Saipem BU Drilling The complete Oil & Gas Service Provider

November 2013

Page 2: 2340 Drilling Bu Presen

Saipem BU Drilling – November 2013

2

Contents

BU Drilling

• Saipem Drilling Strategies • Highlights: Major Offshore and Onshore Drilling Projects • Capabilities • Certifications • Safety records • Leverage of local content • Drilling assets

Page 3: 2340 Drilling Bu Presen

Saipem BU Drilling – November 2013

3

Enhance investments in fleet rejuvenation Offshore

Saipem Drilling Strategy

Onshore

Saipem 12000 – delivered April 2010

Scarabeo 9 – delivered August 2011 Scarabeo 8 – delivered April 2012 Perro Negro 8 – delivered Sept. 2010

Deepwater SSDUs

Jack Ups

5824– Heliportable Rig Ecuador 5804 – HH 300 – Cile

5946/ 5947 – 3000 HP Winterized Rigs Kazakhstan

- Deepwater focused - HSE oriented - New Technologies - Increased Efficiency Deepwater

DrillShip

- Fast Moving Rig - HSE oriented - New Technologies

Fleet rejuvenation to increase quality and competitiveness:

5962 – 2000 HP Saudi Arabia

5964 – 1500 HP Saudi Arabia

Perro Negro 7 Delivered April 2008

Page 4: 2340 Drilling Bu Presen

Saipem BU Drilling – November 2013

4

SAIPEM 12000 Ultra Deep Water Drillship Total Angola 5 years project in Angola

5946- 5947 Caspian Sea Kashagan Experimental Project 6 years

Scarabeo 5 Ultra Deep Water Semisub Statoil –North Sea 3 years project Norway

Scarabeo 9 – Ultra Deep Water VI Generation Semisub Repsol/Eni – 5 years project Central America/Worldwide

Scarabeo 8 – Ultra Deep Water VI Generation Semisub Eni Norge – 5 years project Norway

Highlights: Major Offshore and Onshore Drilling Projects

Scarabeo 7 Deepwater Semisub Eni – 6 years project Angola/Far East

Perro Negro 7 W.D.: 375 ft 3 years project Saudi Arabia

Page 5: 2340 Drilling Bu Presen

Saipem BU Drilling – November 2013

5

Capabilities

Saipem Capabilities

Harsh environment

Frontiers areas

Challenging projects

Difficult conditions

Page 6: 2340 Drilling Bu Presen

Saipem BU Drilling – November 2013

6

Certifications

Page 7: 2340 Drilling Bu Presen

Saipem BU Drilling – November 2013

7

Safety records

Saipem Leadership in Health and Safety (LIHS)

Saipem Leadership in Health & Safety has been strategically developed from a corporate level to disseminate through the entire organization. The program was initiated from the very top, with Saipem’s CEO and Managing Director playing the role of catalysts for the project, as they personally recognized the need for a cultural change. This is done in three distinct phases. Phase 1 – Delivery of Leadership in Health & Safety workshop to all management levels. Phase 2 - Senior Managers cascading the key Leadership in Health & Safety messages to the entire workforce through high influential events. Phase 3 - Delivery of the Five Stars Intervention training tool throughout the organization.

Page 8: 2340 Drilling Bu Presen

Saipem BU Drilling – November 2013

8

Around 92% of operating personnel in the Onshore Drilling comes from the countries of operations. Strong development of local content

Leverage of local content

Saipem Onshore drilling operating personnel by nationality

Nr of Saipem Personnel (Saipem consolidation criteria): 44,297 Nr of Nationalities: 127

< 4,0% each

Page 9: 2340 Drilling Bu Presen

Saipem BU Drilling – November 2013

9

Ultra Deep Water Drillship Units

DP ultra deepwater drillship Built by Samsung Heavy

Ind. - Koje shipyard, Korea,

Delivered in 2000 Suitable to operate in

US GOM, South Atlantic, West Africa and UK sector of North Sea (during summer).

