© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 1111
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
How to Accelerate High-Maturity Implementation of CMMI using Six Sigma
Raghav S. NandyalChief Executive Officer
SITARA Technologies Pvt. Ltd.
Work-product of the 2011 High-maturity Partner Advisory Board of the SEI.
I thank: Bradley Bittorf, Eberhard Huebner and Kaliappan Marrapa for their
feedback.
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 2222
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
LEARNER OBJECTIVES
Why should you consider Six Sigma as a problem solving methodology to accelerate High Maturity process institutionalization?
How can Six Sigma help in accelerating quantitative benefits while assuring a statistical significance?
How can a simple 4-step process help to demystify Six Sigma application in the context of process improvement?
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 3333
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
Some Perspectives …
Why a blind application of Six Sigma might be wrong? (1 of 5)
Noteworthy distinctions while considering the
application of Six Sigma to a software process:
Six Sigma originated in manufacturing and extended itself to other transactional services
Most Six Sigma analysis techniques, tools and
templates are well suited to the needs of a
manufacturing or a transactional service
Well known optimization procedures (e.g.,
DOE), approaches to assess process stability
(e.g., Western Electric rules) and capability
analysis (long-term and short-term capability)
don’t extend naturally to a software process
Quality assurance and not quality control – is
more relevant to a software development
process based on the CMMI
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 4444
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
Noteworthy distinctions … (contd..)
Software processes are not repetitive in the same sense as a manufacturing process:
driven by the changing “constraints of operation”.
In a manufacturing process:– the same controlled process is applied repetitively on raw materials yielding a finished product,– controlled variation of input parameters to optimize the yield or quality of the output is possible, – major change is uncommon; change occurs only when new machinery, or new material processing requirements, or new products are required.
For software process improvements to be effective, it is important to identify the “pain-points” and isolate the “real root-cause” – which is the difficult part (controllable factors)
Some Perspectives …
Why a blind application of Six Sigma might be wrong? (2 of 5)
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 5555
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
Noteworthy distinctions … (contd..)A software process based on the CMMI is prone to numerous in-process and out-of-process variations
Some Perspectives …
Why a blind application of Six Sigma might be wrong? (3 of 5)
New Definition: Common cause variations, have a source of variation assignable to
something within the process control and,
whose impact can be isolated, corrected
and possibly eliminated with effective
“process management” practices.
New Definition: Special cause variations, have a source of variation assignable to
something outside the process control and,
whose impact can be resolved or minimized
with effective “project management”practices.
- Lack of domain understanding, - Internal churn resulting from people leaving midway, - Lack of budgets and resources, - Lack of appropriate tools
- Changing customer requirements, - Lack of access to the validation environment,- Interoperability issues with a legacy application,- Escape defects from the legacy
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 6666
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
Noteworthy distinctions … (contd..)
Six Sigma emphasizes process measurement and its relevance to the bottom-line performance with the onset of planning
Explicit strategies tying process performance to
bottom-line results or improvements, are not quite
evident in CMMI until the maturity level 4
Without Six Sigma thinking, at levels 2 & 3, it is likely
that frivolous measures are collected which might not
help to demonstrate improved business performance
A simple 4-step process inspired from Six Sigma can be applied at the CMMI level 2 itself
This helps to establish the right focus on
measurement and analysis at level 2
Some Perspectives …
Why a blind application of Six Sigma might be wrong? (4 of 5)
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 7777
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
Noteworthy distinctions … (contd..)
