Scott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction Combination of Dead Strings, Capillary Injection Foamer and Plunger Lift

23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

Embed Size (px)

Citation preview

Page 1: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

Scott Campbell - Rocky Mountain Sales Manager

720-946-1365- Denver Office

CVR SystemCritical Velocity Reduction

Combination of Dead Strings, Capillary Injection Foamer and Plunger Lift

Page 2: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

1© 2006 Weatherford. All rights reserved.

Critical Flow Rates

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

0 100 200 300 400 500 600 700 800 900 1,000

Wellhead Pressure (psi)

Flo

w R

ate

(m

cf/

d)

1.00"/0.826"

1.25"/1.076"

1.50"/1.310"

2.0"/1.78"

1.90/1.61

2 1/16"/1.75

2 3/8"/1.995

2 7/8"/2.441

3.5"/2.867

4.5 11.6 lb/ft

5.5 20 lb/ft

7.0" 26 lb./ft

4.5" Casing w / 2 3/8" Tubing

5.5" Casing w / 2 7/8" Tubing

7.0" Casing w / 3 1/2" Tubing

1.00-in. OD/0.826-in. ID CT

1.25-in. OD/1.076-in. ID CT

1.50-in. OD/1.310-in. ID CT

2.00-in. OD/1.780-in. ID CT

1.90-in. OD/1.610-in. ID API Tubing

2 1/16-in. OD/1.750-in. ID API Tubing

2 3/8-in. OD/1.995-in. ID API Tubing

2 7/8-in. OD/2.441-in. ID API Tubing

3.50-in. OD/2.867-in. ID API Tubing

4.5-in., 11.6-lb/ft Casing

5.5-in., 20-lb/ft Casing

7-in., 26-lb/ft Casing

4.5-in. Casing w/2 7/8-in./ Tubing

5.5-in. Casing w/2 7/8-in./ Tubing

7.0-in. Casing w/3 1/2-in./ Tubing

Page 3: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

2© 2006 Weatherford. All rights reserved.

Typical Completion:

2 3/8” Production Tubing

4 ½” Casing 11.6# Casing

200 PSI Line Pressure

Extended Perforation Interval

Page 4: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

3© 2006 Weatherford. All rights reserved.

Critical flow requirements assuming

200-psi WHBP(FTP):

CFR for 2-3/8” = 406 mcf/dCFR for 4-1/2” = 1.63 MMcf/d

Typical Completion

• Production String: 2-3/8”, 4.7 lb/ft

• Casing: 4-1/2”, 11.6 lb.ft

– 4.000-in. ID

– 3.875-in. drift

– Flow area: 12.5683 in.2

2 3/8”tubing

Extended

perforation

interval

4 ½” casing

A B

Page 5: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

4© 2006 Weatherford. All rights reserved.

4 ½” Casing, 2 7/8” Dead String

2 3/8”X-LOC nipple

2 3/8” perforated sub36- ¾” holes

2 3/8” X-nipplew/ retrievable plug

2 3/8” X 2 7/8”crossover

2 7/8” tubing “dead string”

2 3/8” tubing

Shear-out safety jt.

4 ½”., 11.6-lb/ft casing

• Production String: 2 3/8”

• Dead String: 2 7/8” ULTRA FLUSH

– NO couplings = 2 7/8” = 2.875” OD

• Casing: 4-1/2”, 11.6 lb/ft

– Flow area: 12.5683 in.2

• Annular flow area, 2-7/8” inside 4-1/2”

– Flow area: 6.0768 in.2

Critical flow requirements assuming 200-psi WHBP:

CFR for 2-3/8” = 406 mcf/dCFR for 4-1/2” x 2 7/8” annulus = 790 mcf/d

(was 1.63 MMcf/d with open 4 ½” casing)

Page 6: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

5© 2006 Weatherford. All rights reserved.

Casing Size

O.D.= 4 ½”

I.D. = 4.00”

Tubing Size

O.D.= 2 7/8”

I.D. = 2.441”

Annulus Area, in2

6.0768

4 ½” Casing, 2 7/8” Tubing

Page 7: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

6© 2006 Weatherford. All rights reserved.

