22 Fillmore - 16th Street Transit Priority Project Project Goals » Improve safety on 16 Street for people walking, cycling, driving » Improve reliability and travel time of the 22 Fillmore for the 17,000 daily riders » Improve access via Muni for local residents to get to work, school, appointments, or shopping » Balance the needs of all people using 16th Street by designing a project in coordination with stakeholders that will support the local community » Accommodate current demand and planned growth in ridership After Before te: stablish Transit-Only Lanes. A transit-only lane is a travel lane that is dedicated for the exclusive use Summary of Project Features Project Budget Dedicated transit lanes allow buses to bypass traffic, reducing delay and making for a smoother ride. BENEFITS: Reliable Service Expansion of the overhead wire system allows a direct, zero-emission transit connection between development at Mission Bay and the 16th Street BART Station, the Mission District, and Fillmore Street. BENEFITS: Reliable Service Wider sidewalks at bus stops or boarding islands allow buses to board passengers without having to pull out and then back into congested traffic. They also provide space for shelters, signage, and other amenities. BENEFITS: Reliable Service, Safer Streets, Rider Comfort, Sidewalk Space Extension of the bicycle route on 17th Street allows for a safe and attractive parallel east- west connection for people on bicycles. BENEFITS: Safer Streets New Transit Bulb New Transit Bulb The above conceptual figure is not to scale and is for illustrative purposes only. PRELIMINARY COST ESTIMATE * : $ 67.5 M Transit Enhancements: $40.0 M Streetscape Enhancements: $ 3.5 M Roadway Improvements: $ 2.0 M Vision Zero: $ 7.0 M Extension of the Bicycle Route: $ 3.0 M Utility Relocation: $ 2.0 M *Cost estimate in FY 2014 dollars and still under evaluation pending coordination with sewer and stormwater replacement. PLANNED FUNDING SOURCES LOCAL: $44 M Combination of local sales taxes, developer fees, and bond funding FEDERAL: $23 M TIGER 2015 Grant: $ 20 M FTA funds (non-TIGER): $ 3 M FTA Funds 4% Local Sources 66% TIGER Grant 30% DEDICATED TRANSIT LANES EXPANSION OF THE OVERHEAD WIRE SYSTEM EXTENSION OF THE BICYCLE ROUTE NEW TRANSIT BULBS

22 Fillmore - 16th Street Transit Priority Project · 22 Fillmore - 16th Street Transit Priority Project Project Goals » Improve safety on 16 Street for people walking, cycling,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 22 Fillmore - 16th Street Transit Priority Project · 22 Fillmore - 16th Street Transit Priority Project Project Goals » Improve safety on 16 Street for people walking, cycling,

22 Fillmore - 16th Street Transit Priority Project

Project Goals » Improve safety on 16 Street for people walking, cycling, driving

» Improve reliability and travel time of the 22 Fillmore for the 17,000 daily riders

» Improve access via Muni for local residents to get to work, school, appointments, or shopping

» Balance the needs of all people using 16th Street by designing a project in coordination with stakeholders that will support the local community

» Accommodate current demand and planned growth in ridership

After

Before

Note: The above conceptual figure is not to scale and is for illustrative purposes only.

Establish Transit-Only Lanes. A transit-only lane is a travel lane that is dedicated for the exclusive use of transit vehicles. Transit-only lanes are typically identified with signs and pavement markings. Transit-only lanes can reduce transit travel times by allowing transit vehicles to bypass traffic congestion and avoid conflicts with other vehicles in mixed travel lanes. Non-transit vehicles are generally permitted to enter transit-only lanes to access curbside parking or to complete a turn, unless specifically prohibited. Emergency vehicles may use transit-only lanes at all times, and often taxis may also use these lanes. Transit-only lanes can be created by removing an existing travel lane or by removing a parking lane.

SOURCE: SFMTA, Turnstone Consulting, Fehr & Peers, Jungle Communications

Summary of Project Features

Project Budget

Dedicated transit lanes allow buses to bypass traffic, reducing delay and making for a smoother ride.

