Upload
blythe
View
61
Download
1
Tags:
Embed Size (px)
DESCRIPTION
Program Executive Office Command, Control, Communications, Computers and Intelligence (PEO C4I) Consolidated Afloat Networks and Enterprise Services (CANES) Program and Acquisition Overview. 23 April 2009 Jason Livingston Director, NCIIPT (SSC-LANT) 843.218.5409 [email protected]. - PowerPoint PPT Presentation
Citation preview
Information Dominance Anytime, Anywhere…
PEOC4I.NAVY.MIL
23 April 2009Jason Livingston
Director, NCIIPT (SSC-LANT)843.218.5409
Program Executive OfficeCommand, Control, Communications, Computers and Intelligence (PEO C4I)
Consolidated Afloat Networks and Enterprise Services (CANES)Program and Acquisition Overview
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only due to critical technology content November 2008. Other requests shall be referred to the PEO C4I and Space (Program Office PMW 160) or SPAWAR Office of Congressional and Public Affairs (SPAWAR 00P).
2
Agenda
• Program Overview and Status • Program Schedule• Program Contracting Strategy• ACS Overview• ACS Contracting Strategy• Seam Management
Disclosure: Unfortunately, due the acquisition sensitive phase CANES is now it, questions will not be taken but can be submitted via email to the SSC-LANT contracts office.
Disclosure: Unfortunately, due the acquisition sensitive phase CANES is now it, questions will not be taken but can be submitted via email to the SSC-LANT contracts office.
3CANES concept and investment strategy validated by Navy, DoD leadership CANES concept and investment strategy validated by Navy, DoD leadership
Navy Mandate in PR09
CANES Concept – OPNAV N6/DoN CIO, NNWC, and PEO C4ICNO-directed approach to consolidate multiple afloat networks, provide secure, reliable common hosting for multiple C4I applications (Dec 05)
Technical and programmatic realignment of legacyinfrastructure and services-more efficient, additional capabilityFundamental change in C4I acquisition approach
CANES POR (FY11 LRIP)Consolidated afloat network, providing
CCE, Afloat Core Services, CDS, and integrated Voice, Video, and Data network infrastructurePre–MDAP/MAIS, projected ACAT 1D
CANES Migration (FY08-11)Prototype CCE & Afloat Core Services technologies – accelerate capability delivery, mitigate technical risks
Existing Network POR Modifications to support early application migration
LINCOLN SG and CPF MHQ/MOC in 09
Today: By FY11:
4
CANES Status Under NewDoDI 5000.02
• New DoDI 5000.2 signed 2 Dec 08• CANES completed MDD review 14 Nov 08, ADM signed 12 Dec 08
• Proceed to MS B in FY10 after completion of PDR and 2366b certification; MS A not necessary as CANES is network consolidation effort with no new technology development
• CCE and ACS to be established as sub-programs at MS B
• CCE RFP released following SPAWAR/PEO peer review
• ACS RFP will be released upon DoD CIO review of Net-Ready KPP
5
FY08 FY09 FY10 FY11 FY12 FY13 FY14
Increment 1: Subprogram 1A
Common Computing Environment/Cross Domain Solution
Capabilities and Technologies
