    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: A Page 1 of 21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    Specification for 415 V CapacitorBanks.

    Hindustan Petroleum Corporation Ltd

    8 S.V. Marg, Ballard Estate

    Mumbai- 400 001

    Mott MacDonald Consultants (India) Pvt. Ltd.

    Kothari House, CTS No. 185

    Off Andheri - Kurla Road

    Andheri (East)

    Mumbai 400 059

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    2/21

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    3/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: A Page 3 of 21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    List of Content Page No

    1 Introduction 5

    2 Location and Environmental Conditions 62.1 Plant Location 6

    2.2 Environmental Conditions 6

    2.3 Electrical System Data 6

    3 Scope of Supply 6

    3.1 Electrical Equipment & Material: 6

    3.2 Engineering Services 7

    3.3 Exclusions 7

    4 Codes and Standards 7

    4.1 General 7

    4.2 Conflicting Requirements 7

    5 Technical Particulars: 8

    5.1 Design Criteria: 8

    5.2 Construction: 8

    5.3 RATINGS & CONTROLS 9

    5.4 Tropical Protection 9

    5.5 Painting 95.6 Quality assurance: 10

    6 Inspection and testing: 10

    7 Vendor documentation: 11

    8 Spares and special tools: 12

    8.1 Spares 12

    8.2 Special tools 12

    9 Installation and commissioning: 12

    10 Packing and transportation: 12

    11 Statutory Approval: 13

    12 Guarantee: 13

    Appendix-A: Table of Compliance. 14

    Appendix-B: Electrical System Data 16

    Appendix-C: Codes & Standards. 17

    Appendix-D: Requisition for Engineering Documents 18

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    4/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: A Page 4 of 21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    Appendix-E: Guaranteed Technical Particulars 20

    Appendix-F: Electrical Drawings. 21

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    5/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: A Page 5 of 21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    1 Introduction

    This specification is intended to cover the design, manufacture, assembly, testing at manufacturer's works,

    supply & delivery, properly packed for transport F.O.R. site of 415V, 300 kVAR Capacitor Bank along with

    APFC relay & with all accessories for efficient and trouble-free operation for the LPG Bottling Plant project

    at Bathinda of Hindustan Petroleum Corporation Limited, India. The Capacitor bank will be housed in the

    PMCC panel. Hence the capacitor bank forms the part of the PMCC Package Supplier scope of work.

    The scope of work shall also include, the supervision of erection, testing, commissioning and putting into

    successful commercial operation of the switchgear furnished under this specification

    Following are the definitions:

    Company/Client/Owner Shall mean Hindustan Petroleum Corporation Limited

    (HPCL),

    Consultant Shall mean Mott MacDonald Consultants India Pvt. Ltd.

    (MMCI).

    Manufacturer / Vendor Supplier of 415V PMCC, Capacitor Bank etc.

    Shall This is to be understood as mandatory in relation to the

    requirements of this document.

    Should This is to be understood as a strong recommendation to

    comply with the requirements of this document.

    Equipment This is to be understood as vendor supplied equipment

    with all accessories.

    The Vendor shall ensure that the design complies with the requirements of this specification and its

    referenced specifications, data sheets & standards. The Guaranteed Technical Particulars, Appendix E,

    which forms part of this specification, shall be completed by the Vendor. Deviation if any should be

    specifically brought out at the offer stage in the Table of Compliance, Appendix A . Without the compliance

    table and Guaranteed Technical Particulars can cause rejection of the offer. Failure to clearly identify

    specific deviations if any shall be assumed by the Purchaser to be total compliance with the specification.

    This specification does not relieve the Vendor from final guarantee as to materials, apparatus,

    workmanship and performance of the equipment supplied.

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    6/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: A Page 6 of 21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    2 Location and Environmental Conditions

    2.1 Plant Location

    The Plant is situated at Village Phulo Khari, Taluka Talwandi Sabo, District Bathinda Punjab. Capacitorbank listed in scope of supply shall be located inside the PMCC panel which is situated in the MCC Room

    within plant complex.