BENEFITS: Reliable Service

Expansion of the overhead wire system allows a direct, zero-emission transit connection between development at Mission Bay and the 16th Street BART Station, the Mission District, and Fillmore Street.

BENEFITS: Reliable Service

Wider sidewalks at bus stops or boarding islands allow buses to board passengers without having to pull out and then back into congested traffic. They also provide space for shelters, signage, and other amenities.

BENEFITS: Reliable Service, Safer Streets,Rider Comfort, Sidewalk Space

Extension of the bicycle route on 17th Street allows for a safe and attractive parallel east-west connection for people on bicycles.

BENEFITS: Safer Streets

New Transit BulbNew Transit Bulb

Note: The above conceptual figure is not to scale and is for illustrative purposes only.

Install Transit Bulbs. Transit bulbs are sidewalk extensions at the location of a transit stop, typically about the same width as the adjoining parking lane. They can reduce transit travel times on bus routes by eliminating the need for buses to exit and re-enter the flow of traffic to access curbside transit stops and on rail lines by providing a place for boarding passengers to wait directly adjacent to a stopped light rail vehicle (LRV), thereby eliminating the time needed for passengers to walk from the curb across a parking lane to the LRV. Transit bulbs also provide added space for customer amenities such as shelters, improve pedestrian safety by shortening the street crossing distance, and reduce the speed of turning traffic, as well as reducing sidewalk crowding at transit stop locations.

SOURCE: SFMTA, Turnstone Consulting, Fehr & Peers, Jungle Communications

PRELIMINARY COST ESTIMATE*: $ 67.5 M

Transit Enhancements: $40.0 M

Streetscape Enhancements: $ 3.5 M

Roadway Improvements: $ 2.0 M

Vision Zero: $ 7.0 M

Extension of the Bicycle Route: $ 3.0 M

Utility Relocation: $ 2.0 M

*Cost estimate in FY 2014 dollars and still under evaluation pending coordination with sewer and stormwater replacement.

PLANNED FUNDING SOURCESLOCAL: $44 M

Combination of local sales taxes, developer fees, and bond funding

FEDERAL: $23 MTIGER 2015 Grant: $ 20 MFTA funds (non-TIGER): $ 3 M

FTA Funds

4%

Local Sources

66%

TIGER Grant 30%

DEDICATED TRANSIT LANES

ExPANSION OF ThE OvERhEAD WIRE SYSTEM

ExTENSION OF ThE BICYCLE ROUTE

NEW TRANSIT BULBS

Page 2: 22 Fillmore - 16th Street Transit Priority Project · 22 Fillmore - 16th Street Transit Priority Project Project Goals » Improve safety on 16 Street for people walking, cycling,

Proyecto de Prioridad del Transporte Público de la 22 Fillmore - 16th Street

After

Before

Note: The above conceptual figure is not to scale and is for illustrative purposes only.

Establish Transit-Only Lanes. A transit-only lane is a travel lane that is dedicated for the exclusive use of transit vehicles. Transit-only lanes are typically identified with signs and pavement markings. Transit-only lanes can reduce transit travel times by allowing transit vehicles to bypass traffic congestion and avoid conflicts with other vehicles in mixed travel lanes. Non-transit vehicles are generally permitted to enter transit-only lanes to access curbside parking or to complete a turn, unless specifically prohibited. Emergency vehicles may use transit-only lanes at all times, and often taxis may also use these lanes. Transit-only lanes can be created by removing an existing travel lane or by removing a parking lane.

SOURCE: SFMTA, Turnstone Consulting, Fehr & Peers, Jungle Communications

New Transit BulbNew Transit Bulb

Note: The above conceptual figure is not to scale and is for illustrative purposes only.

