Reconciliation of SR UI & Reactive accounts
• Details of payments and disbursement of UI/Reactive energy accounts for the period 17.06.13 to 06.10.13 furnished to all entities on 10.11.13.
• Confirmation received from AP, KPTCL, Powergrid, NTPC, NLC, ERLDC & WRLDC
• No comments received from others. It is compulsory to sent confirmations to comply with Audit.
Status of signing of Reconciliation statement by constituents
Month UI Reactive STOA
Aug-13 AP YES YES NO
Aug-13 KPTCL YES YES NO
Aug-13 KSEB N/A
Aug-13 TNEB NO
Aug-13 Pondy N/A
Aug-13 Goa N/A N/A
Aug-13 PG HVDC YES N/A N/A
Aug-13 RSTPS-I&II YES N/A N/A
Aug-13 RSTPS-III YES N/A N/A
Aug-13 SIMHADRI YES N/A N/A
Aug-13 TALCHER YES N/A N/A
Aug-13 NLC TS-II Stg 1 YES N/A N/A
Aug-13 NLC TS-II Stg 2 YES N/A N/A
Aug-13 NLC TS-I Exp YES N/A N/A
Aug-13 NLC TS-II Exp YES N/A N/A
Aug-13 LKPPL N/A N/A
Aug-13 SEPL N/A N/A
Aug-13 MEPL YES N/A N/A
Aug-13 CTU N/A
Status of signing of Reconciliation statement by constituents
Sep-13 AP YES YES NO
Sep-13 KPTCL YES NO
Sep-13 KSEB N/A
Sep-13 TNEB NO
Sep-13 Pondy N/A
Sep-13 Goa N/A N/A
Sep-13 PG HVDC YES N/A N/A
Sep-13 RSTPS-I&II N/A N/A
Sep-13 RSTPS-III N/A N/A
Sep-13 SIMHADRI N/A N/A
Sep-13 TALCHER N/A N/A
Sep-13 NLC TS-II Stg 1 YES N/A N/A
Sep-13 NLC TS-II Stg 2 YES N/A N/A
Sep-13 NLC TS-I Exp N/A N/A
Sep-13 NLC TS-II Exp YES N/A N/A
Sep-13 LKPPL YES N/A N/A
Sep-13 SEPL N/A N/A
Sep-13 MEPL YES N/A N/A
Sep-13 CTU N/A
Status of signing of Reconciliation statement by constituents
Oct-13 AP YES NO`
Oct-13 KPTCLYES
YES NO
Oct-13 KSEB
Oct-13 TNEB
Oct-13 Pondy
Oct-13 Goa
Oct-13 PG HVDC
Oct-13 RSTPS-I&II
Oct-13 RSTPS-III YES
Oct-13 SIMHADRI
Oct-13 TALCHER
Oct-13 NLC TS-II Stg 1 YES
Oct-13 NLC TS-II Stg 2 YES
Oct-13 NLC TS-I Exp YES
Oct-13 NLC TS-II Exp
Oct-13 LKPPL
Oct-13 SEPL
Oct-13 MEPL YES
Oct-13 CTU
Reconciliation of STOA disbursements
• For the period July 2013 to September 2013 following details have been sent to all entities – Details of payments and disbursement of STU & SLDC
open Access charges
– Refunds due to Curtailement
• Odisha started confirming. TN started for May’13• All applicants requested to verify & confirm
– The Disbursements received
– details of curtailment published in SRLDC website by 2nd of every month
Confirmation of STOA disbursement receipt by STU / SLDC
All STUs / SLDCs are to Check the correctnessOf the disbursement and sign the receipt and send to SRLDC
Confirmation of STOA disbursement receipt by STU / SLDC
TN confirmed only for one month after repeated follwoup
L/C for UI payment- Default
•
TN
Yet to enhance the LC amount to Rs.32.84 Crs from the existing LC of Rs 8.49 Crs as per their liability
SEPL
Simhapuri (SEPL) LC expired on 31.08.13.to be renewed with validity up to 31.03.14
LKPPL
LKPPL to open LC for Rs.2.44 Lakhs due to delay in WK 40 UI payment.
