23rd WP8 Bi-weekly meeting
Lukasz Krzempek (TE-VSC-DLM) 01.09.2015
TAS-Q1 – vacuum equipment design
Lukasz Krzempek 01.09.2015 1 TE-VSC-DLM
General view of 3d conceptual design (ATLAS&CMS) 1) Created solution is a baseline of current vacuum system 2) Where possible – aluminium solution (transition)3) BPMSW4) 3 structures to remove independently: gate valve TAS, VAX+BPM, gate valve IR5) Long bellows to transfer transversal & longitudinal while short ones -
longitudinal
TAS
Experiment
Alignment issues
Sector valve moves with TAS absorber
Sector valve moves with vacuum chamber
VAX+BPM movesindependentlyPumping/venting lines
together with angle valve on site
Tunnel
Lukasz Krzempek 01.09.2015 2 TE-VSC-DLM
Other views
JFC3ATLAS
Important
Angle valves integrated as close VAX body as possible
Chain for quick disconnection DN40
Notes and more views (1)
VAX module:• Penning• Pirani• Rupture
disc• BA• NEG
cartridge• Ion pump
Lukasz Krzempek 01.09.2015 3 TE-VSC-DLM
Height:740mm
Bellow: aluminiumBellow’s connections: stainless steel
In work connection of angle valves with vax body
D159mm
Groove for compressing/extension mechanism
250mm – free length270mm – installation length
Design based on Stainless steel standard solution
Notes and more views (2)
Lukasz Krzempek 01.09.2015 4 TE-VSC-DLM
Conceptual compressing/extending model
In 3d design:20mm distance left for ‘bellow installation length’
Going to aluminium bellows, stretching is even more preferable then compressing (to be further checked)
Cabling/piping management (thermocouples + heating power) - proposal
Nicolas Zelko (TE-VSC-BVO) contribution
Lukasz Krzempek 01.09.2015 5 TE-VSC-DLM
2xConnector LEMO (thermocouples + power)for every structure
extension
patch panel
Zone radioactive
Zone radioactive
Non-radioactive
NH25 for power/MCT32 for Tces
Tce OD2.6mm+/- 0.2mm Power (currently in ATLAS)1mm2 -> 2x1mm2
Cabling management (1)
Lukasz Krzempek 01.09.2015 6 TE-VSC-DLM
Nomenclature:Tce: thermocouple type EVEC: heating collarVET: heating tape + insulation thickness 8mmVEJ: heating jacket + insulation thickness 25mm
Calculated section: 1055mm2
Ion pump cable assumption ~D1cm
Total: 1200mm2
?
Cabling/piping management (2)
Lukasz Krzempek 01.09.2015 7 TE-VSC-DLM
Outside diameters:1. Flange DN63 + heating collar OD114+3 thickness (mm)= OD120 (mm) ~140 (mm)
2. Tube DN63 + heating tape + insulation OD63+tape+8 thickness (mm)=83 (mm) ~100 (mm)
3. Bellow + heating tape + insulation OD83 + tape + 8/25 (mm) = 103/135 (mm) ~120/150 (mm)
The rest of pumping/ venting instruments depends on design
Next steps
Lukasz Krzempek 01.09.2015 8 TE-VSC-DLM
1. Cooperation with integration office2. Alignment issues in further design3. Remote handling issues4. Magnetic tests (M1 magnet available around October/November – contact Benoit Cure)