    2.2 Environmental Conditions

    Design ambient temperature for Electrical Equipment (Indoor): 500

    C

    Design ambient temperature for Electrical Equipment (Outdoor): 550

    C

    For other details Refer EIA Report for Site Enviormental condition.

    2.3 Electrical System Data

    Refer Doc No.: 266763-000-SP-4004BX [in Appendix B] for details.

    3 Scope of Supply

    The following equipments shall be supplied, in accordance with this specification; standards stated herein

    & enclosed appendices.

    3.1 Electrical Equipment & Material:

    Sr. No. Item Description Unit Quantity Remarks

    415V Capacitor Bank as per following details:

    1.0415V, 300 kVAR capacitors bank along with its

    control panels, used for power factor improvement

    in 415V Main PMCC as per following details &

    attached Single Line diagram Dwg. No 266763-

    000-410-002D.

    Rated voltage 415 V

    Highest system voltage 433 V

    Capacitor Bank rating 300 kVA

    Short time withstands current 50 kA for 1 Sec.

    Control supply Voltage Refer Appendix B

    Set 1

    Capacitor Bank

    along with its

    control panel &

    APFC relay will

    be housed in the

    PMCC panel.

    Inspection and Testing as specified.

    Submission of documents as specified.

    Painting as specified.

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    7/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: A Page 7 of 21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    Preservation, preparation of shipment and delivery to site.

    List of Spares for two years normal operation.

    Start-up spares and commissioning spares.

    List of special tools required (Vendor to provide list with the bid).

    Any other items, required to make system complete.

    3.2 Engineering Services

    The Vendor shall provide engineering services, which shall include, but not necessarily be limited to, the

    following:

    Providing/coordinating detailed design of all equipment and components within the scope of

    supply.

    Resolving engineering queries related to the equipment and components within the scope of

    supply.

    Performing all relevant calculations pertaining to the equipment and components within the scope

    of supply.

    Providing progress reports etc.

    Providing expediting services for all sub-vendors, if any.

    Providing quality assurance, including all sub-vendors if any with respect to ISO 9000 or

    equivalent.

    Quality Assurance.

    Supervision of Installation/erection and commissioning.

    Training of clients personnel at site / Vendors shop.

    3.3 Exclusions

    Installation/Erection & commissioning.

    4 Codes and Standards

    4.1 General

    The Capacitor bank shall meet the requirements of this specification and latest edition of applicable

    standards listed in enclosed Appendix-C

    4.2 Conflicting Requirements

    In case of conflict between documents relating to the enquiry or purchase order, the following priority of

    documents shall apply.

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    8/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: A Page 8 of 21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    First priority : This engineering specification along with attached drawings/ data sheets

    and subsequent purchase order & variations thereto.

    Second priority : Relevant Indian /International standards.

    Note: Should any conflict arise either before or after order placement the Vendor shall immediately

    inform the Purchaser for technical resolution of the conflict.

    5 Technical Particulars:

    5.1 Design Criteria:

    5.1.1 The capacitors shall be connected to the bus of the PMCC and shall be manually as well as

    automatically switched in and out in steps so as to correct the power factor to the required value

    depending on the actual kVAR requirement of the bus. Compensation to the lagging kVAR shall be

    made corresponding to the reference power factor as set on the APFC relay at the panel. The

    Tenderer shall supply the necessary L.T. capacitors and the associated control devices complete

    with contactors, relays, switches, lamps etc. to achieve the above objective.

    5.1.2 Capacitors shall comply with the general safety regulations for power installation prescribed in the

    relevant standard.

    5.1.3 Capacitors units shall be suitable for operation at a r.m.s. voltage between terminals not exceeding

    1.1 times the rated voltage, excluding transients

    5.1.4 All capacitors shall be suitably protected against over current by means of suitable over current

    trips (other than fuses), which are adjusted to interrupt the circuit when the current exceeds the

    safe permissible limit. Capacitor units shall also be protected against the internal faults and the

    affected units / banks shall be automatically and immediately isolated in the event of such faults.

