26.01.06 LHC Sector Test 1
LHC Sector TestLHC Sector Test
Roger Bailey, Helmut Burkhardt, Paul Collier, Brennan Goddard, Stephen Jackson, Lars Jensen,
Rhodri Jones, Verena Kain, Alex Koschik, Mike Lamont, Roberto Saban, Jorg Wenninger.
26.01.06 LHC Sector Test 2
This session – with beamThis session – with beam
• IntroIntro
• Proposed tests with beamProposed tests with beam Brennan Brennan GoddardGoddard
• Magnet Quenches with BeamMagnet Quenches with Beam Alex KoschikAlex Koschik
• Beam InstrumentationBeam Instrumentation Lars JensenLars Jensen
• MagnetsMagnets Luca BotturaLuca Bottura• Controls RequirementsControls Requirements Robin LaucknerRobin Lauckner
26.01.06 LHC Sector Test 3
26.01.06 LHC Sector Test 4
26.01.06 LHC Sector Test 5
26.01.06 LHC Sector Test 6
26.01.06 LHC Sector Test 7
LHC sector test 2006LHC sector test 2006
layoutlayout
3.3 km of the LHC including one experiment
insertion and a full arc
27th November – 10th December 2006
26.01.06 LHC Sector Test 8
26.01.06 LHC Sector Test 9
26.01.06 LHC Sector Test 10
26.01.06 LHC Sector Test 11
26.01.06 LHC Sector Test 12
BeamBeam
• Pilot Beam for the most part:Pilot Beam for the most part: Single bunch Intensity: 5 - 10 x 109 protons per bunch Clear aim to minimise losses and use beam sparingly when
we know where it’s going.
• Total intensity: 4 x 10Total intensity: 4 x 101313 protons protons Over 2 weeks Comparable with one nominal intensity LHC extraction from
the SPS
26.01.06 LHC Sector Test 13
Sector TestSector Test
• It is inconvenientIt is inconvenient
• It is justifiedIt is justified
26.01.06 LHC Sector Test 14
Impact Impact
• No transport through 7-8 during:No transport through 7-8 during: preparation 7 days beam 14 days recovery 7 days
• No access to section of 6-7 during testNo access to section of 6-7 during test 17 days
• No access to section of 8-1 during testNo access to section of 8-1 during test 17 days
• Demands on what is to be installed and Demands on what is to be installed and operational (and what is not to be installed)operational (and what is not to be installed)
26.01.06 LHC Sector Test 15
26.01.06 LHC Sector Test 16
Knock-onKnock-on
• Installation Installation
• PlanningPlanning
• Hardware commissioningHardware commissioning
• Radiation ProtectionRadiation Protection
• LHCbLHCb
To be discussed tomorrow
26.01.06 LHC Sector Test 17
So why bother?So why bother?
26.01.06 LHC Sector Test 18
IntegrationIntegration• Integration: full-blown system wide integration test.Integration: full-blown system wide integration test.
Field test beam related equipment and instrumentation Power converters, kickers, septa, dumps, instrumentation,
synchronisation, timing, RF, beam interlocks With cryogenics, QPS, interlocks
and get them all working together Stress test controls infrastructure and all that goes with it. Fully validate integration
The lessons learnt will undoubtedly speed full commissioning
26.01.06 LHC Sector Test 19
BeamBeam
• InstrumentationInstrumentation BPM timing, resolution, offset, cabling BLM thresholds, quench limits, BTV, BCT
• ApertureAperture• AlignmentAlignment• PolaritiesPolarities
Correctors, BPMs• Linear opticsLinear optics• MagnetsMagnets
Stability, reproducibility• HarmonicsHarmonics• Quench limits – Beam Loss MapsQuench limits – Beam Loss Maps• Correction & Measurement TechniquesCorrection & Measurement Techniques
Injection, Threading, Trajectory correction etc. etc.