Widely accepted that “process quantification and process performance management” in CMMI, occurs only at levels 4 and 5
Can this focus shift downwards to the level 2?Note that, process measurement and analysis is addressed at level 2 itselfHowever, CMMI does not provide the required rigor of practices at level 2 for analysisHence, the 4-step process that–
defines the required analysis practices,serving as a strong foundation for high-maturity practice implementation,to improve the rigor of analyzing data,whereby, accelerating high-process maturity institutionalization
Some Perspectives …
Why a blind application of Six Sigma might be wrong? (5 of 5)
Quantitatively
Managed : Level 4
Initial : Level 1
Managed : Level 2
Optimizing
: Level 5
Defined : Level 3
0
1
2
3
4
5
Capability Levels
CMMI-DEV V1.2 Process Areas
Target Level
Achievement
Level
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 8888
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
AGENDA
Establish the Context
What is the 4-step process?Establish that the process is stable & capableUnderstand the underlying process distributionFor a stable process identify the regressions and the residualsGeneralize the regression into a model
One Example of applying the 4-Step Process –
Conclusion, Q & A
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 9999
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
Establish the Context
Six Sigma as a problem solving methodology can
accelerate implementation of High-Maturity
practices of the CMMI constellationsWhen business goals are defined quantitatively, Six Sigma alongside CMMI has proven useful in minimizing the cycle time to transition maturity levelsA systematic and a consistent integrated approach of Six Sigma with CMMI can help in rapid acceleration of maturity levels from chaotic or level 1 mode to an optimizing or level 5 mode of operation in about 3-years timeframeWithout Six Sigma, it would typically takes anywhere between 12-18 months per level of maturity
(1 of 4)
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 10101010
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
Typical organizational contexts where such dramatic results were observed–
small- to medium-sized organizations or business units with less than 300 individuals in size,with annual staff attrition rates less than 5% with negligible impact to competency erosion,projects executed on mature domains/technologies with sufficient organizational memory of execution, good understanding of project requirements with an ability to manage requirements changes to within 10% effort deviation in the requirements-phasewhen at least every individual has a mandatory white-belt certification within the first 6 monthsupwards of 50% have either a green-belt or a black-belt certification
Establish the Context(2 of 4)
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 11111111
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
Establish the Context
Essence of Six Sigma methodology in the CMMI context …
Uses the DMAIC approach (Define-Measure-Analyze-Improve-Control)by identifying business goals in quantitative terms,using voice of customer (VoC) that,establishes performance criteria or, the critical to quality (CTQ) requirements,adding value to the customer
Also ensures:Identification of critical business requirements that are in alignment with the organizational goals,by gathering voice of business (VoB) that, are critical to process (CTP)
(3 of 4)
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 12121212
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
Establish the Context
Essence of high-maturity focus or mindset in the CMMI context can be summarized as …
No conclusions can be made without objective proof.The proof is in the data.There is no guarantee that a process change, contributes towards improvements unless verified and validated statistically.
(4 of 4)
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 13131313
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
What is the 4-step process?
Establish that the process is stable & capableUnderstand the underlying process distributionFor a stable process identify the regressions and the residualsGeneralize the regression into a model
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 14141414
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
What is the 4-step process?
1. Establish that the process
is stable and capable–Key Point: every stable and capable process, can be made more stable and more capableUse control charts/time-series charts to analyze outliersExample: 5-Whys to arrive at a process causeKey Point: When using sample data, consider the mean value of a large number of observations from independent homogenous projects Central Limit Theorem → normal distribution
(1 of 4)
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 15151515
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
What is the 4-step process?
2. Understand the underlying
process distribution–Key Point: Anderson-Darling test of normality is the most widely used test by statistical software (E.g., Minitab)High p-value shows no statistically significant departure from normalityNull hypothesis is that the data is normal – so a high p-value > 0.05 is indicative of a normal distributionKey Point: If the “statistical mean” of derived measures of a number of homogenous projects is used, there is no need for the normality test
(2 of 4)
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 16161616
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
What is the 4-step process?
Key Point: Every derived measure uses some combination of the basic metric dataKey Point: A derived measure can itself be a combination of several phase-wise factors (sub-process control)
(3 of 4)
3. For a stable process identify the regressions and the
residuals–Key Point: Regressions or, the factors are picked based on process knowledge, cost, risks and ease of measurementKey Point: Residuals are a measure of the error in a model; difference between a fit (predicted value) and the actually observed value
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 17171717
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
What is the 4-step process?
4. Generalize the regression into a model–
Key Point: Statistical models help to tie process inputs with the process output using statistically relevant data
Key Point: Models establish a structure using which, estimation and hypothesis testing are enabled
Key Point: Model can be deterministic or predictiveDeterministic: simple math equation: E = mc2
Probabilistic: Uses underlying probability distribution/density functions of random variables that defines the dependent variableExample: Z = A + P + F (for one sample of a project)What if there are 10 samples from 10 different projects?
For each project, Z = A + P + F may still be valid
Taken together, Z = 0.199 + 0.658*A + 0.789*P + 0.345 F+ eRegression model must be iteratively improved by fine-tuning it using the “actual” valueUsing large samples makes the regression equation better
(4 of 4)
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 18181818
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
One Example of applying the 4-Step Process –
Do we need this measure?Cost of Poor Quality : An important level 4 metric which is able to quantify the extent of rework
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 19191919
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
Do we need this measure?
