7/29/2019 266763-000-SP-4006_Capacitor Bank
1/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: A Page 1 of 21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
Specification for 415 V CapacitorBanks.
Hindustan Petroleum Corporation Ltd
8 S.V. Marg, Ballard Estate
Mumbai- 400 001
Mott MacDonald Consultants (India) Pvt. Ltd.
Kothari House, CTS No. 185
Off Andheri - Kurla Road
Andheri (East)
Mumbai 400 059
7/29/2019 266763-000-SP-4006_Capacitor Bank
2/21
7/29/2019 266763-000-SP-4006_Capacitor Bank
3/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: A Page 3 of 21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
List of Content Page No
1 Introduction 5
2 Location and Environmental Conditions 62.1 Plant Location 6
2.2 Environmental Conditions 6
2.3 Electrical System Data 6
3 Scope of Supply 6
3.1 Electrical Equipment & Material: 6
3.2 Engineering Services 7
3.3 Exclusions 7
4 Codes and Standards 7
4.1 General 7
4.2 Conflicting Requirements 7
5 Technical Particulars: 8
5.1 Design Criteria: 8
5.2 Construction: 8
5.3 RATINGS & CONTROLS 9
5.4 Tropical Protection 9
5.5 Painting 95.6 Quality assurance: 10
6 Inspection and testing: 10
7 Vendor documentation: 11
8 Spares and special tools: 12
8.1 Spares 12
8.2 Special tools 12
9 Installation and commissioning: 12
10 Packing and transportation: 12
11 Statutory Approval: 13
12 Guarantee: 13
Appendix-A: Table of Compliance. 14
Appendix-B: Electrical System Data 16
Appendix-C: Codes & Standards. 17
Appendix-D: Requisition for Engineering Documents 18
7/29/2019 266763-000-SP-4006_Capacitor Bank
4/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: A Page 4 of 21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
Appendix-E: Guaranteed Technical Particulars 20
Appendix-F: Electrical Drawings. 21
7/29/2019 266763-000-SP-4006_Capacitor Bank
5/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: A Page 5 of 21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
1 Introduction
This specification is intended to cover the design, manufacture, assembly, testing at manufacturer's works,
supply & delivery, properly packed for transport F.O.R. site of 415V, 300 kVAR Capacitor Bank along with
APFC relay & with all accessories for efficient and trouble-free operation for the LPG Bottling Plant project
at Bathinda of Hindustan Petroleum Corporation Limited, India. The Capacitor bank will be housed in the
PMCC panel. Hence the capacitor bank forms the part of the PMCC Package Supplier scope of work.
The scope of work shall also include, the supervision of erection, testing, commissioning and putting into
successful commercial operation of the switchgear furnished under this specification
Following are the definitions:
Company/Client/Owner Shall mean Hindustan Petroleum Corporation Limited
(HPCL),
Consultant Shall mean Mott MacDonald Consultants India Pvt. Ltd.
(MMCI).
Manufacturer / Vendor Supplier of 415V PMCC, Capacitor Bank etc.
Shall This is to be understood as mandatory in relation to the
requirements of this document.
Should This is to be understood as a strong recommendation to
comply with the requirements of this document.
Equipment This is to be understood as vendor supplied equipment
with all accessories.
The Vendor shall ensure that the design complies with the requirements of this specification and its
referenced specifications, data sheets & standards. The Guaranteed Technical Particulars, Appendix E,
which forms part of this specification, shall be completed by the Vendor. Deviation if any should be
specifically brought out at the offer stage in the Table of Compliance, Appendix A . Without the compliance
table and Guaranteed Technical Particulars can cause rejection of the offer. Failure to clearly identify
specific deviations if any shall be assumed by the Purchaser to be total compliance with the specification.
This specification does not relieve the Vendor from final guarantee as to materials, apparatus,
workmanship and performance of the equipment supplied.
7/29/2019 266763-000-SP-4006_Capacitor Bank
6/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: A Page 6 of 21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
2 Location and Environmental Conditions
2.1 Plant Location
The Plant is situated at Village Phulo Khari, Taluka Talwandi Sabo, District Bathinda Punjab. Capacitorbank listed in scope of supply shall be located inside the PMCC panel which is situated in the MCC Room
within plant complex.