Operational Mode • Drilling activities (exploration-appraisal-development) • Early production and extensive well production/testing • Crude oil storage and offloading • Well completion activities

• water depth 10.000 ft • drill depth 30.000 ft

• drawworks 2 X 4.200 HP

• variable deck load 20.000 tonnes • DP DP class 3

• mud pumps 4 Wirth TPK 2200 7500 PSI

• top drive 2xHydralift HPS 750 2E Rated capacity:750 t

• BOP Shaffer 18 3/4 - 15.000 guidelines

• risers ABB VETCO GRAY • Accommodation 172 people

Technical specifications

DP ultra deepwater drillship Built by Samsung

Heavy Ind. - Koje shipyard - Korea

Delivered in 2010 Offshore Angola

• water depth 12.000 ft • drill depth 35.000 ft

• drawworks 2 X 5.750 HP • variable deck load 20.000 tonnes • DP DP class 3

• mud pumps 4 NOV 14 P-220 triplex 7500 PSI

• top drive 2xNOV HPS 1000 Rated capacity: 1000 t

• BOP Shaffer 18 3/4 - 15.000 guidelines

• risers NOV • Accommodation 200 people

Technical specifications

Operational Mode • Drilling activities (exploration-appraisal-development) • Well completion activities

Saipem 12000 Saipem 10000

Page 10: 2340 Drilling Bu Presen

Saipem BU Drilling – November 2013

10

DP ultra deepwater 6th gen. semisub. Design: Frigstad Delivered August 2011 Catamaran type with two

pontoons and four stabilizing columns supporting the upper hull, dual ram derrick rig

• water depth 12.000 ft • drill depth 35.000 ft

• drawwork RAM RIG • variable deck load drill 7.900 tonnes

• DP DP class 3

• mud pumps 4 Bomco 2200 2200 HP

• top drive 2 Aker Maritime Hydraulics

DDM 1000 HYRR

• BOP Shaffer 18 ¾ -- 15.000

• DERRICK Aker Maritime hydraulic dual ram rig 118 ft high

• accommodation 200

Technical specifications

Scarabeo 9 DP ultra deepwater 6th gen.

semisub. Bare deck design: Moss

Maritime Delivered April 2012 Catamaran type with two

pontoons and six stabilizing columns supporting the upper hull; dual derrick rig

• water depth 10.000 ft

• drill depth 35.000 ft

• main drawwork 4000 HP • aux drawwork 4600 HP

• DP DP class 3

• mud pumps 4 NOV 14P-220

Triplex mud pumps 2200 HP

• top drive NOV HPS-03 1000 NOV HPS-04 500

Rated capacity:1000 t Rated capacity:500 t

• BOP CAMERON “TL” 18 ¾ -- 15.000

• DERRICK WEI double derrick 170 ft high

• accommodation 140

Technical specifications

Scarabeo 8

Ultra Deep Water Semisubmersible Units

Page 11: 2340 Drilling Bu Presen

Saipem BU Drilling – November 2013

11

Anchored Semisubmersible Units

Ultra deepwater 5th gen. semisub. Converted by Tuzla

shipyard, Turkey completed in 1999

Highly versatile drilling unit, compliant with the most severe environmental regulations (“zero pollution” and “zero discharge” rig).

Operational Mode • Exploration and production drilling

• water depth 5.000 ft

• drill depth 25.000 ft

• drawwork 3.000 HP

• variable deck load drill 3.500 tonnes

•Mooring System Automatic

thruster assisted 8 leg moored

• mud pumps

3 Wirth TPK 2000 triplex

pumps 1 emsco F 1000

2000 HP 1000 HP

• top drive Hydralift HPS 650E

Rated capacity 650 tons (m) driven by GE 752

• BOP Shaffer 18 3/4 - 15.000 Guidelines/guidelineless with Vetco HD-H4 Bop conn.

• accommodation 150 people

Technical specifications

Scarabeo 7 Deepwater 3rd gen. semisub.

Built by Rauma Repola - Pori shipyard, Finland completed in 1984

Six column stabilized semisubmersible.