    5.1.5 Capacitors shall be provided with proper discharge device built into the unit to reduce the residual

    voltage to a safe value within the specified time as recommended in the relevant standard after the

    capacitor has been disconnected from the supply.

    5.2 Construction:

    5.2.1 Capacitors units shall be hermetically sealed to protect leaks and contamination of dielectric. All

    joining in the steel casing shall be welded and tested for liquid tightness.

    5.2.2 Terminals of capacitor units shall be suitably brought out through bushings, hermetically soldered

    to the steel case, for external cable connection. Terminals shall be provided with stud, bolts, nuts,

    washers and cable shoes of appropriate size for proper termination.

    5.2.3 Capacitors shall be of two-layer dielectric design. Impregnated paper or equivalent shall be used

    as dielectric material.

    5.2.4 Metal container of the capacitors shall be provided with two distinct earthing terminals with nuts,

    bolts, washers suitable for connecting 50 mm x 6 mm G.S. strip as earth continuity conductor.

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    9/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: A Page 9 of 21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    5.2.5 The capacitors and their control elements like relays, contactors, timers, protective elements shall

    be housed in well-ventilated panels. Capacitors and their control elements may be installed in

    different compartments of the same panel to minimize the space requirement.

    5.2.6 Both manual by ON-OFF push buttons and automatic by Automatic Power Factor Correction relay

    shall be provided for power factor correction. Auto/Manual selector switch for the above shall be

    provided on the capacitor control panel

    5.2.8 The terminals of each capacitor shall be made accessible.

    5.3 RATINGS & CONTROLS

    The following manual controls shall be provided on the front of the panel:

    5.3.1 The selected basic unit size shall be 25kVAr or any lower rating. - to be established by the

    Tenderer/ successful Tenderer by design calculation. The built-up unit sizes shall be multiplicationof the single unit i.e. 25kVAr, 50kVAr and 100kVAr. The total capacitor bank shall comprise a

    number of the built-up units of different ratings.

    5.3.2 The automatic power factor relay shall provide output signals in at least eight (8) stages to enable

    achieve the set power factor at all possible loading conditions.

    5.3.3 The control panel shall have digital display of the set and achieved power factors and analog

    display of current in all the three phases of the line to the capacitor bank.

    5.3.4 Rated capacity of the Power factor capacitor improvement panel shall be 300 kVAR. The panel

    shall be provided with but not limited to following:

    a) 630A ACB with motor operated spring charge operating mechanism and electrically operated

    closing and tripping coil, 415/110 V PTs with set of MCCBs, set of CTs, Ammeter with Ammeter

    switch, indicating lamps.

    b) Capacitors bank will be connected directly with 415V, 1600A, 3 Ph, 4 W bus bars of PMCC.

    c) Required number of capacitor duty contactors with backup fuses to feed capacitor banks of

    various ratings such as 100 kVAr (4x25 kVAr), 50 kVAr (2x25 kVAr) and 25 kVAr (1x25 kVAr).

    5.4 Tropical Protection5.4.1 All equipment, accessories and wiring shall have fungus protection, involving special treatment of

    insulation and metal against fungus, insects & corrosion.

    5.4.2 Screens of corrosion resistant material shall be furnished on all ventilating louvers to prevent the

    entrance of insects.

    5.5 Painting

    5.5.1 All metal surfaces shall be thoroughly cleaned and degreased, pickled and phosphatised.

    Thereafter, a coat of phosphate paint and a coat of zinc chromate primer shall be applied. After

    removing all imperfections, all metal surfaces shall be sprayed with two coats of final paint as per

    colour shade RAL 7032. Final coat shall be of epoxy based. All unpainted parts shall be plated to

    prevent corrosion.

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    10/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: APage 10 of

    21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    5.6 Quality assurance:

    5.6.1 The Manufacturer is expected to demonstrate that he has working Quality Assurance System

    which complies with ISO 9001 or may be appropriate to the type of contract and his product.

    5.6.2 If the Vendor elects to sub-contract part of the work he shall ensure that only those sub-contractorsor suppliers are used who can demonstrate that they operate Quality Systems based on ISO 9001

    or ISO 9002 as applicable. The Vendor shall give his sub-contractors or suppliers assistance in

    attaining the required standard, if necessary. This shall not relieve the Vendor of his responsibility

    for the quality of the finished work. The Owner reserves the right to audit the Vendors Quality

    System.