2 3/8” perforated sub36- ¾” holes

2 3/8” X 2 7/8”crossover

2 3/8” tubing

2 3/8” X-nipplew/ retrievable plug

¼” capillary injection string

injection valve and mandrel

Shear-out sub

2 7/8” dead string

4 ½” casing

• Production String: 2-3/8”

• Dead String: 2 7/8” ULTRA FLUSH

• Casing: 4 ½”, 11.6-lb/ft casing

– Flow area: 12.5683 in.2

• Annular Flow Area: 2-7/8” inside 4-1/2”

– Flow area: 6.0768 in.2

Critical flow requirements assuming 200-psi WHBP:

2 3/8” = 168 mcf/d with foam(was 406 mcf/d without foam)

4 ½” x 2 7/8” annulus = 327 mcf/d with foam

(was 790 mcf/d without foam)

(was 1.63 MMcf/d without Dead String)

4 ½” Casing, 2 7/8” Dead Stringwith Capillary String for Foamer Injection

Page 8: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

7© 2006 Weatherford. All rights reserved.

Bumper Spring

Perforation Interval

THREE ARTIFICIAL LIFT SYSTEMS WORKING TOGETHER:

– Area Reduction (Dead String)

– Surface Tension and Density Reduction (Foamer)

– Plunger Lift (Mechanical Interface)

Page 9: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

8© 2006 Weatherford. All rights reserved.

Heavy-Wall Flow Sub with Isolation

Sleeve

Kobe knockout

equalization plug

Seal ring packing

WX-LOK dogs

Internal fishing neck

Heavy-Duty Flow Sub

2 3/8” tubing, 36 ¾” holes

OD = 3.063”

ID = 1.995”

Top sub w/ WX

1.875” profile

Over 5 times

the flow area

of 2 3/8”

tubing

1.875” polished bore

Pressure equalization

knockout plug

Isolation Sleeve

OD = 1.75”

ID = 0.98”

Seal ring packing

Page 10: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

9© 2006 Weatherford. All rights reserved.

FWHP = 200 PSI

9.1757

12.3120

6.0768

14.3683

8.1360

18.7978

12.5683

7.0315

4.6800

3.1262

Flow Area

(in.2 )

168.4406.70

6.5015.70

0.021712 3/8-in., 4.7-lb/ft tubing

252.1608.800.032502 7/8-in., 6.5-lb/ft tubing

378.8914.700.048833 1/2-in., 9.20-lb/ft tubing

676.91,634.900.087284 1/2-in., 11.6-lb/ft casing

1,012.52,445.400.130545 1/2-in., 17-lb/ft casing

494.21,193.700.063723 1/2-in. tubing and 5 1/2-in. casing

662.81,600.800.085502 7/8-in. tubing and 5 1/2-in. casing

327.2790.300.042202 7/8-in. tubing and 4 1/2-in. casing

773.91,869.000.099782 3/8-in. tubing and 5 1/2-in. casing

438.31,058.500.056502 3/8-in.tubing and 4 1/2-in. casing

CFR with

Foam

(mcf/d)

CFR with

Water

(mcf/d)

CV with

Foam,

(ft /sec)

CV with

Water,

(ft /sec)

Flow Area

(ft2)

Flow Pattern

CV = Critical velocity, ft/secCFR = Critical flow rate, mcf/dFlowing surface temperature = 70°FDensity of water = 8.4 lb/galZ = 0.97

Page 11: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

10© 2006 Weatherford. All rights reserved.

4 ½” Casing with 2 7/8” Dead String with 2 3/8” Production Tubing

Page 12: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

11© 2006 Weatherford. All rights reserved.

Installation Pictures

and

Production Data

Page 13: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

12© 2006 Weatherford. All rights reserved.

4 1/2" , 11.6#, HCP-110 set at 11,600' w/1,930 sx

2 3/8" , 4.7#, N-80, tubing w/"XN" nipple (1.87") and 22.5' tubing below nipple

EOT--10,732' cut off with chemical cutter

Tubing joint cut off - 22.5' long

XN Nipple @ +/-10,709'

10,746' - 10,752' 10,810' - 10,818' Frac w/1486 bbl Primefrac 30 w/30% N2

10,756' - 10,762' 3SPF 120 Deg. 6,077# 100 mesh and 116,847 # 20-40 Econoprop

Upper & Lower Lewis tested after frac 550mcf/d@150psi

10,878' - 10,881' 10,908' - 10,916' Frac #1 w/429 bbl x-link gell and 6,500# 100 mesh--RAN OUT of crosslinker

3SPF 120 Deg. Frac # 2 wPrimefrac 30, 30% N2, 6,705# 100 mesh and 7,276# Econoprop - Screened out

11,206' - 11,208' 11,299' - 11,301'

11,216' - 11,218' 11,305' - 11,310' Frac w/1,826 bbl Primefrac 30 w/30% N2

11,238' - 11,240' 11,314' - 11,319' 6,899# 100 mesh and 175,962# 20-40 Econoprop

11,254' - 11,256' 11,323' - 11,328' Middle & Lower Almond test after frac 856mcf/d@240psi

2SPF 120 Deg.