Install Transit Bulbs. Transit bulbs are sidewalk extensions at the location of a transit stop, typically about the same width as the adjoining parking lane. They can reduce transit travel times on bus routes by eliminating the need for buses to exit and re-enter the flow of traffic to access curbside transit stops and on rail lines by providing a place for boarding passengers to wait directly adjacent to a stopped light rail vehicle (LRV), thereby eliminating the time needed for passengers to walk from the curb across a parking lane to the LRV. Transit bulbs also provide added space for customer amenities such as shelters, improve pedestrian safety by shortening the street crossing distance, and reduce the speed of turning traffic, as well as reducing sidewalk crowding at transit stop locations.

SOURCE: SFMTA, Turnstone Consulting, Fehr & Peers, Jungle Communications

Objetivos del proyecto » Mejorar la seguridad en 16th Street para las personas que caminan, montan bicicleta, manejan

» Mejorar la confiabilidad y la duración de viajes en la 22 Fillmore para los 17,000 pasajeros diarios

» Mejorar el acceso por medio de Muni para que los residentes locales vayan al trabajo, la escuela, citas o de compras

» Mantener un equilibrio de las necesidades de todas las personas que usan 16th Street al diseñar un proyecto en coordinación con las partes interesadas que apoyará la economía local

» Satisfacer la demanda actual y el aumento del número de pasajeros que se planifica

Resumen de las caracrerísticas de proyecto

Presupuesto del proyecto

Carriles exclusivos para el transporte público permiten que los autobuses eviten el tráfico, reduciendo las demoras y logrando un viaje más fluido.

BENEFICIOS: Servicio Confiable

La ampliación del sistema de cables suspendidos permite una conexión directa, con cero emisiones del transportepúblico entre las instalaciones en Mission Bay y la Estación de BART 16th Street, el Distrito Mission, y Fillmore Street.

BENEFICIOS: Servicio confiable

Aceras más anchas en los paraderos de autobús o islas de abordaje permiten que los pasajeros suban sin que los autobuses tengan que salir y luego volver a entrar al tráfico congestionado. También proveen espacio para refugios, letreros y otros elementos de servicio.

BENEFICIOS: Servicio confiable, calles más seguras, comodidad del pasajero, spacio en las aceras

La ampliación de la ruta para bicicletas en 17th Street permite una conexión paralela segura y atractiva en dirección este-oeste para personas en bicicletas.

BENEFICIOS: Calles más seguras

CÁLCULO DE COSTOS PRELIMINAR*: $ 67.5 M

Mejoras al transporte público: $40.0 M

Mejoras al paisaje urbano: $ 3.5 M

Mejoras a la calzada: $ 12.0 M

Vision Zero: $ 7.0 M

Ampliación de la ruta para bicicletas $ 3.0 M

Reubicación de servicios: $ 2.0 M

* Cálculo de costos en dólares del Año Fiscal 2014 y todavía está siendo evaluado mientras esté pendiente la coordinación con el reemplazo de tuberías de aguas residuales y drenaje pluvial.

FUENTES DE FONDOS PLANIFICADALOCAL: $44 M

Combinación de impuestos locales sobre la venta, cuotas de urbanizadores, y financiamiento con bonos

FEDERAL: $23 MSubsidio TIGER 2015: $ 20 MFondos FTA (no de TIGER): $ 3 M

Fondos FTA 4%

Fuentes locales

66%

Subsidio TIGER 30%

CARRILES ExCLUSIvIOS PARA EL TRANSPORTE PúBLICO

AMPLIACIóN DEL SISTEMA DE CABLES SUSPENDIDOS

AMPLIACIóN DE LA RUTA PARA BICICLETAS

NUEvAS SALIENTES DE ACERA PARA EL TRANSPORTE PúBLICO

Page 3: 22 Fillmore - 16th Street Transit Priority Project · 22 Fillmore - 16th Street Transit Priority Project Project Goals » Improve safety on 16 Street for people walking, cycling,

22 Fillmore - 16th Street 公交優先計劃

After

Before

Note: The above conceptual figure is not to scale and is for illustrative purposes only.