    5.6.3 The Vendor shall assign sufficient full time personnel to the Project to ensure the Quality

    Assurance / Quality Control System, documented in a Quality Assurance / Control Manual, is

    maintained and kept up-to-date throughout the duration of any purchase order. The Vendors

    Quality Assurance / Control System shall become an integral part of any Purchase Order. Vendor

    shall organize a prefabrication / inspection meeting with the Owner.

    Within 3 weeks from the date of Purchase Order the Manufacturer shall submit a Quality

    Assurance Plan for the review of the Owner.

    6 Inspection and testing:

    6.1 The responsibility for inspection, certification, etc. of all materials, parts lies with the Vendor.

    6.2 The Vendor shall specify all of the inspection and testing requirements in the quality plan which

    shall identify the activities requiring the Owners approval, review, witnessing etc.

    Inspection and testing requirements shall be in accordance with this specification, other All

    Equipment shall be inspected for compliances with:

    a) Requirement of Owners specification & correspondence therefore.

    b) Applicable codes, standards and specifications, which shall also include sub- referenced

    standards therein.

    c) Test and Inspection Plans produced by the vendor.

    6.3 Inspectors have the right to request additional inspections or tests to ensure that the equipment

    complies with the specification and all relevant codes & standards.

    6.4 Manufacturer shall furnish valid Type Test Certificates of similar models along with the offer. Fresh

    type tests for the equipment are not needed, provided the Manufacturer can submit certificatesthat the equipment complies with all type tests as prescribed by IEC/IS Standard specifying the

    test requirements for that equipment.

    6.5 The routine tests shall include but not necessarily limited to the following:

    a) Operation under simulated service condition to ensure accuracy of wiring, correctness of control

    scheme & proper functioning of the equipment.

    b) All wiring and current carrying part shall be given appropriate High Voltage test.

    c) Primary current and voltage shall be applied to all instrument transformers.

    d) Routine test shall be carried out on all equipment such as circuit breakers, instrument

    transformers, relays, meters etc.

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    11/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: APage 11 of

    21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    6.6 Routine tests on the equipment shall be carried out as per the relevant IS/IEC. Equipment offered

    for final inspection shall be complete and ready for shipment, with the possible exception of the

    final paint finish.

    6.7 Routine Test certificates to be submitted for Equipment and its all auxiliaries. Type test certificateof similar equipment shall be submitted.

    6.8 Vendor to furnish required copies of test certificates, Ref Documents, Drawings, and Instruction

    Manuals before Equipment are dispatched.

    6.9 Factory acceptance test (FAT) is required to be done at no extra cost to the purchaser. The

    purchaser or his representative shall be advised of the tentative date for FAT at least 3 weeks in

    advance prior to the test date.

    6.10 Any defects found by the TPI or the Owners appointed Inspector shall be rectified in his presence.

    Where this is not possible or practical, check lists shall be prepared and signed by the Third Party

    Inspector stating all pending items. Copies of these lists shall be sent to the Owner to enable

    their subsequent checking. The equipment shall not leave the Vendor factory before all defects

    have been rectified and without the written permission of the Owner.

    6.11 All spare parts shall be subjected to the same inspection standards and full material certification as

    the main order.

    6.12 The equipment shall not leave the Vendor / Sub-Vendors factory before all discovered defects

    have been rectified and without the written permission of the Owner/Purchaser.

    6.13 Any acceptance or release of equipment following an inspection or test activity shall in no way

    relieve the Vendor of his contractual responsibility to provide guarantees as to the suitability of the

    materials, workmanship and performance of the equipment in accordance with this Specification.

    6.14 Owner/Consultant reserves the right to waive the inspection at any stage. Inspection shall be

    carried out only on receipt of Vendor's internal test report of the equipment offered and scrutiny of

    the same. In the event, on receipt of inspection call, the Owner/Consultants representative

    reaches the Vendor's works and finds the material not ready for inspection/incomplete/has short

    supply, the inspector will return to his base station and all expenses incurred by the inspector

    including to and from travelling expenses from his base station to place of inspection, boarding

    and lodging etc shall be reimbursed by Vendor.