Instances of delay in SEM data receipt (July13- Oct 13)
ANDRA PRADESH KARNATAKA KERALA
Gooty RS 1 Ambevadi 1 Moolamattom 1
Kakinada 1 Guttur 3 Edamon 1
KTPS( Kothagudam)
11
Hoody 6 Manjeswaram 2
Kurnool 1 Kadakola 3 TAMILNADU
Malkaram 2 kadra 3 Gumminipondy 1
Mamidipally 3 Kodasally 6 Mettur 1
Ragulapadu 1 Sedam 1 Theni 1
Sulurpet 1 Yerandahally 4 GOA
VTPS 5 Ponda 2
Xeldam 2
Instances of delay in SEM data receipt (July13- Oct 13)
POWERGRID (SR-1) POWERGRID (SR-2) NPCIL
Cudappa 2 Bidadi 1 Kudankulam 1
Gooty 1 Kalivanthapattu 2
Hyderabad 2 Karaikudi 1
Munirabad 4 Mysore 1
Pugalur 1
Sriperumbudur 2
The status of weekly SEM data receipt as on every Monday 1700hrs and Tuesday 1200hrs is available at SRLDC website : srldc.org\commercial\ sem data receipt statusStations and SLDCs may pl check this and ensure timely data transmission
TIME DRTIFT STATEMENT STATUS REPORTS NOT RECEIVED FROM
FOLLOWING LOCATIONS:- ANDRA PRADESH KARNATAKA TN
GALWEL AMBEVADI KONAJE ARNI
GOOTY ALIPURA SEDAM ACHARAPAKKAM
KAKINADA GUTTUR YERANDAHALLY ALAMATHY *
KTPP
(BOOPALAPALLY)
HOODY KADRA NCTPS
KALPAKA KADAKOLA KODASALLY SP KOIL
KURNOOL THIRUVELAM
MEHBOOBNAGAR GOA
SUPURPET XELDAM PONDA
* Time drift statements received. But not doing corrections for some meters
TIME DRTIFT STATEMENT STATUS REPORTS NOT RECEIVED FROM FOLLOWING
LOCATIONS:-
ISGS POWERGRID IPPS
SR- 1 SR -2
NLC EXP 1 CUDAPPA PONDYCHERY BHAVNI
VALLUR GOOTY MEPL
HYDERABAD SEPL
SEMs WITH TIME DRTIFT > 8 min
Station Name Feeder Name SEM sl no. Time drift
Remarks
Alamthy (TN) 230kV Side of ICT 2 (LV) NP-2480-A 00:10:26 Not doing corrections
Alamthy (TN) 230kV Side of ICT 3 (LV) NP-2537-A 00:08:52 Not doing corrections
KKNPP 400kV side of ICT 2 NP-5699-A 00:13:09 Correction in progress
KKNPP 220kV side of ICT 2 NP-5700-A 00:17:11 Correction in progress
KKNPP GT-1 Main meter NP-5698-A 00:18:02 Correction in progress
KKNPP GT-2 Main meter NP-5635-A 00:26:41 Not doing corrections
KKNPP GT-1 Check meter NP-5636-A 00:13:26 Correction in progress
KKNPP GT-2 Check meter NP-5634-A 00:16:27 Correction in progress
KKNPP Unit II RAT NP-5696-A 00:15:34 Correction in progress
PSDF Fund Transfer
Period UI A/c.Reactive
A/c.