0
50
100
150
200
250
300
1500 1750 2000 2250 2500 2750 3000 3250 3500 3750 4000 4250 4500 4750 5000 5250 5500 5750 6000S [m]
b [
m]
BETX
BETY
-20
-15
-10
-5
0
5
10
15
20
1500 1750 2000 2250 2500
S [m]
N [s]
-30
-20
-10
0
10
20
30
26.01.06 LHC Sector Test 20
Milestone for…Milestone for…
• Machine ProtectionMachine Protection
• RFRF
• Controls++Controls++
• MagnetsMagnets
• Beam InstrumentationBeam Instrumentation
• BT: Kickers, Septa, TDIBT: Kickers, Septa, TDI
• CollimationCollimation
• Radiation Protection - RAMSESRadiation Protection - RAMSES
• AccessAccess
• Hardware CommissioningHardware Commissioning
• VacuumVacuum
• OperationsOperations
26.01.06 LHC Sector Test 21
PRPR
26.01.06 LHC Sector Test 22
Near Test ScheduleNear Test Schedule
IR7 VACUUM & BDIIR7 VACUUM & BDI Week 1 NovemberWeek 1 November
MACHINE CHECKOUTMACHINE CHECKOUT 1313thth – 24 – 24thth November November Control from CCCControl from CCC
INSTALL DUMPINSTALL DUMP 15 - 1715 - 17thth November November
ACCESS SYSTEMACCESS SYSTEM 2020thth – 23 – 23rdrd November November
CLOSE SECTORCLOSE SECTOR 2323rdrd November November Access system testAccess system test
Safety qualification Safety qualification
BEAM TO TI8 TEDBEAM TO TI8 TED 2424thth November November
SECTOR TEST WITH SECTOR TEST WITH BEAMBEAM
27th November to27th November to1010thth December December
RADIATION SURVEYRADIATION SURVEY 1111thth December December
GATES OUTGATES OUT 1212thth/13/13thth December December
DUMP OUTDUMP OUT 1818thth/19/19thth December December
26.01.06 LHC Sector Test 23
Near test scheduleNear test schedule
26.01.06 LHC Sector Test 24
Cost - 2003Cost - 2003
CAPITALCAPITAL MANPOWERMANPOWER
AB 50 kCHF (optional)50 kCHF (optional)
plus incidentalsplus incidentals
80 kCHF80 kCHF
plus workload plus workload
SPS – power400 kCHF400 kCHF
(energy budget?)(energy budget?)--
TI8 - power 100 kCHF100 kCHF --
TIS/RP 30 – 50 kCHF30 – 50 kCHF 100 kCHF100 kCHF
Access 25 kCHF25 kCHF 7 kCHF7 kCHF
Vacuum 30 kCHF (recoup)30 kCHF (recoup) 10 kCHF10 kCHF
Cryogenics 200 - 400 kCHF200 - 400 kCHF Included in capital total + HWCIncluded in capital total + HWC
Installation - - 100 KCHF (radiation qualified 100 KCHF (radiation qualified personnel).personnel).
Hardware commissioning - - 10 man months + delay10 man months + delay
TOTAL ~1 MCHF~1 MCHF 380 kCHF380 kCHF
26.01.06 LHC Sector Test 25
COST: SPS COST: SPS
• Low energy cycle, intermittent pulsing etc.
• December is expensive
• Plus critical days
26.01.06 LHC Sector Test 26
COSTCOST• Costs mitigated strongly by the fact that the test comes Costs mitigated strongly by the fact that the test comes
while 7-8/8-1 are being commissioned.while 7-8/8-1 are being commissioned. Sectors already cold [? – to be discussed] Hardware re-commissioning not necessary
CAPITALCAPITAL MANPOWERMANPOWER
AB 50 kCHF (optional)50 kCHF (optional)
plus incidentalsplus incidentals
80 kCHF80 kCHF
plus workload plus workload
PS/ SPS – power 760 kCHF760 kCHF --
TIS/RP 30 – 50 kCHF30 – 50 kCHF 100 kCHF100 kCHF
Access 25 kCHF25 kCHF 7 kCHF7 kCHF
Vacuum 30 kCHF (recoup)30 kCHF (recoup) 10 kCHF10 kCHF
TOTAL 900 kCHF900 kCHF 190 kCHF190 kCHF
26.01.06 LHC Sector Test 27
AcknowledgementsAcknowledgements
• MagnetsMagnets Luca BotturaLuca Bottura
• Beam InstrumentationBeam Instrumentation Rhodri Jones, Lars Jensen, Stephen JacksonRhodri Jones, Lars Jensen, Stephen Jackson
• BT: Kickers, Septa etc.BT: Kickers, Septa etc. Brennan Goddard, Jan UythovenBrennan Goddard, Jan Uythoven
• Radiation ProtectionRadiation Protection Doris Forkel-Wirth, Helmut VinckeDoris Forkel-Wirth, Helmut Vincke
• INB INB Ghislain RoyGhislain Roy
• AccessAccess Pierre NininPierre Ninin
• LHCbLHCb Rolf LinderRolf Linder
• HWCHWC Roberto Saban & teamRoberto Saban & team
• Installation Installation Katy ForazKaty Foraz
• PlanningPlanning Esther Barbero SotoEsther Barbero Soto
• VacuumVacuum Paul Cruikshank, Miguel JimenezPaul Cruikshank, Miguel Jimenez
• ControlsControls Robin Lauckner ++Robin Lauckner ++
• OPOP /AP/AP Verena Kain, Massimo GiovannozziVerena Kain, Massimo Giovannozzi