    7 Vendor documentation:

    7.1 All information listed here is to be furnished along with the offer as a minimum.

    a) Clause wise comments / deviations on specification in `Table of Compliance [enclosed Appendix

    A]. If not furnished, compliance to all requirements in specifications will be binding on the Vendor.

    b) Duly filled up Guaranteed Technical Particulars [enclosed Appendix-E].

    c) List of components & accessories with Makes.

    d) List of recommended spares for two years normal operation with itemised rates.

    e) Type test certificates.

    f) Technical Catalogues and brochures of major Components.

    g) List of clientele for similar equipment in last 5 years.

    h) Complete list of special tools (if required)

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    12/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: APage 12 of

    21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    i) Documents as per RED.

    7.2 The Manufacturer shall furnish the drawings and documents as per enclosed Requisition for

    Engineering Documents - RED Form [Appendix-D].

    7.3 The Owner/Consultant will review drawings submitted by Vendor & return to the Vendor one copy

    of drawings with comments to carry out necessary changes, if any, during the engineering /

    manufacturing stage.

    7.4 The documents required by the Third Party Inspection Agency are not covered under this

    specification. The Vendor shall provide all the drawings and documents required by the Third Party

    Inspection agency in compliance with the applicable codes and standards.

    8 Spares and special tools:

    8.1 Spares

    The Manufacturer shall furnish list of spares and provide all necessary spares for testing, pre-

    commissioning, commissioning. Any of the spares if used during testing/commissioning must be

    replenished at no extra cost to the purchaser.

    The Manufacturer shall also provide all consumables required during erection up to commissioning.

    In addition to above, Manufacturer shall quote separately for Spares required for two years of operation.

    8.2 Special tools

    The Manufacturer shall include any special tools, which are required for the installation, commissioning,

    operation and maintenance of the equipment being supplied. A list of special tools shall be supplied along

    with the offer

    9 Installation and commissioning:

    Vendor shall dispatch Installation and Commissioning instructions at least 2 weeks before the arrival of the

    equipment.

    Vendor shall provide qualified personnel to supervise the installation and carryout site testing and

    commissioning of all equipment supplied under this contract. Prices for these services shall be given

    separately.

    10 Packing and transportation:

    Packing, shipping and delivery of equipment at site and unloading requirements shall be as per relevant

    Standard. Vendor to submit the procedure & all the relevant necessary datas / informations along with

    offer.

    Preparation of the skids for shipment is a crucial step in the completion of this contract. The Vendor must

    take in to consideration that all equipment and the skid itself shall be prepared for land transportation.

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    13/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: APage 13 of

    21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    11 Statutory Approval:

    The Equipment supplied shall be acceptable to local Electrical Inspectorate and changes required, if any,

    shall be carried out by the vendor without any extra cost.

    12 Guarantee:

    Equipment shall be guaranteed to meet the specified performance at specified conditions in terms of

    power, air flow, thermal performance, design conditions etc.

    Equipment and its components shall be guaranteed against faulty design, defective / improper materials

    poor workmanship or failure from normal use during the guarantee period.

    Vendor shall make all necessary and desirable alterations, repairs and replacement free of charge in the

    even of mal performance or defects occurring in the equipment during guarantee period.

    Also refer to guarantee clause under Purchase Order.

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    14/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: APage 14 of

    21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    Appendix-A: Table of Compliance.

    The Vendor shall confirm that clauses of the specification have been complied with/accepted or furtherclarifications are desired, or Vendor has taken a deviation with reason thereto.

    CLIENT :

    M/s. Hindustan Petroleum Corporation Ltd

    LPG Bottling Plant project at Bhatinda.

    VENDOR REF.

    Spec. ClauseNo.

