17
21CMA 21 Centimeter Array a.k.a. PAST

21CMA

  • Upload
    shiri

  • View
    51

  • Download
    0

Embed Size (px)

DESCRIPTION

21CMA. 21 Centimeter Array a.k.a. PAST. Reionization. 21cm: hyperfine transition of neutral Hydrogen. 21CMA a.k.a. PAST. B asic ideas:. an experiment, not an observatory use cheap, off-the -shelf technology (i.e. TV+PC) simple design (looking at NCP) - PowerPoint PPT Presentation

Citation preview

Page 1: 21CMA

21CMA

21 Centimeter Arraya.k.a. PAST

Page 2: 21CMA

Reionization21cm: hyperfine transition of neutral Hydrogen

Page 3: 21CMA

21CMA a.k.a. PASTBasic ideas:

• an experiment, not an observatory• use cheap, off-the -shelf technology (i.e. TV+PC)• simple design (looking at NCP)• choose site with minimal EM interference• to become operational before MWA/LOFAR

Xiang-Ping Wu (NAOC)Ue-Li Pen (CITA)Jeff Peterson (Carnegie)

Page 4: 21CMA

VLBI

Map of 21CMA site

21CMA

Page 5: 21CMA

E

N

Urumuqi

Ulastai

Page 6: 21CMA

Log-Periodic antenna

Page 7: 21CMA

20m

A pod (127 antenna)

Page 8: 21CMA

correlator

array LNA filter amplifierOptical

transmitter Opt. fibreOptical receiver ADC

21CMA data collection system

Page 9: 21CMA

Basic Design of 21CMRAAt z=9, 10 comoving Mpc ~ 0.6 MHz, ~ 3.6 arcmin

frequency range 70-200 MHz (6.1<z<19.3)

baseline: 2 km, (at 140 MHz, 3.6 arcmin)

Collecting Area 104 m2 A/L2 ~ 0.01

Page 10: 21CMA

Schedule & Status• summer 2003 Ue-Li, Jeff, Xiang-Ping discussed the idea • autumn 2003 site search began, Ulastai chosen• March 2004 7-antennae prototype, first image• August 2004 array design finished• January 2005 batch I (first 20 pods) constructed• summer 2005 batch II (60 pods) construction, data collecting electronics installation • January 2006 fully operational

Total cost estimate: 15-30 M yuan, now borrowing from other groups in NAOC, will apply a grant, please support!

Page 11: 21CMA

January 1, 2005

Page 12: 21CMA

First skymap (dirty)

3C061.1

3CR390.3

NCP

3CR061.1

Page 13: 21CMA

Dark Energy?• AP test• power spectrum measurement• lensing• ...

Page 14: 21CMA

Discussion on dark energy observation

Page 15: 21CMA

Dark Energy? Observation Data

Theoretical Assumptions

General Relativity Cosmo Principle

G 8∂GT (Ë )μ μ=

Model I Model II Model III

Page 16: 21CMA

Ways to measure dark energy

Gravitational test:• luminosity distance• angular diameter distance• growth of perturbation• solar system & beyond

Non-Gravitational test:• variation of constants• dark energy interaction

• supernovae & GRB• gravitational lensing • cluster • large scale structure • CMB• 21cm• gravitational wave• micro-gravity, solar system & lab

Page 17: 21CMA

What can we do in ChinaExisting projects: LAMOST, 21CMA

New Projects: ?