2.2 Environmental Conditions
Design ambient temperature for Electrical Equipment (Indoor): 500
C
Design ambient temperature for Electrical Equipment (Outdoor): 550
C
For other details Refer EIA Report for Site Enviormental condition.
2.3 Electrical System Data
Refer Doc No.: 266763-000-SP-4004BX [in Appendix B] for details.
3 Scope of Supply
The following equipments shall be supplied, in accordance with this specification; standards stated herein
& enclosed appendices.
3.1 Electrical Equipment & Material:
Sr. No. Item Description Unit Quantity Remarks
415V Capacitor Bank as per following details:
1.0415V, 300 kVAR capacitors bank along with its
control panels, used for power factor improvement
in 415V Main PMCC as per following details &
attached Single Line diagram Dwg. No 266763-
000-410-002D.
Rated voltage 415 V
Highest system voltage 433 V
Capacitor Bank rating 300 kVA
Short time withstands current 50 kA for 1 Sec.
Control supply Voltage Refer Appendix B
Set 1
Capacitor Bank
along with its
control panel &
APFC relay will
be housed in the
PMCC panel.
Inspection and Testing as specified.
Submission of documents as specified.
Painting as specified.
7/29/2019 266763-000-SP-4006_Capacitor Bank
7/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: A Page 7 of 21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
Preservation, preparation of shipment and delivery to site.
List of Spares for two years normal operation.
Start-up spares and commissioning spares.
List of special tools required (Vendor to provide list with the bid).
Any other items, required to make system complete.
3.2 Engineering Services
The Vendor shall provide engineering services, which shall include, but not necessarily be limited to, the
following:
Providing/coordinating detailed design of all equipment and components within the scope of
supply.
Resolving engineering queries related to the equipment and components within the scope of
supply.
Performing all relevant calculations pertaining to the equipment and components within the scope
of supply.
Providing progress reports etc.
Providing expediting services for all sub-vendors, if any.
Providing quality assurance, including all sub-vendors if any with respect to ISO 9000 or
equivalent.
Quality Assurance.
Supervision of Installation/erection and commissioning.
Training of clients personnel at site / Vendors shop.
3.3 Exclusions
Installation/Erection & commissioning.
4 Codes and Standards
4.1 General
The Capacitor bank shall meet the requirements of this specification and latest edition of applicable
standards listed in enclosed Appendix-C
4.2 Conflicting Requirements
In case of conflict between documents relating to the enquiry or purchase order, the following priority of
documents shall apply.
7/29/2019 266763-000-SP-4006_Capacitor Bank
8/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: A Page 8 of 21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
First priority : This engineering specification along with attached drawings/ data sheets
and subsequent purchase order & variations thereto.
Second priority : Relevant Indian /International standards.
Note: Should any conflict arise either before or after order placement the Vendor shall immediately
inform the Purchaser for technical resolution of the conflict.
5 Technical Particulars:
5.1 Design Criteria:
5.1.1 The capacitors shall be connected to the bus of the PMCC and shall be manually as well as
automatically switched in and out in steps so as to correct the power factor to the required value
depending on the actual kVAR requirement of the bus. Compensation to the lagging kVAR shall be
made corresponding to the reference power factor as set on the APFC relay at the panel. The
Tenderer shall supply the necessary L.T. capacitors and the associated control devices complete
with contactors, relays, switches, lamps etc. to achieve the above objective.
5.1.2 Capacitors shall comply with the general safety regulations for power installation prescribed in the
relevant standard.
5.1.3 Capacitors units shall be suitable for operation at a r.m.s. voltage between terminals not exceeding
1.1 times the rated voltage, excluding transients
5.1.4 All capacitors shall be suitably protected against over current by means of suitable over current
trips (other than fuses), which are adjusted to interrupt the circuit when the current exceeds the
safe permissible limit. Capacitor units shall also be protected against the internal faults and the
affected units / banks shall be automatically and immediately isolated in the event of such faults.