• Voice, Video on SR and SCI enclaves• MAC1 for system critical services (Secret enclave only)
• Satisfies NNWC Drop Count Reqmnts• Hosting Up To Near-Real Time Combat Support applications
• Internal Shipboard Wireless – 50% coverage
Platforms (151) • CVN, LCC-19/20, LHA/D, CG, DDG, LSD, MHQ/MOC, SSN, SSBN/GN
• CVN 78, LHA 7 initial SCN platforms
Increment 2 Enhanced Network
Capabilities and
Technologies
• Voice on all enclaves• MAC1 for system critical services (Secret/SCI/UNCLAS enclave)
• Will satisfy NNWC ORT Objective Requirements
• Hosting up to Real Time Weapon-In-The-Loop Applications
• HM&E Applications/Subsystems• Internal Shipboard Wireless – 100% coverage
Platforms (275+) • Increment 1 plus DDG1000, CGX, LCS, JCCX, LHA (R) MALS, LPD-17, JHSV, NECC, PC , MPA/Other Aircraft
FY15MDD MS B MS C LRIP FRP
MS B MS CMDD SDD
Overall Program Approach
Increment 1: Subprogram 1B
Afloat Core Services
Capabilities and Technologies
• Build on existing ISNS Afloat Core Services delivering in 2009
• Incremental acquisition• Federate NCES Core Services to tactical user
6
Nov 06 - ISNS Inc 2 ADM (Pre-Acq Activities)
Nov 06 - ISNS Inc 2 ADM (Pre-Acq Activities)
Dec 07 – CANES: pre-MDAP/M
AIS
Dec 07 – CANES: pre-MDAP/M
AIS
Jan 08 – Gate 3 Review w/ CNO
/VCNO
Jan 08 – Gate 3 Review w/ CNO
/VCNO
Aug 08 – CANES OSD FIG
#1
Aug 08 – CANES OSD FIG
#1
Sep 08 – CANES OSD FIG
#2
Sep 08 – CANES OSD FIG
#2
Oct 08 – AoA Com
pletion / Acquisition OIPT
Oct 08 – AoA Com
pletion / Acquisition OIPT
Dec 08 – MDD ADM
/ CCE Draft RFP
Dec 08 – MDD ADM
/ CCE Draft RFP
Nov 08 – Gate 4/5 Review / M
DD w/ USD (AT&L) / ASD (NII)`
Nov 08 – Gate 4/5 Review / M
DD w/ USD (AT&L) / ASD (NII)`
Apr 09 – CCE RFP Released
Apr 09 – CCE RFP Released
Jun 09 – ACS RFP Released
Jun 09 – ACS RFP Released
Nov 09 – CCE Contract Award
Nov 09 – CCE Contract Award
May 10 – M
S B
May 10 – M
S BProgram Status
CANES is meeting all program milestonesCANES is meeting all program milestones
Inte
gra
tor
Dec 09 – ACS Contract Award
Dec 09 – ACS Contract Award
CANES Program Summary Schedule
FY08 FY09 FY10 FY11 FY12 FY13 FY14Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F
4/7/09
TASK
Major Milestones & Gates
Engineering & Test
Baseline Contract Timeline
ISNS Inc 1 Core Services
Major Install Activities
Afloat Core Services
CCE FRP
Gate 4/5
MDD
IBR
Gate 6
MS B
Gate 6
MS C
IOC
FRPD
SRR
SFR
SFS
SDS
PDR
UNSTRUCTEST
CDR
STRUCTEST
TRR
CSIT
CBTF
CBTF RPT
OTRR
OAOA RPT SIT
Afloat Prep/ LOO
OTRR
IOT&EIOT&ERPT
BLRIPRPT
DraftRFP
FinalRFP
SourceSelection
System Developer (2)
System Developer (1)DownSelect
LRIP
CDR
SIT 1 SIT 2 SIT 3
CS v1.0 CS v1.1
SCD
ShipCheck
LLTMOrdered A-0
DevelopSolicitation
DraftRFP Edit
FinalRFP
Source Selection ACS v1.0 ACS v1.1 ACS v2.0
DevelopSolicitation
DraftRFPEdit
FinalRFP
SourceSelection
AS
RFP Developement
7
8
CANES Contract Strategy
FY08 FY09 FY10 FY11
PCs & S/W Licenses procured using Navy and DoD enterprise contracts
Afloat Core Services
Afloat CS development: ISNS INCR 1 Mod 5 CS v1.0 CS v1.1 CANES ACS v1.0
MS CMS B
Source
Selection
4 mo
CS RFP aligned to System Developer RFP.