Congestion Amount (e-bidding charges)
Grand Total
Upto 30.06.11 49700.00000 242.42169 0.00000 49942.42169
01.07.11 to 30.09.12 11142.00000 45.00000 333.38191 11520.38191
01.10.12 to 10.01.13 1075.00000 0.00000 230.54067 1305.54067
11.01.13 to 31.03.13 1700.00000 0.00000 16000.00000 17700.00000
01.04.13 to 30.06.13 1000.00000 8.32268 37670.50702 38678.8297
01.07.13to31.10.13 1020.00000 0.00000 0.00000 1020.00000
TOTAL 65637.00000 295.74437 54234.4296 120167.17397
(all figures in Rs. Lakhs)
Start up power under UI mechanism. M/s. Coastal Energen
Vide CERC order dated 18-09-13- in petition No. 259/NP/2012 M/s. Coastal Energen have applied for availing grant of Startup power under UI mechanism ranging from 3MW to 40MW.
NLDC submitted a Draft procedure to CERC. The request for Startup power would be regulated as per the ProcedurePending approval by CERC, it is proposed to allow the same with an undertaking that they would abide by CERC guidelines.
Status of weekly data submission for RRF Mechanism
Karnataka
Both Schedule and Actual data being received from only for 5 stations out of 10 stations namely Tuppadahalli, Kalmangi, Sidenur, Tadas, Kanbargi were furnished. Partial data is being received from other stations: Galataga ,Kabbur, Soundatti, Doddavanavar (partial days), Harkanalu, SFC Shiv Solar, BPCL Shiratti
Status of weekly data submission for RRF Mechanism
AP Both Schedule and Actual in respect of only two out of 9 stations namely Wind World Shapuram and Welspun Solar Pulivendula was received up to 17.11.13. Only Schedule in respect of Beta wind farms Tadipatri, Sai Sudhir Kalyanadurg and Rayadurg is received. No data from other stations.
From 18.11.13 data was not received
TN stopped submitting data from 19.08.2013 onwards
Status of white paper as per meeting held on 25.09.13
AP, Karnataka and TN have agreed that that they would give a white paper by 03.10.13 on the status of identification of Coordinating Agency furnishing of Schedules, Actuals etc, Other details such as contact person’s name, address, telephone No., mobile No., e-mail ID, bank account were also required to be furnished. The same were not received till date.
PoC Data for Q4 of 2013-14 (Jan’14-Mar’14)
All the DICs has to furnish
(1) the technical details of new transmission elements, generating units which are expected to commence commercial operation from January’14 to March’14
(2) Yearly Transmission charges
(3) node wise MW/MVAR and
(4) forecast generation and demand data
PoC Data for Q4 of 2013-14 (Jan’14-Mar’14)
AP has not furnished the node wise MW/MVAR data and Load –Generation
Henceforth all DICs are requested furnish the full data required for computations at least by two quarters in advance without waiting for reminders from NLDC
4.1.(c) – Due to non availability of the data of SEMs on TTPs and
RATs at Kudankulam, accounthas been made by using data of SEMs of LV side of ICTs.
– Once the above data received the account account was revised with out going feeders and submitted to SRPC. Also the data was sent to TN by mail.
4.1.(d)– Number of revision in Implemented schedules are due to
revisions of other region ISGS,solar and STOA curtailments.
-All Entities, Traders and other stake holders have to check the correctness of Schedules in the Web based Scheduling program and immediately point out the discrepancies
Item proposed by TANTRANSCO
Raichur Sholapur SEMs location
WR-SR import =
Bhadrawati West BusSEMs + Sholapur end SEMs+ Kolhapur end SEMs (as and when it comes into service)
Annexure-1 (Refer section 6.1 (d)) of IEGC Complementary Commercial Mechanisms
16. Interfaces for Scheduling and UI Accounting In Inter-regional Exchanges:
1. The regional boundaries for scheduling, metering and UI accounting of inter-regional exchanges shall be as follows:
• Eastern Region end of inter-regional links between Eastern Region and Southern, Western and Northern Regions.
• North-eastern end of inter-regional links between Eastern and North Eastern Region
• Western Region end of inter-regional links between Southern and Western Region
• Western Region end of inter-regional links between and Northern and Western Region.
Additional agenda by KSEB
• SRLDC is issuing A,B,C messages as per philosophy circulated in OCC meetings.
• As such no erratic messages were issued
• SRLDC objects to the statement given by KSEB