    ConformsYes/No

    AlternativeYes/No

    Clarification

    1

    2

    2.1

    2.2

    2.3

    3

    3.1

    3.2

    3.3

    4

    4.1

    4.2

    5

    5.1

    5.2

    5.3

    5.4

    5.5

    5.6

    6

    7

    8

    8.1

    8.2

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    15/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: APage 15 of

    21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    CLIENT :

    M/s. Hindustan Petroleum Corporation Ltd

    LPG Bottling Plant project at Bhatinda.

    VENDOR REF.

    Spec. ClauseNo.

    ConformsYes/No

    AlternativeYes/No

    Clarification

    9

    10

    11

    12

    Appendix A:

    Appendix B:

    Appendix C:

    Appendix D:

    Appendix E:

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    16/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: APage 16 of

    21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    Appendix-B: Electrical System Data

    [Doc. No. 266763-000-SP-4004BX]

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    17/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: APage 17 of

    21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    Appendix-C: Codes & Standards.

    IS-13585 ( Part I )

    :1994

    : Shunt capacitors of non self heating types up to & including

    1000VIS-1248 ( Part I to IX):2003

    : Direct acting indicating analogue electrical measuring

    instruments and their accessories

    IS-2419 :1979 : Dimensions for panel mounting indicating and recordingelectrical instruments

    IS-2705 ( Part I to IV) :1992

    : Current Transformer

    IS-3156 (Part I to IV)

    : 1992

    : Voltage Transformer

    IS-3231 : 1986 (Part I)

    / (Part II) : 1987

    : Electrical Relays for Power System Protection

    IS-4146 : 1983 : Application guide for Voltage Transformers

    IS-4201 :1983 : Application guide for Current Transformers

    IS-4237 :1982 : General Requirements for Switchgear and Control Gear forVoltages not exceeding 1000V AC or 1200V DC

    IS 4691 :1985 : Degree of Protection provided by enclosures

    IS-4794 ( Part I & II) :1968

    : Push Button Switches

    IS-5082 :1998 : Wrought aluminium & aluminium alloy bars, rode, tubes andsections for electrical purposes.

    IS-6236:1971 : Direct recording electrical measuring instruments.

    IS-6875 : Part I : 1973 : Control switches (switching devices for control and auxiliarycircuits including contactor relays) for voltages up to andincluding 1000V AC and 1200V DC.

    IS 8623 : ( Part I to II):1983

    : Specification for Low-Voltage Switchgear and Control gearAssemblies

    IS-9224: Part I ( 1979) : Low Voltage Fuses

    IS 10118 :1982 : Code of Practice for Selection, Installation and Maintenance ofSwitchgear and Controlgear

    IS 13947 : 1993: Specification for Low-voltage Switchgear and Controlgear

    IEC 60947 :2007: Low Voltage Switchgear & Controlgear- Part 1 - General rules

    IEC 61439 :2009 :Low voltage switchgear and control gear Assemblies Part 1:Type-tested and partially type-tested assemblies.

    IEC 60831-1 :2009

    IEC 60931-1: Low voltage capacitors.

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    18/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: APage 18 of

    21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    Appendix-D: Requisition for Engineering Documents

    RED Form

    Owner/Purchasers Office Distribution Office

    Hindustan Petroleum Corporation Ltd8 S.V. Marg, Ballard Estate

    Mumbai- 400 001

    Mott MacDonald Consultants (India) Pvt. Ltd.Kothari House, CTS No. 185

    Off Andheri - Kurla Road

    Andheri (East)

    Mumbai 400 059

    SPECIAL INSTRUCTIONS Prints Documents shall be sent to:

    Production Schedule 4 The Purchasing Office via courier service

    Manufacturing, inspection & testing sequence plan 4 The Purchasing Office via courier service

    DRAWINGS Required number for TIMING FOR SUBMITTAL

    OFFER

    APPROVAL

    FINAL - for approval 2 weeks after order date

    Approval drawings / Final drawings tobe submitted under cover of an ADSform / FDS form respectively

    Prints Prints Disk Print - final issue 2 weeks after approvaldate

    Documents shall be submitted to:

    Submission of Following, but notlimited to:

    Guaranteed Technical Particulars 2 4 2 4

    General Arrangement Drawingshowing masses, main dimensions

    2 4 2 4

    Cross section details showingarrangement of auxiliary components,etc.