In keeping with the highest environmental regulation, Scarabeo 6 is a “zero pollution” and “zero discharge” rig; HP HT fitted.

Scarabeo 6

• water depth 2.500* ft • drill depth 25.000 ft

• drawwork 3.000 HP

• variable deck load drill 3.200 tonnes

• Mooring system 8x76 mm (3”) DNV 4 chains,

2x1,554 m

• mud pumps 3 Oilwell A- 1,700

PT Maritime hydraulics

1700 HP

• top drive DDM-650 rated capacity 650 tons

• BOP Cameron 18 3/4” - 15.000 psi H2S service

• accommodation 110 people

Operational Mode • Exploration and production drilling Note: to be upgraded for 1.100 meters water depth

Technical specifications

Page 12: 2340 Drilling Bu Presen

Saipem BU Drilling – November 2013

12

Deep Water Semisubmersible Unit

DP Ultra deepwater 4th gen. semisub Built by Fincantieri - genoa shipyard,

Italy completed in 1990 Column stabilized semisubmersible rig;

dynamic assisted mooring and class 3; fully compliant with Norwegian regulations.

Operational Mode • Exploration and production drilling in harsh environment

• drill depth 25.000 ft • drawwork 3000 HP

• variable deck load 4.500 tonnes

• DP Dynam. Assist

moor. DP class 3

up to 3.000 ft Up to 6.200 ft

• mud pumps 3 emsco FB-1600 1600 HP

• top drive Varco TDS-4 650 API T, electric with PH 85 pipe handler

• BOP Cameron 18 3/4” - 15.000 Guideline/guidelineless with Vetco HD-H4 Bop

• accommodation 100 people In accordance with Norwegian regolations

Technical specifications

Scarabeo 5

Page 13: 2340 Drilling Bu Presen

Saipem BU Drilling – November 2013

13

Mid water Semisubmersible Units

column stabilized,

triangular, built by Blohm Voss shipyards in Hamburg, Germany; completed in 1975

• water depth 1.500 ft

• drill depth 25.000 ft

• drawwork 3.000 HP

• variable deck load 2.700 t

• top drive Maritime DDM 500 500 t

• BOP Vetco H4 18 3/4” - 10,000psi bottom connector

• accommodation 110 people

Technical specifications

• water depth 1.500 ft

• drill depth 25.000 ft

• drawwork 3.000 HP

• variable deck load 2.700 t

• top drive Varco TDS 3 500 t

• BOP Vetco H4 18 3/4” - 10,000psi bottom connector

• accommodation 110 people

Technical specifications

column stabilized,

triangular, built by Blohm Voss shipyards in Hamburg, Germany; completed in 1975

Scarabeo 4 Scarabeo 3

Page 14: 2340 Drilling Bu Presen

Saipem BU Drilling – November 2013

14

Last generation Jack Up Units

Cantilever 350 ft w.d. independent legs Design: GUSTO, Class CJ46-X100-D.

Moss Maritime Built at Labroy Shipyard - Indonesia Delivered in September 2010 Self elevating, triangular, mobile

drilling unit

• water depth 350 ft

• drill depth 30.000 ft

• variable deck load 3.500 tonnes

• cantilever extension 70 ft • cantilever ext. long. 20/20 ft • BOP 15.000 PSI

• drawwork 3.000 HP

• no. 3 mud pumps 2.200 HP/each

• HP mud system 7.500 PSI

Technical specifications (NOV Drilling Package)

Cantilever 375 ft w.d. independent legs Design: Baker Marine, Pacific Class 375 Built by Jurong Shipyard, Singapore Delivered in April 2008 Self elevating, triangular, mobile

drilling unit

• water depth 375 ft

• drill depth 30.000 ft

• variable deck load 3.750 tonnes

• cantilever extension 70 ft

• cantilever ext. long. 15/15 ft

• BOP 15.000 PSI

• drawwork 3.000 HP

• no. 3 mud pumps 2.200 HP/each

• HP mud system 7.500 PSI

Perro Negro 8 Perro Negro 7

Cantilever 350 ft w.d. independent legs Design: GUSTO, Class CJ46-X100_D.

