEL Boiler

    Assessment.

    Units running consistently at PLF > 80%.

    Neyveli TPS Russian design Boilers 4 x 50 MW:

    Scope of work based on RLA and CA

    n oa e o es gn capac y o r

    Exit gas temp. reduced from 190C to 140 C

  • 8/13/2019 2a - Life Assesment of Boilers

    8/9

    R&M Executed

    Kothagudem Thermal Power Station APGENCO

    Scope of work arrived at after RLA studies and

    Condition Assessment and specified by APGENCO.

    Uprating to 120 MW implemented.

    .

    Many other contracts like Ennore 110 MW,,

    BHEL.

  • 8/13/2019 2a - Life Assesment of Boilers

    9/9

    R&M Pro rammes under Execution b BHEL

    Turnkey execution of R&M works (involving Boiler & Aux,

    TG & Aux, C&I, Balance of Plant and Electrical).

    1. GSECL Ukai TPS (2x120 MW)

    2. HPGCL Panipat TPS (1x110 MW)

    3. UPRVUNL Obra TPS (5x200 MW)

    4. PSEB Bhatinda TPS units 3&4 (2x110 MW)Replacement of tangent tube furnace to membrane wall furnace

    Change of mil ling system - from indirect firing to direct firing and

    from tube mills to bowl mills.

    .