Establish Transit-Only Lanes. A transit-only lane is a travel lane that is dedicated for the exclusive use of transit vehicles. Transit-only lanes are typically identified with signs and pavement markings. Transit-only lanes can reduce transit travel times by allowing transit vehicles to bypass traffic congestion and avoid conflicts with other vehicles in mixed travel lanes. Non-transit vehicles are generally permitted to enter transit-only lanes to access curbside parking or to complete a turn, unless specifically prohibited. Emergency vehicles may use transit-only lanes at all times, and often taxis may also use these lanes. Transit-only lanes can be created by removing an existing travel lane or by removing a parking lane.

SOURCE: SFMTA, Turnstone Consulting, Fehr & Peers, Jungle Communications

New Transit BulbNew Transit Bulb

Note: The above conceptual figure is not to scale and is for illustrative purposes only.

Install Transit Bulbs. Transit bulbs are sidewalk extensions at the location of a transit stop, typically about the same width as the adjoining parking lane. They can reduce transit travel times on bus routes by eliminating the need for buses to exit and re-enter the flow of traffic to access curbside transit stops and on rail lines by providing a place for boarding passengers to wait directly adjacent to a stopped light rail vehicle (LRV), thereby eliminating the time needed for passengers to walk from the curb across a parking lane to the LRV. Transit bulbs also provide added space for customer amenities such as shelters, improve pedestrian safety by shortening the street crossing distance, and reduce the speed of turning traffic, as well as reducing sidewalk crowding at transit stop locations.

SOURCE: SFMTA, Turnstone Consulting, Fehr & Peers, Jungle Communications

計劃目標»»增進»16th»Street»的安全以利人們行走、騎自行車、開車»

»»為每日搭乘»22»Fillmore»路線的»17,000»名乘客改進公車的可靠性並縮短行車時間。»

»»提高»Muni»的便利性,使本地居民能搭乘它上班、上學、赴約或購物»»

»»與各方相關人士協調,共同設計出一項能兼顧所有»16th»Street»使用者需求並支持本地社區的計劃»

»»滿足目前需求並能因應預計的乘客數增長

計劃特色摘要

計劃預算

公車專用道讓公車避開車流,»減»少延誤,»使乘車更順利.

優點:服務可靠

擴大架空電纜系統讓米慎灣與»第»16»街»BART»車站的開發區,»米慎區以及»Fillmore»街擁有直接且零排放污染的交通連接.»

優點:»服務可靠

公車站或乘車島增寬的人行道使乘客可直接上車,»公車無需駛出搭載地點後重新駛入擁塞»的車流中.»此外,»延伸區還提供公車亭,»看板»及其他便利設施空間.

優點:服務可靠,»街道更安全,»便利乘客,»人行道加寬

延伸第»17»街的自行車路線讓自行車騎士享有安全,宜人的東西向平行連接自行車道.

優點:街道更安全

初步成本估計*:» » » » » » $6,750»萬

公共交通改進:» » » » » » » $»4,000»萬

街道設施改良:» » » » » » » $»»»»»350»萬

道路改善:»» » » » » » » » $»1,200»萬

Vision»Zero:» » » » » » » » $»»»»700»萬

延伸自行車路線:» » » » » » $»»»»300»萬

公共事業管線遷移:» » » » » $»»»»200»萬

*成本估計以2014財年金額為準,因下水道及雨水系統更換協調事宜而仍在評估中。

規劃的經費來源

地方:» » »»»»»»»»»» » » » » » $4,400»萬結合地方銷售稅、開發商費以及公債資金»»»»

聯邦:» » » » » » » » » » $2,300»萬

TIGER»2015»輔助金:» » $2,000»萬FTA»資金(非»TIGER):»»»»» $300»萬

FTA»資金»4%

當地來源»66%

TIGER»輔助金»30%

公車專用道

延伸自行車路線延伸自行車路線

新建公車停靠延伸區