5.1.5 Capacitors shall be provided with proper discharge device built into the unit to reduce the residual
voltage to a safe value within the specified time as recommended in the relevant standard after the
capacitor has been disconnected from the supply.
5.2 Construction:
5.2.1 Capacitors units shall be hermetically sealed to protect leaks and contamination of dielectric. All
joining in the steel casing shall be welded and tested for liquid tightness.
5.2.2 Terminals of capacitor units shall be suitably brought out through bushings, hermetically soldered
to the steel case, for external cable connection. Terminals shall be provided with stud, bolts, nuts,
washers and cable shoes of appropriate size for proper termination.
5.2.3 Capacitors shall be of two-layer dielectric design. Impregnated paper or equivalent shall be used
as dielectric material.
5.2.4 Metal container of the capacitors shall be provided with two distinct earthing terminals with nuts,
bolts, washers suitable for connecting 50 mm x 6 mm G.S. strip as earth continuity conductor.
7/29/2019 266763-000-SP-4006_Capacitor Bank
9/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: A Page 9 of 21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
5.2.5 The capacitors and their control elements like relays, contactors, timers, protective elements shall
be housed in well-ventilated panels. Capacitors and their control elements may be installed in
different compartments of the same panel to minimize the space requirement.
5.2.6 Both manual by ON-OFF push buttons and automatic by Automatic Power Factor Correction relay
shall be provided for power factor correction. Auto/Manual selector switch for the above shall be
provided on the capacitor control panel
5.2.8 The terminals of each capacitor shall be made accessible.
5.3 RATINGS & CONTROLS
The following manual controls shall be provided on the front of the panel:
5.3.1 The selected basic unit size shall be 25kVAr or any lower rating. - to be established by the
Tenderer/ successful Tenderer by design calculation. The built-up unit sizes shall be multiplicationof the single unit i.e. 25kVAr, 50kVAr and 100kVAr. The total capacitor bank shall comprise a
number of the built-up units of different ratings.
5.3.2 The automatic power factor relay shall provide output signals in at least eight (8) stages to enable
achieve the set power factor at all possible loading conditions.
5.3.3 The control panel shall have digital display of the set and achieved power factors and analog
display of current in all the three phases of the line to the capacitor bank.
5.3.4 Rated capacity of the Power factor capacitor improvement panel shall be 300 kVAR. The panel
shall be provided with but not limited to following:
a) 630A ACB with motor operated spring charge operating mechanism and electrically operated
closing and tripping coil, 415/110 V PTs with set of MCCBs, set of CTs, Ammeter with Ammeter
switch, indicating lamps.
b) Capacitors bank will be connected directly with 415V, 1600A, 3 Ph, 4 W bus bars of PMCC.
c) Required number of capacitor duty contactors with backup fuses to feed capacitor banks of
various ratings such as 100 kVAr (4x25 kVAr), 50 kVAr (2x25 kVAr) and 25 kVAr (1x25 kVAr).
5.4 Tropical Protection5.4.1 All equipment, accessories and wiring shall have fungus protection, involving special treatment of
insulation and metal against fungus, insects & corrosion.
5.4.2 Screens of corrosion resistant material shall be furnished on all ventilating louvers to prevent the
entrance of insects.
5.5 Painting
5.5.1 All metal surfaces shall be thoroughly cleaned and degreased, pickled and phosphatised.
Thereafter, a coat of phosphate paint and a coat of zinc chromate primer shall be applied. After
removing all imperfections, all metal surfaces shall be sprayed with two coats of final paint as per
colour shade RAL 7032. Final coat shall be of epoxy based. All unpainted parts shall be plated to
prevent corrosion.
7/29/2019 266763-000-SP-4006_Capacitor Bank
10/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: APage 10 of
21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
5.6 Quality assurance:
5.6.1 The Manufacturer is expected to demonstrate that he has working Quality Assurance System
which complies with ISO 9001 or may be appropriate to the type of contract and his product.