    - 4 2 4

    Foundation Plan & Loading details 2 4 2 4Single line diagram, Feeder list - 4 2 4

    Block Logic, Schematic & ConnectionDiagrams

    - 4 2 4

    Bill of Material - 4 2 4

    Make of Each Components 2 4 2 4

    Type Test, Routine Test Certificates 2 4 2 4

    Spares List for two Years Operation 2 4 2 4

    As Built Drawing - 4 2 4 Purchasing Office via courier service

    SPARE PARTS DOCUMENTS 2 4

    ESPIR forms including 1 transparency

    TEST AND INSPECTION DOCUMENTS Print

    Documents to be submitted under transmittal Documents shall be submitted to:

    Manufacturing report 1 4

    Test Report / Data Curves 1 4

    Calibration Certificates for testing Instruments. 1 4

    Bought out Equipments Certificates. 1 4 Purchasing Office via courier servicewithin 4 weeks

    of relevant test / inspection.

    OPERATING DOCUMENTS Purchasing Office via courier servicenot later than at time of dispatch ofequipment.

    Installation instructions 1 4

    Operating instructions 1 4 Combine into one manual

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    19/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: APage 19 of

    21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    Maintenance instructions 1 4

    ADDITIONAL REQUIREMENTS

    1. Referenced standards / codes shall be the latest issue unless otherwise stated.

    REMARKS

    Invoice must certify that the drawings andengineering documents specified above have beendispatched to all parties concerned.

    Any deviation from the timing for submittal ofdocuments shall be notified to the Approval /Distribution Offices by fax or E mail.

    Shop fabrication shall not be started before therequired approval drawings have been released for

    construction by the party concerned, unlessotherwise stated on the "Approval DrawingSpecification".

    Each document shall bear the item / tag and orderreference number and be dispatched by air mail,unless other instructions are stated on the RED.

    Units / dimensions to be used on Engineeringdocuments shall be SI.

    The documents shall be in English. Description ondrawings and similar documents may be in otherlanguages provided English translations are also given.

    Drawings and documents shall be suitable formicrofilming and comply with accepted national orinternational standards for the preparation of technical

    drawings. Only the following standard sizes should beused: A4, A3, A2, and A1.

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    20/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: APage 20 of

    21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\CapacitorBank\266763-000-SP-4006.doc

    Appendix-E: Guaranteed Technical Particulars

    1. Reference Standard for Capacitor :2. Rating (Total) kVAR :

    3. Rated insulation voltage Volt :4. Rated service voltage Volt :5. Rated kVAR of basic unit kVAR :6. Rated frequency Hz :7. Operating temperature C :8. Service life Hours :9. Max. permissible voltage Volt :10.

    Max. permissible current Amp :

    11.

    Capacitance tolerance % :

    12

    .

    Dielectric: material & type :

    13.

    Dielectric loss w/kVAR :

    14.

    Total losses w/kVAR :

    15.

    AC test voltage betweenterminals

    Volt :

    16.

    AC test voltage betweenterminals and case

    Volt :

    17.

    Discharge device details :

    18.

    Dimension of Panel: WxDxH mm X mm Xmm

    :

    19.

    Weight of Panel kg :

    20.

    Component Details Make Model/ Cat. No.

    a Panel :b Capacitor :c Air Circuit Breaker :d Power Contactor :e Aux. Contactor :f C. T. :g V. T. :h MCB :i APFC Relay :

  • 7/29/2019 266763-000-SP-4006_Capacitor Bank

    21/21

    LPG BOTTLING PLANT , BATHINDA

    Doc. No. 266763-000-SP-4006 Rev: APage 21 of

    21

    P:\Kolkata\Engineering\JOBS\OGO-269323-HPCL Bathinda-LPG\ELECTRICAL\03. Issued to client\Capacitor

    Appendix-F: Electrical Drawings.

    01. Dwg. No. 266763-000-410-002B:- Single Line diagram for PMCC