285 320 - · PDF fileEarth bund with clay bunding ... planting to outward slope Rainwater...
1
A6 277 285 320 Bencroft Grange 322 Eaglesfield Farm 305 0003 9136 2600 0003 99.4m 99.2m 100.0m 101.4m 101.0m West Wood West Wood BEDFORD ROAD FORTY FOOT LANE (Track) +water +non-conif +non-conif +rough +water Issues Issues Drain Pond A6(T) RAVENSOAKE TO RUSHDEN TO BEDFORD A6(T) ARABLE WEST WOOD ARABLE ARABLE ARABLE ARABLE ARABLE ARABLE POND Future - Phase 2 Digestate Storage Tank No.3 Future - Phase 2 Digestate Storage Tank No.4 Earth bund with clay bunding and grass bank with tree planting to outward slope Rainwater balancing pond Existing hedge and tree line Existing hedge and tree line Reeds planted within reed bed soakaway. Bridleway along south side of hedge line New Native Tree landscaping Sump for pumping water back into building and sluice valve to control water into reed bed Gate Proposed single hand gate Retaining Wall Max height 1.3m Retaining Wall max height 1.1m Proposed Floodgates Retaining Walls max height 1m Crushed concrete farm track to link up to existing farm track network Native Tree and Shrub landscaping New Native Tree landscaping DO NOT SCALE Copyright Rolton Group Ltd 2017 This drawing shall remain the copyright of Rolton Group Ltd. Standard construction hazards that a competent contractor would be aware of have not been identified on this drawing. Risks that may not be immediately apparent are listed below: ! Drawing Title: Project: Checked By: Scales: Drawn By: Date: @A1 @A3 Project-Originator-Zone-Level-Type-Role-Classification-Number RGL Project Ref: 01933 410909 www.rolton.com Specification(s): - Suitability-Revision Drawing Number: Issue Purpose: Status: S3 170447-RGL-ZZ-XX-DR-A-100-0002 P1 TS ARC 1:500 1:1000 03.10.17 170447 Biogen (UK) Ltd AD Power Station Westwood Plant Site Location Plan Denoting Proposed Flue Stack Location PRELIMINARY S3-P1 04.10.17 ARC Preliminary issue Revision Description Status Date Chkd NOTES 1. This drawing is to be read in conjunction with all the relevant contract documentation. 2. All dimensions are in mm unless otherwise stated. Dimensions to be checked on site prior to construction and any discrepancies reported to the Rolton Group Engineer. 3. Drawings marked Preliminary are for guidance/ approval only, i.e. NOT for Construction. 4. Revision clouds are shown for assistance only, the whole drawing is to be checked for new/ amended information. Location of proposed flare stack marked red for planning. Based upon the ordnance survey sheet No. SP 9763 - 9864 X:\17-0\4\4\7\Design Docs (deliverables)\Drawings and Sketches\Working Drawings\Structural\170447-RGL-ZZ-XX-DR-A-100-0002 Site location Plan Showing Flue Stack Location.dwg, 03/10/2017 16:38:30, DWG To PDF.pc3
285 320 - · PDF fileEarth bund with clay bunding ... planting to outward slope Rainwater balancing pond Existing hedge and tree line Existing ... Retaining Wall max height 1.1m Proposed