5.6.2 If the Vendor elects to sub-contract part of the work he shall ensure that only those sub-contractorsor suppliers are used who can demonstrate that they operate Quality Systems based on ISO 9001
or ISO 9002 as applicable. The Vendor shall give his sub-contractors or suppliers assistance in
attaining the required standard, if necessary. This shall not relieve the Vendor of his responsibility
for the quality of the finished work. The Owner reserves the right to audit the Vendors Quality
System.
5.6.3 The Vendor shall assign sufficient full time personnel to the Project to ensure the Quality
Assurance / Quality Control System, documented in a Quality Assurance / Control Manual, is
maintained and kept up-to-date throughout the duration of any purchase order. The Vendors
Quality Assurance / Control System shall become an integral part of any Purchase Order. Vendor
shall organize a prefabrication / inspection meeting with the Owner.
Within 3 weeks from the date of Purchase Order the Manufacturer shall submit a Quality
Assurance Plan for the review of the Owner.
6 Inspection and testing:
6.1 The responsibility for inspection, certification, etc. of all materials, parts lies with the Vendor.
6.2 The Vendor shall specify all of the inspection and testing requirements in the quality plan which
shall identify the activities requiring the Owners approval, review, witnessing etc.
Inspection and testing requirements shall be in accordance with this specification, other All
Equipment shall be inspected for compliances with:
a) Requirement of Owners specification & correspondence therefore.
b) Applicable codes, standards and specifications, which shall also include sub- referenced
standards therein.
c) Test and Inspection Plans produced by the vendor.
6.3 Inspectors have the right to request additional inspections or tests to ensure that the equipment
complies with the specification and all relevant codes & standards.
6.4 Manufacturer shall furnish valid Type Test Certificates of similar models along with the offer. Fresh
type tests for the equipment are not needed, provided the Manufacturer can submit certificatesthat the equipment complies with all type tests as prescribed by IEC/IS Standard specifying the
test requirements for that equipment.
6.5 The routine tests shall include but not necessarily limited to the following:
a) Operation under simulated service condition to ensure accuracy of wiring, correctness of control
scheme & proper functioning of the equipment.
b) All wiring and current carrying part shall be given appropriate High Voltage test.
c) Primary current and voltage shall be applied to all instrument transformers.
d) Routine test shall be carried out on all equipment such as circuit breakers, instrument
transformers, relays, meters etc.
7/29/2019 266763-000-SP-4006_Capacitor Bank
11/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: APage 11 of
21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
6.6 Routine tests on the equipment shall be carried out as per the relevant IS/IEC. Equipment offered
for final inspection shall be complete and ready for shipment, with the possible exception of the
final paint finish.
6.7 Routine Test certificates to be submitted for Equipment and its all auxiliaries. Type test certificateof similar equipment shall be submitted.
6.8 Vendor to furnish required copies of test certificates, Ref Documents, Drawings, and Instruction
Manuals before Equipment are dispatched.
6.9 Factory acceptance test (FAT) is required to be done at no extra cost to the purchaser. The
purchaser or his representative shall be advised of the tentative date for FAT at least 3 weeks in
advance prior to the test date.
6.10 Any defects found by the TPI or the Owners appointed Inspector shall be rectified in his presence.
Where this is not possible or practical, check lists shall be prepared and signed by the Third Party
Inspector stating all pending items. Copies of these lists shall be sent to the Owner to enable
their subsequent checking. The equipment shall not leave the Vendor factory before all defects
have been rectified and without the written permission of the Owner.
6.11 All spare parts shall be subjected to the same inspection standards and full material certification as
the main order.
6.12 The equipment shall not leave the Vendor / Sub-Vendors factory before all discovered defects
have been rectified and without the written permission of the Owner/Purchaser.
6.13 Any acceptance or release of equipment following an inspection or test activity shall in no way
relieve the Vendor of his contractual responsibility to provide guarantees as to the suitability of the
materials, workmanship and performance of the equipment in accordance with this Specification.