Which basic metric and derived measure should we consider in the 4-step process?
Related to this question are the following questions –Why do we need to understand this measure? What do we do with this understanding once we have gained it?What type of a “process input” does this measure cater to? Is this a –
Controllable factor ?Standard Operating Procedure ?Noise ?
Key Point: The 4-step process applies only to a “controllable factor”; standard operating procedures and noise cannot be quantified reliably
(1 of 2)
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 20202020
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
Do we need this measure?(2 of 2)
To answer these questions meaningfully –A thorough design and understanding of the process is required,because, it is in the lifecycle phases that, time is consumed, errors or defects injected and detected
Key point: Measurement process should therefore be an integral part of the development lifecycle
Key point: Data must be collected and analyzed in real-time using simple techniques for it to be useful
Key point: There is little meaning in using software data analysis as in a typical post-mortem – after the fact
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 21212121
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
One Example of applying the 4-Step Process
Step 1: Establish that the process is stable and capable
Cost of poor quality (%): Ratio of the sum of internal and external failure fixing effort (major and minor fault) over total project effortEach observation is a rolled up data (mean) of different projects in execution after establishing data homogeneityFor outliers (point 4), determine cause using a structured 5-Whys approach
(1 of 4)
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 22222222
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
One Example of applying the 4-Step Process
Step 2: Understand the underlying process distribution
Anderson-Darling test of normality is the most widely used test by statistical software Normality is required for continuous data prior to measuring the process capability Is the confidence interval for mean acceptable?
(2 of 4)
Variance measures
the degree to which
the probabilities of
a random variable
is spread out –
more the spread,
more the uncertainty
to predict or guess
the value.
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 23232323
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
One Example of applying the 4-Step Process
Step 3: For a stable process identify the regressions and the residuals
(3 of 4)
Use One-way ANOVA for analysis of different phase-wise contributors
P-value is < 0.05; reject the null hypothesis that the mean COPQ % of the different phases are equalIdentify the regressions for improvements (CUT and Test)
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 24242424
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
One Example of applying the 4-Step Process
Step 4: Generalize the regression into a model
(4 of 4)
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 25252525
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
A simple 4-step process which can be applied to –
establish an early focus on measurement and analysis of software data with a Six Sigma mindset,
based on emphasizing the identification of business objectives,
while considering the voice of business (CTP) and voice of customer (CTQ) was explored
This approach emphasizes identification of “pain-points” and the “real-root causes” to target the quantification and improvement effort (using controllable factors)
Special cause: with project management practices
Common cause: with process management practices
Conclusion
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 26262626
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
From the experience gained from small- to medium-organizations,
Six Sigma at the tactical level with,
model-based improvements using CMMI at the strategic level,
offers the benefit of cycle-time-reduction to advance in process maturity
This approach –
can target individual processes (continuous representation) or,
a group of process areas targeting practices involved in a maturity level (staged representation)
Conclusion
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 27272727
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
Six Sigma techniques relevant to a software process can be applied by organizations at any level of process maturity
Organizations that delay Six Sigma consideration until the level 4 may miss significantly useful opportunities to streamline improvement effort
Without a Six Sigma mindset, frivolous measures are collected which might not help to demonstrate improved business performance
May require to revamp their measurement program after attaining level 3
Conclusion
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 28282828
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
One of the most useful insights to take-away from this presentation–
every stable and capable process can be made more stable and more capable
start your high-maturity journey early, drivecarefully using the 4-step process and, reach safely!
Conclusion
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 29292929
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
References
[Chrissis 2011] Chrissis, Mary Beth et al, “CMMI for Development®: Guidelines for Process Integration and Product Improvement, Third Edition”, Addison-Wesley Professional. 2011
[Nandyal 2012] Nandyal, Raghav, “Building and Sustaining High-maturity Software Organizations”, Tata McGraw-Hill Education. 2012
© SITARA Technologies
For Use and Distribution by the SEI in the proceedings of the 24th SEPG Conference 2012 – Albuquerque 30303030
SITARA Process JewelBoxTM
© SITARA Technologies Pvt. Ltd.
SITARA Process JewelBoxTM
DISCUSSIONS, Q&A
Raghav S. NandyalChief Executive Officer
SITARA Technologies Pvt. Ltd.#54, Sri Hari Krupa6th Main RoadMalleswaramBangalore KA 560 003Telephone: +(91-80) 2334-3222Mobile: + 984-523-3222Email: [email protected]
URL: http://www.SITARATECH.com