RFP Process
3 mo
MDD
CompleteComplete
Developed Functional Baseline & SDS
1 mo
Develop
Solicitation
Draft RFP
3 mo
Source
Selection
6mo
CCE System Developer 2
CCE System Developer 1
14 mo
Down-Select
2 mo
LRIP
GovernmentOversight
GovernmentOversight
11 Dec 08Release draft RFP, technical
components of PR
EDM DropCA + 4 mo
EDM DropCA + 8 mo
EDM DropCA + 12 mo
US TestX2 S Test X2SIT 1 X2
OA X2
SRR
Preliminary Design Review
Final RFP Build
PropPrep
2 mo
Vendor provided Allocated Baseline and Prototype
Develop
SolicitationReview
2 mo
GovernmentOversight
GovernmentOversight
9
Afloat Core Services (ACS)
• The ACS contract is decoupled from System Development contract• Due to nature of SOA as an emergent concept and architecture within the
DoD
• Large number of PEO C4I and other COI applications and hardware interfaces that ACS is anticipated to support
• Leverage lessons learned from the NCES SOA contract
• The Core Services (CS) are a component of the overall system architecture and fundamentally a system application/enhancement• CS v1.0/1.1 provides an initial, technically mature core services stack
• The Government ACS Trusted Agent will provide CS to the CCE developer for incorporation into the network
• The ACS contractors will be responsible for developing open standards compliant products and supporting the integration of those products into the CANES ACS stack
Overall CANES network not dependent on ACS for deliveryOverall CANES network not dependent on ACS for delivery
Services Layers
Service-oriented infrastructure results from applying the principles of service-orientation to the enterprise architecture pillar
Service-oriented infrastructure results from applying the principles of service-orientation to the enterprise architecture pillar 10
11
ACS Contracting Strategy
• The ACS contract will be released and managed from SSC Atlantic with daily interaction with the CANES PMO
• The ACS contract will be an IDIQ MAC with up to five primes who will be responsible for 50% of the work performed
• The contract activities will be broken out into the following areas• Development and Application Integration• Fielding and Procurement • Sustainment
• The ACS RFP is currently planned to be released in June 09 with a contract award in Dec 09
• The seams between ACS and the CCE will be managed via strict government oversight and continuous engagement between the CANES SE, the CCE SD vendors, the ACS Trusted Agent, and the ACS vendors
12
What are we buying?
Integrate Core Services
Procure Core Services
Develop Core Services
Establish multiple SOA/ESB RI sites
Develop and provide SDKs
Develop SOA Allocated Baseline
Develop SOA Product Baseline - CI Specifications / CI Tree - Creation of Dependency TreeDevelop SOA Product Specifications
Develop SOA Unit Test Plans
Support / Implement SOA Testing Process - Procure and provide testing toolsExecute Information Assurance / Accreditation Requirements
Productionize - Provide ILS - Create Load Plans and Procedures - Develop Training - Create documentation- Redundancy/backupConduct Software Support Activity- Licenses / Maintenance- Version control- Trouble ticket tracking and resolution (IAVAs, STRs)- Help DeskProvide Configuration Management -Maintain CM of CIs-Support overall CANES CM
Provide Systems Engineering / Software Engineering Process expertise / artifacts
The Government will serve as the Lead IntegratorThe Government will serve as the Lead Integrator
13
Seam Management
• A governance board will be established within the CANES program office
• An ACS-IPT will be formed• Biweekly meetings to discuss engineering challenges and
disseminate necessary information regarding CS v1.0 or CS v1.1
• Reviews will be conducted regularly with both SD vendors
• Online collaboration sites via the ACS Integrated Development Environment (IDE) will be established• Each SD will have ability for daily interaction with the ACS Trusted
Agent
Interaction and Collaboration are KEY to Seams ManagementInteraction and Collaboration are KEY to Seams Management
Integrated Development Environment
15
Thank You
“The CANES system achieves an open, agile, flexible and affordable network architecture that will move us forward. CANES embraces cross domain solutions
that enable enhanced movement of data. It is a revolutionary change in our information technology infrastructure and it is absolutely vital for us to excel
in 21st century warfare”
ADM Roughead’s CNO testimony to Senate Armed Services Committee on
2009 Budget Priorities28 Feb 08
ADM Roughead’s CNO testimony to Senate Armed Services Committee on
2009 Budget Priorities28 Feb 08