6.14 Owner/Consultant reserves the right to waive the inspection at any stage. Inspection shall be
carried out only on receipt of Vendor's internal test report of the equipment offered and scrutiny of
the same. In the event, on receipt of inspection call, the Owner/Consultants representative
reaches the Vendor's works and finds the material not ready for inspection/incomplete/has short
supply, the inspector will return to his base station and all expenses incurred by the inspector
including to and from travelling expenses from his base station to place of inspection, boarding
and lodging etc shall be reimbursed by Vendor.
7 Vendor documentation:
7.1 All information listed here is to be furnished along with the offer as a minimum.
a) Clause wise comments / deviations on specification in `Table of Compliance [enclosed Appendix
A]. If not furnished, compliance to all requirements in specifications will be binding on the Vendor.
b) Duly filled up Guaranteed Technical Particulars [enclosed Appendix-E].
c) List of components & accessories with Makes.
d) List of recommended spares for two years normal operation with itemised rates.
e) Type test certificates.
f) Technical Catalogues and brochures of major Components.
g) List of clientele for similar equipment in last 5 years.
h) Complete list of special tools (if required)
7/29/2019 266763-000-SP-4006_Capacitor Bank
12/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: APage 12 of
21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
i) Documents as per RED.
7.2 The Manufacturer shall furnish the drawings and documents as per enclosed Requisition for
Engineering Documents - RED Form [Appendix-D].
7.3 The Owner/Consultant will review drawings submitted by Vendor & return to the Vendor one copy
of drawings with comments to carry out necessary changes, if any, during the engineering /
manufacturing stage.
7.4 The documents required by the Third Party Inspection Agency are not covered under this
specification. The Vendor shall provide all the drawings and documents required by the Third Party
Inspection agency in compliance with the applicable codes and standards.
8 Spares and special tools:
8.1 Spares
The Manufacturer shall furnish list of spares and provide all necessary spares for testing, pre-
commissioning, commissioning. Any of the spares if used during testing/commissioning must be
replenished at no extra cost to the purchaser.
The Manufacturer shall also provide all consumables required during erection up to commissioning.
In addition to above, Manufacturer shall quote separately for Spares required for two years of operation.
8.2 Special tools
The Manufacturer shall include any special tools, which are required for the installation, commissioning,
operation and maintenance of the equipment being supplied. A list of special tools shall be supplied along
with the offer
9 Installation and commissioning:
Vendor shall dispatch Installation and Commissioning instructions at least 2 weeks before the arrival of the
equipment.
Vendor shall provide qualified personnel to supervise the installation and carryout site testing and
commissioning of all equipment supplied under this contract. Prices for these services shall be given
separately.
10 Packing and transportation:
Packing, shipping and delivery of equipment at site and unloading requirements shall be as per relevant
Standard. Vendor to submit the procedure & all the relevant necessary datas / informations along with
offer.
Preparation of the skids for shipment is a crucial step in the completion of this contract. The Vendor must
take in to consideration that all equipment and the skid itself shall be prepared for land transportation.
7/29/2019 266763-000-SP-4006_Capacitor Bank
13/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: APage 13 of
21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
11 Statutory Approval:
The Equipment supplied shall be acceptable to local Electrical Inspectorate and changes required, if any,
shall be carried out by the vendor without any extra cost.
12 Guarantee:
Equipment shall be guaranteed to meet the specified performance at specified conditions in terms of
power, air flow, thermal performance, design conditions etc.
Equipment and its components shall be guaranteed against faulty design, defective / improper materials
poor workmanship or failure from normal use during the guarantee period.
Vendor shall make all necessary and desirable alterations, repairs and replacement free of charge in the
even of mal performance or defects occurring in the equipment during guarantee period.
Also refer to guarantee clause under Purchase Order.
7/29/2019 266763-000-SP-4006_Capacitor Bank
14/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: APage 14 of
21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
Appendix-A: Table of Compliance.
The Vendor shall confirm that clauses of the specification have been complied with/accepted or furtherclarifications are desired, or Vendor has taken a deviation with reason thereto.
CLIENT :
M/s. Hindustan Petroleum Corporation Ltd
LPG Bottling Plant project at Bhatinda.