11,401' - 11,409' 11,445' - 11,453' Frac Lower Almond w/1,160 bbl Primefrac-30 w/30% N2,

3 SPF 5,500# 100 mesh and 90,231 # 20-40 Econoprop

9' tubing, 2' bit sub and 3-7/8" bit pushed to 11,456'

PBTD 11,516'

FLOAT COL. 11,553'

SHOE 11,600'

TD 11,620'

Lower Lewis

Upper Lewis

Middle Almond

Lower Almond

Example Well “A”Wamsutter, Wyoming

Before Installation

Page 14: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

13© 2006 Weatherford. All rights reserved.

4 1/2" , 11.6#, HCP-110 set at 11,600' w/1,930 sx

2 3/8" , 4.7#, N-80 Tubing - 334 Joints

10,746' - 10,752' 10,810' - 10,818' Frac w/1486 bbl Primefrac 30 w/30% N2

10,756' - 10,762' 3SPF 120 Deg. 6,077# 100 mesh and 116,847 # 20-40 Econoprop

Upper & Lower Lewis tested after frac 550mcf/d@150psi

10,878' - 10,881' 10,908' - 10,916' Frac #1 w/429 bbl x-link gell and 6,500# 100 mesh--RAN OUT of crosslinker

3SPF 120 Deg. Frac # 2 wPrimefrac 30, 30% N2, 6,705# 100 mesh and 7,276# Econoprop - Screened out

11,206' - 11,208' 11,299' - 11,301'

11,216' - 11,218' 11,305' - 11,310' Frac w/1,826 bbl Primefrac 30 w/30% N2

11,238' - 11,240' 11,314' - 11,319' 6,899# 100 mesh and 175,962# 20-40 Econoprop

11,254' - 11,256' 11,323' - 11,328' Middle & Lower Almond test after frac 856mcf/d@240psi

2SPF 120 Deg.

11,401' - 11,409' 11,445' - 11,453' Frac Lower Almond w/1,160 bbl Primefrac-30 w/30% N2,

3 SPF 5,500# 100 mesh and 90,231 # 20-40 Econoprop

End of 2 3/8" Tubing --10,709.5' -- 334 Joints

End of Weatherford Assembly -- 10722.8'

Weatherford Assembly

- 2 3/8" Heavy Duty Perforated Flow Sub -- 4.8' -- 36 3/4" holes

- X-Nipple - 1.87" Profile - 1.0'

- 2 3/8" CM1CI -- 4.5'

- XN-Nipple -- 1.0'

- 2 3/8" Sheer out safetly joint - Set at 27,000# - 0.8'

- Crossover -- 1.2'

End of 2 7/8" Dead String -- 11349.2'

9' tubing, 2' bit sub and 3-7/8" bit pushed to 11,456'

PBTD 11,516'

FLOAT COL. 11,553'

SHOE 11,600'

TD 11,620'

Lower Lewis

Upper Lewis

Middle Almond

Lower Almond

Example Well “A”Wamsutter, Wyoming

After Installation

NOT TO SCALE-

End of 2 3/8” Tubing @ 10,709’

End of 2 7/8” Dead String @ 11,349’

650’ of 2 7/8” UFJ

Page 15: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

14© 2006 Weatherford. All rights reserved.

CUSTOMER:CUSTOMER:CUSTOMER:CUSTOMER:COMPANY REP:COMPANY REP:COMPANY REP:COMPANY REP:WCS REP:WCS REP:WCS REP:WCS REP:LEASE:LEASE:LEASE:LEASE:WELL NAME AND NUMBER:WELL NAME AND NUMBER:WELL NAME AND NUMBER:WELL NAME AND NUMBER:CASING SIZE AND WEIGHT:CASING SIZE AND WEIGHT:CASING SIZE AND WEIGHT:CASING SIZE AND WEIGHT:LINER SIZE AND WEIGHT:LINER SIZE AND WEIGHT:LINER SIZE AND WEIGHT:LINER SIZE AND WEIGHT:TUBING SIZE AND WEIGHT:TUBING SIZE AND WEIGHT:TUBING SIZE AND WEIGHT:TUBING SIZE AND WEIGHT:DEAD STRING SIZE AND WEIGHT: DEAD STRING SIZE AND WEIGHT: DEAD STRING SIZE AND WEIGHT: DEAD STRING SIZE AND WEIGHT: STATE:STATE:STATE:STATE:COUNTY:COUNTY:COUNTY:COUNTY:

DATE:DATE:DATE:DATE:

ITEMITEMITEMITEM DEPTH

AAAA

B 10,709.50'

C 10,714.30'

D 10,715.30'

E 10,719.80'

F 10,720.80'

G 10,721.60'

H 10,722.80'

I 11,349.20'

650' of 2 7/8" Ultra Flush Joint Tubing

2 3/8" EUE X 2 7/8" X-Over Sub

2 7/8" "Dead String"

4 1/2" 11.6# HCP-1104 1/2" 11.6# HCP-1104 1/2" 11.6# HCP-1104 1/2" 11.6# HCP-110

2 3/8" Mechanical Shear Out Safety

Example Well "B"Example Well "B"Example Well "B"Example Well "B"Wamsutter, WyomingWamsutter, WyomingWamsutter, WyomingWamsutter, WyomingScott CampbellScott CampbellScott CampbellScott Campbell

N/AN/AN/AN/A2 3/8" 4.7# N-802 3/8" 4.7# N-802 3/8" 4.7# N-802 3/8" 4.7# N-80

1/4" Stainless Steel Chemical Injection

Tubing 10,719' Installed

2 7/8" Ultra Flush Joint2 7/8" Ultra Flush Joint2 7/8" Ultra Flush Joint2 7/8" Ultra Flush JointWyomingWyomingWyomingWyomingSweetwaterSweetwaterSweetwaterSweetwater

2 3/8" 4.7# N-80 Production Tubing

2 3/8" X 1.875" WX Profile Nipple With

"XX" Blanking Plug In Place

2 3/8" "CM-1 CI" Chemical Injection Sub

Joint

2 3/8" X 1.875" WXN Nipple

2 3/8" Heavy Duty Perforated Flow Sub

Low er

Almond

11,401'

11,453'

Middle

Almond

11,206'

11,328'

Lower

Lewis

10,878'

10,916'

Upper

Lewis

10,746'

10,762'

A

B

C

D

E

F

G

H

I

PBTD 11,516.00'

Example Well “A”Wamsutter, Wyoming

Page 16: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

15© 2006 Weatherford. All rights reserved.

Wamsutter, Wyoming WCVR Install

0

100

200

300

400

500

600

700

800

900

1000

1100

1200

1300

1400

1500

1600

1-Sep-0

515-S

ep-05

1-Oct-

0515 -O

ct-0

5

1-Nov-0

515-N

ov-05

1-Dec-0

515-D

ec-05

1-Jan -0

615-Ja

n-06

1-Feb-0

615-F

eb-06

1-Mar-0

615 -M

ar-06

1-Apr-0

615-A

pr-06

1-May-

0615 -M

ay-06

1-Jun-0

611-Ju

n-06

Date

Pro

du

cti

on

Gas Casing Line

Foamer and plunger

WCVR InstallNatural Flow

Compressor Problems

Foamer Only

Page 17: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

16© 2006 Weatherford. All rights reserved.

Example Well B

Page 18: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

17© 2006 Weatherford. All rights reserved.

Example Well C

Page 19: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

18© 2006 Weatherford. All rights reserved.

Example Well D

Page 20: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

19© 2006 Weatherford. All rights reserved.

Example Well D

Page 21: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

20© 2006 Weatherford. All rights reserved.

Example Well E

Page 22: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

21© 2006 Weatherford. All rights reserved.

WCVR Presentation Summary

• The WCVR System is specifically designed for Extended

Perforation Interval Liquid Loading Gas Wells

• The WCVR System is a creative combination of three

generally accepted methods used to combat liquid loading in

gas wells; area reduction, foamer, plunger lift

• As of this presentation, over 130 WCVR’s have been installed

Page 23: 23 Critical velocity reduction system for LL gas wells ... · PDF fileScott Campbell - Rocky Mountain Sales Manager 720-946-1365- Denver Office CVR System Critical Velocity Reduction

22© 2006 Weatherford. All rights reserved.

Scott Campbell - Rocky Mountain Sales Manager

720-946-1365 Denver, Colorado Office

CVR SystemCritical Velocity Reduction

Combination of Dead Strings, Capillary Injection Foamer and Plunger Lift

Thank You!

Any Questions?