Moss Maritime Built at Labroy Shipyard - Indonesia Delivered in September 2009 Self elevating, triangular, mobile

drilling unit

Perro Negro 6

• water depth 350 ft

• drill depth 30.000 ft

• variable deck load 3.500 tonnes

• cantilever extension 70 ft

• cantilever ext. long. 20/20 ft

• BOP 15.000 PSI

• drawwork 3.000 HP

• no. 3 mud pumps 2.200 HP/each

• HP mud system 7.500 PSI

Technical specifications (NOV Drilling Package)

Technical specifications (NOV Drilling Package)

Page 15: 2340 Drilling Bu Presen

Saipem BU Drilling – November 2013

15

Conventional Drilling and Workover Jack Up Units

Perro Negro 4

• water depth 150 ft • cantilever capacity 35 ft

• longitudinal skid 7.5/7.5 ft

• activity workover

Perro Negro 5

• water depth 245 ft • cantilever capacity 40 ft

• longitudinal skid 12/12 ft

• activity drilling

Perro Negro 3

• water depth 300 ft • cantilever capacity 40 ft

• longitudinal skid 10/10 ft

• activity drilling

Perro Negro 2

• water depth 300 ft • cantilever capacity 45 ft

• longitudinal skid 12/12 ft

• activity drilling

Page 16: 2340 Drilling Bu Presen

Saipem BU Drilling – November 2013

16

Assisted Drilling Unit

Tender Assisted Self Erecting Rig Design Saipem Delivered June 2008 Tender Assisted Self Erecting Rig Barge Crane (100 ton) used to install

the drilling package plus Service Crane (30 ton)

• Max transverse skidding distance 10 ft • Max longitudinal skidding distance 40 ft • Max stroke of longitudinal skidding 3 ft • Max stroke of transverse skidding distance 3 ft • Drawwork 1.500 HP

• Top Drive 400 ton

Technical specifications

TAD

Page 17: 2340 Drilling Bu Presen

Saipem BU Drilling – November 2013

17

Onshore Rig Tipology: Super Heavy and Heavy

Technical specifications • drawwork 3.000 Hp

• Mud pumps 3x1.600

7500 Hp PSI

• rotary table 37 1/2”

• mast 2.000.000 lbs with 16 lines

• travelling block 750 t • set back capacity 1.500.000 lbs • power 5.750 hp • top drive installed • BOP 10.000-15.000 PSI

Technical specifications

• drawwork 2.000 Hp • Mud pumps 3x1.600 Hp • rotary table 27 1/2”

• mast 1.000.000 lbs with 12 lines

• travelling block 500 t • set back capacity 600.000 lbs • power 5.124 hp • top drive installed • BOP 5.000-10.000 PSI

Super heavy

Heavy

Page 18: 2340 Drilling Bu Presen

Saipem BU Drilling – November 2013

18

Onshore Rig Tipology: Medium and Light

• drawwork 1.500 Hp • mud pumps 2x1.000+1x600 Hp • rotary table 20 1/2”

• mast Telescopic

Hydr. For r.3 DP • trip velocity 1 m/s

• power 2.145 Hp

• top drive Hydraulic, Torque 26

• BOP 5.000-10.000 PSI

• drawwork 1.000 Hp or lighter • Mud pumps 2x1.000 Hp • rotary table 27 1/2”

• mast 800.000 lbs

with 12 lines • travelling block 350 t

• set back capacity 450.000 lbs • power 3.450 hp • top drive Installed • BOP 5.000-10.000 PSI

Technical specifications Medium

Light Technical specifications

Page 19: 2340 Drilling Bu Presen

Saipem BU Drilling – November 2013

19

Onshore Rig Tipology Light Hydraulic

Technical specifications

• max hook capacity 182 t • mud pumps 2x1.000 + 1x600 Hp • rotary table 24 1/2”

• mast Telescopic

Hydr. For r.3 DP • trip velocity 1 m/s • power 3.754 Hp

• top drive Hydraulic,