VENDOR REF.
Spec. ClauseNo.
ConformsYes/No
AlternativeYes/No
Clarification
1
2
2.1
2.2
2.3
3
3.1
3.2
3.3
4
4.1
4.2
5
5.1
5.2
5.3
5.4
5.5
5.6
6
7
8
8.1
8.2
7/29/2019 266763-000-SP-4006_Capacitor Bank
15/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: APage 15 of
21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
CLIENT :
M/s. Hindustan Petroleum Corporation Ltd
LPG Bottling Plant project at Bhatinda.
VENDOR REF.
Spec. ClauseNo.
ConformsYes/No
AlternativeYes/No
Clarification
9
10
11
12
Appendix A:
Appendix B:
Appendix C:
Appendix D:
Appendix E:
7/29/2019 266763-000-SP-4006_Capacitor Bank
16/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: APage 16 of
21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
Appendix-B: Electrical System Data
[Doc. No. 266763-000-SP-4004BX]
7/29/2019 266763-000-SP-4006_Capacitor Bank
17/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: APage 17 of
21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
Appendix-C: Codes & Standards.
IS-13585 ( Part I )
:1994
: Shunt capacitors of non self heating types up to & including
1000VIS-1248 ( Part I to IX):2003
: Direct acting indicating analogue electrical measuring
instruments and their accessories
IS-2419 :1979 : Dimensions for panel mounting indicating and recordingelectrical instruments
IS-2705 ( Part I to IV) :1992
: Current Transformer
IS-3156 (Part I to IV)
: 1992
: Voltage Transformer
IS-3231 : 1986 (Part I)
/ (Part II) : 1987
: Electrical Relays for Power System Protection
IS-4146 : 1983 : Application guide for Voltage Transformers
IS-4201 :1983 : Application guide for Current Transformers
IS-4237 :1982 : General Requirements for Switchgear and Control Gear forVoltages not exceeding 1000V AC or 1200V DC
IS 4691 :1985 : Degree of Protection provided by enclosures
IS-4794 ( Part I & II) :1968
: Push Button Switches
IS-5082 :1998 : Wrought aluminium & aluminium alloy bars, rode, tubes andsections for electrical purposes.
IS-6236:1971 : Direct recording electrical measuring instruments.
IS-6875 : Part I : 1973 : Control switches (switching devices for control and auxiliarycircuits including contactor relays) for voltages up to andincluding 1000V AC and 1200V DC.
IS 8623 : ( Part I to II):1983
: Specification for Low-Voltage Switchgear and Control gearAssemblies
IS-9224: Part I ( 1979) : Low Voltage Fuses
IS 10118 :1982 : Code of Practice for Selection, Installation and Maintenance ofSwitchgear and Controlgear
IS 13947 : 1993: Specification for Low-voltage Switchgear and Controlgear
IEC 60947 :2007: Low Voltage Switchgear & Controlgear- Part 1 - General rules
IEC 61439 :2009 :Low voltage switchgear and control gear Assemblies Part 1:Type-tested and partially type-tested assemblies.
IEC 60831-1 :2009
IEC 60931-1: Low voltage capacitors.
7/29/2019 266763-000-SP-4006_Capacitor Bank
18/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: APage 18 of
21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
Appendix-D: Requisition for Engineering Documents
RED Form
Owner/Purchasers Office Distribution Office
Hindustan Petroleum Corporation Ltd8 S.V. Marg, Ballard Estate
Mumbai- 400 001
Mott MacDonald Consultants (India) Pvt. Ltd.Kothari House, CTS No. 185
Off Andheri - Kurla Road
Andheri (East)
Mumbai 400 059
SPECIAL INSTRUCTIONS Prints Documents shall be sent to:
Production Schedule 4 The Purchasing Office via courier service
Manufacturing, inspection & testing sequence plan 4 The Purchasing Office via courier service
DRAWINGS Required number for TIMING FOR SUBMITTAL
OFFER
APPROVAL
FINAL - for approval 2 weeks after order date
Approval drawings / Final drawings tobe submitted under cover of an ADSform / FDS form respectively
Prints Prints Disk Print - final issue 2 weeks after approvaldate
Documents shall be submitted to:
Submission of Following, but notlimited to:
Guaranteed Technical Particulars 2 4 2 4
General Arrangement Drawingshowing masses, main dimensions
2 4 2 4
Cross section details showingarrangement of auxiliary components,etc.
- 4 2 4
Foundation Plan & Loading details 2 4 2 4Single line diagram, Feeder list - 4 2 4
Block Logic, Schematic & ConnectionDiagrams
- 4 2 4
Bill of Material - 4 2 4
Make of Each Components 2 4 2 4
Type Test, Routine Test Certificates 2 4 2 4
Spares List for two Years Operation 2 4 2 4
As Built Drawing - 4 2 4 Purchasing Office via courier service
SPARE PARTS DOCUMENTS 2 4
ESPIR forms including 1 transparency
TEST AND INSPECTION DOCUMENTS Print
Documents to be submitted under transmittal Documents shall be submitted to:
Manufacturing report 1 4
Test Report / Data Curves 1 4
Calibration Certificates for testing Instruments. 1 4
Bought out Equipments Certificates. 1 4 Purchasing Office via courier servicewithin 4 weeks
of relevant test / inspection.
OPERATING DOCUMENTS Purchasing Office via courier servicenot later than at time of dispatch ofequipment.
Installation instructions 1 4
Operating instructions 1 4 Combine into one manual
7/29/2019 266763-000-SP-4006_Capacitor Bank
19/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: APage 19 of
21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
Maintenance instructions 1 4
ADDITIONAL REQUIREMENTS
1. Referenced standards / codes shall be the latest issue unless otherwise stated.
REMARKS
Invoice must certify that the drawings andengineering documents specified above have beendispatched to all parties concerned.
Any deviation from the timing for submittal ofdocuments shall be notified to the Approval /Distribution Offices by fax or E mail.
Shop fabrication shall not be started before therequired approval drawings have been released for
construction by the party concerned, unlessotherwise stated on the "Approval DrawingSpecification".
Each document shall bear the item / tag and orderreference number and be dispatched by air mail,unless other instructions are stated on the RED.
Units / dimensions to be used on Engineeringdocuments shall be SI.
The documents shall be in English. Description ondrawings and similar documents may be in otherlanguages provided English translations are also given.
Drawings and documents shall be suitable formicrofilming and comply with accepted national orinternational standards for the preparation of technical
drawings. Only the following standard sizes should beused: A4, A3, A2, and A1.
7/29/2019 266763-000-SP-4006_Capacitor Bank
20/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: APage 20 of
21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc
Appendix-E: Guaranteed Technical Particulars
1. Reference Standard for Capacitor :2. Rating (Total) kVAR :
3. Rated insulation voltage Volt :4. Rated service voltage Volt :5. Rated kVAR of basic unit kVAR :6. Rated frequency Hz :7. Operating temperature C :8. Service life Hours :9. Max. permissible voltage Volt :10.
Max. permissible current Amp :
11.
Capacitance tolerance % :
12
.
Dielectric: material & type :
13.
Dielectric loss w/kVAR :
14.
Total losses w/kVAR :
15.
AC test voltage betweenterminals
Volt :
16.
AC test voltage betweenterminals and case
Volt :
17.
Discharge device details :
18.
Dimension of Panel: WxDxH mm X mm Xmm
:
19.
Weight of Panel kg :
20.
Component Details Make Model/ Cat. No.
a Panel :b Capacitor :c Air Circuit Breaker :d Power Contactor :e Aux. Contactor :f C. T. :g V. T. :h MCB :i APFC Relay :
7/29/2019 266763-000-SP-4006_Capacitor Bank
21/21
LPG BOTTLING PLANT , BATHINDA
Doc. No. 266763-000-SP-4006 Rev: APage 21 of
21
P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\Capacitor
Appendix-F: Electrical Drawings.
01. Dwg. No. 266763-000-410-002B:- Single Line diagram for PMCC